(Rs. In million
T Throw-
Date of Exp. Allocati
r Approved Forward
S # Name and Location of the Scheme Approva Upto on for
g Cost for
l 06/2016 2016-17
. 2016-17
1 2 3 4 5 6 7 8
SOCIAL SECTOR
Education
Gilgit
1 T Establishment of vocational 14-09-11 5.000 4.000 1.000 1.000
centers of for women in Gilgit
District.
Total 5.000 4.000 1.000 1.000
WORKS SECTOR
Water/Irrigation
Astore
2 T Provision of pipe for irrigation 26-09-11 4.105 2.867 1.238 1.238
channel at Chamrote and 2" HDP
3 T pipe forofwater
Const. main supply at
water channel at 03-10-13 8.400 7.482 0.918 0.918
Eidgah abd HDP pipe 4" dia at
Shahshaly
Total to Trezay Ghorikote 12.505 10.349 2.156 2.156
Physical Planning &Housing
Gilgit
4 T Const. of Water Supply at 18-08-15 9.500 8.682 0.818 0.818
5 T Jalalabad (Modified).
Water supply scheme Sakwar/Lift 23-04-14 3.000 2.023 0.977 0.977
irrigation scheme for sakwar Gilgit
(2nd Modified)
Ghanche
Page 1 of 15
MGBLA Ph-I 2016-17
(Rs. In million
T Throw-
Date of Exp. Allocati
r Approved Forward
S # Name and Location of the Scheme Approva Upto on for
g Cost for
l 06/2016 2016-17
. 2016-17
1 2 3 4 5 6 7 8
6 T Construction of water supply at 15-08-11 5.380 5.202 0.178 0.178
Hachi Chomik to Bathong I/C
Const. of G/Tank at Bathong, Bara,
Thaskong Khaplu, Frano,
Askrigond, Dawoo and Greater
Page 2 of 15
MGBLA Ph-I 2016-17
(Rs. In million
T Throw-
Date of Exp. Allocati
r Approved Forward
S # Name and Location of the Scheme Approva Upto on for
g Cost for
l 06/2016 2016-17
. 2016-17
1 2 3 4 5 6 7 8
Astore
7 T Const. of water supply at Trizay, 26-09-11 6.325 4.925 1.400 1.400
Zian, Dudagai, Zaipur Bala and
Pain.
Hunza
8 T Laying of Main line of greater 26-09-11 47.500 43.367 4.133 4.133
water supply scheme for central
Hunza (Aliabad, Karimabad,
Haiderabad, Ganish Garalth and
Total 71.705 64.199 7.506 7.506
Transport &Communication
Gilgit
9 T Feasibility Study for construction 20-02-12 1.000 0.583 0.417 0.417
of road from Nomal to Bargo
through
Skardu Hachini Nomal (Modified).
10 T Construction of roads in Roundu 23-04-14 27.500 27.480 0.020 0.020
Valley
Astore(Modified).
11 T Const. of link road at Hurcho 26-9-11 23.486 23.195 0.291 0.291
Nalluh, Mushkin, Turbling, Bunji,
12 T Upper
Const. Doyan, Bolachibridge
of Suspension and Bolan.
at 26-09-11 5.500 4.121 1.379 1.379
Sakamal and foot bridge at
Maponoabad.
Nagar
13 T Const. of link roads at Nagar-II 26-09-11 32.100 31.500 0.600 0.600
Page 3 of 15
MGBLA Ph-I 2016-17
(Rs. In million
T Throw-
Date of Exp. Allocati
r Approved Forward
S # Name and Location of the Scheme
Approva Upto on for
g Cost for
l 06/2016 2016-17
. 2016-17
1 2 3 4 5 6 7 8
Total 89.586 86.879 2.707 2.707
Grand Total: 178.796 165.427 13.369 13.369
Page 4 of 15
MGBLA Ph-I 2016-17
(Rs. In million)
Exp.
Beyond
2016-17
9
0.000
0.000
0.000
0.000
0.000
0.000
0.000
Page 5 of 15
MGBLA Ph-I 2016-17
(Rs. In million)
Exp.
Beyond
2016-17
9
0.000
Page 6 of 15
MGBLA Ph-I 2016-17
(Rs. In million)
Exp.
Beyond
2016-17
9
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
Page 7 of 15
MGBLA Ph-I 2016-17
(Rs. In million)
Exp.
Beyond
2016-17
9
0.000
0.000
Page 8 of 15
E
x
p
SECTOR WISE SUMMARY OF MGBLA Ph-I 2016-17 .
(Rs. in Million) B
Exp. e
No. Exp. Throw- Allocati
Appro Beyon yo
of Upto Forward on for
S# Sector ved d n
Sche 06/201 for 2016- d
Cost 2016-
mes 6 2016-17 17
17 20
1 2 3 4 5 6 7 8 ###1
Part- Social 5
-
I Sector 1
6
###
i Education 1 5.000 4.000 1.000 1.000 0.000
Part- Works
II Sector
i Water/Irrigati 2 12.505 10.349 2.156 2.156 0.000###
on
ii PPH 5 71.705 64.199 7.506 7.506 0.000###
1 2 2 3 4
Skardu
31 T Const. of link roads in Shigar Town. 15-08-11 6.000
33 T Const. of Jeepable susp. Bridge & link road in Gultari Area. 29-05-12 11.500
(Modified)
34 T Dismantling of Suspension bridge Thorgo Shigar and fixing 15-08-11 10.823
at Sino Braldo with link road.
35 T Const. of link roads in Shigar 15-08-11 9.177
Diamer
36 T Const. of link road in Darel vellay (Modified) 15-12-11 10.000
37 T Const. of link road Juglot/Shumari, Gali Pain in between 15-12-11 10.000
Tangir Valley (Modified).
38 T Const. of suspension bridge at Shahbanal Tangir. 08-09-11 3.000
39 T Const. of Jeepable link road Rainay Hat to Gitily, Mani 15-12-11 7.400
Goner Farm and Bunner (Modified).
40 T Reconstruction / re-alignment of flood damaged Jeepable 08-09-11 20.000
road for Thalpan to Gomas Khiner.
41 T Const. of Suspension Bridge at Dong Sari with approach 08-09-11 5.000
road Tangir.
42 T Const. of Jeep road at Baithamba Gais Bala. 08-09-11 2.100
43 T Const. of link roads at Daltho Sumayar, Malukushall Wali 26-09-11 15.000
Abad) Nagar Proper and Shigamating Hoper (Modified).
27.480
4.121