You are on page 1of 4

Sr No Category Sub Category

1
2
3
4
5 132 KV
6
7
8
9
10
11
12
13 33 KV
14
15
16
17
Equipment Change
18
19
20 6.6 KV
21
22
23
24
25
26
27
28
29 LT system
30
31
32
33

34 All types
Project related changes
35 33 kV and above
36 Below 33 kV
37

38 Customer reated
All types
requirements
39

40
41
42
43
44
45
Process related changes All types
46
47
48
49
Changes MOC required
Change/Replacement of 132/33/kV transformer Yes
Change of 132 kV CB,CT,LA,CVT,Insulator Yes
Change of O/H transmission line Yes
Change of jumper Yes
Change of earthing system Yes
Change of ligthning protection system Yes
Equipment protection system change Yes
Substation capacity augmenting Yes
Any capital investment Yes
Change/Replacement of 33/6.6 kV transformer Yes
Change of 33 kV CB,CT,LA,CVT,Insulator Yes
Equipment protection system change Yes
Change of earthing system Yes
Change of ligthning protection system Yes
Feeder cable strengthening Yes
Substation capacity augmenting Yes
Replacement of DT with same capacity No
DT capacity augmenting upto 630 KVA No
DT capacity augmenting more than 630 KVA Yes
Replacement of old BOCB by new VCB No
Feeder cable strengthening No
Equipment protection system change Yes
Change of protection system Yes
Replacement of OCB with ACB No
Replacement of LT feeder TPN switch with SFU No
Replacement of LTDB No
Replacement of Feeder pillar/ service poles No
Replacement of meter with new models Yes
Feeder strengthening No
Change of street light HPMV fitting with LED fititng No
Automatic street light controlling Yes
Changes in house wiring, fittings in VVIP bungalows like 3/5/7C road,
Yes
DC/SDO bungalow,TMDC etc
Changes in house wiring in regular house No

Introduction of new make of


Yes
transformer,CPSS,breaker,Relay,cable,conductor,ACB,MCCB,SFU etc

Modification of existing distribution system Yes


Modification of existing distribution system No
New substations and network eshtablishment for unserved/ served area Yes

Addition of breaker( HT)/Switch,MCCB(LT) for consumer connection No

Feeder/capacity strengthening on customer request Yes

Additional illumination.power supply,TEC etc on customer demand Yes


Any change in QMS system Yes
Any procedure/system change in daily routine job Yes
Addition/ deletion of any inhouse serbice/material Yes
Introduction of any testing/safety equipment Yes
Change in metering system like RMR/AMR etc Yes
Change in airport runway lighting system Yes
Manpower restructuring Yes
New recruitement process change Yes
Change in online system in SAP ISU/VIDUSHI/ SCADA system Yes

You might also like