BRISBANES FLOODSMART

FUTURE STRATEGY
2012-2031
2 |

OUR VISION:
Living with flooding in
our city we are safe,
confident, ready.

A MESSAGE FROM THE LORD MAYOR


CONTENTS
Brisbane is a thriving, world-class Following on from our commitments
city, enjoyed for its subtropical in Councils January 2011 Flood
Brisbanes flood story Page 4 climate. Like many cities in the Action Plan we have now developed
world, it is built on a river. It is Brisbanes FloodSmart Future
Our achievements Page 6
also close to Moreton Bay and has Strategy. This strategy will provide
Councils FloodSmart Future many creeks and tributaries running residents, industry and future business
Page 8
Strategy principles through our suburbs. with the confidence that Brisbane has
an integrated plan to respond to its
What is flood risk During the summer months severe
Page 9 flood risk and that it is OK to invest in
management? storms with heavy rainfall are
Brisbane. The strategy is leading the
common. These storms can result
way in ensuring sustainable planning,
in flooding from the Brisbane River,
Strategic Outcomes economic development and growth.
local creeks, storm surges along
How we will achieve our vision coastal areas and overland flow Council also plays a major role in
Strategic Outcome 1: flooding. While this is a natural part managing the impacts of disasters
A risk-based approach to Page 10 of our environment, I know that the within its boundaries. This strategy
flood management effect can be devastating for those will assist us all to be better
that have experienced it. prepared for and recover more
Strategic Outcome 2: quickly from flooding.
An integrated and Page 11 Managing and minimising the
adaptive approach impacts of flooding and responsive While much work has already been
disaster management have always done, together we can do more. Our
Strategic Outcome 3: been a priority for Brisbane City city is able and ready to move forward.
Page 12
Smart planning and building Council and our city. We have a window of opportunity to
improve our prosperity and wellbeing
Strategic Outcome 4: Continued investment in stormwater
and we want to do this in a way that
An educated and resilient Page 13 maintenance and new infrastructure,
takes into account our subtropical
community the completion of flood studies
environment. The FloodSmart Future
and creek models, early warning
Strategic Outcome 5: Strategy is a key document in assisting
alert systems, improved availability
World-class response Page 14 us to do this well.
and access to flood information
and recovery and a program to install backflow Together we can build a more
prevention devices across a number resilient city; a city that is safe,
Strategic Outcome 6:
of stormwater systems all assist with
Well-maintained and Page 15 confident and ready.
managing water on the ground.
improved structural assets
BRISBANES FLOODSMART FUTURE STRATEGY 2012-2031 | 3

Brisbane is a But we can be a city that lives well


thriving world-class with flooding.
city, enjoyed for its This means ensuring that flooding is expected, designed
subtropical climate. and planned for.
Like many cities around the It means adapting our built form to the natural movement of
world Brisbane has been built water. It means developing communities that are resilient to
on a floodplain. Flooding in weather extremes.
Brisbane is natural and part of
our environment. We also need to meet the challenges of the future.
Climate change and increasing development will require
adaptive approaches to flood risk management.

Walter Taylor Bridge, Indooroopilly

Our vision is for communities Our vision is for growing our Our vision is for connected and
on floodplains that are city and economy responsibly, engaged communities that are

safe confident ready


because they understand their in how we adapt for flooding.
level of flood risk and are taking to flooding.
action to manage it.
4 |

OUR FLOOD STORY

The Brisbane River is the major river There have been many river floods,
Brisbane was settled in the passing through the city. The city most notably the large floods in
includes the floodplains of 32 creeks 1893, 1974 and 2011. There has also
1800s and the core of the city
as well as the southern floodplain of been flooding in the various creeks,
was developed around the river the South Pine River. There are also waterways and overland flowpaths due
and the original port at South thousands of overland flow paths in the to intense shorter duration rainfall. It is
Brisbane. As Brisbane grew, other hilly areas of the city. certain that there will be major floods
parts of the Brisbane River and again in the future.
Brisbanes bayside suburbs are exposed
creek floodplains were developed. to flood risks from storm tides like the As a result of previous planning the
one experienced in 1974. This type majority of Brisbanes dwellings are not
of flooding can occur during cyclones located on floodplains. Furthermore,
which create large waves and high much of the flood-prone land in
winds driving water from Moreton Bay Brisbane is not developed. However, as
into properties. we saw in January 2011, flooding can
affect all of us.

Wynnum 1974 University of Queensland 1974


BRISBANES FLOODSMART FUTURE STRATEGY 2012-2031 | 5

Brisbane 1893

Council has been actively managing Since the January 2011 floods there As Brisbane grows, we will need to meet
Brisbanes flood risks for many years. have been a number of activities the challenges of increased development
There has been significant investment related to the flood and future flood and changes to our climate.
in flood and drainage infrastructure management. These include:
This strategy will assist business and
along with planning controls. Councils Flood Response Review industry to invest with confidence
Over recent years there has been a Queensland Floods knowing the right development is in
change in the way we manage flood Commission of Inquiry the right place. The strategy will also
risks. We are now striving for a more enable business and industry to better
coordinated approach between Councils Flood Action Plan understand their flood risk and develop
planners, emergency services, state strategies to reduce the impact of
The FloodSmart Future Strategy
and federal governments and, most flooding when it occurs. Brisbanes
2012-2031 works with these documents
importantly, the community. residents will be equally informed of
and together will act as an over-arching
their flood risk so they can build or buy
strategy to meet the challenge of
with confidence.
managing floods in Brisbane.

Brisbane City 1974 Coronation Drive, Milton 2011


6 |

OUR ACHIEVEMENTS:
WHAT WE HAVE ALREADY DONE

Lord Mayors Taskforce on Suburban Flooding


In February 2005, the Lord Mayor and Civic Cabinet established the Lord Mayors Taskforce
on Suburban Flooding to look at all possible ways of reducing the impacts of creek flooding.
The taskforce provided professional recommendations on how to minimise the impact that
significant rain can cause in flood-prone areas. Council has been implementing the taskforce
report recommendations with a massive funding commitment of $292 million over six years.

Flood Flag Map


The Flood Flag Map, incorporating overland flow, was introduced to Councils website in
2009. The map indicates Brisbane areas that are at risk of flooding from river, creek, storm
tide or overland flow paths. Over 150,000 flood flag maps were downloaded in 2011.
The maps are free and available on Councils website or by contacting Council directly.

Early Warning Alert Service


Council provides Brisbane residents with a free severe weather alert that includes notice of severe
thunderstorms, destructive winds and potential flooding. The alerts are location-based, so residents
only receive warnings if their registered residential address may be impacted. Alerts are sent by email
and can also be sent by SMS and a recorded message to a nominated landline.
Visit www.brisbane.qld.gov.au/earlywarning to register for email, home phone or SMS updates
in case of an emergency.

Brisbane community response to the January 2011 flood


Brisbanes volunteer response to support those affected by the January 2011 floods was
a truly amazing example of the citys spirit. The Mud Army, as these volunteers became
known, was remarkable not only for the assistance given to flood victims but also for the
civic spirit it inspired.
Council developed a volunteer management strategy and established a capability for
registering, equipping and deploying volunteers to where support was most needed.
The volunteers assisted households and business owners with debris removal and
cleanup. Councils call for assistance was also answered by many volunteers who did not
register. It is thought that, in all, there were between 50,000 and 60,000 volunteers who
assisted over the first weekend after the flood.
BRISBANES FLOODSMART FUTURE STRATEGY 2012-2031 | 7

Victoria Bridge, Brisbane City

Voluntary Home Purchase Scheme


The first key action of the Lord Mayors taskforce report was to acquire, through voluntary
purchase, homes affected by creek or local flooding that have a 50% chance of occurring
each year. The scheme commenced in 2006, offering an opportunity for those affected to
remove their families from flood risks, while also contributing to the restoration of natural
waterways. As of June 2012, 73 properties have been purchased under the scheme.

Backflow prevention devices


During the January 2011 flood, some parts of Brisbane were affected by water which came up
from the river through the drainage networks and into our streets. This is known as backflow
flooding. A backflow prevention device is designed so that water flows in one direction only
through piped stormwater systems and minimises water flowing back up stormwater pipes.
Based on extensive investigations carried out by engineers, 11 stormwater systems have been
identified where these devices will reduce the risk of flooding. These have been progressed to
detailed design and planning stages and will cost $10 million over the coming four years.

FloodWise Property Report


Brisbane City Councils free FloodWise Property Report lists the risk and type of flooding
at a specific property, and indicates how high the water may reach. The flood information
provided in the FloodWise Property Report is sourced from Council flood studies and
models undertaken for the river and our major creeks and waterways. FloodWise property
reports have been available to download from Councils website since 2008; to date, over
one million reports have been generated.

Brisbane Ready for Summer campaign


During the summer months severe storms with hail, damaging winds and heavy rainfall
are common in Brisbane. These storms can result in flooding from the Brisbane River, local
creeks, storm surges along coastal areas and overland flow flooding.
At the start of summer, Council launches a campaign to raise the awareness of the effect of
summer storms. Residents are provided with advice on how to minimise the risks to people
and property.
8 |

OUR SHARED PRINCIPLES:


WHAT WE BELIEVE IN

Brisbanes FloodSmart Future Strategy is based on four principles


stating our key beliefs. These shared principles will help us achieve our
vision by shaping our approach to delivering the strategic outcomes.
Council will direct and prioritise efforts with these principles in mind.

1974 flood marker, City Botanic Gardens

i ii iii iv
Protecting peoples lives, Balancing social, economic A long-term perspective Integrated use of the
property and wellbeing and environmental of flooding provides flood risk management
is a key priority. objectives promotes the both a consistent tools and working
responsible development direction and together with the
Community safety and
of the city appropriate to flexibility to adapt to community and agencies
wellbeing will always be
the risk of flooding. emerging hazards and will achieve optimal
the number one priority.
opportunities. outcomes.
We need floodplains for a
whole range of reasons, so We need to keep a Using the right flood
we need to achieve a balance long-term view, learning management tools in the
in managing these areas. from our experiences of right place produces the best
Economic growth is key to flooding and preparing outcomes. Living with floods
Brisbanes future and that for the challenges and is everyones responsibility;
growth needs to be based opportunities of the future. we will achieve the best
on innovative planning and outcomes when we are all
sound flood risk management involved Council, all other
to protect the investment in levels of government,
future development. residents, businesses,
community groups and
We are confident that smart
non-government
growth can contribute to
organisations all working
good outcomes.
together to build our
understanding and resilience.
BRISBANES FLOODSMART FUTURE STRATEGY 2012-2031 | 9

WHAT IS
FLOOD RISK MANAGEMENT?

Indooroopilly 2011

Everyone accepts that for land How flood management tools relate to disaster management phases
that experiences frequent
and fast-flowing flooding, Phase
a golf course would be a Prevent Prepare Respond Recover
more appropriate use than a
Flood mitigation
nursing home. This involves infrastructure
an assessment of flood risk.
Flood risk is understood as the Land use planning &
development control
combination of the likelihood
Tool

and the consequences of


Flood awareness &
flooding. In the example above,
information
the likelihood is the same but the
consequences are very different. Flood emergency
management
Flood risk needs to be considered
for the full range of floods that are
possible at a particular location.
If decisions about land use and KEY Strong interaction Moderate interaction Some interaction Little or no interaction

building design are based only on


consequences in the one per cent
annual chance flood event, the flood
A series of large floods in the 1970s This is consistent with best practice
risk is not fully understood and poor
resulted in a change to land use planning disaster management which takes a
outcomes may result.
as a means of controlling developments comprehensive approach across four
Flood risk management involves on floodplains. The 1990s saw a focus phases: prevention, preparedness,
assessing and managing flood risks on flood emergency management and response and recovery. The linkages
to reduce the impacts on people more recently there has been a focus between the four flood management
and property. Up to the 1970s, flood on providing flood information. tools and the four disaster management
mitigation infrastructure (e.g. dams, phases are shown above.
Now it is recognised that best practice
levees, channel modifications) was
flood risk management requires the
the main way of managing flood risks
coordinated integration of all these
in Australia.
management tools.
10 |

STRATEGIC OUTCOMES:
HOW WE WILL ACHIEVE OUR VISION

1 STRATEGIC OUTCOME 1:
A RISK-BASED APPROACH TO FLOOD MANAGEMENT

Adopting a risk-based approach


to managing flooding, by
much attention was placed on a singular
flood event such as the one per cent
Our approach:
Incorporate risk-based considerations
annual chance flood event. A risk-based
understanding the behaviour and into any new planning policies,
approach ensures that we consider schemes and plans, including
consequences of flooding across peoples safety and develop our city
the full range of probabilities. the implications of rare but very
responsibly, for every potential flood damaging floods.
A risk-based approach considers the scenario. It also offers more flexibility
and helps to weigh up the merits of Ensure flood emergency plans
likelihood and impacts of the full range
various flood risk reduction options. consider the appropriate responses
of floods at a location. In the past too
for all magnitudes of flooding.
Develop guidelines to facilitate
consistent approaches to flood
risk assessment to allow better
comparison of various flood risk
Land use planning reduction options across our
and development catchments.
control
Incorporate risk-based considerations
(including the implications of flooding
higher than the designed flow)
into the design of all infrastructure
Flood Flood
awareness and Flood risk management emergency located in the floodplain, including
information management urban drainage design.
Gather, collate and provide
comprehensive flood information,
including flood behaviour, for the full
range of flood events.
Flood mitigation
infrastructure

Flood risk management tools


BRISBANES FLOODSMART FUTURE STRATEGY 2012-2031 | 11

2
Bowies Flat Wetland, Coorparoo

STRATEGIC OUTCOME 2:
AN INTEGRATED AND ADAPTIVE APPROACH

Implementing integrated and The future holds a number of Contribute to flood studies and
adaptive approaches to total opportunities for Brisbane to integrate the development of floodplain
flood management within a wider management plans for the Brisbane
water cycle management, approach to water cycle management River catchment.
including flooding. that ensures that water availability, Consult with a wide range of
waterway health, our environment and stakeholders when developing
the liveability of our city are improved. any new flood planning policy.
There are opportunities for improved Consider the full suite of flood risk
cooperation and collaboration between management tools in developing
all involved in flood risk management, all flood risk assessments and plans.
including all levels of government,
non-governmental organisations and Assess flood mitigation infrastructure
Brisbanes businesses and residents. on a whole-of-catchment basis
and as part of the suite of flood risk
There are also emerging opportunities management tools.
including new technologies and
Partner with communities to build
modes of communication which will
a sense of place and flood readiness
Water sensitive urban design at Hellawell Road, enhance our ability to prepare and
Sunnybank in our homes, neighbourhoods,
respond to flooding.
catchments and city.
Our approach: Foster networks between engineers,
Develop floodplain management planners, emergency services and
plans for creek catchments that are state and federal governments to
consistent with citywide initiatives. ensure a coordinated and consistent
These will form the foundation for approach to flood risk management.
local application and encourage Consider the implications of a
planning and use of the floodplain as changing climate in all forward
a valuable and sustainable resource planning activities.
capable of multiple uses of benefit
to the community. Take advantage of new
technologies and communication
modes to help communities prepare
for and respond to flooding.
12 |

3 STRATEGIC OUTCOME 3:
SMART PLANNING AND BUILDING

Shaping the citys built Our approach:


form to increase our resilience Locate the right land use in the
to flooding. right place by considering how
development can be designed and
There is a lot of potential to shape sited to tolerate natural hazards for
our city in a way that adapts to the the full range of flood events.
movement of floodwater and increases
our capacity to live with flooding. Locate new growth areas where
This involves smart land use planning there are few flood constraints or
and smart building design. Applying where the effects of flooding can be
these approaches is easiest for new managed.
development. But we can also achieve Ensure new development is designed
significant gains through innovative and constructed to be more resilient
redevelopment of existing areas. to flooding.
Plan now for rising sea levels, bigger
storm tides and heavier rainfalls
associated with our changing climate.
Maximise the efficiency of the
citys disaster response capability
by planning for the movement of Bowies Flat Wetland, Coorparoo
emergency workers, evacuees and
supplies around the city during
floods through improvements
to major road networks and the
location of key land uses.
BRISBANES FLOODSMART FUTURE STRATEGY 2012-2031 | 13

4
Brisbane River CBD

STRATEGIC OUTCOME 4:
AN EDUCATED AND RESILIENT COMMUNITY

Promoting community Our approach:


understanding of flooding to Help residents and businesses to be
promote readiness. resilient and prepare for flooding by
providing simple, accessible and
An educated and involved floodplain fit-for-purpose flood information
community is a prepared and resilient that builds awareness of flood risk
community. This is why promoting and links risk to action.
community interest and understanding
of flooding is so important. As people Promote awareness of the extremes
living and working on floodplains, of weather we can expect living in
we need to know how we could be a subtropical city. From year to year
affected by flooding and what we can we may experience severe weather,
do to minimise a floods impacts on floods, droughts and storms.
our homes and businesses. We need to Encourage households in flood
remember that despite sometimes long affected areas to better prepare
spells of drought, we need to be well for and respond to flood events
prepared for floods. by developing household
emergency plans.
Encourage businesses in flood
affected areas to better prepare
for and respond to flood events by
preparing business continuity plans.
14 |

5 STRATEGIC OUTCOME 5:
WORLD-CLASS RESPONSE AND RECOVERY

Our approach: Maintain and continuously enhance


Councils workforce capability
Development of an All Hazards
Disaster Management Strategy by providing training and routine
(including flooding) to provide exercises.
Council with a strategic direction and Maintain and enhance Councils
intent to managing disaster events. Disaster Recovery Plan using an
Comply with legislative requirements all hazards approach.
by annually reviewing, maintaining Maintain and enhance solid
and amending Councils Disaster and enduring relationships with
Management Plan and related emergency management agencies
sub-plans and standard operating and not-for-profit organisations for
procedures, using a comprehensive consistent and open communication
approach and the principles of and collaboration.
Further develop our capacity prevention, preparedness, response
to respond to and recover from and recovery (PPRR).
flood events. Maintain effective mechanisms,
plans and processes to efficiently
An efficient and effective response
respond to disaster events.
to flood events and a swift recovery
requires pre-planning, robust processes
and procedures to be in place. It
requires a workforce that has the
capability and training to be resourceful
and proficient in responding to
community needs. Council working
together with a flood aware and resilient
community will achieve improved flood
risk management outcomes for the city.
BRISBANES FLOODSMART FUTURE STRATEGY 2012-2031 | 15

6
Brisbane River, Indooroopilly

STRATEGIC OUTCOME 6:
WELL-MAINTAINED AND IMPROVED STRUCTURAL ASSETS

Maintaining and investing Our approach: Prioritise improvements to


in flood mitigation assets to Inspect, assess and maintain existing the capacity of existing flood
infrastructure in areas where it is
support the citys economic flood mitigation infrastructure
to ensure its continued, effective identified as currently under-sized
growth. or not able to meet the capacity
functioning.
Council has built and maintains of future development within
Recognise the limited protection a catchment.
infrastructure including more than
afforded by some flood mitigation
2700km of pipes under the city that Provide new infrastructure as
infrastructure (e.g. underground
play a very effective role in conveying necessary to support the growth
pipe drainage) to encourage
flood flows that result from the intense, and liveability of the city.
preparedness for flooding.
heavy subtropical rainstorms that
Brisbane can experience during our
summer storm season.
This infrastructure has a value of over
$2.5 billion and is maintained by Council
to make sure we dont even see some
small floods that pass under our roads
and houses. As the city grows, new
assets will be needed to keep pace with
this growth and existing assets will need
to be maintained.
Brisbane City Council Printed on recycled paper For more information
Information visit www.brisbane.qld.gov.au
GPO Box 1434 or call (07) 3403 8888
Brisbane Qld 4001 Facebook.com/BrisbaneCityCouncil
N2013 - 03014 @brisbanecityqld
Brisbane City Council 2013