S. Buildin Building Building Activity Description No g No.1 No.2 No.3 1 Sprinkler /Hose Reel G.I piping 2% 4% 2% 2 Below Ground HDPE piping 70% 70% 70% 3 FHC installation 0% 0% 0% 4 Sprinkler Installation 0% %4 0% 5 Fire Pump Installation & Testing 0% 0% 0% 6 Conduting works for Fire Alarm systems 50% 50% 50% 7 Cabling works for Fire Alarm systems 0% 10% 0%
MARCH (1st Week)
Activities Planned for the Week (01.03.17 to 08.03.17) S. Buildin Building Building Activity Description No g No.1 No.2 No.3 1 Sprinkler /Hose Reel G.I piping 10% 10% 10% 2 Below Ground HDPE piping 70% 70% 70% 3 FHC installation 0% 0% 0% 4 Sprinkler Installation 0% %4 0% 5 Fire Pump Installation & Testing 0% 0% 0% 6 Conduting works for Fire Alarm systems 70% 70% 70% 7 Cabling works for Fire Alarm systems 20% 20% 20%
MARCH (1st Week)
Activities Completed for the Week (01.03.17 to 08.03.17) S. Buildin Building Building Activity Description No g No.1 No.2 No.3 1 Sprinkler /Hose Reel G.I piping 8% 8% 8% 2 Below Ground HDPE piping 70% 70% 70% 3 FHC installation 0% 0% 0% 4 Sprinkler Installation 0% %4 0% 5 Fire Pump Installation & Testing 0% 0% 0% 6 Conduting works for Fire Alarm systems 60% 60% 60% 7 Cabling works for Fire Alarm systems 20% 20% 20% MARCH (2ND Week)
Activities Planned for the Week (09.03.17 to 16.03.17)
S. Buildin Building Building Activity Description No g No.1 No.2 No.3 1 Sprinkler /Hose Reel G.I piping 30% 30% 30% 2 Below Ground HDPE piping 70% 70% 70% 3 FHC installation 0% 0% 0% 4 Sprinkler Installation 0% %4 0% 5 Fire Pump Installation & Testing 0% 0% 0% 6 Conduting works for Fire Alarm systems 90% 90% 90% 7 Cabling works for Fire Alarm systems 30% 30% 30%
MARCH (2ND Week)
Activities Completed for the Week (09.03.17 to 16.03.17)
S. Buildin Building Building Activity Description No g No.1 No.2 No.3 1 Sprinkler /Hose Reel G.I piping 2 Below Ground HDPE piping 3 FHC installation 4 Sprinkler Installation 5 Fire Pump Installation & Testing 6 Conduting works for Fire Alarm systems 7 Cabling works for Fire Alarm systems