Benefits Of Bim and its Advantages In Building Planning

Building Information Model is the procedure for developing building model which will be
used in visualizing and presenting building components, construction sequences, resource
allocation and other disciplines of construction process in a virtual environment. Building
Information Model can be an object-oriented building progress tool that utilizes 4D
modelling, concepts along-side Autodesk Revit, Tekla structure, Archi CAD softwares to
design and build a building, as well as communicate its essentials. BIM process generates 3D
Model encompassing geometric and geographic information of the building and properties
of its components.

If you ask building owners and operators they will tell you numerous features of BIM and
significant advantages of using building information modelling, (BIM) during building
construction life cycle. Some of very prominent benefits of BIM modeling are:

Benefits of BIM to Building Contractors:

a. BIM provides a good estimation during bidding and procurement


b. BIM improves coordination in construction sequencing
c. Effective marketing presentation of construction approaches
d. BIM helps in distinguishing possible conflicts that may arise during building construction
e. Biggest advantageous asset of using BIM is lesser amount of errors and therefore
rectifications saving costs and resources
f. BIM permits more what if analysis, such as for instance construction sequencing options,
shuffling of human resources, fine-tuning cost factors, and so on
g. BIM helps end-users and clients in understanding and visualizing the final end product
h. BIM supports owner in taking informed decisions about the proposed project.

Great things about BIM to the Building Designer:

BIM allows designer to use sophisticated web-based tools such as for example Trelligence
Affinity, which connects the projects program to other BIM tools such as for example Tekla,
Revit and Archi CAD.
Designer has a demand of incorporating eco-friendly design aspects before the
commencement of the project.

Advantages of BIM to Cost Engineer:

BIM model allows for better cost estimation of human raw structural materials, resources
and components.

Construction and Building projects are dynamic in nature and the status of construction
changes frequently whilst the time progresses. Most civil engineers plan their project
cantered on primary filed drawings which are prune to frequent changes during the
execution period. The 4D BIM model not only provides the visual aid, it allows the building
owner to also perform what-if analysis. With Building Information Modeling, construction
documents are produced more, allowing architects to spend additional time on the building
design.