Professional Documents
Culture Documents
PROCUREMENT NOTICE
GENERAL INFORMATION
Title: Architecture /Interior Designer
Project Name : Sustainable Palm Oil (SPO)
Reports to: Programme Manager for Climate
Duty Station: UNDP and Project Office
Expected Places of Travel (if applicable): N/A
Duration of Assignment: 20 November 2014-31 January 2014 ( 40 working
days)
X APPROVED e-requisition
BACKGROUND
Indonesia is one of the worlds largest producers of palm oil, and has received
much attention in recent years particularly from the global community concerned
about the sustainability of palm oil production. In response, the Government of
Indonesia is taking steps towards building a greener economy that promotes
growth, equity, improved livelihood and environmental integrity. In order to
promote sustainable palm oil production and operation in Indonesia, the Ministry
of Agriculture, UNDP and several multinational companies have launched the
Sustainable Palm Oil (SPO) Initiative. The SPO initiative aims to improve the
capacity of palm oil smallholders and conserve natural resources together with
the Government of Indonesias Sustainable Palm Oil (ISPO) system, a mandatory
national sustainable palm oil certification scheme managed by the Ministry of
Agriculture, and through working with the Ministry of Forestry and relevant
Government of Indonesia institutions.
The SPO Initiative with the Ministry of Agriculture is organized around five
components: (1) Strengthen smallholders focusing on productivity and
environmental management, 2) Strengthen ISPO to protect forests, enhance
biodiversity conservation and mitigate and monitor GHG emissions, (3) Facilitate
social responsibility, empowering related communities and mediation systems,
(4) Reinforce ISPO framework and clarify ISPO standards for wider acceptance,
and (5) Establish SPO national and provincial multi-stakeholder platforms to
facilitate sustainable palm oil in Indonesia.
In order to provide conducive environment for SPO project staffs that are located
in Ministry of Agriculture office so that they are able to function in achieving SPO
output, it is therefore viewed that a professional architect/interior designer is
needed. A national consultant is being sought to support the SPO team as a
project officer to carry out the tasks specified below
Implementation Phase/Monitoring:
1. Provide UNDP and MoA with technical solutions/support between design and
construction by receiving inputs from UNDP and MoA.
2. Technical contribution to the analysis of bids managed by Procurement Unit for
the renovation and acquisition of new furniture and the like.
3. To monitor/supervise and daily inspection at the work site.
4. To participate in coordination meetings with contractors, and UNDP and MoA
focal point during construction phase.
Implementation Phase/Monitoring:
1.To produce weekly report (plan vs development progress)
2. To produce final report including the hand-over note.
I. Academic Qualifications:
Minimum Bachelor Degree in Architecture
Deliverables
Key deliverables include the following:
No Reports, Date Due Payment
Document and
Deliverables
st
1 1 payment will be made upon 30 November 40%
submission and approval by UNDP 2014
of Schematic/Conceptual Design,
Design Development and Detail
Design Phases
-Work-plan and timeline.
-Draft concept of design drawing.
-Proposed design drawing in 3D
including plan and elevation.
-Architecture and construction
drawing.
-Bill of Quantity (BoQ) of the facility
to be redesigned/ renovated
-cost estimation