You are on page 1of 1

NOTES :

-) THIS DRAWING SHOULD NOT USED FOR


EXECUTION UNLESS IT IS STAMPED AND
SCHEDULE FOR FIRST FLOOR BEAM SIGNED
-) THIS DRAWING MUST BE READ ALONG
WITH THE WORKING/ARCHITECTURAL
DRAWING
B1 B2 -) THIS DRAWING SHOULD NOT BE
SCALED OFF ONLY WRITTEN
DIMENSIONS SHOULD BE FOLLOWED
-) STEEL FE-415 EXCEPT FOR 6 MM DIA
BARS
-) GRADE OF CONCRETE M-20 UNLESS
B3 S1 SPECIFIED
B4
-) STEEL LAYING SHOULD BE GOT
CHECKED BEFORE CONCRETING
-) S.B.C ASSUMED IN 30 T/SQ.M TO BE
CONFIRMED ON SITE
B5 B6

STRUCTURAL CONSULTANT WILL NOT


BE RESPONSIBLE FOR :
B7 S2 B8 1) THE STABILITY OF STRUCTURE IF ANY
CHANGES OR MODIFICATIONS ARE MADE IN
B9 THE WRITTEN CONSENT
2) DRAWING RELEASED FOR 'APPROVAL' IS
USED ON THE SITE FOR CONSTRUCTION
B10 PURPOSE
3) SAFETY OF ANY ARCHITECTURAL
PROJECTION PROVIDED WHICH IS NOT GIVEN
IN THIS DRAWING
4) QUALITY OF CONCRETE, QUALITY OF
B11 B12 S4 MATERIALS USED FOR CONSTRUCTION,POOR
S3 B13 WORKMANSHIP, FAULTY CONSTRUCTION
PROCEDURE.
5) ANY ACCIDENTS OCCURRING DURING
CONSTRUCTION OF STRUCTURE.
6) ANY ACCIDENTS DUE TO INSUFFICIENT AND
IMPROPER SHUTTERING AND CENTERING
B15 B14 WORK.
SCHEDULE FOR FIRST FLOORSLAB 7) STABILITY OF ADJOINING STRUCTURES
8) SETTLEMENT OF BED CONCRETE.
9) CRACKS IN WALLS

OUR RESPONSIBILITY SHALL


REMAIN LIMITED TO SAFE AND SOUND
STRUCTURAL DESIGN.
SUPERVISION, IF SPECIFICALLY
ASKED FOR, WILL BE PROVIDED TO THE
EXTENT OF VERIFICATION OF
REINFORCEMENT ON SITE BUT
RESPONSIBILITY REGARDING CORRECT
& SOUND CONSTRUCTION SHALL SOLELY
L1/4 L1/4 L2/4 L2/4 REST WITH CONTRACTOR / BUILDER /
c d e d c
OWNER .
REFERENCE DRAWING
L1/5 a b L1/5 L2/5 b a L2/5 NO. TITLE DRAWING NO.
L1 L2

TYPICAL DETAIL OF BEAM


REVISIONS
150 230
REV DATE DESCRIPTION MADE. CHEK. APPR.

NOTE
Max. no. of bars Max. no. of bars
in one Layer - 2 Nos. in one Layer - 3 Nos.
DESIGN DRAWN BY DATE DWG. NO.
TOR STEEL DENOTED BY # TYPICAL C/S OF BEAM
JOB.NO:
D.K.PATIL D.K.PATIL 3\09\16
CHECK APPR. REV. FO-01
RELEASED FOR
APPROVAL

DRAWING CONTENTS :-
DIMENSION ARE NOT TO SCALE SCHEDULE FOR FIRST FLOOR BEAM AND
SLAB
PROJECT

GENERAL NOTES -) FOR CANTILEVER BEAM TOP REINFORCEMENT TO BE -) DESHUTTRING PERIOD SHALL NOT BE LESS THAN SPECIFIED BELOW -) PROPER LINKED FOR COLUMN REINFORCEMENT IN
Mr. DHIRAJ KERBA PATIL
ANCHORED BEHIND FOR 1.5 TIMES OF CANTILEVER BEAM I) VERTICAL FACE OF COLUMN BEAM & WALL = 24 HOURS. JUNCTION OF COLUMN, BEAM, & SLABS AS PER LINKS
BASIC REFERENCE CODE IS IS 456-2000/IS 1893-2002 -) BAR BENDING SHOULD BE AS PER DETAILS GIVEN II) a) SLAB SPANNING UP TO 3.5 M = 7 HOURS. SPACING MENTIONED IN OUR DRAWING. B.E. (CIVIL), M.TECH. (CIVIL STRUCTURE)

COVER TO REINFORCEMENT -) LAP LENGTH FOR I) BEAM & SLAB = 60 X DIAMETER OF BAR b) SLAB SPANNING UP TO 3.5 M = 14 HOURS. -) ALL STRUCTURAL CONCRETE SHALL BE WEIGHT AT/PO GOKUL SHIRGAON,
SR. NO DESCRIPTION COVER II) COLUMN = 45 X DIAMETER OF BAR c) BEAM = 21 HOURS. BATCHED , MACHINE MIXED AND MECHANICALLY KOLHAPUR -416234.
i) FOOTING 60 mm
ALL LAPS SHOULD BE STAGGERED & NOT MORE THAN 50% BEFORE DESHUTTRING, DUE CARE SHOULD BE TAKEN TO VIBRATED.
ii) COLUMN 40 mm STRUCTURAL CONSULTANT.
iii) BARS TO BE LAPPED AT ANY GIVEN SECTION ASCERTAIN THAT REQUISITE STRENGTH OF CONCRETE IS GAINED -) ANY DISCREPANCY BETWEEN OUR DRAWING AND
BEAM 25 mm
iv) SLAB 15 mm -) DO NOT CAST ANY RCC WORK UNLESS IT IS CHECKED AND -) FIRST STIRRUPS IN BEAM SHOULD START FROM ITS FACE OF ARCHITECTS DRAWING SHALL BE BROUGHT TO OUR
CONFIRMED BY CONCERNED AUTHORITY SUPPORT NOTICE BEFORE EXECUTION OF WORK

You might also like