Risk
Motor does not provide required power
Competition indroduce similar technology
Core system unable to match conventional weight system performance
Market proves too small
Material supplier closes down
Cannot meet cost target
Outside the scope of existing expertise
Application system design unstable
System not user friendly
Manufacture takes longer than predicted
Sourcing parts from overseas causes delays
Parts out of stock or delay in delivery
Control system cannot accurately distinguish when to swap between brake and motor mode
Issues at Critical Design Review hold back project
System fails to cater for 5th to 95th percentile
Completed application system does not meet strength requirements
In response to our product competitors reduce their own selling prices
Product overweight
Product not well received by consumers
Non-linear relationship between linear actuator position and brake torque
Category Likelihood Consequence
Technical L H
Commercial M M
Technical M H
Commercial L M
Project L L
Commercial H M
Technical M H
Technical L H
Technical L M
Commercial M M
Commercial M M
Commercial M M
Technical M H
Project H M
Technical L M
Technical L H
Commerical L M
Technical L L
Project M M
Technical M L
Identity
7
3
13
1
16
8
6
14
2
10
11
12
19
4
9
17
15
20
5
18
Risk
Outside the scope of existing expertise
Core system unable to match conventional weight system performance
Control system cannot accurately distinguish swap between brake and motor mode
Motor does not provide required power
Completed application system does not meet strength requirements
Application system design unstable
Cannot meet cost target
Issues at Critical Design Review hold back project
Competition introduce similar technology
Manufacture takes longer than predicted
Sourcing parts from overseas causes delays
Parts out of stock or delay in delivery
Product not well received by consumers
Market proves too small (costs not recovered)
System not user friendly (not easily understood by consumers)
In response to our product competitors reduce their own selling prices
System fails to cater for 5th to 95th percentile
Non-linear relationship between linear actuator position and brake torque
Material supplier closes down
Product overweight
Category Likelihood Consequence
Technical M H
Technical M H
Technical M H
Technical L H
Technical L H
Technical L H
Commercial H M
Project H M
Commercial M M
Commercial M M
Commercial M M
Commercial M M
Project M M
Commercial L M
Technical L M
Commerical L M
Technical L M
Technical M L
Project L L
Technical L L
Identity
7
3
13
1
16
8
6
14
2
10
11
12
19
4
9
17
15
20
5
18
Risk
Outside the scope of existing expertise
Core system unable to match conventional weight system performance
Control system cannot distinguish swap between brake and motor mode
Motor does not provide required power
Completed application system does not meet strength requirements
Application system design unstable
Cannot meet cost target
Issues at Critical Design Review hold back project
Competition indroduce similar technology
Manufacture takes longer than predicted
Sourcing parts from overseas causes delays
Parts out of stock or delay in delivery
Product not well received by consumers
Market proves too small (costs not recovered)
System not user friendly (not easily understood by consumers)
In response to our product competitors reduce their own selling prices
System fails to cater for 5th to 95th percentile
Non-linear relationship between linear actuator position and brake torque
Material supplier closes down
Product overweight
Category Likelihood Consequence
Technical M H
Technical M H
Technical M H
Technical L H
Technical L H
Technical L H
Commercial H M
Project H M
Commercial M M
Commercial M M
Commercial M M
Commercial M M
Project M M
Commercial L M
Technical L M
Commerical L M
Technical L M
Technical M L
Project L L
Technical L L
Mitigation
Employ or subcontract to specialists
Redesign of resistance method
Design system to run forward and back of the motor
Source larger motor
Reinforcements
Reinforcements
Review supply chain, ''Lean''
Critical Design Review early
Allowance in project evaluation
Account for delays in allocated manufacture time
Submit orders well in advance
Submit orders well in advance
Improved marketing
Extend to home users
Redesign interface
Increase marketing and consider reducing costs
Redesign
Incorporate a feedback loop into the brake mechanism
Other suppliers
Change design to incorporate weight saving measures