You are on page 1of 35

Rethinking Manukau Station Road could take many forms.

Here are just a few options to illustrate the potential of


reallocating space to create high amenity, while continuing to
meet movement demands.

Hayman Park

Davies Ave

Osterley Way

Existing Potential option 1 Keep the median

Rainbow's End
Great South Road

Extent of the development sites


(orange) along the length of Manukau
Station Road

Potential option 2 Green the sides Potential option 3 Asymmetrical

116 117
Manukau
Station Road
(potential)

118
The components of this key 2. Developing new street patterns and
move can be summarised as: movement networks across the area
Summary The Wiri 1. Increasing housing supply to aid local connectivity.
neighbourhood, lying to the and choice in Wiri: 3. Consolidating open space on the Puhinui
south of State Highway 20, will with the progressive replacement of Stream and a new Wiri Wetland Domain
become a place where people 380 existing Housing New Zealand (see Key move one).

can live in healthy homes, in Corporation homes over time to create 4. Increasing community facilities, services
up to 1,180 new homes and amenities, with a focus on children
safe neighbourhoods with good and young people and potentially including
at least 350 new homes on
schools. The neighbourhood is the DHB site new leisure facilities.
bound together by the Puhinui
Key move three Stream. The SuperClinic is
at least 200 homes at the Panuku-
controlled Barrowcliffe site (which
These components are described
in more depth on the following pages.
also located here, and will be will be part of a planned urban
enlarged to include rehabilitation neighbourhood development forming
Developing the Wiri healthy part of Manukau Central)
services and amenities that
neighbourhood foster healthy living. 900 homes on the Pacific Gardens,
Great South Road special housing
area site.
Working in partnership to create healthy homes
and neighbourhoods in the Wiri neighbourhood
centred around the Puhinui Stream.

120 121
Context
The neighbourhoods of Wiri has significant The Housing New Zealand Corporation
potential for more homes, better amenities residential estates of Rt Vine, Inverell
The neighbourhoods of Wiri has and services, and improved socio-economic and Hoskens which together have the
significant potential for more prospects for its residents to become a potential to yield around 1,180 houses of
mixed-income healthy neighbourhood. different types and tenures (currently, the
homes, better amenities and majority of the houses are three-bedroom
services, and improved socio- Wiri has five defining features
units, while demand is for one and five
that support this move.
economic prospects for its plus bedrooms).
The Puhinui Stream which winds
residents to become a mixed- through the centre of the area, and
A 9 hectare special housing area called
income healthy neighbourhood. Pacific Gardens which it is proposed
provides an open space network with
will contain over 900 terraced and
significant potential to enable healthy
apartment homes.
lifestyles for residents and higher quality
development for surrounding sites. The area is also characterised by having
three schools, retirement villages and aged-
The Counties Manukau DHB SuperClinic
care facilities, a vacant site being developed
site much of this 49 hectare site is
by Panuku known as Barrowcliffe, four places
currently open grazing land, and the
of worship and a neighbourhood retail cluster.
DHB has plans to use it for a Living Well
Centre, to support its vision of healthy All of these features combined provide
communities, health services and people. a solid foundation to deliver a healthy
neighbourhood for Wiri, centred on the
The Vodafone Events Centre which
Puhinui Stream and defined by developments
hosts large events, has recently opened
on the DHB site and at the Vodafone
the associated Wero Whitewater Park
Events Centre.
and plans to develop a hotel, an outdoor
amphitheatre and a water-ski rope course.

122 123
Talbot Park
Housing New Zealand

Key move description


Increasing housing Stream, with new and improved pedestrian
supply and choice in Wiri connections from Manukau Central (via
Barrowcliffe Bridge) through the site and on,
The Wiri neighbourhood has a significant role further south, into the Inverell and Hoskens
to play in lifting the residential population of neighbourhoods.
the Transform Manukau area and increasing
housing choice. The existing Housing New The Pacific Gardens special housing area site,
Zealand Corporation stock in the area has located east of Great South Road and south
the potential, over time, to be progressively of the Vodafone Events Centre, has resource
replaced with homes that are fit for purpose consent and is likely to be a significant initial
and better support the neighbourhoods new source of housing in the area.
public spaces, including the Puhinui Stream Rt Vine should be redeveloped to
(i.e. front onto the stream rather than respond to the street pattern established
turn their backs on it). It is estimated that by the Pacific Gardens development, where
the current stock of 380 houses could be possible, to create a cohesive and integrated
increased to 1,180. urban form between the two areas.
Housing development is also possible on Cumulatively, these vacant or under-used
13 hectares of the DHBs land, following sites will, over 20 years, yield an array of new
public consultation in mid-2016. This land has housing options for the Transform Manukau
the potential to deliver at least 350 homes, area, complementing the high-rise apartment
alongside a new Puhinui Wetland Domain living that will develop in Manukau Central.
and a healthy living and rehabilitation care The desire is to create a mixed-income
extension to the SuperClinic. neighbourhood, with the current number of
Panuku has its own 5 hectare Barrowcliffe social houses being retained (as a minimum),
site at the northern gateway to Wiri from to be joined by both private market rate and
Manukau Central, which will be developed in affordable housing.
partnership with the New Zealand Housing To ensure the existing communities can
Foundation and iwi as a flagship medium- remain in place over the course of this
density housing scheme for affordable living. change, we will develop a careful strategy
The site will create a neighbourhood of at for developing vacant sites and re-homing
least 225 households alongside the Puhinui residents before redevelopment begins.

124
New street patterns and new public open space would merge into the
movement networks parkland and recreation facilities proposed
as part of the DHBs future rehabilitation and Key 2
The current street networks in Wiri reflect Living Well Centre development, enabling the
the fact that each subdivision was master- creation of a large integrated open space.
Potential development 1
planned in isolation. This has resulted in
poor overall connectivity. By applying Some existing open space in the area, Housing redevelopments
best practice urban planning and design, such as Inverell Park, is poorly located and
1 Trevor Hoskens neighbourhood
we will reconfigure old subdivision block configured. This space could potentially be 7
layouts over time as part of comprehensive incorporated in the adjoining school sites, 2 Inverell neighbourhood
redevelopment, to provide improved which will be under pressure to expand as a
3 Land recently released by DHB
connections, enhanced surveillance and consequence of residential growth.
4 Pacific Gardens
positive use of the streets.
Increasing community 5 Rt Vines
Focussing on the facilities, services and
Puhinui Stream and amenities with a focus on New open space 3 4
a new Wiri Wetland Domain children and young people 6 Proposed Wiri Wetland Domain
Provision of amenity open space in Wiri The DHBs proposed Living Well Centre 3
needs to be focused on the Puhinui Stream has the potential to include new sports Schools
(Key move one). In particular, all residents and recreation facilities that could serve 7 Wiri Central School 6
of the Wiri healthy neighbourhood should wider community needs and possibly
be within a five minute walk of useable be cross-funded with Auckland Council. 8 Manurewa High School
open space along the streams route. As the Other opportunities to provide additional
stream runs through the DHB site, there is community facilities in the area include Health developments
working with the Vodafone Events Centre
potential to develop a suburban-scale open
and its landholdings, and with the Ministry
9 Manukau SuperClinic 5
parkland domain on the site, making use of
the stream edges and land within the low- of Education in relation to the capacity of
lying flood-prone area. Furthermore, this local schools.

9
8

126
Learning and innovation are seen as Key components
a cornerstone of changing how the of the key move include:
Summary Learning and Transform Manukau area functions a Transform Manukau learning network,
innovation are seen as a empowering the local community to which at its simplest level, would involve
drive economic prosperity. The building
cornerstone of changing blocks are already there, with improving
closer collaborative working between
learning establishments, providing a
how the Transform Manukau early childhood education participation, complete learning pathway from early
area functions empowering and primary and secondary education childhood education through to further
performance, and a rapidly increasing
the local community to drive tertiary presence in the area. As a
education and training, and
onto employment
economic prosperity. consequence, educational attainment
the Southern Initiatives local enterprise
Key move four
is up, which bodes well for the future,
and will provide further impetus for the and innovation initiatives, including the
diversification of Manukaus economy. Makerhood, and Mori and Pasifika trades
and training programmes
Together with our partners, we will
Harnessing learning and innovation nurture this learning revolution, with the Manukau Innovation Neighbourhood,
as a means of engaging large-scale local
innovative teaching practices employed,
opportunities new pathways to work established employers to establish a collaborative
and innovation fostered. There will be network aimed at growing local
a particular focus on local community innovation and talent
Supporting Manukau as a hub for learning, creating and social enterprise, iwi and pasifika an integrated energy initiative,
enterprise, and growth sectors (health,
a business innovation network, championing energy food and environmental tech, and
to explore the potential for collective
local energy solutions
efficiency, and enabling the community to drive advanced manufacturing).
a multipurpose learning and
social and economic prosperity. innovation centre that would be
the physical manifestation of all the
preceding component.
a shift to innovative learning environments
in the area's schools, which prepare
children to play their part in the Manukau
of the future.

128 129
Context
Learning and innovation are pillars of initiatives, local economic development
The ability to engage in life- successful social and economic development. and innovation. Drawing upon Manukaus
The ability to engage in life-long learning, local characteristics can give learning and
long learning, be it through be it through formal education, skills-based innovation an edge and point of difference
formal education, skills-based or intergenerational learning, is personally when attracting and retaining talent.
or intergenerational learning, is satisfying, rewarding and gives people the
Education sector students, staff, graduates
ability to contribute to the wellbeing and
personally satisfying, rewarding prosperity of their family, community
and collaborators will need conducive urban
and gives people the ability environments to attract and sustain them.
and places.
This should include good quality public and
to contribute to the wellbeing Manukau has a significant education social spaces (including cafes, bookstores,
and prosperity of their family, presence through a number of early childcare bars, retail, groceries), efficient public
community and places. centres and schools, and tertiary learning transport, accommodation and
facilities provided by AUT, MIT and a range digital infrastructure.
of other tertiary providers (current roles for
Local part-time employment prospects
AUT and MIT are 1,540 and 3,500 equivalent
for students (e.g. retail and hospitality
full-time students respectively). After
sectors) will continue to be important,
2017, AUT and MIT will have the combined
as many students work while studying.
capacity to accommodate 9,000 students.
Strengthening transitions between
There is an opportunity to work with these learning institutions, and improving pathways
existing institutions to ensure they prosper, to work experience, apprenticeships and
contribute to civic life, and are supported by employment opportunities with local
local amenities and services. There are also businesses, after students have completed
opportunities for them to collaborate with their studies, is also important.
and draw upon local talent, and connect with
local businesses to craft tailored programmes
and services that can inspire grass roots

130 131
Key move description
This key move supports the presence The underlying principles for
Transform Manukau Ways this can be done include: The creation of an enterprise accelerator
and growth of all learning and education Key move four are: hub (as described below) can also be used
This key move supports providers. It recognises them as an learning network contributing to start-up funding
taking a place-based approach to learning for training and upskilling Mori and Pasifika
for a set time
the presence and growth important platform for driving innovation
and innovation, responding to the areas There is opportunity for the areas local trades training trainees and graduates
(social, science, digital, technological). schools, AUT, MIT and private training
of all learning and education It also seeks to explore how co-location,
skills base and local employment sectors supporting mentors to provide South who could then go on to find work on
establishments to establish further learning Aucklands growing social enterprise development sites within the Transform
providers. collaboration and partnership between maintaining an end-to-end approach, opportunities and networks with local network, and Mori and Pasifika small- Manukau area and South Auckland.
these groups and others organisations building awareness of a broader spectrum businesses, the health sector and industry. to medium-sized enterprises with
(such as Auckland Tourism, Events and of work pathways for Manukaus Embedding these educational institutions The Transform Manukau project could
technical, legal, accounting, marketing and
Economic Development, Counties Manukau young people (up to age 24) that more firmly in the community will strengthen contribute to the expansion of Mori and
communication services
DHB, the Southern Initiative, and Te Papa), they can realistically target, and reveal their ties to both the place and to the Pasifika trades training through:
grass-root community groups and local opportunities within the sectors, across a educational and economic future of its supporting the Makerhood initiative,
supporting a specialist team to support
entrepreneurs might unlock new, unforeseen more diverse range of vocations and job people. In the first instance, existing loose which is an example of how a culture
more recruitment and pastoral care for
possibilities that make the most of local opportunities relationships need to be formalised into a for creating and making can be started
trainees, and achieve more employment
talent and resources. network, which can then develop a strategy at the grass-roots level. The initiative is
formalising existing learning and for local people
for coordinated action. founded in the mind-set that only the
enterprise networks and creating a clear hood, can change the hood. As a result, having procurement policies that
platform for action it places importance on developing encourage contractors to use local
establishing clear performance targets,
The Southern Initiative creativity, problem-solving skills and an expertise, resources and people.
relating to lifting the learning and innovation local enterprise and entrepreneurial mind-set for locals.
potential of the area innovation initiatives Having access to meaningful and high-value
recognising that the learning journey The Southern Initiatives vision is that South employment opportunities, and being well
is continuous with a focus on formal Auckland will become the social enterprise equipped with the skills needed for the
education from ages 0 to 24 through early capital of New Zealand, and a leader in future, particularly as the nature of work
childhood education, school, tertiary and community-led economic development. changes, are essential to South Auckland
vocational training, followed by life-long Transform Manukau, along with the Southern transforming itself.
learning to strengthen work and life skills. Initiative, is working to support community- The Southern Initiatives Mori and Pasifika
Transitions are seamless and build on led enterprises (in particular, Mori and trades training scheme is a successful
linkages between educational providers. Pasifika whnau and small- to medium- programme that is already creating
sized enterprises) to access commercial employment pathways for its 260-plus
opportunities and industry networks that graduates. The scheme has the
would otherwise be unavailable to them. potential to scale-up significantly.

132 133
Manukau Innovation Integrated
Neighbourhood energy initiative
There are currently a number of Innovation in relation to sustainability The potential for this will be explored in detail
collaborative business networks established provides a significant prospect for Manukau through the Manukau Integrated Energy
in the Manukau area. These networks focus to be a national and global leader. An Initiative. The purpose of this initiative is to:
on various outcomes. One of these networks opportunity exists with regards to sustainable
bring together a coalition of partners who
is the Manukau Innovation Neighbourhood, energy production and management within
share an interest in an energy-efficient and
which includes a number of private-sector the Transform Manukau area. An integrated
low-carbon future, to progress the notion
organisations that operate in the broader energy approach looks beyond individual
that collective efforts may get us further
Manukau area and aim to work together buildings and sites, to instead consider
than individual efforts
to achieve common innovation outcomes districts within the Transform Manukau area
in Manukau focused around talent and (or the entire Transform Manukau area) in identify and implement opportunities that
social responsibility. terms of their energy efficiency and carbon leverage the collective strength of its
generation. An integrated energy system partners
The Transform Manukau project presents
across the 600 hectare Transform Manukau
an opportunity to engage with and support use the regeneration of Manukau as an
area could be developed through leading-
emerging networks such as this. opportunity to pilot new ideas and thinking
edge thinking that goes beyond the norm.
implement projects that will deliver energy
efficiency and low-carbon outcomes.

134 135
Multipurpose learning
and innovation centre
A multipurpose learning and innovation
centre could potentially represent a physical
manifestation of, and resource for, all of
the preceding components. The centre
could offer:
an enterprise acceleration hub, e.g. for
training, providing hot desks, co-working
and incubating start-ups
hands-on making, with a combination of
low and high technology that can be used
for youth development, and for providing a
maker or fabrication space
a learning resource centre for local
schools and institutes, thereby introducing
students to innovative and entrepreneurial
activities, as well as to local roles in growth
sectors that are often not considered as
career possibilities.
The Panuku-controlled land to the rear of the
MIT building presents one possible site for
such a facility, potentially in co-location with
Te Papa Manukau, an urban school and MIT-
related activity. Panuku has also identified
other non-residential sites in Manukau
Central that might be appropriate. We will
start work on developing a proof of concept
during 2017, with the potential business case
to follow.

136
Te Papa Manukau
(early concept)

138
The component parts of
Key move five can be summarised as:
Summary Manukau will
upgrading Great South Road as an
continue to be transformed important northsouth urban avenue
from a car-based centre to a delivering a mass-transit route from the
mixed-use, transit-oriented airport to Botany, via Manukau Central
development with better creating a comprehensive cycle network
connectivity to its surrounding making it easy, safe and attractive to
communities and multiple walk around Manukau.
movement options.
Key move five
Enhancing community connectivity
Enhancing community connectivity further
developing the public transport network, and
spreading a safe cycling and walking network, to
improve community connections, near and far.

140
Great South Road
as it runs through
Otahuhu

Context
Manukau emerged as a car-based centre in The historic urban spine
the 1970s, an era dominated by the private
Manukau emerged as a car- motor vehicle, which influenced the way we Great South Road is a key historic spine of
the south, with many South Auckland town
based centre in the 1970s, an moved through, planned, thought about and
centres having emerged and grown along its
era dominated by the private built our city.
length over time. It was formed, prior to the
motor vehicle, which influenced Due to the structure and impact of the road 1860s, as far as Drury and served as the main
and motorway network, Manukau has been link to the agricultural areas of the south. In
the way we moved through, developed with good regional accessibility 1862, as the prospect of war loomed in the
planned, thought about and for vehicles. However, this has been at the Waikato, work began to improve the road for
built our city. cost of being less accessible and attractive military purposes giving it a darker past.
for access by foot and cycle to and from the
immediate neighbouring communities. Manukau Central emerged out of farm
land between Manurewa and Papatoetoe.
However, it has never had a real address
on Great South Road. The first buildings
sat away from Great South Road, and since
then development has shied away from the
street, with car parks taking prominence.
This gives a sense of Manukau presenting its
back door to the historic spine of the south.
This is in stark contrast to the older town
centres along Great South Road, which front
the road, and provide active, vibrant, and
culturally rich main streets.

142
Eastwest mass-transit route Cycling
While Auckland continues its growth The role of cycling is increasing within The existing cycling infrastructure is
southwards, there has been significant Auckland. Cycling is one of the most efficient generally of poor quality. A mix of shared
growth both east and west of Manukau. ways for people to move over distances paths and unprotected cycle lanes on busy
To the west is Auckland Airport, a major between 2 and 12 kilometres. Providing safe roads does not provide sufficiently safe
destination and growing commercial base. cycle infrastructure can be cost effective, infrastructure to attract new users. Providing
To the east, there has been significant particularly if other works are occurring safe and connected infrastructure, working
growth in areas such as Botany, Flatbush in the corridor. Unlike public transport, with the community to overcome barriers
and Ormiston. such infrastructure has minimal ongoing to cycling, and providing education about
operational costs. cycling will be key factors in improving
Auckland Transport is undertaking early
cycling to and from Manukau Central.
investigations into a proposed mass-transit Much of the existing residential population
route (bus or light rail) that will provide a within the broader Manukau area live at a
connection between the airport and Botany, distance from Manukau Central that makes
and connect both to the southern rail walking impractical or less attractive. The
line, Manukau and the Auckland Manukau distances are often compounded by physical
Eastern Transport Initiative corridor. This barriers, such as a motorway or stream,
will significantly strengthen eastwest and psychological barriers, such as large
connections and enhance connectivity to block structures and a generally poor urban
and from Manukau in all directions. environment. However, the distances from
residential areas to the centre, or across
It is timely for Panuku to consider and
the centre, are well suited to trips by bike.
explore the benefits that this connection will
Also in favour of biking, is the generally
bring to Manukau, to help inform thinking
flat topography of the area, and the young
about the potential alignment of the route,
population (residential and student).
and maximise the development potential of
Manukau Central.

144 145
Key move description
Support the connectivity of Manukau Through progressive street improvements
Great South Road
(potential) to the communities of the south, creating (predominantly focused on the section
safe, attractive and abundant travel options between Cavendish Drive and Manukau
Multi-modal street,
in all directions. Station Road), Great South Road will become
designed for moving people
and as a business address more attractive; a desirable place to have a
Upgrading Great South Road business address, with buildings encouraged
to front the street. Great South Road will
Auckland Transport has undertaken long- also become part of the framing city avenues
term network planning for Great South for Manukau Central (see Goal two form:
Road. Great South Road will continue to organising ideas).
be a key transport spine for the south.
However, it has been recognised that the As Manukau Central expands and develops,
focus needs to be on effective movement Great South Road will become an inherent
of people, rather than solely vehicles. This part of the area, and provide a quality link
will see future improvements to the corridor to the Vodafone Events Centre and Wero
that are focused on ensuring multi-modal Whitewater Park. Rather than skirting around
connectivity, with a particular focus on Manukau, people will travel through Manukau
improving provision for pedestrians, cyclists Central along Great South Road, a city
Great South Road (now) and public transport users. avenue lined with trees and quality mixed-
use development. Manukau Central will then
Designed for moving cars have a prominence and presence on this
historic spine of the south.

146 147
Auckland CBD
40 minutes

Delivering a mass-transit route Ronwood Avenue more central speeds, lower volumes, less through traffic, Making it easy, safe and
and accessible to the heart of and well-located cycle parking). A street that attractive to walk
Key In the long-term, but ideally sooner, an Manukau Central is good for social and economic exchange will
Rail (existing) eastwest mass-transit route will provide a automatically be good for people on bikes. The challenges and barriers for walking
Otahuhu high-quality connection from the airport to Manukau Station Road proximity to the around Manukau have been raised through
Then we can radiate investment in cycle
Light rail/bus (proposed) Manukau Central and onwards to Botany. transport hub for transfers and close to many forums. A concerted effort is required
facilities out from the centre.
This connection will provide significant the heart of Manukau Central. to improve the environment for walking, as
Bus
improvements and options for the mobility This work is likely to integrate and coincide the most important travel mode.
Expanding cycle network Middlemore
with the Puhinui Stream project (see Key
of local communities and labour force. The Creating a comprehensive Investment to improve the walkability of
route may be either a bus-based or a light rail move one), to link the stream corridor to parks,
cycle network destinations such as the Auckland Botanic Manukau will be embedded in much of what
system. It is expected that its development
Papatoetoe Botany could be a catalyst for a new cycle of It is envisaged that cycling will be a more Gardens, schools, the Manukau SuperClinic, we do (e.g. through street upgrades and site
development within Manukau Central, prominent part in the local movement and Manukau Central. This will provide facilities developments outlined in Key move one, and
particularly if light rail is selected. While the network in the future. Cycling is seen for the widest range of activities recreation, the Puhinui Stream upgrade outlined in Key
planning is at early and preliminary stages, as a key aspect of improving movement utility cycling and commuting and for the full move two). In addition to this, Panuku will
Puhinui
options within Manukau Central are expected options, supporting healthy lifestyles, and range of abilities. work collaboratively with Auckland Transport
Airport to consider: improving the efficiency and environmental on a programme of minor improvements to
Investment will then potentially spread into supplement other investments.
performance of the transport network.
connectivity to key growth nodes and trip the streets that surround Manukau Central,
generators Panuku is partnering with Auckland Transport and link activities, to enable bikes to reduce This work will focus on improving
Manukau Central to promote Manukau as a key location for distances to key destinations like AUT and connectivity, attractiveness, ease and safety
integration with a connected network, e.g. significant investment through the next the SuperClinic. This could include streets for walking within the project area. This could
proximity of the existing train station and round of funding in the Urban Cycleways such as Great South Road, Ronwood include initiatives such as:
Homai bus interchange Programme. This could see a range of Avenue, Sharkey Street, Manukau Station making intersection improvements
efficiency of movement from east to west projects emerging from 2018 onwards. Such Road, Lambie Drive and Cavendish Drive.
funding (and the ensuing projects) would providing safe and convenient
Manurewa capacity of corridors to cater for the Infrastructure would include not only safe opportunities to cross streets
help support the efforts of Panuku, Auckland
network, taking into account both cycle facilities, but could also extend to
Transport and key government partners, filling in missing links
quantitative and qualitative capacity. providing a bike-share scheme around the
such as the Counties Manukau DHB and
study area, with stations in the centre near managing speeds across the project area
Te Mahia This could see some of the following Housing New Zealand, in their aspirations for
key transport hubs, shops, MIT, AUT, the
alignments within Manukau considered: healthy and connected communities. making safety improvements.
SuperClinic and other large employers.
Cavendish Drive may be a catalyst We envisage starting by making the streets
Supporting all this, will be education and
Takanini for growth and regeneration within the within the heart of Manukau Central safe
encouragement to get local people to see
northern part of Manukau Central for cycling, without the need for specific
cycling as a safe activity and an option for
infrastructure (measures may include lower
exercise and some trips.

148 149
Whanga wh:
Whakattakinga

Section four:
Delivery
This section describes how we will deliver
the Transform Manukau project. It provides a
high-level introduction to our delivery approach,
Wh 04
and outlines the broad delivery sequencing
for sites and projects. It will be further refined
through a detailed implementation plan.

151
Working in partnership Mana Whenua Crown entities For instance, working with multiple Crown
entities on shared projects will see a
There is also a great opportunity to create
and provide a new large suburban open
Ministry of Education is the leading
education provider in the project area
The partnership with Mana Whenua and public institutions
A critical part of achieving a holistic significant improvement to the housing space, the Wiri Wetland Domain (see Key and is interested in managing roll growth,
is unique and multi-faceted. Panuku, as the identified lead council agency stock, quality of life and health benefits for move three), within the flood-prone area of investigating new schooling provision
transformation for Manukau Central is
Panuku is a caretaker, or kaitiaki, and in the project, has in some cases strengthened residents in the Wiri area. This is only possible the DHB site. options, providing innovative learning
the integrated and collective effort of
developer of land on behalf of the Auckland and in others established new relationships with where development of the Crowns large, environments and strengthening
many partners; and in Manukau there are An additional DHB proposal, which is still in
Council. Tmaki Makaurau Mana Whenua are 13 Crown entities and two public institutions, but somewhat fractured, landholding is education pathways.
many. While this plan focuses on Panukus its concept stages, is for a Living Well Centre
the indigenous Mori population and kaitiaki during the Transform Manukau project planning amalgamated and planned with the council
activities, it also seeks to capture and bring as part of the healthcare facilitys expansion. Ministry of Business, Innovation
of their lands and waterways. phase and the formation of this framework and other key landholding agencies.
together a collective view to help guide This presents an opportunity for the council and Employment has a range of
planning document.
thinking across the area. Panuku acknowledges, through the principles A collaborative partnership with the to consider access to, and potentially a interests in the area, from stimulating
of Te Tiriti o Waitangi and the importance The Crown entities in Manukau represent council, through Panuku, could see housing partnership in, these future facilities. economic activity, increasing the rate
With the combined effort of our partners,
of whenua (land) and moana (including around 100 hectares of land within the intensification programmes by entities such of housing supply and improving social
the scope for achieving change in Manukau Finally, in the north-west of the DHB site,
waterways) to Mori, that our particular Transform Manukau area, and are key as Housing New Zealand Corporation and outcomes and energy initiatives; and is
is unprecedented in Auckland. the release for development of 13.1 hectares
relationship with Mana Whenua is one of partners and major contributors and the Ministry of Business Innovation and further represented by the Crown Land
investors in the overall Transform Manukau for housing will contribute strongly to the
partnership, i.e. in co-management and Employment provide greater housing supply Development Programme to help deliver
project, through their planned and proposed goals of this framework plan, in particular to
development of these essential taonga or and choice, at scale and at pace. By working housing in the project area.
developments and service delivery initiatives. Key move three, which relates to developing
treasures. collaboratively, these programmes will also
the Wiri healthy neighbourhood. This project New Zealand Transport Agency
The 13 entities and two public institutions all contribute to improving the urban form
Furthermore, Mana Whenua have a could also incorporate adjacent council land is a key stakeholder in enabling the area
support the broad content of the framework in Wiri, promoting safer neighbourhoods,
commercial interest in the development of at 58R Kerrs Road, and enable the Crown to grow into a vibrant family friendly
improving accessibility through the area, and
gerp s land. This may be through land ownership plan and its intent. They all generally support and council to work together to ensure community, as it is involved in transport
r o n the five key moves and Panukus proposed creating greater public amenity in existing
St er shi (via current treaty settlement negotiations)
development of the council sites in the and new spaces along the Puhinui Stream
and demonstrate good urban planning and
development outcomes.
investment, street improvements, mass
transit routes, safety and cycleway
n or as investors or developers of projects.
part manner outlined in this framework plan (i.e. corridor, as described in this framework plan.
programmes, and the motorway network
with a residential focus). The Crown entities that are currently
Another example is the collaborative (State Highways 1 and 20), and holds
involved in the Transform Manukau
master-planning process that is taking remnant property interests that may

r e ater tion Partnership with Crown entities, and


central government as a whole, could place for the development of the Crowns
project are listed below.
contribute to Transform Manukaus
g orma support greater alignment and integration largest landholding in the project area Treasury and State Services outcomes.
sf
tran for the project, which is vital to enabling a the 49 hectare Counties Manukau DHBs Commission leads cross-Crown entity
Ministry of Culture and Heritage
more ambitious scale and holistic project. SuperClinic site. This site presents a range of leadership, integration, coordination
is collaborating to support and progress
This collaboration is also critical in order opportunities, including an agreed subdivision and advice on delivering development
Te Papa Manukau in Manukau Central.
to achieve the ambition and multiply plan and urban planning layout, and agreed opportunities at scale and at pace.
the benefits of the Transform Manukau access arrangements to the Puhinui Stream
Framework Plans three goals and five and flood-prone areas.
key moves.

152 153
Te Papa Tongarewa has an opportunity The public institutions that are Auckland Council and council-controlled
to work together with Panuku, to evolve, currently involved in the Transform organisations
plan and design Te Papa Manukau National Manukau project are listed below. Within the council family, there are multiple
Cultural Centre in Manukau Central, and partnerships in place for planning, advocating
Auckland University of Technology
to potentially integrate the centre with and delivering the Transform Manukau
(AUT) supports Panuku to progress
Hayman Park. project (such as local boards, Auckland
investigations into the re-development of
New Zealand Trade and Enterprise the Manukau Sports Bowl. The university Transport, The Southern Initiative, parks
helps the project by advocating for is also a key advocate for increased department, Healthy Waters departments
hotels and short-stay accommodation in connectedness of its south campus to etc). Panuku will continue to work with the
Manukau and the project area. Manukau Central and its bus and train council family to coordinate our efforts and
stations, and for eastwest connections. expertise, and identify project synergies to
Government Property Group is the
Panuku and AUT are also exploring how maximise the benefits that can be achieved
delivery agency for the Crowns Auckland
to provide services and accommodation for the community.
Accommodation Project, which will
options for students, and use the power of
continue to consider Manukau Central
the student population to help invigorate The private sector
a key commercial office location for
Manukau Central. AUT is also interested in
government workers in the future. Private land owners and the development
being part of a wider energy initiative for
community have an essential role to play in
Ministry of Social Development the project area.
delivering this framework plan in relation to
could potentially work in partnership
Manukau Institute of Technology commercial sites. A partnership approach
with Panuku, the Southern Initiative and
(MIT) MITs Manukau Campus is a key enables parties to leverage off one another
Auckland Council to explore designing,
site fronting Hayman Park and above the to create the best sustainable outcomes.
supporting and operating a Manukau
train station. There is significant future
multipurpose learning and innovation
development potential in its 25 Davies
centre, like that delivered at the airport
Avenue site, and it is interested in working
(called ARA), to help improve socio-
with Panuku to further develop this site
economic wellbeing and to increase
in the context of both its Manukau and
Mori and Pasifika economic participation
tara campuses, in order to enhance the
through development projects.
student experience and develop its twin
Ministry of Pacific Peoples is campus strategy so that it aligns with this
currently exploring the feasibility and location framework plan.
of a Pacific Cultural Centre for Auckland.
One option could see it located within the
Transform Manukau project area.

154 155
Our approach to delivery Funding strategy
Panuku is a place-led and property-focused Overall priority in our decision-making The cost to Panuku and its partners in fully Transform Manukau area. Commercial return A detailed implementation plan will be
regeneration agency. While our resources are relating to delivery strategies for Panuku realising the framework plan is substantial. is one of the drivers behind the commercial developed in early 2017, building on this
Panuku is a place-led significant within the Transform Manukau development sites will be given as follows Investment in public good projects, large- sites that have been identified as potentially framework plan. The implementation plan
and property-focused area, they are also finite. (in order of importance). scale residential redevelopment and contributing to this framework plan. Panuku will provide the detailed business cases for
major transport initiatives, e.g. light rail, will aim to secure early wins on sites that the overall programme of site developments
regeneration agency. While our The scale of potential Panuku funding in 1. Contribution to delivering on the
will easily exceed $1 billion over the life of are ready for sale and development, and and projects, taking care to understand
resources are significant within Transform Manukau, via the realisation of residential-led strategy, i.e. preference
the framework plan. The following broad that are suitable for specific uses, such as the interdependencies that exist. The
land value across our sites, is estimated to be shall be given to residential use with the
the Transform Manukau area, worth up to $100 million over 10 to 15 years. overall density optimised (market and
funding strategy, to be further developed in residential development. This will help create implementation plan will be signed off by
the implementation plan, relates to priority momentum in the market and encourage Panukus board, before being presented to
they are also finite. Funds will be channelled into enabling public planning rules permitting).
projects over the next 10 to 15 years, further private-sector investment. Auckland Council.
good projects, including contributions to the
2. Maximisation of the realisation value of and includes:
public realm (streetscape and open space There are a number of additional funding
Panuku land, ensuring reinvestment in Total value analysis
upgrades, as well as general place activation reprioritisation of existing council budgets options available to Panuku for operational
public good projects is optimised.
initiatives) and social infrastructure projects, towards delivering the key moves and capital expenditure. These include TVA is a quantitative cost-benefit
and a range of soft socio-economic initiatives 3. Delivery of outcomes contained within the council long-term plan funds, Panuku assessment of the overall impact of
further funding requests through the
to be delivered by our partners, as outlined in Corporate Responsibility Framework and development and strategic development investments. It takes into account
2018 2028 long-term plan, including for
this framework plan. High-level Project Plan. funds, local board discretionary funds, and environmental, social, cultural and economic
both capital and consequential operational
Auckland Transport capital funds. effects which might lie outside normal
expenditure needs
Panuku will continually seek to partner with commercial costs and revenues.
release of funds from the sale of council
funding agencies to maximise efficiency and Panuku is required to deliver both
land funding forecast to be at least
improve outcomes for Manukau. commercial and strategic outcomes and to
$100 million
Panuku funding will always seek to leverage be transparent about balancing these when
potentially accessing funds arising making significant decisions on development
other public or private investment, with an
from the partnership approach with projects. TVA presents an opportunity to
expectation that the multiplier effect will be
Crown entities move beyond financial analysis and towards a
clearly evident in terms of outcomes.
leveraging private sector investment To this end, Panuku has developed a total consistent measure of the costs and broader
associated with Panuku projects and value analysis (TVA) tool for assessing the community benefits likely to be generated
opportunities. commercial and non-commercial outcomes from development projects.
(social, economic, environmental, cultural)
Commercial development opportunities
of proposed projects. TVA is explained in the
are important to create the level of capital
following text.
receipts needed for re-investment in the

156 157
CA
RR
Broad phasing of

UT
development activity

H
RD
Project area
PUHINUI RD REAGAN RD
BO Short term (03 years)
UN

PLUNKET AVE
DA Medium term (310 years)
RY
RD
SP
Long term (1025 years)
O
BO RTS
AUT WL

Our delivery programme CAVEN


DIS H DR TE IRIRANGI RD

RONWOOD AVE
Broad sequencing Medium-term (310 years): Manukau Long-term (1025 years): Public realm HAYMAN
Central will continue to build momentum upgrades across Manukau Central will PARK
Three broad delivery phases are expected with further public realm improvements. be nearing completion. The majority of MIT
over the life of the Transform Manukau Site developments will be well underway Panuku sites will be fully developed. The SOUTH
-WEST MANU
project. These phases recognise that the ER NM K AU STATION ROAD
or completed across the central area. redevelopment of the Manukau Sports OTO
RWA
project is made up of many different projects, Master-planning, with Westfield Manukau Bowl is complete. The private sector Y
sites and delivery agents, and contains City, for the malls car parks will be takes on the momentum of development, WIRI STATION RD
complex interdependencies. The three completed and staged development of consolidating retail and realising medium-
phases are as follows. this land will be underway, including the density residential opportunities. Great

G RE
DRUCES RD
HOBILL AVE
Short-term (03 years): Manukau progressive creation of a main street on South Road has been upgraded and is HNZ

AT S O U T
Central activity begins with place- Putney Way. Housing New Zealand will be moving more and more people by multiple EVENTS
CENTRE
making activities, the bus interchange, actively improving housing stock, creating modes. The new airport to Botany mass
HNZ

SOUTHERN
HR
associated public realm upgrades to a series of healthy neighbourhoods in Wiri. transit route is underway. The socio-

D
Putney Way and the staged delivery of The DHB SuperClinic site will be home economic fortunes of the area will be
to new housing developments, expanded much improved, sitting at least on a par KERRS RD
Hayman Park. Residential development
SHA
of the Barrowcliffe site will get health facilities and a new open space with the Auckland average on the

MOTORWAY
underway, along with early stages network, including the Wiri Wetland relevant indices.

DALGETY DR
of the special housing area (Pacific Domain. The upgrade of the Puhinui HNZ
Gardens). We will also make a start on Stream environs will be largely completed. CMDHB
an extensive engagement and upgrade The integrated development to the rear
programme for the Puhinui Stream. Sites of MIT will have been realised as a new
will become ready for marketing and hub for innovation, learning and cultural BROWNS RD ORAMS RD BOTANIC
sale within Manukau Central. The work celebration. The full masterplan for the GARDENS
of the Southern Initiative will be further Vodafone Events Centre and AUT will be
amplified, working in tandem with the realised, and the future of the Manukau
physical regeneration push. Sports Bowl is agreed. The cycle network
has extended from Manukau Central
and is nearing completion within the
project area.

158
7
4

MIT

Ro
HAYMAN

nw
PARK

oo
3

dA
Public realm projects

ve
MANUKAU
STATION

nu
e
Public realm projects include streetscape Short-term Long-term nue
s Ave
upgrades, Puhinui Stream improvements, proposed projects proposed projects Davie
(03 years) (10 years +)
2
the Barrowcliffe Bridge beautification project
and general place activation. Considerable 1 Putney Way stage 1 1 Putney Way stage 3
investment is required in the public realm to 1 4
create significant and immediate benefits, 2 Barrowcliffe Bridge 2 Amersham Way stage 2
and it needs to be timed to support 3 Hayman Park (playground) 3 Osterley Way stage 2 8 3
development of adjoining sites. COUNTIES MANUKAU

4 Barrowcliffe ponds 4 Osterley Way stage 3


POLICE STATION
3
The following are the proposed projects and
Way
MANUKAU 6
indicative phasing that fall out of the key 5 Puhinui Stream (programme initiation 5 Osterley Way stage 4 rley 6 6
PLAZA 5
Oste
moves. It is expected that these projects will: and stage 1) 2
6 Barrowcliffe link road
create the most benefit for 6 Minor works (Karoro Court, Manukau 7 Great South Road 1
existing and new communities Plaza, Manukau Station Road) 5 WESTFIELD
MANUKAU CITY

demonstrate change Medium-term MANUKAU

2 DISTRICT
1

CA

Ma
R
RU
align with development opportunities proposed projects COURT

TH
6

RD

nu
(310 years)

ka
PUHINUI RD REAGAN RD

align with our partners programmes

uS
PLUNKET AVE
BO

6
UN

1 Putney Way stage 2 DA


R

tat
Y
SP RD
O

combine over time to create a more


BO RTS
WL

io
AUT
CAVEND

Amersham Way stage 1

nR
2
ISH DR TE IRIRANGI RD

attractive place to live, work or visit.

oa
RONWOOD AVE

Osterley Way stage 1

d
3 RAINBOWS
HAYMAN
PARK

SOUTH
-WEST
ER N MANU
END
MOT K AU STATION ROAD
ORW
AY

4 Hayman Park (ponds) WIRI STATION RD

4
Karoro Court

G RE
DRUCES RD

5
HOBILL AVE

HNZ

AT S O U T
EVENTS
CENTRE

5
HNZ

HR

SOUTHERN
Manukau Plaza
D
6 KERRS RD

7
MOTORWAY
SHA

7 Cycling and walking network


DALGETY DR

HNZ

DHB

development and improvements


BROWNS RD ORAMS RD
a d
Ro
BOTANIC

Manukau Station Road


GARDENS

8 th
ou
tS
ea
Gr

160
Hayman Park
1

Ro
2

nw
oo
dA
ve
nu
e
Development opportunity sites
7
The market is a key driver for when we Through due diligence of the portfolio, Avenue
can develop sites. Establishing relationships proactive management and a robust Davies
and building confidence, particularly in the approach to project delivery, the aspirations Development opportunity sites 8

Pu
development industry, is seen as a key role of this framework plan can be achieved.

tne
1 MIT
3

yW
for Panuku to enable the transformation
In addition to readiness factors, the timing of 2 1 + 6 Manukau Station Road 4

ay
process to be achieved.
development for Panukus portfolio will be
This will involve Panuku exploring a range subject to a range of factors, including: 3 50 Manukau Station Road
10 9
of different types of sale and joint venture 4 59A Manukau Station Road
5
market readiness (for the type of
agreements with a variety of potential
developments desired) 5 59B Manukau Station Road
partners, which will take time to negotiate y
rley Wa
and get the project right. time to establish development agreements 6 Clist Crescent Oste
While Panukus portfolio of land within design and consenting processes 7 2 and 8 Davies Avenue 12
the Transform Manukau area comprises
alignment with our partners and 8 14 Davies Avenue
100 hectares, not all of this land is ready
their projects, including public 11 Westfield Manukau City
or suitable for development (the portfolio 9 9 Osterley Way ce
realm investments. Pla
cliffe
includes under-used recreation space and
10 Ktuku House Barrow

Ma
at-grade car parking). Furthermore, there

nu
are a number of commercial, contractual, 11 Westfield Manukau City

ka
occupation and ownership issues to be

uS
12 Civic block
overcome to enable the sites to be ready

tat
ion
for market. For reserve land, there are
Potential predominant

Ro
also public consultation processes to be
building uses:

ad
undertaken, before any land is released,
and the need to ensure that the land is not Residential Retail
still required for reserve purposes.
Hotel Education 6
Office Public building

ad
Ro
o uth
tS
ea
Gr
162 Rainbows End 163
The following table provides a simple Readiness Potential
summary of site readiness and an estimate Site Dependencies for market development
of potential development timing. Barrowcliffe Nominal Ready now Short
1 & 6 Manukau Station Road Nominal Ready now Medium
Readiness for market:
Lot 59B, 31-33 Manukau Subdivision post-bus-station Ready soon Short
ready now (available now, or Station Road (MSR) construction
within the next 12 months) Lot 59A, 31-33 Manukau Subdivision post-bus-station Ready soon Medium
ready soon (subject to some Station Road (MSR) construction
dependencies, available from 2018) 2 & 8 Davies Avenue To consider overall parking Ready soon Short
provision for centre
complex sites (range of multiple
dependencies, existing leases or other 50 Manukau Station Road To consider overall parking Ready soon Medium
investigations required). provision for centre
14 Davies Avenue To consider overall parking Ready soon Medium
Possible timing (potential provision for centre
development subject to market): 4 Osterley Way To consider overall parking Ready soon Medium
provision for centre
short (03 years)
Clist Crescent Short-term parking Ready soon Long
medium (37 years)
Manukau Sports Bowl Open space demand or Complex site Long
long (10+ years). requirements to be determined
58 R Kerrs Road Integration with DHB site Ready now Medium
development
Ktuku House Subject to civic extension Ready soon Medium
completion
Rainbow's End Continued use and NA NA
development by Rainbows End
Westfield Manukau City Long-term lease to Westfield Ready soon Medium
Manukau City
MIT site Lease to MIT Ready now Medium
Rationalisation (range of sites) Release additional sites To be confirmed To be confirmed

164 165
Site profiles and design principles
Site Key design principles Site Key design principles Site Key design principles Site Key design principles
Barrowcliffe Layout/building placement urban perimeter 1&6 Layout/building placement urban perimeter Lot 59B, Layout/building placement building to hold Lot 59A, Layout/building placement buildings placed
blocks (max. 60-80m wide) with strong street Manukau blocks, ground floor occupied frontage to MSR, 3133 common building line to back of pavement along 31-33 to provide primary (continuous) frontage to MSR
edges (max. 5m setback from back of footpath) Station Road internal courtyard spaces, max. 5m setback to Manukau Putney Way. Setback of up to 5m from back of Manukau with max. 3m setback to back of pavement.
to a common building line. (MSR) back of MSR footpath with possible 1m (max.) Station Road pavement on Osterley Way. Station Road Occupied ground floor frontage to MSR, Osterley
threshold for privacy. (MSR) (MSR) Way and Davies Avenue.
Bulk and massing min. 2 storeys with height Bulk and massing min. 5 storey.
generally placed to optimise views/edge of Bulk and massing min. 3 storeys height generally Bulk and massing min. 5 storeys height
Architectural expression/character strong
amenity pond and reserve. biased towards the southern edge to optimise views generally biased towards the MSR edge.
architectural expression on the Putney Way/
and State Highway 20 noise attenuation. Variable
Architectural expression/character variety Osterley Way intersection. Architectural expression/character special
roof line/height to create diversity in form.
of housing typologies and architectural treatment/ corner treatment on MSR/Davies Avenue and
Intensity min. 4,000sqm GFA.
material selection/colour palette. Architectural expression/character potential MSR/Osterley Way.
corner treatment on MSR. Differentiated building Land use commercial, residential or hotel uses.
Intensity min. 20,000sqm Gross Floor Area Intensity min. 5,000sqm GFA of commercial/
designs to provide variety and richness. Ground floor retail/food and beverage along the
(GFA)/200 residential units. residential.
Putney Way ground frontage.
Intensity min. 40,000sqm GFA.
Land use - residential townhouses Land use commercial, education, community,
Access single vehicle access/egress off
and apartments. Land use residential apartments (min. 400 hotel, student accommodation, car park building.
Osterley Way. Primary pedestrian entrance on
units) plus potential hotel site on the western
Access/street network access via Manukau Putney Way. Access/street network principal pedestrian
edge, commercial development on eastern edge of
Station Road and Barrowcliffe Place. Primary access/entrances to the development from MSR.
site and retail on ground floor along MSR. Possible Car parking max. 30 spaces concealed
street network fixed and to include water sensitive Vehicular access off Osterley Way.
shared parking building. from Putney Way with a strong preference for
design. Northsouth secondary streets preferred.
basement/undercroft parking and/or use of off- Car parking concealed from MSR either
All roads to incorporate tree planting. Access/street network principal pedestrian
site shared parking building. at-grade behind buildings or underground/
access/entrances to the development from
Car parking max. 1.5 car parks per unit as an undercroft. Possible car park building to the centre
MSR. Vehicular access off MSR (assume left in
average. Rear loaded, undercroft and courtyard of site shielded by other uses on Davies Avenue/
left out) and a further access point ideally on Wiri
parking preferred. Osterley Way.
Station Road.
Car parking max. one space per unit concealed
from the street behind buildings within the interior
courtyards as, a semi basement podium or at-
grade courtyards.

166 167
Site Key design principles Site Key design principles Site Key design principles Site Key design principles
2 Davies Layout/building placement infill (100 8 Davies Layout/building placement infill (100 percent 50 Manukau Layout/building placement perimeter block 14 Davies Layout/building placement large-scale
Avenue percent site coverage) single aspect development Avenue site coverage) development. All development with Station Road development fronting MSR and Wiri Station Road Avenue perimeter block infill developments creating a
wrapping around the north and west sides of the frontage hard to back of pavement. (MSR) (WSR) with internal courtyard space. Max. 5m new built edge to Davies Avenue and a perimeter
existing parking building. Continuous building line setback to back of MSR and WSR footpaths. lane alongside adjoining existing buildings. Building
Bulk and massing Point tower on the
to pack of pavement. frontage to back of footpath/lane edge.
Amersham Way/Davies Avenue intersection Bulk and massing min. 3 storeys height
Bulk and massing min. 9 storeys stepped on (min. 15 storeys, with lower level (min. 4 storeys) generally biased towards the southern edge for Bulk and massing bulk placed on Davies
the western and southern edges. development running along Amersham Way. views and State Highway 20 noise attenuation. Avenue (min. 9 storeys) to maximise Hayman Park
outlook. Min. 4 storeys on new perimeter lane in
Architectural expression/character corner Architectural expression/character corner Architectural expression/character potential
interior of the urban block.
treatment on MSR/Ronwood Avenue/Davies treatment/landmark element on intersection of corner treatment on MSR/WSR. Landmark
Avenue. Davies Avenue/Amersham Way. building opportunity fronting State Highway 20. Architectural expression/character
strong urban edge to Davies Avenue with rich
Intensity min. 10,000sqm GFA. Intensity min. 15,000sqm GFA. Intensity min. 10,000sqm GFA.
architectural expression (rhythm and texture)
Land use ground floor retail with residential Land use point tower ground floor retail with Land use commercial office space or hotel.
Intensity min. 25,000sqm GFA.
apartments or hotel above. residential apartments or hotel above. Amersham Occupied ground floor frontage to MSR.
Way with retail ground floor frontage and car Land use ground floor retail and food and
Access principal pedestrian entrance off Access principal pedestrian entrance off MSR.
parking or commercial above. beverage on Davies Avenue and east-west lane/s.
Davies Avenue. Vehicular access off Barrowcliffe Place and
Residential apartments above.
Access principal pedestrian entrance off potentially WSR.
Car parking no new spaces. Uses existing
Amersham Way and corner of point tower. Vehicle Access/street network predominantly east
parking building. Car parking max. 100 spaces concealed from
access off Amersham Way. west lane connections with multiple pedestrian
the street either at-grade behind buildings within
access points/entrances, including potential route
Car Parking Up to 180 spaces either the interior courtyards or underground (semi-
from Ktuku House. Vehicular access from new
underground or in upper floor car park building basement).
perimeter lane off Davies Avenue.
potentially tied into the existing.
Car parking max. 100 spaces concealed from
the street either on street (lane) or underground/
undercroft (semi-basement).

168 169
Site Key design principles Site Key design principles Site Key design principles
9 Osterley Layout/building placement infill development Clist Layout/building placement single commercial Ktuku Layout/building placement infill
Way (100 percent site coverage) with frontage hard to Crescent office block running along MSR boundary edge. House development/extension to Ktuku Houses Putney
back of pavement on Amersham Way and Putney Max. 5m setback to back of MSR footpath with (Putney Way Way frontage. No setback from back of pavement.
Way. possible 1m (max) threshold for privacy. infill)
Bulk and massing min. height 4 storeys.
Bulk and massing min. 4 storeys height with Bulk and Massing min. 4 storeys.
Architectural expression/character strong
possible set back at the 4th floor (plinth + tower)
Architectural expression/character architectural expression that supports the civic
off Putney Way, to support viewline down the
background building that reinforces the qualities of nature of Manukau Plaza.
street from the south.
the existing public buildings along MSR.
Intensity new build, min. 6,000sqm GFA.
Architectural expression/character corner
Intensity min. 4,000sqm GFA.
treatment required on Amersham/Putney Way Land use commercial or residential with ground
intersection. Land use commercial development with floor retail and food. Shared parking building
possible retail use at ground floor fronting MSR. possible.
Intensity min. 9,000sqm GFA.
Access principal pedestrian access/entrances Access pedestrian access off Putney Way
Land use residential apartments or commercial
to the development from MSR. Vehicular access with possible access from 14 Davies Avenue.
development with retail on ground floor along both
off Clist Cresecent. No vehicular access.
Amersham/Putney Ways.
Car parking at-grade staff car parking Car parking no on-site parking.
Access principal pedestrian access/entrances
concealed from MSR, possible visitor parking on
off Amersham/Putney Ways. Vehicular access off
eastern or western side of the building.
Putney Way.
Car parking max. 140 spaces either in
basement utilising level change or on the
upper floors.

170 171
Site Key Design Principles Site Key Design Principles
Westfield Layout/building placement urban perimeter blocks MIT site Layout/building placement development
Manukau with generally no setback from back of pavement. Max. over rail trench and at-grade car park with primary
City 15m setback on Great South Road (GSR). frontage to an extended Putney Way. Max. 12m
setback to back of MSR pavement but generally
Bulk and massing min. height generally 4 storeys
5m. No setback to Putney Way extension
with exception of standalone retail units with a min.
common building line required.
2 storeys equivalent. Height to be placed on primary
street network, i.e. Putney Way extension, GSR, MSR. Bulk and massing min. 5 storeys creating
Variation in roofline required. Potential for vertical point strong edge to both Putney Way and MSR.
tower development alongside predominately horizontal Variation in roof line to create an urban silhouette
building forms. as viewed from Hayman Park.
Architectural expression/character landmark Architectural expression/character
building opportunity on the corner of MSR/GSR. development to be differentiated through
Putney Way extension requires a rich urban grain/ architectural expression as a series of buildings
rhythm reflective of a main street condition. General adding variety and richness. Putney Way extension
need for variety in built form/architectural design viewline to be terminated to the west by a
and materials. landmark building that also addresses Cavendish
Drive/MSR intersection.
Intensity min. 80,000sqm GFA realised in
progressive stages. Intensity min. 45,000sqm GFA.
Land use mixed with target 20 percent retail, 30 Land use commercial office space, education,
percent commercial and 50 percent residential apartments public building, residential. Active (retail and
(target 500 units). Generally retail and food and beverage food and beverage) and/or occupied ground
at ground floor. Shared parking building possible. floor fronting to Putney Way. Occupied ground
floor frontage to MSR with potential threshold
Access multiple generally as per existing with greater
treatment for privacy.
emphasis given to Putney Way.
Access principal pedestrian entrance off Putney
Car parking concealed from the street either at-
Way. Vehicular access off MSR.
grade behind buildings within the interior of blocks,
underground/undercroft or in shared carparking Car parking Max. 250 spaces either
building/s. Limited short-stay on-street parking possible. underground or in a shared parking building. At-
Standalone retail units at-grade parking to rear or side. grade limited to drop off, VIP and disabled parking.

172 173
Te Aranga Mori
Design Principles
Te Aranga Mori Design Principles are a Te Aranga Mori Core Mori values
set of outcome-based principles, founded Design Principles are:
on intrinsic Mori cultural values, and designed Core Mori values underpin the application of
to provide practical guidance for enhancing mana the status of iwi and hap as Mana the outcome-oriented Te Aranga Mori Design
Mana Whenua presence, visibility and Whenua is recognised and respected Principles. The underpinning Mori values are:
participation in the design of the physical realm. whakapapa Mori names are celebrated rangatiratanga the right to exercise
The principles provide a clear process authority and self-determination within ones
tohu Mana Whenua significant sites and own iwi or hap realm
for positively engaging with Mana Whenua cultural landmarks are acknowledged
and shaping our built environment to kaitiakitanga managing and conserving the
acknowledge our status as a city and taiao the natural environment is protected, environment as part of a reciprocal relationship,
destination in the South Pacific. They foster restored and enhanced based on the Mori world view that we as
and guide culturally appropriate design mauri t environmental health is protected, humans are part of the natural world
processes and design responses that enhance maintained and enhanced
appreciation of both the natural landscape and manaakitanga the ethic of holistic
the built environment. mahi toi iwi/hap narratives are captured hospitality, whereby Mana Whenua have
and expressed creatively and appropriately inherited obligations to be the best hosts they
The principles are intended as a strategic can be. Manaakitanga informs place-making
foundation for design, that Mana Whenua ahik iwi/hap have a living and enduring and place activation, and supports safe people-
can adopt, customise and further develop in presence, and are secure and valued within centred sustainable outcomes for all people
response to their local context. The principles their rohe.
also provide other stakeholders and the design wairuatanga the immutable spiritual
A specific Transform Manukau Te Aranga Mori connection between people and their
community with a clearer picture of how Design framework will be developed over the
Mana Whenua are likely to view, value and environments
course of 2017, as a means of guiding the
wish to participate in the design and principles application on kotahitanga unity, cohesion and
development of the built environment within specific projects. collaboration
their ancestral rohe.
whanaungatanga a relationship through
Successful use of the principles is predicated shared experiences and working together,
on the development of high-quality durable which provides people with a sense of
relationships. belonging
mtauranga Mori and Mana Whenua
knowledge and understanding.

174 175
Monitoring and review
Panuku will continually review progress KPIs for Goal one KPIs for Goal two KPIs for Goal three
towards achieving the goals and outcomes
for Transform Manukau. Manukaus function in the Auckland Manukaus form and the way Manukaus people bring vibrancy
The following are the key performance region and for the people of the south the place touches the land and pride to the place
indicators (KPIs) for our three overarching Our goal: A strong, permanent residential 6. Diversity of visitors (age, ethnicity, Our goal: To have an urban and built form Our goal: To establish strong and 7. Percentage of visitors satisfied with
goals. The KPIs are not intended to be an population in Manukau Central, allowing it to income, origin). that is cohesive, walkable, human-scale, prosperous residential communities in the quality and variety of events in
exhaustive list, but seek to establish an function as a vibrant and connected quality high-quality, resilient and responsive to the Manukau Central and the surrounding area the centre.
appropriate range of representative measures 7. Percentage of Aucklanders surveyed
compact centre and place of manaakitanga, needs of residents and businesses and its that are actively engaged in and enjoy the
across a wide range of activities. These KPIs who visited the centre in the past year. 8. Percentage of local population regularly
with an emphasis on local as well as regional natural environment. benefits of living, working and celebrating in
relate to activities that Panuku controls or attending cultural events and activities
activities and identity, supported by new and 8. Gross floor area (square metres) of new a successful and culturally rich place.
has a strong influence over, or that are not in the centre.
revitalised adjoining healthy neighbourhoods. commercial space. KPIs
measured by others. KPIs 9. Number of people attending all place-
9. Number of workers and businesses. 1. Square metres of street and public realm
In addition to the measures below, Panuku KPIs making activities.
10. Number of residents. upgrades. 1. Percentage of local residents and
will collate and report on a much broader 1. Percentage of workers, residents and businesses that agree to a sense of
range of measures and statistical information. 11. Percentage of people who perceive 2. Linear metres of Puhinui Stream corridor
students using sustainable transport community and pride.
This will occur during projects, through KPIs Manukau as a great place. enhanced.
modes (walking, cycling, bus or train).
that others measure (e.g. members of the 2. Percentage of local residents and
12. Number of hospitality (food and 3. Percentage of visitors satisfied with
council family and our Crown partners), 2. Percentage of residents working or businesses satisfied with the quality of
beverage) outlets, and number that are quality of public spaces.
as well as other available information (e.g. studying in the area. the centre.
census information). Collectively, this will open beyond 5.30pm on weekdays and 4. Percentage of public spaces designed
3. Number of pedestrians increase and open in the weekend. 3. Percentage of local residents, businesses
provide a broad insight into the change that and constructed to meet universal design
people stay longer (public life survey to and visitors that perceive public spaces
is occurring over time, help inform decisions, standards.
provide baseline). are safe, during the day, and at night and
and allow us to adapt our thinking and 5. Linear metres of new or upgraded weekends.
activities as required. 4. Number of tertiary students learning in
cycleways.
the area (MIT/AUT). 4. Percentage satisfaction with community
In general, we will measure our KPIs every 6. Number of buildings that meet facilities and services.
three years (this timeframe may vary 5. Number of dwelling units (within
sustainability design standards.
depending on the type of measure, expected Manukau Central and the Transform 5. Reduction of incidences of crime
amount of change over time, and availability Manukau area). 7. Number of dwellings that meet reported within Manukau.
of information). Lifemark universal design standards.
6. Number of Mori initiatives implemented
8. Diversity of dwelling units or active (commercial, cultural,
(size, typology, price points, tenure). environmental).

176 177
Glossary

178
Mori word Definition Mori word Definition Mori word Definition
ahik the people who keep the home fiires maunga mountain, mount or peak. In the Auckland tohu literally means a sign, indicator, landmark,
burning. Not necessarily Mana Whenua of Council context, it also refers to the symbol, mark, signature or instruction.
that place. regions volcanic cones. toiora wellbeing and welfare.
awa river, stream or creek. mauri life force. waka traditionally, a canoe. In modern terms, a
hap a number of families related through a mauri t Te Aranga Mori Design Principle term vehicle used for transportation purposes
common ancestor section of a large used to refer to environmental health. Not or a receptacle to hold things.
kinship group. its literal meaning. whi tapu literally means sacred place. Includes burial
iwi a number of families related through a moana sea, ocean or large lake. grounds, and other places of cultural
common ancestor section of a large p Mori settlements or villages. significance.
kinship group. wairuatanga spirituality.
rangatiratanga authority made evident through a persons
kaitiakitanga guardianship, trusteeship. chiefly deeds towards others in the whakapapa genealogy and ancestral links tracing Mori
kotahitanga unity, togetherness, solidarity, working interest of hap and iwi. In the context to Io, Rangi and Papa etc.
collaboratively. of this document, the right to exercise whakatauk proverbial saying.
mahi toi arts, crafts. authority and self-determination within the
realms of ones own iwi/hap. whnau family, and in the modern sense a term
mana authority, status, prestige bestowed on used for a group of people who may not
one by others. rohe region, district or area. necessarily have any kinship ties.
Mana Whenua the people of the land who have mana taiao natural environment, nature or natural whanaungatanga relationships and kinship ties. In a modern
or customary authority their historical, world. context, a sense of affinity, association and
cultural and genealogical heritage is tangata whenua original, indigenous people of the land. affiliation with others.
attached to the land and sea. taonga a treasure, which can be either tangible or whenua land, country, earth, ground. Also placenta
manaakitanga hospitality, generosity. intangible. and afterbirth.
mataawaka Mori whose authority resides outside the te ao Mori literally means the Mori world; including
Auckland Council region. its language, processes and practices
mtauranga knowledge. based on the Mori belief system.

180 181
Contact
Panuku Development Auckland
PO Box 90343, Victoria Street West, Auckland 1142, New Zealand.
+64 9 336 8820
www.panuku.co.nz
facebook.com/DevelopmentAKL
transformmanukau@developmentauckland.co.nz

You might also like