Professional Documents
Culture Documents
COMPONENTS REBUILT
Drive Motor: Complete Overhaul
Control Items: Unloader Valve
Minimum Pressure Valve
Oil Stop valve
Discharge check valve
Oil Circuit Thermostat
COMPONENTS REPLACED
Air Filter Oil Filter
Oil (4.5 Gallons) Air Oil Separator
Oil Scavenge Tube Control Air Hoses
COMPONENTS TESTED
Control items: Function tested
Entire Unit: Cleaned, operational tested for 30 minutes
and quality control inspected. Compressor
performs to like new condition.
www.aircompressors.com
Additional Images
www.aircompressors.com