You are on page 1of 26

COTAS Y LONGITUDES

3790 msnm
3785 msnm
7.79 m LONGITUDES
DESCRIPCION
8.62 m PVC PE100
3787.3735527118 msnm Captacion 1 al CRP N1 1408.24
CRP N1 al CRP N2 943.32
CRP N2 al CRP N3 622.64
NUDOS cota (msnm) CRP N3 a la CR. 48.42
Captacion 1 4254.522 Captacion 2 al S 4.61
CRP N1 4190.925 S a CR 19.84
CRP N2 4135.908 CR. Al CRP N4 192.77 50.97
CRP N3 4070.741 CRP N4 al CRP N5 95.32 92.62
Captacion 2 4061.227 CRP N5 AL Reservorio 146.07
Sedimentador 4058.804 Reservorio al CRP N6 2440.27 104.66
Filtro Lento 4057.526 CRP N6 a la TEE 1 627.79
Cmara Reunin 4055.997 TEE 1 a ULT Viv Margen derecha 278.66 20.42
CRP N4 3998.146 TEE 1 a ULT Viv Margen Izquierda 535.01
CRP N5 3947.544 Longitud Total (m) 7362.96 268.67
Rerservorio 3891.903
CRP N6 3836.652 248.25
TEE 1 3799.325
ULT VIV DER 3787.511
TEE 1 3797.671
TEE 2 3802.840
TEE 3 3804.602
TEE 4 3807.129
TEE 5 3808.104
TEE 6 3807.654
TEE 7 3806.131
TEE 8 3787.615
A 3805.749
B 3805.252
C 3804.785
D 3805.635
E 3798.851
F 3808.189
G 3788.235
H 3787.591
ULT VIV IZQ 3782.011
243.74
187.94
146.07
2544.93
627.79
299.08
535.01
7631.63
CALCULO DE LA DOTACION

Mza N Lotes:
TOTAL 37

Calculo de Caudal Medio Qm:


Dotacion: 100lts/h/dia (RNC)
Qm=DotacionxPoblac./86400 (lts/seg)
Qm= 100lts/h/dx37lotx5.0per/lot/86400 (lts/seg)
Pf 2029 diseo= 229 Hbts
Qm= 0.27 lts/seg,

Calculo del Consumo Maximo Diario Qmd:


Qmd= K1xQm
Donde K1=1,3
=> Qmd= 1,3x0,27 lts/seg,

Qmd= 0.35 lts/seg,

Calculo del Consumo Maximo Horario Qmh:


Qmh= K2xQm
Donde K2=2,5
Qmh= 2,0x0,27 lts/seg,

Qmh= 0.53 lts/seg,

Calculo del Caudal de Aguas Residuales (Q)


'Poblacin x Dotacin x %Contribucin 14.68 m3/dia
Qcontribucion al desague 0.17 (lt/seg)

Aforos caudales (lps)


captacion 1 0.15
captacion 2 0.35
Oferta de Captaciones 0.5
CALCULO DE LINEA DE CONDUCCION
Calculo Hidraulico desde la Captacin 1 hacia la Cmara de Reunin Tuberias PVC clase 10, C=140

Cota del Terreno


Cota del Terreno (msnm) Perdida
Presion Perdida de Perdida de Perdida de (msnm) Perdida de
Longitud de Carga Diametros Longitud Desnivel
Caudal Residual Carga Diametro Velocidad Carga Carga por Carga
Tramo (1) Total (m)
(lps) (3) deseada deseada
Unitaria
(mm) (9)
considerados
(m/s) (11) Unitaria
Parcial (m)
Tramo (m)
del terreno
Acumulada
(2) deseada (pulg) (10) (13) (m) (17)
(m) (6) (m) (7) (m/m) (12) (14) (m) (18)
Inicial (4) Final (5) (m) (8) Inicial (15) Final (16)

Capt 1 - CRP N1 1408.24 0.150000 4254.522 4190.925 20 43.60 0.03096 18.1946 1 0.296025 0.0055227 1408.24 7.77734984 4254.52 4190.93 63.60 7.777
CRP N1 - CRP N2 943.32 0.150000 4190.925 4135.902 20 35.02 0.03713 17.5134 1 0.296025 0.0055227 943.32 5.20971543 4190.93 4135.90 55.02 5.210
CRP N2 - CRP N3 622.64 0.150000 4135.902 4070.741 20 45.16 0.07253 15.2158 1 0.296025 0.0055227 622.64 3.43868169 4135.90 4070.74 65.16 3.439
CRP N3 -CR 48.42 0.150000 4070.741 4055.997 10 4.74 0.09798 14.2847 1 0.296025 0.0055227 48.42 0.26741129 4070.74 4056.00 14.74 0.267
3022.62
Calculo Hidraulico desde la Captacin 2 hacia la Cmara de Reunin Tuberias PVC clase 10, C=140
Perdida Cota del Terreno
Cota del Terreno (msnm) Presion Perdida de Perdida de Perdida de Perdida de
Longitud de Carga Diametros Longitud (msnm) Desnivel
Caudal Residual Carga Diametro Velocidad Carga Carga por Carga
Tramo (1) Total (m)
(lps) (3) deseada deseada
Unitaria
(mm) (9)
considerados
(m/s) (11) Unitaria
Parcial (m)
Tramo (m)
del terreno
Acumulada
(2) Inicial (4) Final (5) deseada (pulg) (10) (13) Inicial (15) Final (16) (m) (17)
(m) (6) (m) (7) (m/m) (12) (14) (m) (18)
(m) (8)
Capt 2 - SED 4.61 0.350000 4061.227 4058.804 2 0.42 0.09176 19.9841 1 0.690725 0.0264796 4.61 0.12207112 4061.23 4058.80 2.42 0.122071
SED - CR 19.84 0.350000 4058.804 4055.997 2 0.81 0.04068 23.7071 1 0.690725 0.0264796 19.84 0.52535598 4058.80 4056.00 2.81 0.525356
24.450
Calculo Hidraulico desde la Cmara de Reunin hacia el Reservorio Tuberias PVC clase 10, C=140
Perdida Cota del Terreno
Cota del Terreno (msnm) Presion Perdida de Perdida de Perdida de Perdida de
Longitud de Carga Diametros Longitud (msnm) Desnivel
Caudal Residual Carga Diametro Velocidad Carga Carga por Carga
Tramo (1) Total (m)
(lps) (3) deseada deseada
Unitaria
(mm) (9)
considerados
(m/s) (11) Unitaria
Parcial (m)
Tramo (m)
del terreno
Acumulada
(2) Inicial (4) Final (5) deseada (pulg) (10) (13) Inicial (15) Final (16) (m) (17)
(m) (6) (m) (7) (m/m) (12) (14) (m) (18)
(m) (8)

CR - CRP N4 243.74 0.500000 4055.997 3998.146 10 47.85 0.19632 19.5064 1 0.98675 0.0512248 243.74 12.4855433 4056.00 3998.15 57.85 12.48554
CRP N4 - CRP N5 187.94 0.500000 3998.146 3947.544 10 40.60 0.21604 19.1183 1 0.98675 0.0512248 187.94 9.62719703 3998.15 3947.54 50.60 9.627197
CRP N5 - Res 146.07 0.500000 3947.544 3891.903 10 45.64 0.31246 17.6927 1 0.98675 0.0512248 146.07 7.48241285 3947.54 3891.90 55.64 7.482413
577.75
Calculo Hidraulico tipo Seccionamiento desde el Reservorio hasta la Red de Distribucin Tuberias PVC clase 10, C=140

Perdida de carga Cota Piezometrica Cota del Terreno


Gasto Presin (m)
Longitud Diametro Velocidad (m) (msnm) (msnm)
Tramo (1) Tramo
Tramo Diseo (m) (pulg) (m/s) Unit (m) Inicial Final Inicial Final Inicial Final
(m)
Reservorio al CRP N6 . 0.531019 2544.93 1.25 0.671 0.019334 49.204 3892.903 3843.699 3891.90 3836.652 1.00 7.047
CRP N6 a la TEE 1 0.531019 0.531019 627.79 1.00 1.048 0.057258 35.946 3843.699 3807.753 3836.65 3797.671 7.05 10.082
TEE 1 a Ult Viv Margen derecha 0.162009 0.162009 299.08 0.75 0.568 0.025818 7.7216 3807.753 3800.031 3797.67 3787.591 10.08 12.440
TEE 1 a Ult. Viv Margen Izquierda 0.370306 0.370306 535.01 1.00 0.731 0.029392 15.725 3807.753 3792.028 3797.67 3782.011 10.08 10.017
4006.81
Qunitario=Qmh/Pfut. 0.002314

0.011572
Longitud 1 1/4" 2544.93
Longitud 1" 4252.61
Longitud 3/4" 299.08
Longitud Total 7096.62
Codo 1"*45 45
Codo 1"*90 5
Codo 3/4" *45 11
Cruz 1" 2
Codo 3/4" *90 2
Codo 1 1/4" * 45 13
Codo 3/4" * 90 3
Tee 3/4" 6
Tee 1" 17
Red 2" a 1 1/4" 2
Red 2" a 1" 5
Red 1" a 3/4" 4
Cota Piezometrica
(msnm)
Presion
Final (m)
(21)
Inicial
Final (20)
(19)

4254.52 4246.74 55.82


4190.93 4185.72 49.81
4135.90 4132.46 61.72
4070.74 4070.47 14.48

Cota Piezometrica
(msnm) Presion
Final (m)
Inicial (21)
Final (20)
(19)
4061.23 4061.10 2.30
4058.80 4058.28 2.28

Cota Piezometrica
(msnm) Presion
Final (m)
Inicial (21)
Final (20)
(19)

4056.00 4043.511 45.37


3998.15 3988.519 40.97
3947.54 3940.062 48.16
CALCULO DEL RESERVORIO

VRES.= VREG. + VC.I. + VEMERG.


Datos de Diseo:
Qmd= 0.35 lts/seg.
N Lotes 37.00 lotes
Hab/lote 5.60 hab/lote
Pob.= 229.40 hab. Trabajamos con este valor segn el RNE
Como no existe Diagrama de Variaciones Horarias
Vol. Regulacion:
VREG. = 0,25xQmd

VREG. = 7.46 m3/d

Vol. Contra Incendio:


Como es una poblacion de 229 hab.< 10000 hab, No requiere Demanda Contra incendio.

VC.I. = 0 m3/d

Vol. Emergencia:
Para 1hora de suministro del Qmd.
VEMERG.= 1hxQmd

VEMERG.= 1.24 m3

Volumen del Reservorio:

VRES.= 8.70 m3/d ,luego:

<> VRES.= 20.00 m3/d

Dimencionamiento del Reservorio.


V= Pix(3h/2)^2xh
=> h= ((4V/PI/9))^(1/3)
h= 2.83 mts.
l= 4.40 mts.
=> a= 2.90 mts.
Redondeando Valores:

Altura= 2.8 mts.

Largo= 4.40 mts.

Ancho= 2.9 mts.

Asumiendo Borde Libre de 0.6 mt


Altura de Nivel de Agua 2.0 mt
tra incendio.
CALCULO DE LA LINEA DE ADUCCION
Datos de Diseo:
Del grafico: CT:

CNA 3893.31 m
Hr= 1.41 3172.72

CT: 3891.903 msnm


NUDO
NUDO
CT: ###
CT: 3799.325 msnm

Consumo Maximo Horario: Qmh= 0.53 lts/seg.


Cota Nivel Agua Reservorio: CNA= 3893.313 mts.
Cota Terreno en Reservorio: CTR= 3891.903 mts.
Cota Terreno en Nudo: CTN= 3799.325 mts.
Longitud Tuberia: 3.173 Km.
Ecuacion H-W:
Q = 0,0004264xCxD2,64xhf0,54
C= 150 pie / seg,
Despejando D
D2,64=Q/(0,0004264xCxhf0,54) pulgadas.
Elecion de Clase de Tuberia:
Carga Disponible: H= CNA-Ctnudo
H= 93.988 mts.
Escogemos: Tuberia Clase C-10
Longitud Equivalente: Leq.= 1,2xL
Leq.= 3.807 Km.
Carga: hf= Carga Disp./Leq.
hf= 24.6865 m/Km.
k1= 0.3613
Calculo de D D= 1.16 pulgadas.

Asumiendo: D= 0.50 pulgadas


Veloc, V= Q/A m/seg.
A= 0.00013 m2
V= 4.19 m/seg. >>>> Reglamento, Vmax=3,0m/seg,
Vmin=0,6m/seg.
Asumiendo: D= 1.00 pulgadas
Veloc, V= Q/A m/seg.
A= 0.00051 m2
V= 1.05 m/seg. <<<< Reglamento, Vmax=3,0m/seg,
Vmin=0,6m/seg.
Asumiendo: D= 1.50 pulgadas
Veloc, V= Q/A m/seg.
A= 0.00114 m2
V= 0.47 m/seg. <<<< Reglamento, Vmax=3,0m/seg,
Vmin=0,6m/seg.

De acuerdo a los clculos anteriores seleccionamos para la tubera de aduccion el dimetro de 1".
ION
Reservorio
3891.903 msnm

Qmh

msnm

Vmax=3,0m/seg, Desechado
Vmin=0,6m/seg.

Vmax=3,0m/seg, OK.
Vmin=0,6m/seg.

Vmax=3,0m/seg, Desechado
Vmin=0,6m/seg.

metro de 1".
CLCULO DE UNA ESTACIN DE CLORACIN

Caudal de diseo: Qd = 0.4849

Dosis mxima de cloro: DM = 2

Concentracin de la solucin: C= 10

Caudal mnimo de agua requerido para la operacin del eyq = 0.097

Capacidad requerida del equipo: W= 1.0


3.5

Capacidad del clorador: W max = 700

Capacidad comercial mximas ms cercana: W max' = 194.4

Capacidad mnima del clorador: W min = 35.0

Velocidad en la tubera de alimentacin de agua: V= 0.9

Area de la tubera: A= 1.08E-04

Longitud de la tubera de alimentacin de agua: L= 4

Dimetro de la tubera de alimentacin de agua: D= 0.012


0.5

Coeficiente de friccin: f= 0.03

Prdidas de carga por friccin: Ho = 0.39

Coeficiente total de prdidas de carga por accesorios: KT = 4.45

Prdidas de carga menores: Hm = 0.18

Presin requerida por el eyector: h= 30

Carga dinmica total: H= 30.57

Peso especfico del agua: = 1000

Eficiencia: E= 0.85

Potencia de la bomba: P= 0.047


Tiempo de contacto: T= 25

Volumen del tanque de contacto de cloro: VTc = 0.7


l/s

mg/l

mg/l

l/s

mg/s
gr/hr

gr/hr

mg/s

gr/hr

m/s

m2

m
pg

kg/m3

HP
min

m3
CLCULO DEL ALMACENAMIENTO DE CLORO

Dosis mxima de cloro: DM = 2

Dosis mnima de cloro: Dm = 1

Dosis promedio de cloro: D= 1.5

Tiempo de almacenamiento: T= 90

Caudal de diseo: Qd = 100


8640.0

Peso de cloro requerido en el perodo de almacenamienW = 1166.4

Peso de un cilindro: p= 67

Nmero de cilindros que se almacenarn: N= 17.4

Area que ocupa cada cilindro: Ac = 0.071

Area ocupada por los cilindros: AT = 1.5


mg/l

mg/l

mg/l

das

l/s
m3/dia

kg

kg

m2

m2
SEDIMENTADOR
El rea de sedimentacin se calcular con una carga superficial (CS) de 1,2 m3/(m2*h), segn la norma S090. Como factor de seguridad se utilizar para el dimensionamiento el
caudal mximo.
Cs = 1.2 m3/(m2*h)

El rea superficial mnima de sedimentacin (As), ser:


Qmax 3.6 m3/hora
As =
Cs

As = 3.00 m2

Considerando que el sedimentador estar ubicado colineal a la Captacin, la longitud del


sedimentador ser asumido como: 2.50 mts.
El ancho mnimo ser por tanto de:

Ancho SEDIMENTADOR = 1.50 mts.

De acuerdo a la Norma S090 la profundidad del sedimentador debe ser 2.20 m. Se


considera adems un borde libre sobre el sedimentador de 0.80 m. Con lo que la profundidad
total del sedimentador ser de:

Prof. SED. = 2.75 mts.

Nivel de Agua del sedimentador ser de: 1.40

You might also like