You are on page 1of 4

www.GQIS.co.

uk Daily Report

Project: HPC-HINKLEY POINT C-


AGGREGATE JETTY-
Customer: EM
PRELIMINARY STEEL
PILE PROJECT
Sub-Vendor: ZHEJIANG CHANKONG
Vendor: ESC GROUP
STEEL PIPE CO.,LTD
PUTUO,SHANG HAI, Sub-Vendor Address: TIANNING,JIASHAN,ZHE
Vendor Address: CHINA JIANG

Vendor Reference: Sub-Vendor Reference:

Purchase Order No: 3568 Customer Reference:

GQIS Assignment No: Report No: GQIS--011

8 am, 3rd Sept. -- 8 pm, Next Visit Date:


Date of Visit: 3rd Sept.,2016
MATERIAL INSPECTED THIS VISIT
Item No. Quantit Description Tag No., Batch
y No., Serial No.,
Cast, Heat No.

3568-C06-057 1 1778x(25x2.7M+30x5.7M+25x9.689M)
SSAW+LSAW+SSAW
3568-PI-032 1 1778x25x34.28M SSAW
3568-DC-040 1 1778x25x30.447M LSAW
1 1778x25x30.447M LSAW
3568-DC-041

SUMMARY / AREAS OF CONCERN

GUI-036-00 (Revision 0) Flash Report Dated: 22nd March 2016


www.GQIS.com
Daily Report

Customer: EM Purchase Order 3568


No.:

1.0 SUMMARY / AREAS OF CONCERN

1. Conduct in-process inspection for installation of ancillaries, witness the fit-up and welding of grouting
pipework, I found that the fit-up and welding quality of grouting pipework is not satisfactory, such as improper
gap of the fit-up, excessive penetration inside the grouting pipe. I already communicated with the manufacturer
and require them to provide good workmanship for the fit-up and welding of grouting pipework, ensuring good
penetration.Pile No.:3568-C06-057.

Reference: Inspection Test Plan


No.15 Production and installation of ancillary
No.18 Welding inspection-Welding preparation
No.19 Welding inspection-welding process
No.20 Welding inspection-Weld dimension inspection
No.21 Welding inspection-Visual inspection

The gap is a little big


Excessive penetration inside pipe

1.2 Witness UT inspection at site, one area has problem and was marked, will be repaired by welding.Pile
GUI-035-00 (Revision 0) Inspection Report Dated: 22nd March 2016
www.GQIS.com
Daily Report

Customer: EM Purchase Order 3568


No.:

No.:3568-PI-032.

Reference: Inspection Test Plan


No.22 Welding inspection-UT inspection, 100% of butt weld(spiral weld, longitudinal weld,
CIRC weld)

Indication on CRT

1.3 Witness the pile forming, the result is accepted.Pile No.: 3568-DC-040, 3568-DC-041.

Reference: Inspection Test Plan


No.14 Pile forming-Visual and dimensional inspection

1.4 Verify the material identification for main lift padeye, the result is accepted, the manufacturer already improve
GUI-035-00 (Revision 0) Inspection Report Dated: 22nd March 2016
www.GQIS.com
Daily Report

Customer: EM Purchase Order 3568


No.:

it.

Reference: Inspection Test Plan


No.11 Material Identification-Material traceability (Marking of material identify, and recording
of heat number for each components)

Summary: The comments that I proposed are typical, and applicable to all of our products, but not just limited to
the products that I conduct actual inspection.

Accepted Yes Non-Compliant Yes / No

Technical Specialist: Robin Gu Operations Coordinator:


Date:
Date: 8 am, 3rd Sept. -- 8 pm, 3rd Sept.,2016

GUI-035-00 (Revision 0) Inspection Report Dated: 22nd March 2016