Beams
Beams
Solid Slabs
Hollow Block Slabs
Slabs
Flat Slabs
Paneled Beam system
Structural
Simple Beam or Continuous Be. or Cantilever Beam
Sys.
Members Beams
of Position ref.
Dropped Beam or Inverted Beam or Hidden Beam
to slab
Concrete
Construction Loads
Axially Loaded Col. or Eccentric Loaded Col.
Design
Column Long Column or Short Column
Section
Rectangular Column or Circular Column
Bracing
Braced Column or Unbraced Column
Isolated Footing
Combined Footing
Shallow found.
Strip Footing
Footing
Raft/ Mat found.
Friction Pile
Deep found.
Bearing Pile
ALB Dr. Eng. ALaa Ali Bashandy
Design of R. C. Beams
Beams
Cross Sections of Beams
Beams
Referring to its position comparing to slabs
: slab
ALB Dr. Eng. ALaa Ali Bashandy
.
Beams
Referring to its position comparing to slabs
Intermediate Beam
1 1 2 1 2 2
Sec. 1 Sec. 2
1 1 2 1 2 2
Internal Beam
Sec. 1 Sec. 2
) T Sec.) ) R Sec.)
Dr. Eng. ALaa Ali Bashandy
Design of R. C. Beams
Edge Beam
1 1 2 1 2 2
Sec. 1 Sec. 2
Edge Beam 1 1 2 1 2 2
Sec. 1 Sec. 2
) L Sec.) ) R Sec.)
Dr. Eng. ALaa Ali Bashandy
Design of R. C. Beams
Load Distribution
S9
S8
S7
S6
S3
S5
S2
S4
S1
ALB Dr. Eng. ALaa Ali Bashandy
Design of R. C. Beams
S9
S8
S7
S6
S3
S5
S2
S4
S1
ALB Dr. Eng. ALaa Ali Bashandy
Design of R. C. Beams
L
One direction One direction One direction
2-sides 2-sides 1-side
LS LS LC
One-way slab Cantilever one-way slab
L
One-way S. Slab 2.00
Ls
WB2 = 1.4 ( O. Wt B2 + Wwall ) t/m\
L B2 Ls
L
W Wu S x S 1.4 x O.Wt W
2
Ls
B2
B1
B1 Wall
B1
B1 L
B1
B2 W
B1
s
L
2 s
C
Wu x S Wu x L 1.4 x O.Wt W
B1
Wall
Lc
B1
L
Cantilever Slab
Dr. Eng. ALaa Ali Bashandy
Design of R. C. Beams
L
Two-way S. Slab 2.00
Ls
L
B1
L
Ls
B2
B1
Dr. Eng. ALaa Ali Bashandy
Design of R. C. Beams
B2 B1
L
B1
Wa B1 Wu S X Ls
x Ca 1.4 x O.Wt B1 O.Wt Wall t/m\
2
Wa
Equivalent load for Shear (Wa or W)
L
WeB1 Wu S x Ls
x Ce 1.4 x O.Wt B1 O.Wt Wall t/m\
2
Equivalent load for Moment ( We or W) We
L Dr. Eng. ALaa Ali Bashandy
Design of R. C. Beams
Ca 1 2 for Shear
L Ce 2 3 for Moment
for Triangle Load only
Ls
B2
B2
Ls
B1
Wa B 2 Wu S x Ls
x Ca 1.4 x O.Wt B2 O.Wt Wall t/m\
2
Equivalent load for Shear (Wa or Wa
W)
LS
WeB 2 Wu S x Ls
x Ce 1.4 x O.Wt B2 O.Wt Wall t/m\
2
Equivalent load f or Moment (We or W ) We
LS
Dr. Eng. ALaa Ali Bashandy
Design of R. C. Beams
WB
WB Load for Moment Load for Shear
L
Area
L
x Wu s 1.4 x O.Wt W
B wall
L
2. L1
2 or
L1 L1
L L
WB
WB Load for Moment Load for Shear
L1 Area
x Wu s 1.4 x O.Wt W
L L1 B wall
Dr. Eng. ALaa Ali Bashandy
Design of R. C. Beams
3.
L L
WB
L
4.
WB Ca 1/2
WB Ca 1/2
Ce 1/3 Ce 1/2
Area
WB WB x Wus
Ca 1/2 Span
Ce 2/3
Dr. Eng. ALaa Ali Bashandy
Design of R. C. Beams
Main and Secondary Beams
Beams
Main Beams
Main Beam
Secondary Beams
Secondary
Beam
B2
B1
B2
B4
B5
B6
B3
Col.
Col.
Col.
Col.
Beam
Beam
Beam
Col.
Col.
Col.
Col.
Beam
Beam
Col.
Col.
Col.
Col.
Beam
Col.
Col.
Col.
B2
B1
B2
B4
B5
B6
B3
Col.
Col.
Col.
Col.
Beam
Beam
Col.
Beam
Col.
Col.
Col.
Beam
Beam
Col.
Col.
Col.
Col.
Beam
Col.
Col.
Col.
Design of Beams
Load Values
1. Dead Load (D.L)
From Slab 1 - Own weight of slab (O.Wt)
W VConcrete x R. Concrete 1.00 m
t x 1.0 x 1.0 *
s
R.C
2.5 t/m 3
& 2.2 t/m 3 1.00 m
R.C P .C
2. Live Load ( L .L )
according to code
3. Total Load ( T.L )
WBeam (t/m) = (Wall Wt. + O. Wt.Beam ) x 1.4 + Wus (From slab)
Dr. Eng. ALaa Ali Bashandy
Design of R. C. Beams
Estimation of tB
tB min = 40 cm
Continuous Slab Continuous Slab Cantilever Beam
Simple Slab From tow side
From one side
Value of tB
Generally
t B = span / 10 span / 12 Lc / 5
Moment Values
Wu t/m\
Wu x L2
min M + ve =
8 LS
Empirical values for B.M (Max difference in load & span 20% and D.L >L.L )
2
WL2 /24 WL2 /24 W1L21/24 WL2 /9 W2 L 2 /24
2 2
WL2 /8 W1L1 /11 W2 L 2 /11
Simply supported continuous two spans
2 2 2
W1L1 /12 W2 L 2 /16 W3L3 /16
continuous more than two spans
Dr. Eng. ALaa Ali Bashandy
Design of R. C. Beams
M support
a1 a2
P1 P2
k P L' k 2 P2 L'2
2 2
Concentrat ed Load Msupport 1 1 1
( L'1 L'2 ) L1 m L2 m
L = L L = 0.8L
m L m
L
Shear Values
Estimation of b
Mu
Values of b : d C1
Fcu . b
T - sec. L - sec.
L2 = L L2 = 0.8 L L2 = 0.7 L L2 = 2 L
Design of Section
Given : M u , ts , b =100 cm , Fcu , Fy
Req. : As
d = ts - c (cover) c = 20 - 50 mm
Mu
d C1 C1 ..... J .....
Fcu . b
Mu
As ........ cm 2 / m
J . d . fy
Ac = b x d
Dr. Eng. ALaa Ali Bashandy
Design of R. C. Beams
C1 & J
Shear Behavior of Beams
Q1 0.4 W1 L1 Q3 0.6 W2 L2
Continuous two spans S.F.D a + b + C
- -
Q2 0.6 W1 L1 Q4 0.4 W2 L2
L1 m L2 m
Check of Shear
Cases of qu
Check of Shear
Where :
Reinforcing Rebars
Simple Beam
4+2
Simple Beam
2+2+2
Simple Beam
1
5
6
3
4 7
Dr. Eng. ALaa Ali Bashandy
Design of R. C. Beams
Cantilever Beam
5
1
2 6
7
3
Dr. Eng. ALaa Ali Bashandy
Design of R. C. Beams
Reinforcement Detailing
Using Straight Rebars
Simple Beam
Using Straight Rebars
2-spans Beam
Using Straight Rebars
More than 2-spans Beam
Using Straight Rebars
Over hanging Beam
Using Straight Rebars
Cantilever Beam
Using Bent Rebars
Simple Beam
Using Bent Rebars
2-spans Beam
Using Bent Rebars
More than 2-spans Beam
Using Bent Rebars
Cantilever Beam
Case 1
Case 2
Example:
For the given plan it is required to:
Calculate loads for slabs & Beams
Data:
FL.C = 150 kg/m2
L.L = 300 kg/m2
Steel Grade 360/520
Solution:
Slabs S1 ts = 400/40 = 10 cm
To have slab thickness ts S2 ts = 300/45 = 6.67 cm take ts = 12 cm
S3 ts = 500/45 = 11.1 cm
For S2 r 4 1.33
3
trapezoidal Ca = 0.63 & Ce = 0.81
triangle Ca = 1/2 & Ce = 2/3
6
For S3 r 1.2
5
trapezoidal Ca = 0.582 & Ce = 0.769
triangle Ca = 1/2 & Ce = 2/3
5
For S4 r 1.67
3
trapezoidal Ca = 0.701 & Ce = 0.881
triangle Ca = 1/2 & Ce = 2/3
Beams
B4 tB = span / 10 = 600 / 10 = 60 cm
W4 ( Wa & We) t/m\
take tB = 60 cm B1 B2
Wall weight = Wwall = 0.25 (width) x 2.7 (height) x 1.8 (wall = 1.2 1.8 t/m3) = 1.2 t/m\
L
Wa 4 We 4 Wu s x s 1.4 x O. wt. 1.4 x W wall
2
1.5 m
1.11 t/m 2 x 1.4 x 0.375 t/m 1.4 x 1.2 2.95 t/m'
2
2.95 t/m\
B1 B2
8.85 t 6m 8.85 t
B. M. D.
13.275 m.t
We1 Wu s x s x Ce 1.4 x O. wt 1.4 x W wall
L
2
2
x 1.4 x 0.3125 t/m' 1.4 x 1.2 3.605 t/m'
4m
1.11 t/m2 x
2 3
Part bc
Wa1 Wu s x s x Ca 1.4 x O. wt 1.4 x W wall
L
2
1
x 1.4 x 0.3125 t/m' 1.4 x 1.2 3.505 t/m'
5m
1.11 t/m2 x
2 2
We1 Wu s x s x Ce 1.4 x O. wt 1.4 x W wall
L
2
2
x 1.4 x 0.3125 t/m' 1.4 x 1.2 3.977 t/m
5m
1.11 t/m 2 x
2 3
Part cd
Wa3 We3 1.4 x 0.3125 t/m' 1.4 x 1.2 2.1175 t/m'
Dr. Eng. ALaa Ali Bashandy
Design of R. C. Beams
8.85 t
B1
3.228 t/m\ 3.505 t/m\
Shear
G1 G2 G3
4m 5m 1.5 m
B. M. D.
5.244 m.t W1L12/11 W2L22/11 6.214 m.t
B2
tB = span / 12 = 500 / 12 = 41.67cm R B4
take tB = 50 cm a b c
d
O. wt. of beam = 0.25 x 0.5 x 2.5 t/m3 = 0.3125 t/m\
4m 5m 1.5 m
Part ab
Wa2 Wu s x s x Ca 1.4 x O. wt. 1.4 x W wall
L
2
4m 1 3m
1.11 t/m2 x x 1.11 t/m 2 x x 0.63 1.4 x 0.3125 t/m' 1.4 x 1.2 4.276 t/m'
2 2 2
4.275 t/m\ 4.475 t/m\ 2.1175 t/m\
Shear
x Ce 1.4 x O.wt 1.4 x W wall
Ls
We2 Wu s x 4m 5m 1.5 m
2
4m 2 3m
1.11 t/m 2 x x 1.11 t/m 2 x x 0.81 1.4 x 0.3125 t/m' 1.4 x 1.2 4.954 t/m'
2 3 2
4.954 t/m \ 5.257 t/m\ 2.1175 t/m\
Part bc Moment
4m 5m 1.5 m
5m 1 3m
Wa2 1.11 t/m2 x x 1.11 t/m2 x x 0.582 1.4 x 0.3125 t/m' 1.4 x 1.2 4.475 t/m'
2 2 2
4m 2 3m
We2 1.11 t/m2 x x 1.11 t/m2 x x 0.769 1.4 x 0.3125 t/m' 1.4 x 1.2 5.257 t/m'
2 3 2
Part cd
Wa2 We2 1.4 x 0.3125 t/m 1.4 x 1.2 2.1175 t/m'
Dr. Eng. ALaa Ali Bashandy
Design of R. C. Beams
8.85 t
B2 4.275 t/m\ 4.475 t/m\ 2.1175 t/m\
Shear
G1 G2 G3
4m 5m
1.5 m
+ 8.85 t
0.4x4.276x4 = 6.84 t 0.6x4.475x5 = 13.43 t 3.176 t
Wc Lc 8.85 t
Q1 0.4 W1 L1 Q3 0.6 W2 L2
S.F.D a + b + C
- -
Q2 0.6 W1 L1 Q4 0.4 W2 L2
L1 m L2 m
0.6x4.276x4 = 10.26 t 0.4x4.475x5 + 8.85 = 17.8 t
8.85 t
Moment Values of B2
4.954 t/m\ 5.257 t/m\ 2.1175 t/m\
4m 5m 1.5 m
B3 a b c
Part ab
Wu s x s x Ca 1.4 x O. wt 1.4 x W wall
L
Wa3 Left Span
2
1.11 t/m 2 x
3m
x 0.63 1.11 t/m2 x 1 m 1.4 x 0.3125 t/m' 1.4 x 1.2 4.276 t/m'
2
Wu s x s x Ce 1.4 x O. wt 1.4 x W wall
L
We3 Left Span
2
1.11 t/m 2 x
3m
x 0.81 1.11 t/m2 x 1 m 1.4 x 0.3125 t/m' 1.4 x 1.2 4.576 t/m'
2
Part bc
Wu s x s x Ca 1.4 x O. wt 1.4 x W wall
L
Wa3 RightSpan
2
1.11 t/m 2 x
3m
x 0.701 1.11 t/m2 x 1 m 1.4 x 0.3125 t/m' 1.4 x 1.2 4.395 t/m'
2
Wu s x s x Ce 1.4 x O. wt 1.4 x W wall
L
We3 RightSpan
2
1.11 t/m 2 x
3m
x 0.881 1.11 t/m2 x 1 m 1.4 x 0.3125 t/m' 1.4 x 1.2 4.694 t/m'
2
B3
4.276 t/m\ 4.395 t/m\
Shear
G1 G2 G3
4m 5m
Moment Values of B3
W1L12/9
or 13.04 m.t
W2L22/9
B. M. D.
W1L12/11 W2L22/11
6.656 m.t 10.67 m.t
G1
6.0 m 3.0 m
RB2 at point a = 0.4 x (4.267 t/m\ x 4 m) = 6.842 t
WG1 Wa G1 We G1
Area 1.4 x O. wt 1.4 x W
wall
Span
2 m 6 m 1
1.11 t/m 2 x x 2 m x 3 m x 1.5 m
2 2 1.4 x 0.5625 t/m' 1.4 x 1.2 3.732 t/m'
9m
RB2
G1
6.842 t
WG1 (wa = we = 3.732 t/m)
B. M. D.
47.29 m.t
Mmax = 48.75 m.t
Distance 5.11 m from left supp.
RB2
23.69 t
WG2 (wa = we = 4.997 t/m\)
G2
6.0 m 3.0 m
Wa G2 Wa G2 We G2
Area 1.4 x O. wt 1.4 x W
wall
Span
2 m 6 m 1 m 6 m 1
1.11 t/m 2 x x 2 m x 2.5 m x 3 m x 1.5 m x 2
2 2 2
1.4 x 0.5625 t/m' 1.4 x 1.2 4.884 t/m'
9m
G2
RB2
23.69 t
WG2 (wa = we = 4.997 t/m)
B. M. D.
91.33 m.t
20.455 t
G3 WG3 (wa = we = 4.38 t/m\)
RB2 at point c = 0.4 x 4.475 x 5 + 8.85 + (8.85x1.5 + (2.1175 x (Lc 2 /2))/5) = 20.455 t
WG3 Wa G3 We G3
Area 1.4 x O. wt 1.4 x W
wall
Span
1 m 6 m 1 1.5
1.11 t/m 2 x x 2.5 m x 3 m x 1.5 m x 6 m
2 2 2
1.4 x 0.5625 t/m' 1.4 x 1.2
9m
4.38 t/m'
G3
20.455 t
WG3 (wa = we = 4.38 t/m\)
26.53 t 33.35 t
B. M. D.
80.34 m.t
Wubeam t/m\
2
WL /12 WL2 /16 WL2 /16