You are on page 1of 1

UNIVERSITI TEKNOLOGI MARA

PROGRESS REPORT FORM FOR FINAL YEAR RESEARCH PROJECT 1 (CHE687 / CBE684)
(EH220, EH221 & EH222)

Please be informed that the content/format of this progress report is based on Supervisor interest. Please follow instruction from your
supervisor. However, progress report 1 must consist of extraction/summary of data from a least 5 journals while progress report 2 is
additional of another 5 journals. Your supervisor have the right to increase the number of journal to be read.

Name :
ID:
Supervisor:
Title:
Summary of Journal

TITLE YEARS / SOURCE / PROBLEM TECHNIQUE / REMARK/FINDINGS CONCLUSIO


AUTHOR NAME OF STATEMENT METHODOLOGY N
JOURNAL

Integration of Karim M. Jordan Most batch System proses Process data for the Integrating
Statistical and Aljebory & Journal of processes model process Boundary Adjustment Chart statistical and
Engineering Mohammed Mechanical are run control statistical (Time, original process process
Process Control Alshebeb, and without analysis (Matlab output, adjusted process control
for Quality (2014). Industrial real-time, and Minitab) output, EWMA, Adjustment improve
Improvement (A Engineering online and Cumulative Adjustment process.
case Study: monitoring, or Set Point). Further
Chemical No study on investigation is on process
Industry - dynamic comparison before and
National on-line after adjustment for different
Chlorine model to lamdar (0.1, 0.2, 0.3, 0.4,
Industries), , integrate 0.5 and 0.6)
SPC/EPC
Second Journal
Third Journal
Fourth Journal
se F

You might also like