SK MINUTES OF MEETING
PLANNING
1.1
19-Nov-2016
1.2
Management
1.3
Ronald
19-Nov-2016
1.4
Spool Tracking need to be shared to all department Every Monday and Thursday. Add one column
for Site installation
Info
ENGINEERING
2.1
2 of 13
SK MINUTES OF MEETING
As-built Preparation to expedite and proceed in submission to PMT. Monitoring Log for As-Built
Preparation to be provided by engineering
Engineering
Info
2.2
Engineers also to highlights in MRS the materials that are not required for the project to avoid
collecting not needed materials Engineering pointed that they started marking the access
material as zero in the MRS
Info
2.4
TQ Status
Engineering
Info
2.12
Engineering
Follow up
2.14
Engineering to transmit IFC revisions to Document controller as soon as they are finished /
Document controller to distribute Revisions and Only Relevant documents to person in charge of
the project thru hard and soft copy immediately
Engineering
Document controller
Info
2.16
3 of 13
SK MINUTES OF MEETING
Engineering
Follow up
2.18
Engineering
Closed
2.19
Engineering
15-Dec-2016
3.1
Gilbert
6-Nov-2016
8-Nov-2016
10-Nov-2016
30-Nov-2016
3.3
Gilbert
On-Going
4 of 13
SK MINUTES OF MEETING
3.5
Push supplier to provide the missing documents for the received materials
INFO
3.7
Zahid to attend the daily meeting every day at 3:00 Pm Juymah meeting room
Zahid
INFO
3.12
Zahid
3.14
Zahid
22-Dec-2016
3.15
Procurement to provide Mechanical expansion bolt and bricks for burn pit in Ethane
Project Urgent
Zahid
25-Dec-2016
3.16
Procurement to provide isolation Kits for Ethane and CIS urgently Coordinate with
project engineers
Zahid
15-Dec-2016
3.17
5 of 13
SK MINUTES OF MEETING
E&I Cables for new projects Delivery to be expedited Follow up with head office on reason for
delay
Zahid
15-Dec-2016
3.18
Zahid
25-Dec-2016
3.19
Zahid
25-Dec-2016
4.1
Mirza/Neil
On-Going
4.2
Israel
Follow up
4.3
6 of 13
SK MINUTES OF MEETING
Israel
Follow up
4.4
To expedite the material collection for 546 721 724 725 outstanding Valves to be collected and
gasket
Israel
4.10
ISRAEL
16 Disposal
4.11
ISRAEL / BADER
New Projects
QUALITY CONTROL
7 of 13
SK MINUTES OF MEETING
5.3
Arnold
15-Dec-2016
5.6
QC
Follow up
5.7
QC to expedite test package preparation for 7 ops & Ethane & CIS
QC
25-Dec-2016
5.13
QC
22-Dec-2016
5.14
QC
Follow up
5.15
QC
22-Dec-2016
8 of 13
SK MINUTES OF MEETING
CONSTRUCTION:
6.1
Mechanical
6.2
Info
6.5
Construction to prepare for hydro testing in their areas 38 packages for 7 ops , 26 packages for
Ethane
Musa / Zghol
Info
6.6
E&I
6.7
PMT highlighted that the E&I work for ethane to complete the E&I activities to be finished before
Romeo
30-Nov-2016
6.8
9 of 13
SK MINUTES OF MEETING
Civil
6.9
Miqdad
GENERAL
8.1
Validity of testing equipment, Pressure Gauges; Reliefs; Air Compressor; Welding Machines is
common responsibility of the user to monitor and report to the concern authorities
Info
8.3
Omer / Husam
Info
8.4
Info
8.5
10 of 13
SK MINUTES OF MEETING
INFO
8.6
Zahid
Info
8.8
6-Nov-2016
16-Nov-2016
8-Dec
22-Dec-2016
8.9
One focal point of QC, Engineering , Material to attend weekly meeting every Sunday and
fabrication at 2:00 Pm
Info
8.10
Zahid
25-Dec-2016
8.11
11 of 13
SK MINUTES OF MEETING
8.12
Zahid
25-Dec-2016
8.13
Admin to follow up for recruited Man power for Coating from Philippines
By Mr. Jude
Admin
20-Dec-2016
Fabrication
9.1
Info
9.2
Ahmad Naji
Info
12 of 13
SK MINUTES OF MEETING
Signed by:
-------------------------------------------------
13 of 13