1.GENERALPROVISION

1.Introduction

Thismethodstatementdescribestheprocedurefortheconstructionofdriven
pilesthatbeusedinbuildingofHRAPProject.

2.ScopeofWork

Theworkconsistsofcontrolandinstallingthedrivenpilesbyreferenceto
applicabledocuments,ISOformandlocationsshownonthedrawing.

3.Reference

TIS 3962524PrecastConcrete

4.Responsibility

Subcontractorshallberesponsibleforcomplyingwiththeworkinstruction.
InspectionandrecordingshallbeperformedbytheMaincontractorsEngineers.
And,supervisedbytheConstructionManager.

5.Materials

PrestressconcretepileI300x300x24000mm.Min.Capacity=39ton/pile.

PrestressconcretepileI260x260x25000mm.Min.Capacity=32ton/pile.

PrestressconcretepileI260x260x24000mm.Min.Capacity=32ton/pile.

PrestressconcretepileI220x220x25000mm.Min.Capacity=25ton/pile.

2.OUTLINEOFCONSTRUCTIONWORK

1.ProjectName

HondaR&DAsiaPacific(HRAP)

2.SiteLocation

RamintraBangkokThailand

3.ProjectOwner

AsianHondaMotorCo.,ltdandHondaR&DAsiaPacificCo.,ltd.

4.Maincontractor

Taisei(Thailand)Co.,ltd.

5.ConstructionPeriod

StartWork 9June2008

CompletedWork 10July2009

6.OutlineofBuilding

No. Using
1 OfficeMeetingBuilding
2 WelfareBuilding
3 EnergyBuilding
4 CanteenBuilding
5 DesignBuilding
6 ReceivingBuilding
7 MaterialBuilding
8 TestBuilding
9 DesignEvaluationBuilding
10 Security
11 Security
14 WasteMaterailStorage
15 Storage&Toilet
7.PilingWorkSubcontractor

SangsiamIndustralCo.,ltd

BangPainConcretePileCo.,ltd

8.ScheduleofPilingWork

7July6October

3.CONSTRUCTIONCONTROLORGANIZATION

TAISEI(THAILAND)CO.,LTD

MR.TAKAHASHIKEIZO
PROJECTMANAGER


MR.NAVIN LOHITYOTHIN
ASS.PROJECTMANAGER

MR.NAVEE MR.CHITHONG MR.ANON MR.PALASIN


ENGINEER ENGINEER ENGINEER ENGINEER

MR.SAJJAPHONG MR.XXXXX MR.SUTTIGIAT MR.TINAKON MR.DANCHI MR.WEERA MR.WORAWAT MR.ARKOM

FOREMAN FOREMAN FOREMAN FOREMAN FOREMAN FOREMAN FOREMAN FOREMAN


MR.XXXXX MR.XXXXX MR.XXXXX MR.XXXXX
FOREMAN FOREMAN FOREMAN FOREMAN

Subcontractor


Companyname SangsiamIndustralCo.,ltd Companyname BangPainConcretePileCo., ltd

Address 27/4SamkhokPathuthani12160 Address 145BangPainAyutaya13180

Telephone (02)5816774 Telephone 0819205606

PersoninCharge PersoninCharge
Mr.Sirichai Mr.Chairat


4.CONSTRUCTIONMETHOD

1.SequenceofWork

START

SETTINGOUTPILELOCATION

PILEDELIVERY

NO
CHECKING
NO
INSPECTION BYTAISEI
REPLACE
BY TAISEI
YES
YES
SETTINGOFPILE

NO
CHECK
PLUMBING&DEVIATIONBY
TAISEI

YES

PILEDRIVING

WELDING

PILEDRIVING

NO
CHECKING
LASTTENBLOWBY
SUBCONTACTOR

YES

END
2.SitePreparation

Allexcavationwithintheareatobeoccupiedbybearingpilesshallbecompleted
beforethepilesaredriven.

3.PilesTransportationandPilesCondition

Allpilesaretransportedinsite.Beforepilesarestokedatthesite.Theymustbe
inspectedbyTaisei.Incaseofnotfollowingthisconditions,thepilewillbe
rejected.

Surfaceofconcretedonthavecrackthatcanseesteelbar.

Pilecanhaveacrackcontinuouslynomorethanhalfofperimeteranditmust
haveananglebetween80and90degreeswithneutralaxis.Moreover,the
distancebetweenthecrackmustseparatemorethan500mm.


Sectionareaofpilecandeviatebetween6mmand+15mmbyrandomcheck
pileatleat2pionts.

Pilemustbestraight.Bendingperiodatanypartofpile.Ifbemeasurebetween
thelineattheendofbothbendingpartwitnanysurfacebutnoexceedL/360.

Lengthofpilecandeviatebetween20mmand+70mm.

4.PilesStorage

Allpilesaretobestackedforstorage.Then,supportbetweenpilesshallbe
stackedbyfollowingpicture.Because,theresultoftheimpactonimproper
strackingforpilesblocking.

5.PileInstallationforDriving

Thepileisinstallatedwiththepilerigbyknottingslingwithpileinpositionthat
followingpicture.Forprotectionoftheimpactonbendingmomentforpile
blocking.


6.SequenceofDrivingPiles

Thepilerigmovingspendtime.So,conditionsequenceofdrivingpilesis
importance.Because,Itsavestime.(Followattacheddrawing)

Subcontractorshallofferthesequenceofdrivingpilesthatshallbechecked
andapprovedbyMaincontractor.

7.DrivingProcedures

7.1Positioning.Thepiledriverisbroughtintopositionwiththehammerand
capatthetopoftheleads.

7.2Lashing.Generally,thepilelineislashedaboutonethirdofthedistance
fromthetopofthepile,thepileisswungintothehelmet,andthetipis
positionedintotheleads.Amemberofthehandlingcrewcanclimbtheleads
and,usingatugline,helpalignthepileintheleads.

7.3Centering.Thepileiscenteredunderthepilecap,andthepilecapand
hammerareloweredtothetopofthepile.Ifadrophammerisused,thecapis
unhookedfromthehammer.
7.4Driving.Thehammerisraisedanddroppedtodrivethepile.Drivingshould
bestartedslowly,raisingthehammeronlyafewinchesuntilthepileisfirmly
set.Theheightoffallisincreasedgraduallytoamaximumof50cm.Blowsshould
beappliedasrapidlyaspossibletokeepthepilemoving.Repeatedlongdrops
shouldbeavoidedsincetheytendtodamagethetopofthepile.

8.PileWelding

Fortheconnectionofpile,weusethethicksteelplate6mmandplaceto
betweenthepiles.Then,weweldtheconnections,whichshouldbemorethan4
mm.(Followattacheddrawing)Ifthegabbetween2pilesareover5mm,we
havetousesteelplatetofillinthegapandweldthemtogether.

Thereare2conditionsthatwewillstopweldingimmediately

Firstly,Incaseofhavingwindspeedmorethan15m/s.

Secondly,Incadeofhavingrain

9.PileAligning

Todriveapile,youmustexactlydriveatthecenter.Themostmaximumperiod
attheendofthepilemustbedeviatefromaplumbline.

10.PileDeviation

Todriveapilethatdeviatefromtheidentifiedpoint,itmustnotexceed1%
ofthelengthbutmustbelessthan10cm.Themeasurementmustparallelwith
bothofthecoordinateaxesaswell.


Controldeviationofdirectionbyreferfrombaseline.

Incaseofnotfollowingthiscondition,thestructuremustberevisedby
engineer.

11.InspectionbyCalculation

11.1Numberofblowiscountedduringpiledriving&lastdriving.

Blowcount

Lasttenblow

11.2CalculationbyDanishstheory

=UltimateLoad

=HammerEfficiency

=RatedHammerenergy

L=LengthofPile
A=AreaofthePileCrossSection

E=ModulusofElasticityofthePileMaterial

S=PenetrationofPilePerHammerBlow

5.QUALITYCONTROL

1.InspectionforQualityControl

Inspectionpointsforqualitycontrolshallbereferredbelowdocuments,

InspectionchecklistforprestressedconcretepilebyTaisei

PillingworkinspectionsheetbyTaisei

InspectionchecklistforsettingoutbyTaisei

2.InspectionforQualityPC.PilesatProductLocationbysubcontractorwillbring
fromrandomcheck.(every100piles,subcontractorwillchooseonly1pile.)

3.InspectionforQualitymachinesshallbereferredbydocumentsof
departmentofpublicworksandcountyplanningministry(2.)bysubcontractor.

4.Protectionofpileheads

Theheadsofprecastconcretepilesandcasingshallbefittedintocushiontype
drivecapshavingaropeorothersuitablecushionnexttothepileheadand
fittingintoacastingthatinturnsupportsatimbershockblock.

6.SAFETYCONTROL&ENVIRONMENTCONTROL

6.1SafetyControl

1.Thescheduleandplanningofconstructionworksuchasvariety,accessrout
andworkprocedureofheavyequipmentshallbeinstructedtoeachconcerning
personinmorningtalkbeforestarttowork.

2.Properindividualprotectiveequipmentshouldbewornatalltimes.All
equipmentguardsshouldbemaintainedandinplace.

3.Operatorsmustneverstandunderornearapilehammer.Ifanyadjustment
istobemadeatorbelowahammer,thehammershouldbestoppedandrested
onapileorsecuredbyplacingthehammerretainingpinthroughthepileleads.
Laddersshouldbeprovidedonframesandleadstogiveaccesstothehammer.

4.Allequipment,particularlypileleads,mustbeexaminedfrequentlyforany
cracksorloosebolts.

5.Helmets,drivingcaps,anvilblocks,andotherpartsreceivingimpactmustbe
inspectedregularlyfordamageorfracture.Wornpartsshouldbereplacedbefore
wearbecomesexcessive,andparticularcaretakentoavoidwearthatwill
developastressconcentrationonamovingpart.

6.Thehammermustbekeptatthebottomoftheleadswheneverpossible.

6.2EnvironmentControl

1.Accessroadinside&outsideofprojectsiteshallbekeptasclean.

2.Dailyhousekeepingshallbedone.

3.Waterspreadshallbedoneinresposetositeconditionduringdryseason.

7.PHOTOPROCEDURE


PILESSTORAGEPRODUCTLOCATION


TRANSPORTATIONPILESTOSITE

PILEUNLOADING


LASHINGSLINGWITHPILE


INSTALLATIONPILEWITHPILERIG


CHECKINGDEVIATIONBYPLUMBING



WELDINGPILESINCONNECTIONJIONT


LASTTENBLOW

ATTACHMENT

BOR:NG LOG


LOCA ON:THUNGTARAENG,3ADTGKHENI BANGKOK

O Natual Watcr Content o su(uc1 0 su'(ut



Su( Su'(h

X OP/2

1 Hbstic Lhnit

^ Liquid Linit


DESCR:PT10N OF MATERIAL
25 5 75
t%)
SPT N(Blow/tl

40 00 100 20 `:0 60



01 ST

02 1 S T

_ L _

03 ST
_
04 ST b


051 ST
`
CIy,trace sond dark grey,soft tO

061 ST medium {CH D

ST
r

OBI ST

)9i ST

101 ST

1 1 ST

1770m /
light greenish
Silty clay,tra(:e sand
21 ST


31 SS grey,stiff{CH}

41 SS

5, SS

-1 Sltv fine sanctrace t(,some medium

n
:::][ R] )
::

171 SS J42

O o
RttS' 4/77frl P/6 k/2 a ` 7 F F


5 S OR7Va F ED I 2 0
S 'Rl PK:
lra
0
LC)G OF 30RING Noo BH 1
LOCA ON:TEIUNGTARAENCt,3AN ,BANGKOK

O Su( C) e Su'(u`,)
A N,?tu,ralWater Clntflnt `Su lFvl Su (R
,. Plastic l:imit X(
2(7n
Liguid Limit }
DESCR:Frr!ON OF MATERIAL 6
t%)

SS

SS

:

1Jl

SS

SS


3
tr::`g

!
1"'


57311 :L 0 0
LO)G OF BORING lNoo BH 2
LOCAT10N: NGT4RAENG,BANGKHEN,BANCtK4)K

O Su( Cl e Su'{U`
O Mattual Watet Co,ntent 0, Su(0 Su(Fv)
x Plqshic limit x Clp
2
Liquid Lmit
/7r
)
DEScRIPT10 OF MATERIAL
^
t%t
EI SF ,N(Blow/ftl

oll ST

021 ST

03 ST

04 ST

C C dWk S "
05 ST P

o6 ST

o ST

oo ST

o9 ST

lo ST

g
ll ST
12 SS

] l
:
13 SS J[:
i
14 SS

15 SS

161 SS
71,
RT:;

,7 SS


"
rF/7

573 L 0 //a O
LOG OF BORING INo BH2
(G1
PR(uECr, LOCAT10N:THUNCTARAENG,BANGKIIEN,BANGK4)K

CLICNT :

J
O Sul C) O Su (
',

O Matural Water Conteat


Su(Vl Su`Fv)

X Clp

x Plastlc Limit 2 "


2)


o, Liquid Limit


DE:,CRlrr:0,:oF MATERIAL
25 :i 7.5
t%t

t EI SPT`N(BI,w/ft)

40 60 100 20 40 00

1 SS

17,
Sty fine san`:,loose sand at SS
WSh
%medum B
19 SS
:
P



2 SS

3045m_ 40
21 SS
t END OF 80RING
{A)

f:11 '
:T

0G,M
'
2 24 Blc. ,ACKEf'l '

5731W
=L 0 /7VFINIS,9a 573,o ,`:
4 P/6 ' No 03
LOG OF BORING No. BH 3
LOCAT10N: THItlNC.IARAIING,I'ANGllCHEN BANGKOK

O su(ucl e su'tuc)
O Nawal Wats Content Su(F S u ( F v )
x Plastic Limit x O p 2
^ Liquir' Limit (/nF)
DESCRIPT10N OF MATERIAL 21; , 7
/%)

01 ST

02 ST

00 ST

04 ST

05 ST
Clay, trace sirnd, dark grey, so1'tto
medium. {CFl)
06 ST

0 ST

08 ST

09 ST

10 ST

ST


SS
lttij
::
Pht

CS

es :lP::S
SS


1
:
F
S,S


' / 1 7 F /
7
L
S 9 03/Va 0
LOG OF BORING No. BH 3
PR()JIICT : IIRAP LOCAI10N:THUNGl 1lNG,BAIIGKHEN,BANGKOK
'-?/
CLIEIIT :

O SuUC)

0 " C o n t t t r Su'{ucl

Su(") Su(B"

x Opr2 1t/t

x ` rm7r

" /mr


DESCRIPT10N OF MATERIAL
5 75

l
"

SPI,N IBIow/ftl

20 40 00 BC, 100 20 40 6()


SS

17

/
:& rown'

SS
F 6

Ci S

SS
L t'to oF BoRTNG
(At
Clst, trace s'rnd & roots, light
brownirshgrey. (CH,Top Soil)

BO
VC, 4 7 9 0 R=C_ CrF77 `
,


L
S , 2/7V F
=S a2 2 O 0/79 4 PK cla 71ra
LOG OF BORING No. BH 4
PRoJIi,C't,(*09/ N,BANGK{)K
1
LOCA ON:'rHtNGTARAENG,BANG

CLIENT :

()Su(uC, e Su(ul,

7/J %rar a "


Su(R

Su(FVl

x Pl ``: )`p 12

(7nf)
DESCRIPT10N OF MATERIAL
4
2.6 75


SPT,N(Bow/ftl

40 6() 80 101) 21, `10 0C


t/\t O,Eioh[.

01 ST


02 ST D

/
/


00 ST


04 ST

05 S,T

10
06 ST 7: rd'dark grev,sdtto


0 ST

/ /

t
(

0 ST

ST I

09

15

I:
ST

10


11 ST

1850m

ST
l
12

: 11:Sand
,l /
li:,11:li

20
13 ST

SS

14 E

SS

15

=f[
SS

,6

17 SS 26

-0.9:tM. 24 ,
30RINe F, '
OS,0 2/c, ACKEII wL- 7 f / 7 , 0 ' N 6 _

57U:
L OR=NG iS`0 22 03,O a9 4 PK_ O 7Va 0
LC)G OF BORING Noo BH 4
I,OCATION . THTJNGTARAENG, BANGKEEN, BANGKI)K

A O su(uc1 0 su (Ul)
Netutal Water C.n&.nt Su(Fvl Su(
I Pldstic Li,nit x Op2 1t7n
Liquid L|mit )
DE SCRIPT:Oi1 0F MATERIAL
6
t%l
SPT,N(Bbw/f

20 40 0C

)I:itt
lfW
1
1


:
tS h
ght brown
k
8: ,:t
Sandvtty,very
Strf
1[13Jnd'Hght greyLh


'
/9
S ;
LOG OF BORING Noo BH 5
PRoJItc't,(*"*) LOCATIOnT:THUNGTARAINGr,BANGttN,BANGKOK

CLII IT :

C ()Su(uC) O Su(0,
Aldtural Water C0ntent


` S u { F 0 Su'(

\ Plastic Limit x ` p 2

r Liqurd Limit ltnf)


DESCR:PT10 OF MATERIAL 25 75
t%)
Srr,N O ow7ftl

Z10 00 80' 100 20 `:0 6C


{
1 0::O in

01 IT





02 ST

00 ST E 1
J I


]
o4 ST

]]
dark grey"sdtto /
1
05 ST eCttrd
::


06 ST
,

07 ST I: 1 /

7
00 ST I

09 S,T I /
1

10 ST 1550m.

1' ST

12 SS roWnth 7

13 SS
:
1:R
/:
;:1

14 SS

Silty clay. sornesand, brown, stiff. {CL}


15 SS 21. :
4
C



1

SS

i :


[

SS 40

30R=NC S 7Fp 24 R=0 4 /


S ,: L
ar1/v F S a2 250 0 4 ` 03/1/a
O
LOG OF BORING No. BH 5
LOCAnON:. GTARAENG,BANGttN,BANGK()K

a C)Su(luC) o su `u`:)
Natural Water Content Su(FO Su{n)
x Plastic Limtt x Clp
2 uhF)
DESCRIPT10,1 0F LuTER:AL
6 Liqrid Limit
(%)

10 SS

19 SS
]
11

]llillitll
:

20 SS

21 SS

'
}W
`
:
l
3R ght gttsh
ttnd'

S L a lva 0
LOG OF BORING No.BH 6
LOCA oN: IING ,ARAING,1,
G] BANGKOK

O O Su (UC) o Su{ut))
Natual Water Content a Su (Fvl A Su
x Pls'tlc Limit r( Op/2
Liquitl Linit
lt7nF)
6
DESCRlPT10N OF MATERIAL , 7.5
(%)

40 00 80 101

':pe
'"e"

:; d
i8

20114 SS

Clavevsand, brown, rnediumdense. (SC)

Wn very
medunl
1:)br
::

IML 4 447F/7


S7 4/a
03
LOG OF BORING Noo BH 6
LOCAT10N: THUNGTARAENG,BAN( ttN,BANGKOK

O su(uc) (D Su (uc}
O Nafitral Water Cd\tent Su(PO Su(Fvl
\ Hastic Limit x Op72
l
6 Liqrid Lnnit
DESCRIPT10N OF MATER:AL 25 5 7.6
t%)

20 40 60 80 100

brown,medum to Very
:
1:i

`
2
n/4

;
571'A ;
a 0
_

PILECALCULATION
BYSANGSIAMINDUSTRIALCO.,LTD

PILECALCULATION
BYBANGPAINCONCRETEPILESCO.,LTD

PILEDRIVINGDIRECTION

INSPECTIONSHEET

DATE :
TAISEI (THAILAND) CO., LTD. DAILY WORK REPORT START :
FINISH :
PROJECT : THAI NIPPON FOOD RECOVERY WEATHER : AM 5 O 6
: PM 5 O 6
LOCATION : ROJANA INDUSTRIAL PARK
MANPOWER EQUIPMENT
PREVIOUS ACCUMULATED TOTAL PREVIOUS ACCUMULATED TOTAL
SUBCONTRACTOR NO OF
NO. TOTAL SUBCON TYPE NO
NO. TOTAL SUBCON
WORKERS SIGN SIGN

ACCUMULATED TOTAL TO DATE


ACTIVITIES

ACCUMULATED TOTAL TO DATE


MATERIALS IN COMING / OUT GOING
ITEMS QUANTITY

REMARKS

REPORTED BY CHECKED BY PM.

FM-BCS-01 REV.01
DATE:
TAISEI (THAILAND) CO., LTD. DAILY WORK SCHEDULE

PROJECT : THAI NIPPON FOOD RECOVERY

COMPANY/PERSON IN CHARGE :
TARGET
JOB LOCATION / AREA JOB DESCRIPTION
DATE

NORMAL TIME

OVER TIME

MANPOWER & MACHINERIES REQUISITION


MANPOWER QTY OF WORKER MACHINERY QTY
FOREMAN ()
HEADMAN ()
CARPENTER ()
BARBENDER ()
MASON ()
LABOUR ()
CHECKER ()

REQUESTED BY:

APPROVED BY:

ACKNOWLEDGED BY:

FM-BCS-02 REV.01
TAISEI (THAILAND) CO., LTD.

SETTING OUT INSPECTION CHECK LIST

PROJECT:

DATE:

LOCATION OF BUILDING

DESIGN LOCATION : REFER TO DRAWING NO.

CHECKED BY: (SURVEYOR) DATE:

APPROVED BY: (ENGINEER) DATE:

STRUCTURAL LEVEL

DESIGNED LEVEL: REFER TO DRAWING NO.

CHECKED BY: (SURVEYOR) DATE:

APPROVED BY: (ENGINEER) DATE:

COMMENT:

CORRECTIVE ACTION:

DONE BY: DATE:

RE-INSPECTED BY: DATE:

APPROVED BY: (PM) DATE:

FM-BCS-03 REV.01
INSPECTION CHECK LIST Ref.No. :
TAISEI ( THAILAND ) CO.,LTD.
FOR PRESTRESSED CONCRETE PILE Date : ______/______/______
PROJECT : HRAP PROJECT
LOCATION : RAMINTRA ROAD , THAMBOL THARANG , BANGKHEN , BANGKOK
PRODUCED BY :
PILE NO. :
PRODUCTION DATE :
SIZE OF PILE : 260X260X12000(460)

PRESTRESSED CONCRETE PILE CHECK LIST YES NO DETAIL CHECK LIST

1. LENGTH OF PILE BETWEEN -20 mm AND +70 mm


2. WIDTH BETWEEN - 6 mm AND +15 mm
3. BENDING FROM CENTER LINE < L/360.
BY L IS LENGTH OF BENDING.
4. NO HONEYCOMB NO VISUAL EXPOSURE OF COARSE
5. NO CRACKING NO VISUAL EXPOSURE OF COARSE
IN CASE OF SEEING CRACK , WRITE THE
POSITION OF CRACK IN DETAIL CHECK LIST.

INSPECTED BY : DATE : _______ / _______ / _______


COMMENTS :

APPROVED BY : . DATE : _______ / _______ / _______


Ref. No. :
TAISEI (THAILAND) CO., LTD. PILLING WORK INSPECTION SHEET
PROJECT: Location : Ramintra Km.8 Bangkok Project No.

Type of Pile Total Piles Driven Supplier's Name

Date Weight of Pile (T.) Accumulated Total

Ground Level Weight of Hammer (T.) Drop (M.)

Actual Elev. Driven Settlement/


Driving Time Elev. Spec.(M.) No. of Blows Per Ft. Deviation of Direction (Cm.)
No. Location Pile No. (M.) 10 Blows
Start Finish P. Top P. Tip P.Top P. Tip 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 1 2 3 N E W S
N
W + E
S
N
W + E
S
N
W + E
S
N
W + E
S
N
W + E
S
N
W + E
S
N
W + E
S
N
W + E
S
N
W + E
S
N
W + E
S
Inspected By Reviewed By / Date Approved By / Date

Project Manager's Approval Comment Comment

FM-BCS-17 REV.00
TAISEI (THAILAND) CO.,LTD.
PROJECT : HRAP PROJECT - BUILDING 1

INSPECTION CHECK LIST FOR PILE LOCATION


DATE : REF.No. :

TYPE OF FOUNDATION :
PILE No. : INSPECTION DATE :
DRAWING REF. No. : INSPECTION TIME :

PILE PILE TOP PILE TIP PILE LENGTH DESIGN PILE ACTUAL PILE CHECKED BY CHECKED BY
No. LEVEL LEVEL IN GROUND (m.) CUT OF LEVEL CUT OF LEVEL SUB-CON. TAISEI

PILE DIVIATION DATA

PILE
N S E W
No.

REMARK : PILING
NO ...
INSPECTION BY : APPROVAL BY :

NAME : NAME :
TITLE FOREMAN TITLE : SITE ENGINEER
DATE : DATE :
.2


(Mobile Cranes)

............................................................................................................................. ..............................
..................../ ......................................................................... /.......................................
/........................................................ ...............................................................................................
....................................................................................................................... ..........................................
/ ...................................................... ................................................. / ...........................................
/ ...................................................... .............................................. ................................................
.. 2505
........................................................... .................................... ...................................................

.............................................................................
.............................................................................................. / ..................................................................
..................... / .................................... ................................... / ....................................
/ ................................................... ......................................................... ........................................
...................................................... ........................................................................
....................................................................................................................................................................................................


() ..................................................................... () ......................................................................
(...................................................................) (.....................................................................)
/


.2

1.


2. ........................................................ ...........................................
............................................................................................................
.......................... ()
.......................... ()
3. (Specification)



4.



(Joints)





5.


.
.2

6.
...............................................................................................................
......................................................................................................................



7. (Rollers)


8. (Running Ropes)
................................................................................ (Safety Factor)
........................................................ ....................................
3

6

9. (Standing Ropes)
......................................................................... .....................................
.................................


10. /
5






.
.2

11.


12. (Guard)

13.

14.


15.


16. 5

17.

18.

.
.2

.................................................................................................................................................................
.................................................................................................................................................................
.................................................................................................................................................................
.................................................................................................................................................................
.................................................................................................................................................................
.................................................................................................................................................................
.................................................................................................................................................................
.................................................................................................................................................................
.................................................................................................................................................................
.................................................................................................................................................................
.................................................................................................................................................................
.................................................................................................................................................................
.................................................................................................................................................................
.................................................................................................................................................................
.................................................................................................................................................................
.................................................................................................................................................................
.................................................................................................................................................................
.................................................................................................................................................................
.................................................................................................................................................................
.................................................................................................................................................................
.................................................................................................................................................................
.................................................................................................................................................................
.................................................................................................................................................................
.................................................................................................................................................................
.................................................................................................................................................................
.................................................................................................................................................................
.................................................................................................................................................................
.................................................................................................................................................................
.................................................................................................................................................................
.................................................................................................................................................................
.................................................................................................................................................................
.................................................................................................................................................................
.................................................................................................................................................................
.................................................................................................................................................................
TAISEI (THAILAND) CO., LTD. SAFETY PLAN
9th. Floor, Thanapoom Tower 1550 New Petchaburi Road, Makkasan, Rachtavee, Bangkok 10410 DAILY CONTROL
Tel. (662) 207-0330 Fax : (662) 207-0332

(DAILY SAFETY CHECK LIST)


(Project) : Inspection No. : _________/_________
(Location) : Inspection Date : ______/______/______
(Inspection Area) :

(Inspection List) (Score) (Remark)


4 3 2 1 0
1.
1.1
1.2
1.3 -
1.4
1.5
2.
2.1 1 / 1,000 2
2.2
3.
3.1 (. 2)
3.2
3.3 /
3.4
4.
4.1 (. 1 . 2)
4.2 -, -
5.
5.1 2 .
5.2
5.3 ( 0.9 ~ 1.1 .)
6.
6.1 2
6.2 2
6.3
7.
7.1
7.2
7.3
7.4
7.5
: 4 = Excellent, 3 = Good, 2 = Fair,1 = Improve, 0 = Fail
/ 2

SP-DC-01
TAISEI (THAILAND) CO., LTD. SAFETY PLAN
9th. Floor, Grand Amarin Tower 1550 New Petchaburi Road, Makkasan, Rachtavee, Bangkok 10310 WEEKLY CONTROL
Tel. (662) 207-0330 Fax : (662) 207-0332

SAFETY PATROL IN CONSTRUCTION AREA


Project : Inspection No. :
Location : Inspection Date :
Inspection Area :

Inspection List Scores Remark


4 3 2 1 0
1. Construction and Working Area
1.1 Temporary Fence
1.2 Safety and Warning Sign Board
1.3 Entering Site Control
1.4 Cleaning, Arrangement Materials, and Scrap
1.5 Labour Camp
2. Electrical and Fire Protection
2.1 Temporary Electrical System
2.2 Temporary Electric Panel (1,000 m2 /panel)
2.3 Electric Wiring & Fixtures
2.4 Flamable Material Storage
2.5 Fire Extinguisher (Type,
( 1Set/1,000m2 @ 45m. , Not less than 1set/floor))
3. Scaffolding and Bracing
3.1 Installation of Scaffolding for Working Level Higher Than 2.00 m.
3.2 Type of Scaffolding, Bracing and Limit of Work
3.3 Stair, Walk Way, Hand Rail
3.4 Seizure of Scaffolding and Bracing
3.5. Take off Scaffolding and Bracing
4. Others
4.1 Working level higher than 4 m. must use safety belt.
4.2 Fenc or barricade at opening, Edge of Building with Sign Board.
4.3 Soil Slide Protection
4.4 Safety Net
4.5 Temporary Stair

Safety Officer : Project Manager :


Comment : Comment :

Remark : 4 = Excellent, 3 = Good, 2 = Fair,1 = Improve, 0 = Fail

SP WC 01
SP-WC-01
TAISEI (THAILAND) CO., LTD. SAFETY PLAN
9th. Floor, Thanapoom Tower 1550 New Petchaburi Road, Makkasan, Rachtavee, Bangkok 10410 WEEKLY CONTROL
Tel. (662) 207-0330 Fax : (662) 207-0332

SAFETY PATROL IN CONSTRUCTION AREA


(Project) : YAMAHA SAFETY RIDING ACADEMY Inspection No. : _________/_________
(Location) : Inspection Date : ______/______/______
(Inspection Area) :

(Inspection List) (Score) (Remark)


4 3 2 1 0
1.
1.1
1.2
1.3 -
1.4
1.5
2.
2.1
2.2 (1,000 2 / )
2.3 ()
2.4
2.5 (, 1/1,0002 @ 45. 1/)
3.
3.1 ( / / )
3.2
3.3 /
3.4
3.5
4.
4.1 2 .
4.2 ,
4.3 ( 0.9 ~ 1.1 .)
4.4
4.5
5.
5.1 4.
5.2 ,
5.3
5.4 (/)
5.5 -

. / . : :
: :

: 4 = Excellent, 3 = Good, 2 = Fair,1 = Improve, 0 = Fail


/ 2 (Corrective & Preventive Action Request)

SP-WC-01

You might also like