You are on page 1of 5

Doc. No.

: KG-COM-HSE-
Gujarat State Petroleum FR-006-REV 00
Corporation Limited Issued : 01/09/2015
Title : Job Safety Analysis

Department
: Mechanical

Activity:
Erection / removal of scaffolding (General)
Location:

Date :

Sr. Activity Potential Safe work Remar


No. Hazards & Practices/Control ks
Effects Measures
1 Shifting of Physical injury while Use appropriate PPE like hard
scaffolding shifting the material hats, gloves and goggles while
material / tools to shifting material from one
work place
place to another

Shift the materials via the


staircase and by using nylon
rope with Gin pulley to be
used for shifting of scaffolding
materials to higher elevation. if
scaffolding to be erected in
platforms

At a time only one person shall


use the staircase

Dont toss scaffolding material


from one place to another,
pass it by hand only

2 Erection of base Fall hazards Ensure contact of base plate


plates, standards, and platform should be flat.
ledgers and Dont use concrete blocks,
bracings.
barrels, boxes, loose bricks
etc. for support of scaffolds

Use safety harness throughout


the work and inspect the
safety harness condition
before starting of the job

Use safety harness throughout


the work and inspect the
safety harness condition
Doc. No. : KG-COM-HSE-
Gujarat State Petroleum FR-006-REV 00
Corporation Limited Issued : 01/09/2015
Title : Job Safety Analysis

before starting of the job

Proper use of safety harness to


be ensured

Inspect the condition of all


scaffolding pipes and fittings
and it shall meet the
requirements as mentioned in
the scaffolding SOP (KG-
COM-HSE-SOP-020 Rev 00)

Slip hazards Check for any rain water on the


working platform. In case of
any rain stop the work.

Material slippage / Hit Use hand gloves throughout the


hazards work. Check pipes and clamps
for any grease or oil before
using.

Use hand gloves throughout the


work. Check pipes and clamps
for any grease or oil before
using.

Barricade the area before


starting of the job

Dont toss scaffolding clamps or


tools, pass it by hand from one
person to another

Use hard hats, gloves and


goggles throughout the job to
protect from falling object like
tools and scaffolding material

3 Erection of Fall hazards Dont climb on bracings, use


scaffolding ladders to climb from one
platforms, rails and platform to another
ladders
Ensure 2 persons to assist
scaffolding while erecting
platforms

Temporary platform/Jali to be
installed during erection of
Doc. No. : KG-COM-HSE-
Gujarat State Petroleum FR-006-REV 00
Corporation Limited Issued : 01/09/2015
Title : Job Safety Analysis

scaffolding.

Temporary Ladder to be used


during erection of scaffolding.

Three Points contacts should be


maintained during erection of
scaffolding

Inspect for damage or missing


rungs of the ladder before use.

Use safety harness throughout


the work and inspect the
safety harness condition
before starting of the job

Ensure proper use of safety


harness

Dont lean or load on any hand


rail

Consider wind velocities while


erecting scaffolding. In case of
heavy winds, stop the work.

Slip hazards Check for any rain water on the


working platform. In case of
any rain, stop the work.

Ladder rungs shall be free from


grease, oil or mud to avoid slip
from the ladder

Material slippage / Hit Use hand gloves throughout the


hazards work. Check pipes and clamps
for any grease or oil before
using.

No person shall work below the


platform and ensure the
working area is barricaded.

Dont toss scaffolding clamps or


tools, pass it by hand from one
person to another

Use hard hats, gloves and


Doc. No. : KG-COM-HSE-
Gujarat State Petroleum FR-006-REV 00
Corporation Limited Issued : 01/09/2015
Title : Job Safety Analysis

goggles throughout the job to


protect from falling object like
tools and scaffolding material

Instability/collapse of Ensure base plates and


scaffolding standards properly supported.

Ensure proper tightness of all


scaffolding clamps

Height of scaffolding does not


exceed 3 times of base area
unless it is clamped to a
secure structure.

4 Removal of Collapse of Dismantle the scaffolding from


scaffolding scaffolding / Fall top to bottom.
Hazard
Dismantling shall be done level
by level. Two persons should
not work at a time in different
platforms

Use safety harness throughout


the work and inspect the
safety harness condition
before starting of the job

Ensure proper use of safety


harness

Dont lean or load on any hand


rail while dismantling of the
scaffolding

Consider wind velocities while


dismantling of scaffolding. In
case of heavy winds, stop the
work

Material slippage / Hit Use hand gloves throughout the


hazards work. Use rope / bag to shift
scaffolding material from top to
bottom.

No person shall work below the


platform and ensure the
working area is barricaded.
Doc. No. : KG-COM-HSE-
Gujarat State Petroleum FR-006-REV 00
Corporation Limited Issued : 01/09/2015
Title : Job Safety Analysis

Dont toss scaffolding clamps or


tools, pass it by hand from one
person to another

Use hard hats, gloves and


goggles throughout the job to
protect from falling object like
tools and scaffolding material

Slip hazards Check for any rain water on the


working platform. In case of
any rain, stop the work.

Do proper housekeeping and


ensure no scaffolding
pipes/clamps left near by the
work area

Above points have been discussed and conveyed to the crew / team members
of the task. It is verified that they understood the discussion points.
Name and Sign Name & Sign
Work In-charge (HOD)