You are on page 1of 2

1.

The Feeder returns to the casting store Without no work


2.He feeds the Raw Material to a M/C Cell in a shift for 25 times
3.Depends on the Production Planning Schedule
4.Total Bin Capacity = 1400
5.Empty Bin Stays there and they take empty bin from the cell for which the raw material is neede
6.He Counts the Part and Drops into another pallet and he takes the rejected parts from the machin

7.Total Quantity of the casting moved by a feeder is 200


aw material is needed
parts from the machine cell and drops in the Scrap Area