SAUDI ARAMCO ID/PID - 18-May-05 - REV 0 (Standards Cutoff - June 2008) REV 3 30-Jun-08

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER

Review Procedure - Radiographic Testing (RT) SAIC-RT-2001 NDE-


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A General Requirements (Radiographic examination procedure)

RT procedure is applicable to specific requirement of the project


Schedule Q,
(Identified, traceable to Project Quality Plan & updated doc. list) and
Section 3 &
A1 was approved by both Subcontractor & Prime Contractor.
Att. VI
ASNT certified Level III Inspector(s) reviewed &
Tables
approved.

OID/NDTU Document Review Sheet is attached to procedure & lists


Revision Specific approval Status & NDTU Comments.
Note 1: Document Review Sheet with OID/NDTU
Schedule Q,
comments shall be attached to NDT Procedures (Controlled Field
Section 3 &
A2 Copies). Note 2:Technicians
Att. VI
shall be trained and are aware of their responsibilities regarding use of
Tables
controlled field copies.
Note 3:Technicians understand OID/NDTU comments and can explain
details regarding technique & other OID/NDTU comment

Radiographic examination shall be performed in accordance with a


written procedure. Each procedure shall include following information
but not limited to
a) Material type and thickness range
Para T-221,
b)
Artcile 2,
Isotope or Maximum X ray voltage used
A3
c) Source to Object distance
ASME Section
d) Distance from source side of object to film
V
e) Source size
f) Film brands
and designation g)
Screens used

RT techniques deviating from SAEP-1143 shall be recorded on the RT


Para. 5
technique sheet and submitted to Insp Dept. OID/NDT RT Level III for
A4 SAEP-1143,
approval prior to implimentation.

Surafce Preparation: The weld surface should be free from ripples and
Para. 5.3
irregularities which can mask indications on radiographic image. The
A5 SAEP-1143,
weld reinforcement should not exceed permissible value of the
reference code

Back scattered radiation: The Lead letter B (size- 13mm Height/1.5mm Para. 5.4
A6 thk) shall be attached on the back side of each film holder during SAEP-1143,
exposure to determine if back scattered radiation is exposing the film

Film Identification: Each radiograph shall be permanently identified


using Lead numbers and letters. The film identification information Para. 8.4
A7 shall include JO/BI number, Component/vessel/piping identification, SAEP-1143,
Weld joint and welder identification, repair identification, Date of
radiography and Manufacturer symbol.

Page 1 of 15
Para. 6.5.4
A8 Film density monitoring: Calibrated Densitometer shall be used. SAEP-1143,

Page 2 of 15
SAUDI ARAMCO ID/PID - 18-May-05 - REV 0(Standards Cutoff - June 2008) REV 3 30-Jun-08

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER

Review Procedure - Radiographic Testing (RT) SAIC-RT-2001 NDE-


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

B Equipment & Materials

Film: Radiography shall be conducted with industrial radiography film. Para. 6.2.1
B1 Film shall be either Type I or Type II. Type 1 film shall be used for RT of SAEP-1143,
pipe diameters 8"NPS or less.

Para. 6.2.2
Radiographic film can be processed either manually or automatically
B2 SAEP-1143,

Intensifying screens: Only Lead intensifying screens shall be used. The


front lead screen thickness shall be 0.13mm for Ir-192 , Se-75 and
Para. 6.3
0.25mm for Co-60 or the linear accelerator.
B3 SAEP-1143,
(For other screen material
written approval from designated SA NDT Level III is required before its
use).

Image Quality Indicators (IQI): IQIs shall be wire type. Following IQIs
shall be used: 1)
EN wire type as desribed in BS EN 462.1
Para. 6.4
2) ASME wire type as desribed in ASTM SE-747
B4 SAEP-1143,
3) DIN wire type as desribed in
DIN 54 109 4) ISO wire type
as desribed in ISO 1027
(See Attachment 1)

IQIs shall be selected from either the same alloy material group or Para. 6.4.3
B5 grade or from an alloy material group or grade with less radiation SAEP-1143,
absorption than the material being radiographed.

Viewing facilities: Viewing facilities shall provide subdued background


Para. 6.5
lighting of an intensity that will not cause reflections, shadows or glare on
B6 SAEP-1143,
the radiograph. Radiographic viewers shall meet minimum requirements
setforth in ISO 5580 and shall provide variable light source.

Acceptable radiation sources:


1) X ray generators (upto 6Mev)
2) Iridium 192 (Ir-192) (Upto
Para. 6
200Ci) 3) Cobalt 60 (Co-60)
SAEP-1143,
(Upto 100Ci) 4) Selenium
B7 Para. 9.3 & 10.2
75 (Se-75) (Upto 50 Ci) 5) Cs-137
SAEP-
sources are acceptable as control sources for X ray pipeline crawlers
1141
Note: In Offshore only Ir-192
(Maximum 30Ci) shall be used . For Se-75 specific approval from ID-
RPO is needed.

Densitomer: Densitometer shall be calibrated atleast every 90days using


national standard step tablet or a step wedge calibration film traceable to
national standard step tablet. The densitometer is acceptable if the
density readings do not vary by more than +/-0.05 density units from the T-260
B8
actual density stated on national standard step tablet or a step wedge ASME Sec V
calibration film. Periodic calibration verification checks shall be
performed at the begining of each shift , after 8hrs of continuous use or
after changes of apertures whichever comes first.

Page 3 of 15
SAUDI ARAMCO ID/PID - 18-May-05 - REV 0(Standards Cutoff - June 2008) REV 3 30-Jun-08

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER

Review Procedure - Radiographic Testing (RT) SAIC-RT-2001 NDE-


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

Stepwedge comparison film: Step wedge comparison films shall be


verified annually and the measured density readings by calibrated T-260
B9
densitometer donot vary by more than +/-0.1 density units from the ASME Sec V
density stated on the step wedge comparison film.

C Examination

Radiographic technique: A single wall exposure technique shall be used


for radiography whenever practical. When it is not practical, a double Para. 7.1
C1 wall technique shall be used. The direction of the central beam of SAEP-1143,
radiation should be centered on the area of interest whenever practical.
(See attachment 1)

Para. 8.1.2
Use of Co-60 is only permitted when the thickness of the material
C2 SAEP-1143,
exceeds the practical limits of Ir-192 or Se-75.
Geometric unsharpness(Ug): The minimum source to object distance
shall be great enough to ensure that Ug of the radiograph does not
exceed the values noted below:

Para. 8.2
C3 SAEP-1143,

Location markers: The location markers shall be placed on the part, not
on the exposure holder or casette. Location markers shall not intrude
into the area of interest. The starting point and the direction of
numbering shall be identified adjacent to the weld. Number belt spacing
around the circumference of the piping (size 3.5" NPS and more) shall
not exceed table 6, SAEP-1143
Para. 8.3
C4 SAEP-1143,

IQI selection: IQI shall be selected as per Table 7 & 8 SAEP-1143. IQIs
Para. 8.6
shall be placed on source side at all times. When film side IQIs are used,
C5 SAEP-1143,
a lead letter 'F' shall be placed adjacent to or on the IQIs and shall not
interfere with the IQI or be on matter of interest.

IQI selection for welds joining dissimilar materials or welds with dissimilar
filler metal shall be based on weld metal. When the density limits canot
T-276.3
C6 be met with one IQI, and the exceptional density areas is at the interface
ASME Sec V
of the weld metal and base metal, the material selection for the
additional IQI shall be based on the base material

Number of IQIs: One IQI at center and one IQI with in 1" from one end of
Para. 8.7
the film shall be placed for Rt techniques requiring multiple exposures
C7 SAEP-1143,
and the film to be interpreted is greater than 5". Minimum 4 IQIs are
required for panoramic exposure.

D Evaluation

Page 4 of 15
SAUDI ARAMCO ID/PID - 18-May-05 - REV 0(Standards Cutoff - June 2008) REV 3 30-Jun-08

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER

Review Procedure - Radiographic Testing (RT) SAIC-RT-2001 NDE-


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

All radiographic films shall be free from :


a) Fogging
b) Processing defects such as streaks, watermarks, or chemical stains Para. 9.1
D1 c) Scratches, SAEP-1143,
finger marks, crimps, dirtiness, static marks, smudges or tears

d) False indications due to defective screens

Radiographic density limitations: The density range for Gamma Para. 9.3
D2 radiography shall be 2 to 4 and for X rays 1.8 to 4. A tolerance of 0.05 in SAEP-1143,
density is allowed for variations between densitomer readings.

Density variation: Radiographic density anywhere through the area of


interest shall not vary more than -15% and +30% from the measured Para. 9.4
D3 density next to the designation wire of the IQI. If the density variation SAEP-1143,
exceeds the permissible variation, additional IQI shall be used for each
exceptional area and the area of interest reradiographed.

IQI sensitivity: Radiography shall be performed with a technique of Para. 9.5


D4 sufficient sensitivity to display the essential wire of a wire IQI.The SAEP-1143,
radiograph shall also display the IQI identifying numbers and letters.

Excessive backscatter: If a light image of the lead letter "B" appears ona
Para. 9.6
darker background of the radiograph, protection from back scatter is
D5 SAEP-1143,
insufficient and the radiograph shall be considered unacceptable. A dark
image of the letter "B" on a lighter background is not cause for rejection.

Film viewing: Radiographs shall be interpreted only in those areas in


Para. 10
which the IQIs have established that a suitable radiographic technique
D6 SAEP-1143,
has been used. Composite viewing of double film exposure is not
permitted unless in writing approval from designated SA NDT Level III.

Film Interpretation: The radiographs shall be examined and interpreted


Para. 11
for film quality and for discontinuities by personnel certified to perform
D7 SAEP-1143,
RTFI by Saudi Aramco. The acceptance criteria for discontinuities shall
be as per applicable construction code.

E Documentation

Radiographic reports shall be issued using Saudi Aramco form 4719-A-


Para. 12
ENG "Radiographic request & report sheet" (See Attachment 2).
E1 SAEP-1143,
Alternative forms are acceptable but should contain all the details as
listed in para. 12 SAEP-1143

Page 5 of 15
SAUDI ARAMCO ID/PID - 18-May-05 - REV 0(Standards Cutoff - June 2008) REV 3 30-Jun-08

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER

Review Procedure - Radiographic Testing (RT) SAIC-RT-2001 NDE-


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
The manufacturer shall prepare and document the technique details. As
a minimum following information shall be provided:

T-291
E2 ASME Sec
V

Para. 12.3
Radiographs shall be turned over to proponent upon completion of the
E3 SAEP-1143,
work

F NDE Control Procedure for RT Technique Procedure Direction & Use on IK Projects ... (SEE SAIC-RT-2010)

RT procedure usage is strictly controlled as follows:


An approved NDE Control Procedure shall
Schedule Q,
details the NDT responsibiliy, reporting, documentation, supervision,
Section 3 &
F1 interface between Prime Contractor, Subcontractor, NDT Service
Att. VI
Provider. Refer to SAIC-RT-2010*.
Tables
* A single NDT Control Procedure on Projects shall
detail the above for all applicable NDE Methods on the project.

REMARKS:

Attachments: 1. Image Quality Indicators, Technique & exposure requirements.


2. Radiographic request / report form - Form 4719-A-ENG (09/98), Form 4719-A1-ENG (09/98)
3. Document review sheet
4. Document approval letter

REFERENCE DOCUMENTS: 1.
1. SAEP-1143, Radiographic Examination, 29 May, 2002
2. Schedule Q, Contractor's Quality Requirements (November 2003)
3. Approved Project Document Control Procedure (to be identified)
4. ASME Section V, Non Destructive Examination, Ed 2007

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 6 of 15
SAUDI ARAMCO ID/PID - 18-May-05 - REV 0 (Standards Cutoff - June 2008) REV 3 30-Jun-08

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER

Review Procedure - Radiographic Testing (RT) SAIC-RT-2001 NDE-


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

Attachment 1: Image Quality Indicators, Technique and Exposure requirements

Page 7 of 15
SAUDI ARAMCO ID/PID - 18-May-05 - REV 0 (Standards Cutoff - June 2008) REV 3 30-Jun-08

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER

Review Procedure - Radiographic Testing (RT) SAIC-RT-2001 NDE-


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

Attachment 1: Image Quality Indicators, Technique and Exposure requirements

Page 8 of 15
SAUDI ARAMCO ID/PID - 18-May-05 - REV 0 (Standards Cutoff - June 2008) REV 3 30-Jun-08

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER

Review Procedure - Radiographic Testing (RT) SAIC-RT-2001 NDE-


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

Attachment 1: Image Quality Indicators, Technique and Exposure requirements

Page 9 of 15
SAUDI ARAMCO ID/PID - 18-May-05 - REV 0 (Standards Cutoff - June 2008) REV 3 30-Jun-08

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER

Review Procedure - Radiographic Testing (RT) SAIC-RT-2001 NDE-


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

Attachment 2: Radiographic request / report form - Form 4719-A-ENG (09/98), Form 4719-A1-ENG (09/98)

Page 10 of 15
SAUDI ARAMCO ID/PID - 18-May-05 - REV 0 (Standards Cutoff - June 2008) REV 3 30-Jun-08

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER

Review Procedure - Radiographic Testing (RT) SAIC-RT-2001 NDE-


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

Attachment 2: Radiographic request / report form - Form 4719-A-ENG (09/98), Form 4719-A1-ENG (09/98)

Page 11 of 15
SAUDI ARAMCO ID/PID - 18-May-05 - REV 0 (Standards Cutoff - June 2008) REV 3 30-Jun-08

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER

Review Procedure - Radiographic Testing (RT) SAIC-RT-2001 NDE-


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:
N/A
QC Supervisor Proponent and Others
Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date: N/A

Page 12 of 15
*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 13 of 15
SAUDI ARAMCO ID/PID - 18-May-05 - REV 3 (Standards Cutoff - June 2008) REV 3 30-Jun-08

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER

Review Procedure - Radiographic Testing (RT) SAIC-RT-2001 NDE-


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

Page 14 of 15
Page 15 of 15

You might also like