You are on page 1of 1

STUDENT: TEACHER:

GRADE/SECTION: DATE:
1st 2nd 3rd
ASSESSMENT CRITERIA (Result will be either Competent (C) or Not Yet
Check Check Check
Competent (NYC)
RESULT RESULT RESULT
1. Plan and determine cable routes in accordance with network design and actual
installation site.
2. Identify and obtain necessary network materials in accordance with established
procedures and check against system requirements
3. Obtain and check tools, equipment, and testing devices in accordance with
established procedures
4. Perform UTP cable splicing
5. Install network cables to patch panel and keystone jack (RJ-45 modular box)
STUDENT: TEACHER:
GRADE/SECTION: DATE:
1st 2nd 3rd
ASSESSMENT CRITERIA (Result will be either Competent (C) or Not Yet
Check Check Check
Competent (NYC)
RESULT RESULT RESULT
1. Plan and determine cable routes in accordance with network design and actual
installation site.
2. Identify and obtain necessary network materials in accordance with established
procedures and check against system requirements
3. Obtain and check tools, equipment, and testing devices in accordance with
established procedures
4. Perform UTP cable splicing
5. Install network cables to patch panel and keystone jack (RJ-45 modular box)
STUDENT: TEACHER:
GRADE/SECTION: DATE:
1st 2nd 3rd
ASSESSMENT CRITERIA (Result will be either Competent (C) or Not Yet
Check Check Check
Competent (NYC)
RESULT RESULT RESULT
1. Plan and determine cable routes in accordance with network design and actual
installation site.
2. Identify and obtain necessary network materials in accordance with established
procedures and check against system requirements
3. Obtain and check tools, equipment, and testing devices in accordance with
established procedures
4. Perform UTP cable splicing
5. Install network cables to patch panel and keystone jack (RJ-45 modular box)
STUDENT: TEACHER:
GRADE/SECTION: DATE:
1st 2nd 3rd
ASSESSMENT CRITERIA (Result will be either Competent (C) or Not Yet
Check Check Check
Competent (NYC)
RESULT RESULT RESULT
1. Plan and determine cable routes in accordance with network design and actual
installation site.
2. Identify and obtain necessary network materials in accordance with established
procedures and check against system requirements
3. Obtain and check tools, equipment, and testing devices in accordance with
established procedures
4. Perform UTP cable splicing
5. Install network cables to patch panel and keystone jack (RJ-45 modular box)
STUDENT: TEACHER:
GRADE/SECTION: DATE:
1st 2nd 3rd
ASSESSMENT CRITERIA (Result will be either Competent (C) or Not Yet
Check Check Check
Competent (NYC)
RESULT RESULT RESULT
1. Plan and determine cable routes in accordance with network design and actual
installation site.
2. Identify and obtain necessary network materials in accordance with established
procedures and check against system requirements
3. Obtain and check tools, equipment, and testing devices in accordance with
established procedures
4. Perform UTP cable splicing
5. Install network cables to patch panel and keystone jack (RJ-45 modular box)

You might also like