PRODUCTION OF F MINE TO CRUSHING PLANT IN ASPHALT MINE
OF PT. XYZ
Yusman Latunggu
(Department of Mining Engineering Faculty of Science and Technology of Earth
Halu Oleo University)
ylatunggu@gmail.com
ABSTRACT
This research was conducted in the Village Of Mantowu, District Pasarwajo,
Buton. Purpose of this research is to determine road geometry from mine F to the crushing plant at PT. XYZ and compare it to hauling road standard according to AASHTO. To determine road geometry, first thing to do is measuring the width of the biggest transport used. Where, biggest transport used is Dump Truck Hino Fm 260 Ti with width of 2.72 m wide. From the results of road geometry measurement in PT. XYZ obtained, width on straight road for each segment is 4.60 m until 7.20 m, wide on road curve is 6.20 m until 7.10 m, curve radius from 7.80 m until 7.94 m, and 0.15 m until 0.16 m on super elevations, 0.01 m until 7.42 m on elevations, and grade value 0.0045o until. 3.34o. While cross slope is not found in all segments. Based on AASHTO, those data need correction and some addition in several geometry parameters. Road width from 4.20 m to 9.52 m on the straight roads, and 6.21 m to 11.32 m on the curving roads, curve radius of 7.38 m became 8.85 m, super elevations from 0.15 m to 1.25 m, cross slope of 0.19 m, while road grade is already in accordance with AASHTO standards.
Kajian Geometri Jalan Tambang Berdasarkan Aashto Dan Kepmen No 1827/K/30/Mem/2018 Pada Penambangan Andesit Di PT XYZ, Kecamatan Rumpin, Kabupaten Bogor, Provinsi Jawa Barat