VillageofMountKisco

FireDepartment
StationRenovations

ConceptualDesignPresentation
MutualEngineandHose
UnionHookandLadderandFireRescuePolice
IndependentFireCompany
February27,2017
TopicsofDiscussion

Introduction
DiscussSummaryofNeeds
Assessment
DiscussSummaryofAdditionalNeeds
IdentifiedbyFireDepartment
ReviewConceptualPlansforEach
Station
ReviewPreliminaryProjectCost
Summary
Answeranyquestions
SummaryofNeedsatFireStations
IdentifiedDuringBuildingAssessments
GeneralConstruction

ExteriorEnvelope roof,windows
shouldbereplaced,accesstoroof
InteriorRenovations
Kitchenfinishesandequipment
upgrades
ProvideADAtoiletsandADAaccess
tosecondfloor
SummaryofNeedsatFireStations
IdentifiedDuringBuildingAssessments
Electrical
Electricalserviceisantiquatedand
shouldbeupdatedtoaccommodate
newloads
Mainserviceconduit/groundis
corroded;needsreplacement
LEDlightingandnewemergency
egresslightingshouldbeinstalled
SummaryofNeedsatFireStations
IdentifiedDuringBuildingAssessments
CCTVSystems:
Replacenonfunctioningcamerasand
addadditionalasrequired
FireProtection:
Providecodecomplaintfire
protectionsystem
Generator:
Replacegeneratorsandtransfer
switchesatallstations
SummaryofNeedsatFireStations
IdentifiedDuringBuildingAssessments
Plumbing: Mechanical:
Naturalgasservicehassufficient Boilersappeartobeingoodcondition,
capacitytosupportadditionalloads butlacksufficientcapacityfor
Existingabandonedfueloiltankshould expansion
beremovedat(2)stations Provideairconditioningand/or
Toiletandshowerfixturesrequire ventilation,inspaceslackingAC&
replacement ventilation
Providecontrolsbetweenheating,
ventilation,andcooling,potentially
wastingenergy
Rooftopcoolingunitsappeartobe20
25yearsoldandareattheendof
usefullife.Replacementrecommended,
withnewrooftopheat/coolingunits
SummaryofAdditionalNeedsIdentifiedbyFire
Department

Additionalapparatusspace Separatelocker/gearstoragespace
Safeclearancesbetweenbays/ adjacenttoapparatusrooms
apparatus Fitnessroom
Trainingclassrooms Additionalstorage
Trainingprops Sourcecaptureventilationsystemfor
Readyroomadjacenttoapparatus apparatusexhaust
rooms
Additionalofficeandconferenceroom
spaceforBOFC,DepartmentOfficers
EOC
Sleepingaccommodationsforlong
durationincidents
DedicatedareaSCBA fillstation
DecontaminationareaforFirefighters
MutualEngine&Hose;
SiteandFirstFloorPlan
MutualEngine&Hose;
FirstandSecondFloorPlan
MutualEngine&Hose;
ExteriorRendering
UnionHookandLadderandFireRescuePolice;
SiteandFirstFloorPlan
UnionHookandLadderandFireRescuePolice;
FirstandSecondFloorPlans
UnionHookandLadderandFireRescuePolice;
ExteriorRendering
IndependentFireStation;
SiteandFirstFloorPlan
IndependentFireStation;
FirstandSecondFloorPlan
IndependentFireStation;
ExteriorRendering
PreliminaryProjectCostOpinionSummary

Option B
Option A Upgrades New Village
Addition / Identified in Construction Repurposing of
Alteration Facility Option Stations
Fire Company Scheme Assessment

Mutual $1,961,610 $1,595,920 $7,821,125 $610,000

Independent $3,701,117 $2,208,166 $6,721,125 $540,000

Union $4,629,660 $2,663,047 $7,856,125 $715,000

$10,292,387 $6,467,133 $22,398,375 $1,865,000

NOTE: The cost to construct a new main station to house all companies, approximately
25,000 SF is $14,000,000. This does not include site purchase costs