DAILY FIT-UP/WELDING I

Report No: Supervisor Name: Area: MODULE B

Welder Stamp
Visual Insp
No
Sr Dia Thick Weld
Drawing No Line No Weld No
No inch (mm) Type
Fitup
R/H F/C Acc/Rej
Date

5
ABIS

NAME: NAME:

POSITION: POSITION:

DATE: DATE:

SIGNATURE: SIGNATURE:
Doc.No.QRD-QC-04

ELDING INSPECTION REPORT Page: 1 of 1


Rev: 00
Date: 14/12/10

Visual Inspection NDT

Welding RT Rep. UT Rep


Acc/Rej DPT Rep.No Acc/Rej Acc/Rej Acc/Rej Remark
Date No No.
PETROKEMYA
ALBARRAK INDUSTRIAL
Daily Welding Inspectio

Report No: Supervisor Name:


Sr Line/Iso/Dwng Dia Thk
Sh No Sp No Weld No
No No (Inch) (mm)

Prepared By ABIS QA/QC


Name: Name:

Signature: Signature:
Date: Date:
Doc.No.QRD-QC-12
INDUSTRIAL SERVICES Rev.:00
Page: 1 of 1
ding Inspection Report
DATE: 14/12/10

Area: Date:
Welder I.D Visual Inspection
WPS No
R/H F/C Fit Up Welding

QA/QC Client QA/QC


Name:

Signature:
Date:
-QC-12

/10

Remarks