RUMAILA OPERATING ORGANISATION

Construction
SOC
DAILY PROGRESS REPORT

Contract No Call of Number

Station/Location DS-02 Facility Workshop/site DS2

Report No: 87 Report Date 09.02.2017 Working Hrs 8:00 14:00

Workshop /Nahed S. Mahdi


Fabrication Manager Site /Falah H. Aljabrauy Project Manager Yahya Hasan Ahmed
Rafid W. Abdulkareem
07704929601
Phone 07704932888 Phone 07704929624
07704932913
Nahed.Mahdi@roobasra.com
Email ID: Falah.Aljabrauy@roobasra.com Email ID: Yahya.Hassen@roobasra.com
rafid_waleed@yahoo.com
Homoud Kadhem Zaid
HSE Officer Permit Authority
Zeyad Khalaf Abood
07809261798
Phone Phone
07703278891

HSE
Permit no. 2 Time of issue of Permit (work started) 8:45 am
Incidents to report 00 Stop Cards Issued 00
Number of Visitors 00 Number of Site induction 00
Number of Safety Huddle 00 Lifting Operations Carried Out 00

Safety Huddle / Drill /


Incident Details

DS2 Train 2 - SOC Piping S Curve


100
90
80
70
60
50
Percentage 40
30
20
10
0
SI
hS
hS

Line No ISO No Va
eM
eM
el Fi
el Fi

SYS 507 - process support systems - Atmospheric vent collection


065524-N-DG- 28 1 1 5 1 2 2 2
DG02-PE-ISO-4009- Sep

Page 1 of 8
201
001 6
5 3
065524-N-DG-
DG02-PE-ISO-4010- 6 2 0 1
0
001
065524-N-DG-
DG02-PE-ISO-4003- 6 3 0 1 0
001
21 2
065524-N-DG- 1 1
Sep
DG02-PE-ISO-4004- 201
4 0 2 0
3 3
001 6
065524-N-DG- 10
11 4 3 1 1 2
DG02-PE-ISO-4110- 10
001
Oct 0 8 2 0 0
25 6
065524-N-DG-
Sep 3 3 2
DG02-PE-ISO-4054- 4 0 9
201 4 4 0
001 6
065524-N-DG-
DG02-PE-ISO-4054- 0 0 0 0
002
4 3 9
065524-N-DG- 3 3
Oct 1
DG02-PE-ISO-4082- 2
201 9 3 8
001 6
065524-N-DG- 0 0
DG02-PE-ISO-4082- 0 0
002
065524-N-DG-
26 3 6 9
DG02-PE-ISO-4086-
Sep 8 3 9 0 1
201 9 9
001 6
065524-N-DG- 0 0
DG02-PE-ISO-4086- 0 0
002
065524-N-DG- 5 0
DG02-PE-ISO-4023- 3 1 0
001
22 1 0
065524-N-DG-
DG02-PE-ISO-4024-
Sep 2 1 4 3 2
201 2
001 6
065524-N-DG-
18 3 0
Sep 1
DG02-PE-ISO-4025- 3 8 0
201 0
001 6
19 2 0
065524-N-DG- 2
Sep 1
DG02-PE-ISO-4025- 201
2 2 1
9
002 6
065524-N-DG- 2 1 7 5
1
DG02-PE-ISO-3001- 3 4
005 1
29
065524-N-DG-
Sep 2 1 1
DG02-PE-ISO-3002- 7 3 5
201 3 4 1
005 6
M
M
S
S
F
F

Line No ISO No
065524-N-DG- 21 3 3 1 1 1 1 Va
0
Sep

Page 2 of 8
DG02-PE-ISO-3002- 201
0 0
007 6
065524-N-DG-
1
DG02-PE-ISO-2002- 6 6 2 1
7
001
065524-N-DG- 3 5 2
DG02-PE-ISO-0021- 3 0 5
001
065524-N-DG- 3 5 2
DG02-PE-ISO-0022- 3 0 5
001
065524-N-DG- 4 5 1
DG02-PE-ISO-0023- 4 0 5
001
065524-N-DG- 4 5 1
DG02-PE-ISO-0024- 4 0 5
001
065524-N-DG- 4 5 1
DG02-PE-ISO-0025- 4 0 5
001
065524-N-DG- 4 5 1
DG02-PE-ISO-0026- 4 0 5
001
SYS 503 - process support systems - HP Vent collection and KO drum(TP 01)
14-
065524-N-DG-
12- 1 1
DG02-PE-ISO-4011- 2 2 6 3 3
201 3 3
001 6
14- 1
065524-N-DG-
12-
DG02-PE-ISO-4011- 201
7 5 9 5 1 0
002 6
065524-N-DG-
1
DG02-PE-ISO-4128- 4 8 6 3
0
001
065524-N-DG-
1
DG02-PE-ISO-4130- 2 2 6 3
0
001
NO ISO ? For line ref
GF2015, GF2020,
GF2021, GF2022,
GF2024, GF2025

SYS 503 - process support systems - HP Vent collection and KO drum(TP 02)
07/
065524-N-DG-
12/
DG02-PE-ISO-4018- 201
3 3 1 1 1 0 1
001 6
05/
065524-N-DG-
12/ 1
DG02-PE-ISO-4018- 2 2 7 1 0
201 0
002 6
06/
065524-N-DG-
12/
DG02-PE-ISO-3001- 201
3 3 7 4 0 0
006 6

Page 3 of 8
065524-N-DG-
DG02-PE-ISO-3001- 4 1 6 0 0
007
28/
065524-N-DG-
12/ 1 1
DG02-PE-ISO-3001- 2 8 4
201 5 0
003 6
22/
065524-N-DG-
12/ 1
DG02-PE-ISO-3001- 9 2 7 4
201 4
002 6
NO ISO ? For line ref
VH2005
SYS 503 HP Flare Pipeline to HP Candles
065524-N-DG-
DG02-PE-ISO-5028-
001
065524-N-DG-
DG02-PE-ISO-5028-
002
065524-N-DG-
DG02-PE-DAL-3001-
004
SYS 501 LP Flare Pipeline to LP Candles

065524-N-DG-
DG02-PE-ISO-0031-
001
065524-N-DG-
DG02-PE-ISO-0031-
002
065524-N-DG-
DG02-PE-DAL-3001-
005

Page 4 of 8
Manpower Equipment details

Equipment Nos No of
Sl No Category
s list Persons
1 Site Engineer 2
2 Draft man 0
3 Welding Inspector 0
4 Fabricator 4
5 Fitter 0
6 Welder 4
7 Grinder 5
8 Mechanical Technician 2
9 Painter 0
10 Worker 9
11 Rigger 0
12 Electrician 0
13 Surveyor 0
14 Civil Workers 0
15 PA 3
16 HSE officer 0
17 Scaffold 0
18 Store man 2
19 Administration 0
Sl No
1 Welding Machine 4
2 Grinding Machine 6
3 Crane 2
4 Hiab 3
5 Fork lift 0
6 Generator 0
7 Trailer 0
8 JCB 0

Todays Progress Summary


Work in progress (fabrication, cutting and welding) in workshop on ISO. No. bellow
No work in workshop

Work in progress (fabrication, cutting and welding) in site on ISO. No. bellow
065524-N-DG-DG02-PE-ISO-4024-001
welding 1 joint size 10(elbow 10 x 90 on Y-piece 10)
065524-N-DG-DG02-PE-ISO-4004-001

Page 5 of 8
Cutting and preparing 1 spool 10on Y-piece
065524-N-DG-DG02-PE-ISO-5028-001
Starting fabricating and welding on HP flare line 2 joint size 20 (root & hot passes)

Item
Unit
Quantity
Fit-up
Pipe Dia, No. of Joints
20 , 2
Welding
Pipe Dia, No. of Joints
10 , 1
RT
# of Joints
0
MPI
# of Joints
0
ACTIVITIES
% OF COMPLETED
Material Received
Pipe
0%
Fittings (Flanges, Elbow, Tee, Reducer, Weldolet)
0%
Valves
0%
Gaskets
0%
Fabrication Activities
Welding (pre fab)- Inch dia
0%
Welding (field joint)
0%
NDT(pre fab)
0%
NDT(field joint)
0%
Painting
0%
Pie spool Shifting to site
0%
Installation at site
0%
Hydro test
0%
Handover Package dossier (in %)
0%
Tie-ins
0%
Areas of Concern with regards to welding and material

PTW issued at 09:44 AM


Work stopped at 11:40 AM due to high winds
Collecting materials for HP candle from RSB to workshop
Welding Summary
065524-N-DG-DG02-PE-ISO-4024-001

Page 6 of 8
welding 1 joint size 10(elbow 10 x 90 on Y-piece 10)

Schedule Risk

Progress Visuals

Activities Planned for Tomorrow


1-Work in workshop on
065524-N-DG-DG02-PE-DAL-3001-004

2- work in site DS2 on


065524-N-DG-DG02-PE-ISO-4024-001
065524-N-DG-DG02-PE-ISO-4004-001
065524-N-DG-DG02-PE-ISO-4009-001

Lost Time Details


Date
Activity / Description
Man hours Lost
Remarks