Page No:

VINDAIR ENGINEERS PVT. LTD 1 of 3


Document No:
CONSTRUCTION SAFETY CHECKLIST

Date inspection conducted: Location:

Name(s) of those participating in this inspection:

INDICATE EITHER: A = Acceptable/Yes; U = Unacceptable/No; N/A = Not Applicable


PERSONAL PROTECTIVE EQUIPMENT EMERGENCY ITEMS
Safety glasses and/or goggles available + Emergency evacuation map posted near work
being used? area?
Protective eyewear use is specified in Emergency phone numbers posted and known
writing? by all?
Face shield available for bulk liquid tasks? Emergency eyewash and/or shower units
Grinding? accessible?
Hand protection used/worn as required? First aid kit available at work site?
Foot protection worn as required? First aid trained competent person available?
Hearing protection worn where required? BBP kit available/BBP trained individual on site?
Hard hats worn when falling object hazard is Fire extinguishers readily available (not
present? blocked)?
Supplies on hand for incidental chemical Fire extinguishers inspected monthly/yearly as
spills? needed?

ELECTRICAL SAFTEY ISSUES ELECTRICAL SAFETY ISSUES


GFCIs used for all portable electrical hand
tools? Strain relief integrity for cords and plugs in tact?
Extension cords rated for hard or extra hard For extension cords; hard usage cord includes
usage? three wire
(2 wire ribbon cord is unacceptable for
industrial usage)
Certified or listed equipment is used per Electrical cords inspected & have all prongs
manufacturer? intact?
Strain relief intact for all flexible cords & plug
Electrical panels are labeled appropriately? fittings?
Portable generators are grounded per NEC
Electrical panel knockouts are in place? requirements?
Light bulbs for illumination protected from Electric power tools are double insulated or
breakage? grounded?
CONSTRUCTION SAFETY & HEALTH
ISSUES CONSTRUCTION SAFETY & HEALTH ISSUES
Flammable liquids are in OSHA/FM metal safety
General housekeeping is neat and orderly? cans?
Flammable liquids storage containers labeled
MSDS openly available to all employees? properly?
Page No:
VINDAIR ENGINEERS PVT. LTD 2 of 3
Document No:
CONSTRUCTION SAFETY CHECKLIST

Concrete work? Silica dust training Fire extinguisher readily available, accessible +
documented for all? inspected?
All hazardous containers labeled Impact style air tools have safety clips or
appropriately? retainers on them?
Lockout/Tagout is being used for appropriate
tasks? Pneumatic power tools have hoses secured?
Hot work permits used for grinding, cutting, Compressed air used for cleaning limited to 30
welding? psi ?

INDICATE EITHER: A = Acceptable/Yes; U = Unacceptable/No; N/A = Not


Applicable
CONSTRUCTION SAFETY & HEALTH ISSUES CONSTRUCTION SAFETY & HEALTH ISSUES
Compressed gas cylinders stored secured + Wall openings + floor holes are covered or
upright? guarded?
Oxygen/acetylene torch units have flash back 100% fall protection in place above 6 feet in
arrestors? height?
Grinders (portable + stationary) have guards Employees operating lifts are trained on the
in place? equipment?
Stationary grinding wheel tool rest is 1/8 inch Fall protect. full body harness+ lanyard used
or less? at all times?
Stationary grinding wheel tongue guard is Excavation? Ladders used > 4 feet deep?
inch or less? Extend 3 feet?
Grinders are inspected, ring tested + free of Excavation? Protection from cave-ins for >5
defects? feet deep?
Safety glasses + face shield used for grinding Rebar caps used for protruding reinforced
tasks? steel posts?

CONSTRUCTION SAFETY & HEALTH ISSUES CONSTRUCTION SAFETY & HEALTH ISSUES
Ladders are safe and inspected as Portable circular saws equipped with protective
appropriate? guards?
Stair rails = reqd at 30 change in elevation
Unsafe hand tools are prohibited?
or 4 risers?
Stairs or ladder provided for access points > Impact tools, hammers kept free of
19 high? splinters/mushrooms?
Extension + straight ladders extend 3 beyond Wire rope used for lifting? Deterioration is
landing? absent?
Stepladder or commercial stepstool used for Web slings used for lifting? Deterioration is
high access? absent?
Page No:
VINDAIR ENGINEERS PVT. LTD 3 of 3
Document No:
CONSTRUCTION SAFETY CHECKLIST

Crane use? Written lift plan on file listing load


Step ladders are only used in open position?
capacities?
Scaffolding = guardrails used? Competent Hooks used for lifting have safety latch in
person on site? place?

CORRECTIVE ACTION PLAN


LIST ITEM, THE PERSON RESPONSIBLE AND EXPECTED COMPLETION DATE

PERSON (S) TO BE DONE


ACTION ITEM STATUS
RESPONSIBLE BY

Status column should be marked = either listed as open, in process, or closed

Signature of lead inspector: