You are on page 1of 9

SUPER MULTIPLE JUNCTION (SMJ)

Installation

Installation NGEL0146
To install SMJ, tighten bolts until orange fulltight mark appears
and then retighten to specified torque as required.
: 3 - 5 Nm (0.3 - 0.5 kg-m, 26 - 43 in-lb)
CAUTION:
Do not overtighten bolts, otherwise, they may be damaged.

AEL343C

AEL645B
SUPER MULTIPLE JUNCTION (SMJ)
Terminal Arrangement

Terminal Arrangement NGEL0147

AEL646B
FUSE BLOCK JUNCTION BOX (J/B)
Terminal Arrangement

Terminal Arrangement NGEL0148

AEL520C
FUSE AND FUSIBLE LINK BOX
Terminal Arrangement

Terminal Arrangement NGEL0149

AEL521C
JOINT CONNECTOR
Terminal Arrangement

Terminal Arrangement NGEL0198

AEL523C
ELECTRICAL UNITS
Terminal Arrangement

Terminal Arrangement NGEL0150

AEL522C
NOTES