You are on page 1of 3

4/4/2017 SECTION095400SpecialtyCeilings

(/arcatcos/cos42/arc42100.html)

SECTION095400SpecialtyCeilings

SPECIALTYCEILINGSYSTEMS
Copyright2015ARCAT,Inc.Allrightsreserved
**NOTETOSPECIFIER**ZipUPCeiling(R)andZipUPUnderDeck(R),adivisionofMPGlobalProductsindoorceilingsystemsandunderdeckceilingsystems.
ThissectionisbasedonZipUPCeiling(R)andZipUPUnderDeck(R)Systems,adivisionofMPGlobalProducts,whichislocatedat:
34020JamesJ.Pompo.
Fraser,MI48026
TollFree:8884494787
Phone:5862946671
Fax:5862946672
Email:zipup@mpglobalproducts.com(mailto:zipup@mpglobalproducts.com)
WebSite:www.zipupceiling.com
ZipUPCeiling(R)isthefirstceilingproductofitskindthathasaddressedwhatconsumerswantoutofceilingsystemsaestheticspartneredwithfunctionality.Thisisagrid
freeceilingmadefromPVCthatsavesheadroom,hasunprecedentedaccesstoplumbingandwiring,andboastsanimpervioustowaterandmoisturewarranty.
Additionally,ZipUPCeiling(R)willnotmoldormildew.
ZipUPUnderDeck(R)finishestheundersideofyourdeckprovidingdry,useableoutdoorlivingspacewithoutsacrificingheadroomorthebeautyofyourdeck.TheZipUP
UnderDeck(R)Systemprovideseaseofinstallationandawashablemoldresistantsurface,whilechannelinganywaterfromabovetoyourguttersystem.ZipUP
UnderDeck(R)wasdesignedsothatEVERYONEcanenjoythesatisfactiontransformingoutdoorspaceintoclean,dry,livingspace.Stopdraggingaroundyourpatio
furnitureandrelaxZipUPUnderDeck(R)hasyoucovered!
Wethinkofourselvesasproblemsolversforothercompaniesthatneedustoenhanceorimprovetheirproducts.Weareenvironmentallyfriendlywerecyclewhat
normallywouldhavebeenwasteandturnitintoproductstoimprovelives.WeareMPGlobal...lookingoutforourcustomers'bestinterests,andtheircustomerstoo.

PART1GENERAL

1.1 SECTIONINCLUDES

**NOTETOSPECIFIER**Deletetypebelownotrequired.

A. Interiorceilingsystems.(ZipUPCeiling)

B. Exteriorunderdeckceilingsystems.(ZipUPUnderDeck)

1.2 RELATEDSECTIONS

**NOTETOSPECIFIER**Deleteanysectionsbelownotrelevanttothisprojectaddothersasrequired.

A. Section061000RoughCarpentry.

B. Section092116.23GypsumBoardShaftWallAssemblies.

C. Section095123AcousticalTileCeilings.

D. Section099000PaintingandCoating.

E. Section233713Diffusers,RegistersandGrilles.

F. Section265100InteriorLighting.

1.3 SUBMITTALS

A. SubmitunderprovisionsofSection013000AdministrativeRequirements.

B. ProductData:Manufacturer'sdatasheetsforproductsspecified,includingbutnotlimitedto:

1. Preparationinstructionsandrecommendations.
2. Storageandhandlingrequirementsandrecommendations.

3. InstallationInstructions.

C. ShopDrawings:Reflectedceilingplanstocoordinatepenetrationsandceilingmounteditemsdetailsincludinginstallationtolerances,relationshipwith
adjacentconstruction.

D. VerificationSamples:Foreachproductandfinishspecified,twosamples,minimum12inches(305mm)square,representingactualproductsandfinishes.

1.4 REFERENCES

A. ASTMInternational(ASTM):

1. ASTMD256StandardTestMethodsforDeterminingtheIzodPendulumImpactResistanceofPlastics.
2. ASTMD638StandardTestMethodforTensilePropertiesofPlastics.

3. ASTMD790StandardTestMethodsforFlexuralPropertiesofUnreinforcedandReinforcedPlastics.

4. ASTMD1784StandardSpecificationforRigidPoly(VinylChloride)(PVC)CompoundsandChlorinatedPoly(VinylChloride)(CPVC)Compounds.

5. ASTME84StandardTestMethodforSurfaceBurningCharacteristicsofBuildingMaterials.

B. UnderwritersLaboratories,Inc.(UL):ANSI/UL723TestforSurfaceBurningCharacteristicsofBuildingMaterials.

1.5 QUALITYASSURANCE

A. Manufacturer'sQualifications:Minimum3yearsproducingtypesofproductsspecified.

**NOTETOSPECIFIER**Includeamockupiftheprojectsizeand/orqualitywarranttakingsuchaprecaution.Thefollowingisoneexampleofhowamockuponalarge
projectmightbespecified.Whendecidingontheextentofthemockup,considerallthemajordifferenttypesofworkontheproject.

http://www.arcat.com/sdspecs/htm04/09_54_00mpg.htm 1/3
4/4/2017 SECTION095400SpecialtyCeilings

B. MockUp:Afterapprovalofshopdrawings,provideamockupofthespecifiedceilingtodemonstrateaestheticeffectandsetqualitystandardforfabrication
andinstallation.

1. FinishareasdesignatedbyArchitect.Mockupshallbeinstalledinanareawhereitcanbecomepartofthefinalinstallation.

2. DonotproceedwithremainingworkuntilworkmanshipandappearanceareapprovedbyArchitect.

3. Modifymockupareaasrequiredtoproduceacceptablework.

1.6 DELIVERY,STORAGEANDHANDLING

A. Deliver,storeandhandlematerialsandproductsinstrictcompliancewithmanufacturer'sinstructionsandrecommendationsandindustrystandards.

B. Storeproductsindoorsinmanufacturer'sorfabricator'soriginalcontainersandpackaging,withlabelsclearlyidentifyingproductnameandmanufacturer.Lay
componentsonflatsurface.Protectfromdamage.

1.7 PROJECTCONDITIONS

A. Maintainenvironmentalconditions(temperature,humidityandventilation)withinlimitsrecommendedbymanufacturerforoptimumresults.Donotinstall
productsunderenvironmentalconditionsoutsidemanufacturer'srecommendedlimits.

1.8 SEQUENCINGANDSCHEDULING

A. Conference:Conveneapreinstallationconferencetoestablishprocedurestomaintainoptimumworkingconditionsandtocoordinatethisworkwithrelated
andadjacentwork.

1.9 WARRANTY

A. Warranty:Providemanufacturer'sstandardlimited25yearwarranty,formaterialsandworkmanshipandthatsystemwillremainimpervioustowaterand
moisture.

PART2PRODUCTS

2.1 MANUFACTURERS

A. AcceptableManufacturer:ZipUpadivisionofMPGlobalProducts,whichislocatedat:30235StateHwy,AXMacon,MO63552Tel:3144799353Email:
requestinfo(clammers@mpglobalproducts.com)Web:www.zipupceiling.com

**NOTETOSPECIFIER**DeleteoneofthefollowingtwoparagraphscoordinatewithrequirementsofDivision1sectiononproductoptionsandsubstitutions.

B. Substitutions:Notpermitted.

C. RequestsforsubstitutionswillbeconsideredinaccordancewithprovisionsofSection016000ProductRequirements.

**NOTETOSPECIFIER**Deleteifnotrequired.

2.2 INDOORCEILINGSYSTEMS

A. SystemDesign:Interlockingcomponents.

B. MaterialPerformance:PVCcomplyingwiththefollowing:

1. FirePerformance:ASTME84,ANSI/UL723,ClassA,flamespreadindex5,smokedevelopedindex450.

2. ImpactResistance:ASTMD256,9.8ftlb/invalueat73degreesF(23degreesC)1.6ftlb/invalueat32degreesF(0degreesC).
3. TensileProperties:ASTMD638,6040psi(41.6Mpa)tensilestrength,428,000psi(2.951Mpa)tensilemodulus.

4. FlexuralProperties:ASTMD790,11,500psi(79.0Mpa)flexuralstrength,421,000psi(2,903Mpa)flexuralmodulus.

5. CellClassificationValue:ASTMD1784,16354,directlyattached.

C. WallTrim:"E"shapedtrim,attachedtowallsorjoistsaroundperiphery.

D. MainRails:Mountingpieceswhichrunthelengthofroom,attachedtojoists.

E. Panels:Panelswhichinterlockintotherails.Provideinlongestlengthsavailablebasedonsystemconfiguration.

F. SeamTrim:Forcappingendsofmainrailsthatdonotendatwalltrim.

**NOTETOSPECIFIER**Deleteifnotrequired.

2.3 EXTERIORUNDERDECKCEILINGSYSTEMS

A. UnderdeckCeilingSystems:ZipUPUnderDeckasmanufacturedbyMPGlobalProductswiththefollowingcharacteristics.

1. SystemDesign:Interlockingcomponents.

2. MaterialPerformance:PVCcomplyingwiththefollowing:
a. FirePerformance:ASTME84,ANSI/UL723,ClassA,flamespreadindex5,smokedevelopedindex450.
b. ImpactResistance:ASTMD256,9.8ftlb/invalueat73degreesF(23degreesC)1.6ftlb/invalueat32degreesF(0degreesC).
c. TensileProperties:ASTMD638,6040psi(41.6Mpa)tensilestrength,428,000psi(2.951Mpa)tensilemodulus.
d. FlexuralProperties:ASTMD790,11,500psi(79.0Mpa)flexuralstrength,421,000psi(2,903Mpa)flexuralmodulus.
e. CellClassificationValue:ASTMD1784,16354,directlyattached.

3. WallTrim:"E"shapedtrim,attachedtowallsorjoistsaroundperiphery.

4. MainRails:Mountingpieceswhichrunthelengthofroom,attachedtojoists.
5. Panels:Panelswhichinterlockintotherails.Provideinlongestlengthsavailablebasedonsystemconfiguration.

6. SeamTrim:Forcappingendsofmainrailsthatdonotendatwalltrim.

7. PitchingRails:Forimpartingaslopeof1/8inchperfoottodrainunderdecksysteminthedirectionofguttersstackedincrementallyevery48inches(1219mm)to
provideproperpitch.Typeandlengthassuitableforprojectconditions.

PART3EXECUTION

3.1 EXAMINATIONANDPREPARATION

A. Preparesubstratesusingthemethodsrecommendedbythemanufacturerforachievingbestresultforthesubstratesunderprojectconditions.

http://www.arcat.com/sdspecs/htm04/09_54_00mpg.htm 2/3
4/4/2017 SECTION095400SpecialtyCeilings
B. Donotproceedwithinstallationuntilsubstrateshavebeenpreparedusingthemethodsrecommendedbythemanufactureranddeviationsfrom
manufacturer'srecommendedtolerancesarecorrected.Commencementofinstallationconstitutesacceptanceofconditions.

C. Ifpreparationistheresponsibilityofanotherinstaller,notifyArchitectinwritingofdeviationsfrommanufacturer'srecommendedinstallationtolerancesand
conditions.

3.2 INSTALLATION

A. Installation:Installinaccordancewithmanufacturer'sinstructionsincludingthefollowing:

1. Ifproductshavebeenstoredinseverecoldtemperatures,allowcomponentstoacclimatizetoroomtemperatureaccordingtomanufacturer'sinstructions.
2. Allowforthermalexpansionandcontractionasrecommendedbymanufacturer.
a. Punchelongatedholesinmainrailswithvinylsidingholepunchpriortoattachment.
b. Usescrewswithwashersandonlyuseenoughtorquetosecuremainrailstojoist,yetallowingformovementofmainrailsforthermalexpansion.

3. Installwalltrimwithoutbulging,withmiteredoroverlappingjoints.

4. Installsecondrail,mainrailandseamrailsinaccordancewithapprovedshopdrawings.

5. Installinproperrelationshipwithadjacentconstruction,lightingfixturesandotherceilingmounteditems.

3.3 PROTECTION

A. Protectinstalledproductsuntilcompletionofproject.

B. Touchup,repairorreplacedamagedproductsbeforeSubstantialCompletion.

ENDOFSECTION

http://www.arcat.com/sdspecs/htm04/09_54_00mpg.htm 3/3

You might also like