You are on page 1of 5

Mounded LPG Storage Facilities and hence the foundation experiences a cycling

By Rakesh Agrawal loading.


Jt. Dir(MO) OISD
Locations are often situated in coastal areas
Mounded Storage: The LPG mounded Storage
where soft marine clay is present. In such
facilities have inherent advantages. In case of
situations careful consideration need to be
mounded LPG storage vessels the Horizontal
made regarding the load transfer mechanism as
cylindrical vessels (Bullets) are placed on a
the soil may get compacted under cycling
specially made layered (sand bed) foundation
loading pattern.
wherein the vessels rest finally on sand
uniformly throughout its length. The Vessel is In some cases piles are driven up to a depth
covered with passive (inert) material from all where a hard stratum is reached or effective
sides. This mounding material gives vessel a lot soil resistance is available. Then all such piles
of protection from external heat and impact. are joined at top with a properly designed RCC
slab over which compacted layers of moorum
and sand bed are created.

Precautions need to be taken to ensure the


proper drainage of water which might get in
thru lateral entry or through top of the mound.
Stagnating water may loosen the sand base and
may ultimately result in excessive settlement of
the vessel. Excessive settlement may result in
These vessels remain buried and are not visible
pressure on the bottom nozzle.
and thus require special considerations while
designing, constructing, commissioning, Thus permanent bench mark need to be
Operation of the Storage facility and as such created at the project stage itself and the
require special protection against corrosion. settlement needs to be closely monitored. In
case of any abnormality mound integrity need
A well-designed and executed system during
to be reassessed and corrective measures
the planning to project stage, backed up by
taken.
good operating procedures and further backed
up by sound maintenance practices is a must Water Ingress:
for maintaining the asset integrity and ensuring
a safe working environment. The mound is covered with UPVC sheet at top
and also on sides to ensure that water on
Areas requiring focus in Mounded Storage account of rainfall or during testing of water
Facilities: sprinklers does not enter the mound. In some
cases it has been seen that the UPVC sheet is
a. Settlement of the vessel
provided at the top only but the sloping sides
b. Water Ingress
are not covered with UPVC sheet. In such cases
c. C P System in Mounded Storage Facilities
it has been observed that due to the cracks in
Settlement of the vessel: the stone pitching water ingress takes place.
Also the water comes out at lower levels with
The LPG vessels in a Mounded Storage vessel is sand oozing out thus destabilizing the complete
placed on specially prepared sand bed which facility. Hence provision of UPVC sheet at top
provides the vessel a continuous support. The and at sides is very important.
vessels go through numerous repeated cycles
of getting filled and subsequently evacuated Apart from affecting the foundation the
moisture thus reached insides also lowers the
Resistivity of the mounding material. The Lower Should be an effective electrical insulator
resistivity values are prone to higher corrosion and its ability to maintain substantially
and increases the CP System current constant electrical resistivity with passage
requirement thus interferes with the impressed of time.
Current Cathodic Protection System installed. Should be resistant to disbondment.
Should have the ability to resist
Variations in soil resistivity with moisture
development of holidays with passage of
content
time.
Percent Moisture Soil resistivity in Resistance to chemical degradation.
% by weight cm (Sandy Loams) Retention of physical properties.
0 1000 x 106 Non-toxicity to the environment.
2.5 1,50,000 The coating must be suitable for the
5 43,000 design conditions i.e. service temperature
10 22,000 of (-) 27 C to (+) 55 C and for LPG and ()
15 13,000 43.5 C to (+) 55 C for Propane.
20 10,000
As per available listed service temperature
30 8,000 data, conventional coatings like Coal Tar / Pur-
Tar do not meet the requirements of low
temperature.

Now a days Polyurethane coatings are being


used meeting the above requirements.
Needless to mention that prior to the
application of the coating the surface needs to
be blast cleaned and compatible primer needs
to be applied for a perfect adhesion and zero
Holidays which will result in minimal current
requirements.
Proper UPVC Sheet coverage at Sides

Coatings:

For the Corrosion protection of mounded LPG


bullets highest performing coatings as a
primary protection against corrosion combined
with impressed current cathodic protection
system secondary protection against corrosion
are employed.

Criteria for selection of coatings for Mounded


Bullets are essentially as enumerated in NACE A coated Vessel
RP 0169 with the special consideration that the
coating is applied on site rather than in a Impressed Current Cathodic Protection System
coating plant. To list a few the coating must (ICCP):
possess the following qualities:
C P System is easy to maintain if understood
Good adhesion to the base metal is steel. well. The most important aspect in maintaining
the C P System is Knowledge Transfer to the
Should be an effective moisture barrier.
operating persons by OEMs / Technical
persons. It is observed that during the change
of role holder due to business requirements the c. The Copper Copper Sulphate Half Cells
incoming person lags particularly in this area (Cu-Cu SO4 Reference cells)
and as a result the system suffers. Hence the The Cu/CuSO4 portable Reference
hand shaking time must be meticulously Electrodes (Half Cell) is the accepted
planned during such periods involving change standard for the measurement of surface
in operating / maintaining crew. The operating potentials (PSPs) for land installations and
persons must get exposed to OISD-STD-150 and can be used for any voltmeter normally
NACE SP0169-2007. used in the field of Cathodic Protection.
Normally 12 or 16 permanent ref cells are
The primary object of the following section is to placed at 3, 6, 9 & 12 Oclock Positions (i.
highlight the components of the ICCP System
e. 4 nos at a section) of the mounded
and their functions for easy understanding by vessels at 3 to 4 sections along the vessel.
the operating persons. (So total = 4 X 3 =12 & 4 X 4 =16)
Components of ICCP

d. Zinc Half Cell (Zn-Zn SO4 Reference cells)


As a backup at least one Zn-Zn SO4
reference cell is placed at 6 Oclock
Positions of the vessels.

CP System Architecture
e. The Polarization cell.
The main components of ICCP are as follows These are used to divert any accidental
electrical surge on the MSV to the ground
a. The Cathode i.e. the Vessels to be safely. They are normally open but under
Protected: Mounded Storage Vessels surge give a conductive path to the earth.
In earlier installation Kerk Cells were used.
b. Long life Flexible Polymeric type Anodes They contained a no of metal shims
A flexible, cable-like anode, which is placed (alternately connected to one pole)
parallel and in close proximity of the submerged in KOH solution with mineral
Mounded Vessel. Uniform distribution of oil at Top. Kerk cells are not being used in
cathodic protection current is therefore new installations due to the maintenance
achieved along the length of the vessel. issues.
Up-to 4 Anodes are placed for uniform
protection of vessel from all sides. Anode
ratings are specified in terms of safe
current per m of anode.
f. Insulation Joints in the Pipeline
(Monolithic Couplings)
These are used to isolate protected system
(Vessels) from unprotected system.
(Sprinklers / pipes after IJ / QB lines etc.) A
surge suppressor is used across each IJ.

g. Transformer Rectifier unit (TRU) Inside of Ref Cell JB with reference points
and measurement points.
TRU gets 230 Volts AC supply and converts
it to low voltage DC Supply thru a
j. Variable Resisters
transformer and a rectifier. Further it has
These are used for adjusting the current in
control cards to automatically adjust the
different Anodes for achieving uniform PSP
current according to the reference
readings all around the vessel.
electrodes.

Variable resistors (Green) and Shunts


inside the Anode JB
h. Uninterrupted Power Supply to the TRU
This is to ensure the CP System remain on k. Shunts
all the times. Shunts are known calibrated low
resistances. These are used to measure
i. Anode Junction Box, Cathode Junction Box, the current in the wire without isolating
Reference cell Junction Box. the wire. They are installed in series.
By Ohms Law : V=IXR => I = V/R
Here V in DC Milli-Volts is measured and
then I is calculated using its known R value.

l. Electrical Isolation of Armours of the


cables coming to the protected side of the
Vessel to unprotected side needs to be
ensured as they may earth the vessel thru
the Flame Proof Metal Glands.

Shunts inside the Cathode JB


Calculating the Current requirement of C P
System :
The vessels require 15 Milli Amps per M2 of the
bare surface for effective protection for PU
coating. With this current the system should be
able to get the PSP (-)1.2 to (-)0.85 Volts wrt Cu
Cu SO4 Ref cells. Overprotection of vessel
beyond (-)1.2 should be avoided as it may lead
to Hydrogen embrittlement of the vessel. Off
PSP should be minimum (-)0.85 V.

Let the Dia of the vessel be 6 mtrs and the


length of the cylindrical part 20mtrs.

a. Area of Dished ends = 2*2 R2 =


4*3.14*3*3=113.04 Sq Mtr.
b. Area of the Cylindrical Portion = D L =
3.14*6*20= 376.8 Sq Mtr.
c. Total Area = 113.04+376.8 = 489.84 Say
490 Sq Mtrs.
d. The Current requirement for PU coated
vessel considering 5% holiday =
(5/100)*(490)*15 milli Amps = 367 Milli
Amps. ie 0.367 Amps for one vessel.

In case the system is drawing more current


then there is need for investigation as
higher current may lead to:-
a. Disbondment of the coating from the
vessel.
b. Burning of the anodes.
c. Corrosion of other structures if the
current is leaking to other plant
structures as they may become anodic
and start sacrificing.