You are on page 1of 17

1

RENCANA ANGGARAN BIAYA


PROYEK : PERBAIKAN PENGOLAHAN AIR LIMBAH (STP) DILINGKUNGAN PERKANTORAN KEMHAN TW. III TA. 201
LOKASI : JL. MERDEKA BARAT 13-14 DAN JLN. TANAH ABANG TIMUR NO. 4-8 JAKARTA

NO. URAIAN PEKERJAAN VOL SAT

1 2 3 4

PEKERJAAN PEMELIHARAAN AIR LIMBAH (STP)


A PEMELIHARAAN STP GEDUNG A. YANI
I PEKERJAAN PEMELIHARAAN BAK INDUK STP
1 Pekerjaan Pembersihan 1 Lot
2 Pekerjaan penggantian oli blower 1 Lot
3 Pekerjaan chemikal 1 Lot
4 Pekerjaan foging 1 Lot

II PEKERJAAN PEMELIHARAAN BAK TRANSIT STP


a. (Bak transit penampungan air hujan)
1 Pekerjaan pembersihan bak transit 1 Lot
2 Pekerjaan pemeliharaan panel pompa transfer 1 Lot

b. (Bak transit penampungan Ged. S. Parman )


1 Pekerjaan pembersihan bak transit 1 Lot
2 Pekerjaan pemeliharaan panel pompa transfer 1 Set

III PEKERJAAN PERBAIKAN


1 Penggantian pompa transfer 1,5kw (celup) 1 Unit
bak transit Gedung S. Parman

B PEMELIHARAAN STP GEDUNG D.I. PANJAITAN


I PEKERJAAN PEMELIHARAAN BAK INDUK STP
1 Pekerjaan pembersihan 1 Lot
2 Pekerjaan penggantian oli blower 1 Lot
3 Pekerjaan chemical 1 Lot
4 Pekerjaan foging 1 Lot

II PEKERJAAN PEMELIHARAAN BAK TRANSIT STP


a (Bak Transit Masjid)
1 Pekerjaan pembersihan bak transit 1 Lot
2 Pekerjaan pemeliharaan panel pompa transfer 1 Lot

b (Bak transit Gedung D.I. Panjaian )


1 Pekerjaan pembersihan bak transit 1 Lot
2 Pekerjaan pemeliharaan panel pompa transfer 1 Lot

c (Bak transit Gedung Suprapto)


1 Pekerjaan pembersihan bak transit 1 Lot
2 Pekerjaan pemeliharaan panel pompa transfer 1 Lot
2

NO. URAIAN PEKERJAAN VOL SAT

1 2 3 4

III PEKERJAAN PERBAIKAN


1 Pekerjaan pengurasan limbah cair bak induk STP 1 lot
2 Pekerjaan pengurasan limbah padat bak induk STP 1 lot
3 Service air blower assy 1 Unit
4 Penggantian air diffuser 8 bh
5 Ganti motor air blower star delta 1 unit
Capacity : 4,5Kw/5Hp
RPM : 1.450
Volt : 220/380V
6 Pengecatan pipa header blower dan pompa outlet 1 unit
7 Penggantian gate valve 2 " 3 unit

C PEMELIHARAAN STP GEDUNG PIERRE TENDEAN


I PEKERJAAN PEMELIHARAAN BAK INDUK STP
1 Pekerjaan pembersihan 1 Lot
2 Pekerjaan penggantian oli blower 1 Lot
3 Pekerjaan chemical 1 Lot
4 Pekerjaan foging 1 Lot

II PEKRJAAN PEMELIHARAAN BAK TRANSIT STP


a (Bak transit Basement 2 Gedung Pierre tendean)
1 Pekerjaan pembersihan bak transit 1 Lot
2 Pekerjaan pemeliharaan panel pompa transfer 1 Lot

b (Bak transit Ruang kesehatan Ged. Pierre Tendean)


1 Pekerjaan pembersihan bak transit 1 Lot
2 Pekerjaan pemeliharaan panel pompa transfer 1 Lot

D PEMELIHARAAN STP GEDUNG A.H NASUTION


I PEKERJAAN PEMELIHARAAN BAK INDUK STP
1 Pekerjaan pembersihan 4 Bak
2 Pekerjaan penggantian oli blower 4 Unit
3 Pekerjaan chemical 4 Bak
4 Pekerjaan foging 4 Bak

II PEKERJAAN PERBAIKAN
1 Penggantian pompa transfer 1,5kw (celup) 2 Unit
2 Pekerjaan Rewirring panel system STP 2 Unit
3

NO. URAIAN PEKERJAAN VOL SAT

1 2 3 4

D PEKERJAAN LAIN-LAIN
1 Pekerjaan buang sampah limbah 12 Rit
2 pekerjaan pembersihan 1 Ls
4

PERKANTORAN KEMHAN TW. III TA. 2016


NO. 4-8 JAKARTA

HARGA SATUAN JUMLAH HARGA


Rp. Rp.
5 6

34,664,000.00 34,664,000.00 (1,000.00)


6,643,750.00 6,643,750.00 (1,250.00)
36,280,500.00 36,280,500.00 (109,500.00)
7,477,500.00 7,477,500.00 (22,500.00)
JUMLAH I 85,065,750.00

5,547,000.00 5,547,000.00 (3,000.00)


1,749,000.00 1,749,000.00 (1,000.00)
JUMLAH (a) 7,296,000.00
-
2,143,500.00 2,143,500.00 (6,500.00)
1,749,000.00 1,749,000.00 (1,000.00)
JUMLAH (b) 3,892,500.00
JUMLAH II 11,188,500.00

SUB TOTAL I + II 96,254,250.00

-
32,901,000.00 32,901,000.00 32,753,000.00
JUMLAH III 32,901,000.00
JASA 10% 3,290,100.00
SUB TOTAL III 36,191,100.00

JUMLAH A 132,445,350.00
-
-
-
41,262,500.00 41,262,500.00 (2,500.00)
8,200,000.00 8,200,000.00 (20,000.00)
41,385,000.00 41,385,000.00 (15,000.00)
11,500,000.00 11,500,000.00 (5,000.00)
JUMLAH I 102,347,500.00
-
-
-
5,547,000.00 5,547,000.00 (3,000.00)
1,296,000.00 1,296,000.00 (4,000.00)
JUMLAH a 6,843,000.00
-
-
2,143,500.00 2,143,500.00 (6,500.00)
1,296,000.00 1,296,000.00 (4,000.00)
JUMLAH b 3,439,500.00
-
-
2,143,500.00 2,143,500.00 (6,500.00)
1,296,000.00 1,296,000.00 (4,000.00)
5

HARGA SATUAN JUMLAH HARGA


Rp. Rp.
5 6

JUMLAH c 3,439,500.00
JUMLAH II 13,722,000.00

SUB TOTAL I + II 116,069,500.00

-
17,650,000.00 17,650,000.00 2,400,000.00
22,000,000.00 22,000,000.00 2,150,000.00
13,450,000.00 13,450,000.00
2,647,500.00 21,180,000.00 (2,500.00)
24,735,000.00 24,735,000.00 14,985,000.00

5,485,000.00 5,485,000.00 (2,015,000.00)


1,059,000.00 3,177,000.00 (11,441,000.00)
JUMLAH 107,677,000.00
JASA 10% 10,767,700.00
JUMLAH III 118,444,700.00

JUMLAH B 234,514,200.00
-
-
-
23,085,000.00 23,085,000.00 (15,000.00)
4,664,000.00 4,664,000.00 (1,000.00)
25,750,500.00 25,750,500.00 (49,500.00)
5,383,500.00 5,383,500.00 (16,500.00)
JUMLAH I 58,883,000.00
-
-
2,143,500.00 2,143,500.00 (6,500.00)
1,749,000.00 1,749,000.00 (1,000.00)
JUMLAH a 3,892,500.00
-
2,143,500.00 2,143,500.00 (6,500.00)
1,296,000.00 1,296,000.00 (4,000.00)
JUMLAH b 3,439,500.00
JUMLAH C 66,215,000.00
-
(1,350,000.00)
17,845,000.00 71,380,000.00 16,095,000.00
2,545,000.00 10,180,000.00
20,245,000.00 80,980,000.00
2,985,600.00 11,942,400.00
JUMLAH I 174,482,400.00 #VALUE!

32,901,000.00 65,802,000.00 32,901,000.00


5,348,500.00 10,697,000.00 4,598,500.00
JUMLAH II 76,499,000.00 #VALUE!
JASA 10% 7,649,900.00
SUB TOTAL II 84,148,900.00
233,471,074
JUMLAH D 258,631,300.00
6

HARGA SATUAN JUMLAH HARGA


Rp. Rp.
5 6

748,500.00 8,982,000.00
1,485,000.00 1,485,000.00
SUB TOTAL D 10,467,000.00
7

233,471,074
0.99700

34,665,000.00
6,645,000.00
36,390,000.00
7,500,000.00
JUMLAH I

5,550,000.00
1,750,000.00
JUMLAH (a)

2,150,000.00
1,750,000.00
JUMLAH (b)
JUMLAH II

SUB TOTAL I + II

148,000.00 233,471,074
JUMLAH III
JASA 10%
SUB TOTAL III

JUMLAH A

41,265,000.00
8,220,000.00
41,400,000.00
11,505,000.00
JUMLAH I

5,550,000.00
1,300,000.00
JUMLAH a

2,150,000.00
1,300,000.00
JUMLAH b

2,150,000.00
1,300,000.00
8

233,471,074
JUMLAH c
JUMLAH II

SUB TOTAL I + II

15,250,000.00
19,850,000.00

2,650,000.00
9,750,000.00

7,500,000.00
12,500,000.00
JUMLAH
JASA 10%
JUMLAH III

JUMLAH B

23,100,000.00
4,665,000.00
25,800,000.00
5,400,000.00
JUMLAH I

2,150,000.00
1,750,000.00
JUMLAH a

2,150,000.00
1,300,000.00
JUMLAH b
JUMLAH II

1,350,000.00
1,750,000.00
JUMLAH III
JASA 10%
JUMLAH III

JUMLAH C

750,000.00 750,000.00
1,632,000.00
JUMLAH D
9

233,471,074
REKAPITULASI
PROYEK : PERBAIKAN PENGOLAHAN AIR LIMBAH (STP) DILINGKUNGAN PERKANTORAN KEMHAN TW. III TA. 201
LOKASI : JL. MERDEKA BARAT 13-14 DAN JLN. TANAH ABANG TIMUR NO. 4-8 JAKARTA

A PEMELIHARAAN STP GEDUNG A. YANI

B PEMELIHARAAN STP GEDUNG PANJAITAN

C PEMELIHARAAN STP GEDUNG P. TENDEAN

D PEMELIHARAAN STP GEDUNG A.H NASUTION

D PEKERJAAN LAIN - LAIN

JUMLAH
PPN 10%
TOTAL
DIBULATKAN

TERBILANG : TUJUH RATUS TUJUH PULUH DUA JUTA LIMA RATUS RIBU RUPIAH

Jakarta, 2017

CV. MAJU JAYA

LINDA WIJAYA
Direktur
NTORAN KEMHAN TW. III TA. 2016

132,445,350.00

234,514,200.00

66,215,000.00

258,631,300.00

10,467,000.00
###
702,272,850.00
70,227,285.00 490,000,000.00 mj
772,500,135.00 490,600,000.00 cv.fajar ilham sentosa
772,500,000.00 490,900,000.00 cv indira pertiwi
491,400,000.00 cv. Dagizam sinar persada
RATUS RIBU RUPIAH
491,700,000.00 cv. Semanggijaya

Jakarta, 2017

CV. MAJU JAYA

LINDA WIJAYA
Direktur
JADWAL WAKTU PELAKSANAAN

PROYEK : PERBAIKAN PENGOLAHAN AIR LIMBAH (STP) DILINGKUNGAN PERKANTORAN KEMHAN TW. III TA. 2016
LOKASI : JL. MERDEKA BARAT 13-14 DAN JLN. TANAH ABANG TIMUR NO. 4-8 JAKARTA

BULAN KE - BULAN KE - BULAN KE -


NO. U R A I A N P E K E R J AA N I II III
1 2 3 4 5 6 7 8 9 10 11

A PEMELIHARAAN STP GEDUNG A. YANI ()() ()() ()() ()() ()() ()() ()() ()()

B PEMELIHARAAN STP GEDUNG PANJAITAN ()() ()() ()() ()() ()() ()() ()() ()() ()()

C PEMELIHARAAN STP GEDUNG P. TENDEAN ()() ()() ()() ()() ()() ()() ()() ()() ()()

D PEKERJAAN LAIN - LAIN ()() ()() ()() ()() ()()

Jakarta, 2017

CV. MAJU JAYA

LINDA WIJAYA
Direktur
N KE -
I Ket.
12
Jangka Waktu
()() Pelaksanaan 120
(Seratus Dua
Puluh )
()()

()()

Hari
Kalender
DAFTAR ALAT

PROYEK : PERBAIKAN PENGOLAHAN AIR LIMBAH (STP) DILINGKUNGAN PERKANTORAN KEMHAN TW.
TA. 2016
LOKASI : JL. MERDEKA BARAT 13-14 DAN JLN. TANAH ABANG TIMUR NO. 4-8 JAKARTA

NO. DAFTAR PERALATAN JUMLAH SAT

1 PERALATAN TUKANG MEKANIKAL 6 SET

2 PERALATAN TUKANG LISTRIK 5 SET

3 PERALATAN TUKANG PIPA 6 SET

4 PERALATAN K3 1 SET

5 WORKSHOP 1 LOT

6 MOBIL BAK 1 UNIT

Jakarta, 2017

CV. MAJU JAYA

LINDA WIJAYA
Direktur
N PERKANTORAN KEMHAN TW. III

8 JAKARTA

KET

MILIK SENDIRI

MILIK SENDIRI

MILIK SENDIRI

MILIK SENDIRI

MILIK SENDIRI

MILIK SENDIRI

, 2017

MAJU JAYA

DA WIJAYA
SPESIFIKASI MATERIAL

PROYEK : PERBAIKAN PENGOLAHAN AIR LIMBAH (STP) DILINGKUNGAN PERKANTORAN KEMHAN TW.
2016
LOKASI : JL. MERDEKA BARAT 13-14 DAN JLN. TANAH ABANG TIMUR NO. 4-8 JAKARTA

NO. NAMA MATRIAL/BAHAN MERK/TYPE


1 2 3

MATERIAL MEKANIKAL

1 Electroda WLC Omron/setara


2 pompa transfer 1,5 KW (celup) Ebara/setara
3 Pompa Submersible outlet 1,5 kw Ebara/setara
4 Check Valve Kitzh/setara
5 Gate valve Kitzh/setara
6 Exhaustfan KDK/setara

Jakarta, 2017

CV. MAJU JAYA

LINDA WIJAYA
Direktur
RKANTORAN KEMHAN TW. III TA.

8 JAKARTA

KETERANGAN.
4