Name of Project : Design Example 18.5, Page 561, Reinf concrete A.K.Jain
Given Data:
1 Grade of Steel Fe 415
2 Grade of Concrete M 15
C C
B B
X
A A
O
1 2 3 4
Details of Columns
Considering column A-1 as origin (O) Moment about X-axis Mx clockwise +ve
Moment about Y-axis My Anticlock -ve
Ix = 21.6 X 12.6 3
12
= 3600.68 m4
Iy = 12.6 X 21.6 3
12
= 10581.58 m4
A = 12.6 X 21.6
= 272.16 m2
P Myy Mxx
= + .x + .y
A Iy Ix
Corner C-4
6300.00 3000.00
C-4 = 48.87 + 10.8 + 6.3
10581.58 3600.68
= 48.87 + 6.430 + 5.249
= 60.547 KN/m2
Corner A-4
A-4 = 48.87 + 6.430 - 5.249
= 50.049 KN/m 2
Corner C-1
C-1 = 48.87 - 6.430 + 5.249
= 47.687 KN/m 2
Corner A-1
A-1 = 48.87 - 6.430 - 5.249
= 37.189 KN/m 2
Grid B-4
B-4 = 48.87 + 6.430 - 0.000
= 55.298 KN/m2
Grid B-1
B-1 = 48.87 - 6.430 - 0.000
= 42.438 KN/m2
Therefore ks = 1
c = 0.25 ck N/mm2
= 0.97 N/mm2
Hence,
Shear Strength of Concrete = 0.97 N/mm2
Vu 825000
Nominal Shear Stress v = =
bod 1407109
= 0.59 N/mm2
Vu 2250000
Nominal Shear Stress v = =
bod 2322996
= 0.97 N/mm2
v - c = 0.00 N/mm2
Hence Effective depth is O.K.
Therefore effective depth required = 819 mm
Adopt effective depth = 820 mm
Overall depth = 860 mm
Development Length :
0.87 y
Development length Ld =
4 bd
where, bd = 1.6 x 1.0 = 1.6
Therefore,
Ld = 56
For 20 mm bars (along X-direction)
Ld = 1120 mm
21.60
(Reinforcement Details)
DRAWING
21.60
(Reinforcement Details)