Professional Documents
Culture Documents
CONTACT INFORMATION......................................................................................................................... 3
COMPANY PROFILE.................................................................................................................................. 3
ABOUT US ............................................................................................................................................... 3
SERVICES ................................................................................................................................................. 4
CODES AND STANDARDS ......................................................................................................................... 6
OCCUPATIONAL HEALTH AND SAFETY ..................................................................................................... 6
STAFF ...................................................................................................................................................... 7
KEY CONSULTANTS .................................................................................................................................. 8
STRATEGIC PARTNERS ............................................................................................................................. 9
CLIENT LIST .............................................................................................................................................. 9
REFERENCES .......................................................................................................................................... 10
WORK EXPERIENCE ................................................................................................................................ 11
APPENDIX A: CV NANA OSEI K. MAINOO (Director) ................................................................................ 19
APPENDIX B: CV MICHAEL APPIAH ASARE (DIRECTOR OPERATIONS) ................................................... 26
2|Page
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
CONTACT INFORMATION
Website www.correctplumbinggh.com
Email info@correctplumbinggh.com
COMPANY PROFILE
ABOUT US
Correct Plumbing and Engineering Services Limited (CPES) is a reputable, Accra-based company,
providing world-class mechanical plumbing / civil engineering services. The company was
3|Page
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
formed and incorporated in 2008 in response to the demand for convenient and professional
plumbing and plumbing engineering services in Ghana.
CPESs services are delivered by a team of certified Plumbers, guided by International Codes
and Standards, and supervised by experienced and motivated Managers and Engineers. CPES
prides itself on its unwavering commitment to deliver expedient, high-quality plumbing and
plumbing engineering services at competitive prices. In addition, CPES emphasis on customer
care, creates a client-friendly atmosphere where transparency and accountability are an
integral part of the Clients experience.
SERVICES
4|Page
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
PPR Pipes and Fittings Interplast, Wavin
Steel Pipes and Fittings CRANE Energy, Angus, WATTS
Tanks HDPE (Polytank, Sintex), Glass Reinforced Plastic
Sectional Tank (Braithwaite Ltd), Galvanized Steel
Sectional Tank (Braithwaite Ltd)
Grease Traps / Interceptors Endura, Dormont, Zurn, Thermaco
Drains McAlpine, Wade, Drain Net, Oatey, Sioux Chief, Kohler,
Advanced Tabco, Josam, WATTS, Euro, Redi
Installation works (e.g. piping systems PVC, PE, HDPE, ABS, PPE, Copper, Aluminum,
Steel, process equipment etc.) suitable for domestic, commercial and industrial
structures.
Electro-mechanical installation for domestic, commercial and industrial pumping
applications (surface pumps - centrifugal vertical and horizontal; submersibles -
boreholes, sewage; dosing systems; hydro-pneumatic tanks; single-phase; 3-phase
systems)
Installation of piping systems for heating, ventilation and air-conditioning.
Installation, management and maintenance of plumbing systems and process
equipment for fluid systems (i.e. tanks, heat exchangers, boilers, pneumatic systems,
cooling water systems, fire protection, water treatment, waste water management and
effluent treatment, rainwater harvesting, grey - water recycling, vegetable oil extraction,
pharmaceuticals, food processing, etc.)
Erection of Glass Reinforced Plastic Sectional Tanks, Galvanized Steel Sectional Tank,
High Density Polyethylene Tanks, Erection Galvanized Steel Towers (6m, 9m and 12m)
for mounting overhead tanks
5|Page
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
Fire protection (external hydrants, fire rings, hose reels, fire hoses and sprinkler
systems)
Process and Piping system design.
Plumbing diagram drafting and interpretation.
Piping and Instrumentation diagram drafting and interpretation
Drainage works
Concrete coring services
General Earth and Civil works
International & Uniform Plumbing Codes American Society of Heating Refrigeration and
Air Conditioning Engineers Standards
Uniform Mechanical Code American Society of Mechanical Engineers
(ASME) Standards
National Fire Protection Association (NFPA) American Society of Testing and Materials
Standards (ASTM) Standards
International Fire Code International Building Code
Plumbing and Drainage Institute (PDI) American Water Works Association Standards
Standards
Ghana Standards Board Chartered Institute of Building Services
Engineers
It is our policy to provide a workplace free from accidents, injuries and exposure to hazardous
chemicals; conserve natural resources and prevent pollution to protect the environment.
Employees are issued with Personnel Protective Equipment (PPE), to be worn at all times while
performing Company duties. Site supervisors will maintain safety awareness and supervision of
6|Page
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
work practices on a daily basis to insure employees perform all duties in accordance with
documented safety and basic procedures.
STAFF
NAME NAME
1 James Kofi Asiedu - Logistics 14 Raymond Akorlie - Masonry Technician
2 Noah Ntim Appenteng - Junior Mechanical 15 Godson Agbesi - Lead Mechanical Technician
Technician
3 Albert Aguiar - Lead Mechanical Technician 16 Welbeck Aziagba - Lead Mechanical Technician
4 Abdullai Issah Akuka - Lead Mechanical 17 Samuel Senyo Gamor - Lead Mechanical
Technician Technician
9 Michael Tettey- Dapaah - Mechanical Technician 22 Godfred Owusu Kwafo - Lead Mechanical
Technician
10 Michael Appiah - Lead Mechanical Technician 23 Ebenezer Bentum - Lead Mechanical Technician
13 Obed Bonney - Lead Mechanical Technician 26 Daniel Boakye - Junior Mechanical Technician
7|Page
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
NAME NAME
27 Joe K Amoah - Lead Logistics 36 Awatu, Philip Atsu - Senior CAD Technician
28 Joseph Mensah Gadese - Mechanical Technician 37 Nyarko, Lord Sackitey - Senior CAD Technician
34 Isaac Kwadwo Osei - Junior CAD Technician 43 Emefa Francisca Kukah - Research & Development
KEY CONSULTANTS
8|Page
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
STRATEGIC PARTNERS
Correct Engineering Group - is a full service Mechanical, Process, Environmental and Civil Engineering
company specializing in process water, drinking water and wastewater treatment applications. The
company also provides process plant operations, management and maintenance services.
Edidor Limited are the West African regional partner (excluding Nigeria), for U.K. engineering firm
Braithwaite Engineers, manufacturers of galvanized steel and glass reinforced plastic water tanks. They
have engaged in numerous water projects in Ghana.
JIT Investment - is a Construction Services Firm with investments in Plant and Equipment.
Grote Engineering - is a full service civil / environmental engineering consulting company. Their
expertise is design and installation of water and waste water infrastructure.
CLIENT LIST
In addition to our extensive domestic customer base, some of our corporate clients include:
9|Page
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
Imperial Homes Accra Compost and Recycling Plant (ACARP)
AISWAM Sierra
REFERENCES
Kwame Abanquah Lance Batho
(Projects Manager) (Projects Manager)
IMPERIAL HOMES DAVENPORT DEVELOPERS LTD
No. 11A Noi Fetreke Street,Aiport Residential Finatrade Group, West Africa Office
Area 21 Spintex Road, Accra, Ghana
P.O. Box 5230,A/N Tel: +233 (0)302 819 101 /2/3, Mob: +233
Tel:233 (0)577 706555/ 233 (0) 244 203558 (0)544 325 642
Email: Email: lance.batho@finatradegroup.com
ekabanquah@imperialhomesghana.com
10 | P a g e
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
WORK EXPERIENCE
Work experiences include but are not limited to the following:
11 | P a g e
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
Client Description Period
Volta Capital Supply and install mechanical plumbing for Yoo Mart 2014 - Present
Kasoa and Graphic Road Super Markets
Omega Capital Supply and install mechanical plumbing for Pinewood 2014 - Present
Terraces - 8 Townhouses and 10 Apartments at
Distell Ghana Supply and install mechanical plumbing systems for 2013
Limited distillation plant
Imperial Homes Install mechanical plumbing system for multiple luxury 2013 - Present
residential and commercial projects (Apartment
complexes, Town Houses and Office Complexes,
Hotels and Mansions)
12 | P a g e
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
Client Description Period
Labadi Beach Hotel Supply and install mechanical pipes, fittings and civil 2012 - 2013
works for fire ring pipelines, fire hydrants, fire hydrant
chambers and valve chambers.
13 | P a g e
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
Client Description Period
Davenport Supply and install mechanical plumbing for 2 2012 - 2015
Developers / commercial buildings and 2 warehouses.
Finatrade Group
Installation of 14m3 GRP ground tank (with Edidor Ltd)
14 | P a g e
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
Client Description Period
Mantrac Ghana Maintenance woks for mechanical plumbing systems 2011 - 2012
for 1 commercial and 2 residential buildings in Accra.
15 | P a g e
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
Client Description Period
Labadi Beach Hotel 3 x 16m3 ground tanks installed to increase water 2010
(with Edidor storage capacity
Limited)
Union Management Maintenance works for 1 commercial and 3 residential 2010 2013
buildings in Accra
Walltech Ghana Ltd Installation contract for cooling water system (23 2009 2010
cu.m/hr) for hydraulic and welding machinery
Antrak Air Maintenance works for 2 commercial and 5 2009 Present
residential buildings in Accra
Ministry of Works 6 x 250m3 water tanks erected on Six 12m high water 2009
Housing and towers for the
Construction (with
Edidor Ltd)
Cassba Group Maintenance works for 2 commercial and 1 2009 Present
residential building in Accra
Coconut Grove Maintenance works for 1 commercial building in Accra 2010
Hotel, Accra
Domani Properties Maintenance works for rental buildings in Accra 2009 Present
Home Garden Maintenance works for rental buildings in Accra 2009 2011
Realtors
WaterHealth Ghana Install contract for 7 rural WTPs (3 cu.m/hr). 2009 2011
Ltd
Maintenance agreement for all water treatment plants
in Ghana. 2010 - 2011
16 | P a g e
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
Client Description Period
Can West Mechanical Plumbing Design for water supply and 2015- Present
waste water treatment for 5 storey office complex
Wonda World Mechanical design, pricing and installation of water 2015- Present
supply, drainage, storm water and waste water
treatment for 9 storey residential apartment
17 | P a g e
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
APPENDIX A: CV NANA OSEI K. MAINOO (Director)
Work Experience
Mar 2012 Present Managing Director / Lead Process & Environmental Engineer
Responsible for:
Notable achievements:
Responsible for:
Notable achievements:
Contracted for the following:
Design and costing of plumbing systems for residential and commercial buildings
for Rivonia Ltd, Arch Xenus Ltd., Imperial Homes, Primrose Properties, Davenport
Developers, Volta Capital, Pinewood Realty and many others.
Installing complete plumbing systems for residential and commercial buildings
Imperial Homes, Primrose Properties, Davenport Developers, Volta Capital,
Pinewood Realty, Asante & Associates and many others.
Renovating existing washrooms and bathrooms for Domani Properties, Broll,
Asante and Associates, Imperial Homes and many others
Overseeing defect liability period on 4 water treatment plants in the Eastern
Region for UNIHA/GWCL.
Installation and management of Reverse Osmosis Plants for Dredging
International
Installation of water cooling piping and cooling tower assembly for MANTRAC Gh.
Responsible for:
Notable achievements:
20 | P a g e
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
After funding had been sourced, organized importation of treatment equipment
and pre-fabricated super-structure
Supervised construction of civil works and installation of treatment equipment
and initiated start-up operations
Recruited and trained operators from community
Set up and supervised standard operating procedures for operational safety,
collating data, conducting daily/weekly/monthly maintenance
Responsible for all technical activities including operations of treatment
equipment, repairs and maintenance etc. On 24 hour call to provide emergency
solutions for system breakdowns.
NOVA Chemicals, Capital and Projects Division, Corunna Site Ethylene Plant, Ontario,
Canada
Academic Background
Faculty of Engineering
22 | P a g e
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
Areas of research interest include: conversion of organic wastes with
saprophages - vermicomposting (composting using earthworms), decentralized
low-cost fecal waste management, biological waste water treatment and
greenhouse gas emissions from livestock in urban Sub-Saharan Africa.
Comprehensive research and analysis conducted on toxicology, contaminant
transport and contaminant remediation in soil and water
Relevant Courses taken: Biological Treatment of Organic Wastes, Biological Treatment of
Wastewaters, Principles in Toxicology, Advanced Soil Ecology, Environmental
Bioremediation, Environmental Data Analysis
Faculty of Engineering
Relevant Courses taken: Chemical Manufacturing Processes, Fluid Mechanics, Heat and
Mass Transfer, Separation Processes, Chemical Reaction Engineering, Process Design,
Process Control, Materials Engineering Biochemical Engineering, Water Treatment and
Pollution Control, Geo-Environmental Engineering, Environmental Systems,
Environmental Management.
United World College of the Atlantic (St Donats Castle), Wales, U.K.
Areas of study: Physics, Chemistry, Mathematics, English, German and Political Science
Grade: 40/45
Sept 1994 - May 1996 International General Certificate for Secondary Education (IGCSE)
Grade: Distinction
23 | P a g e
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
IT Skills
Publications
Nana-Osei K. Mainoo, Joann K. Whalen, Suzelle Barrington and Luis Sampedro. Pilot-scale vermicomposting of
pineapple wastes with earthworms native to Accra, Ghana. Bioresource Technology, Volume 100, Issue 23,
Nana-Osei K. Mainoo, Joann K. Whalen and Suzelle Barrington. Vermicompost as a fertilizer for urban and peri-
urban farms: Perceptions of farmers in Accra, Ghana. Ghana Journal of Agricultural Science Vol 41, No 2, 2008.
Nana-Osei K. Mainoo, Joann K. Whalen and Suzelle Barrington. Earthworm abundance related to soil
physicochemical and microbial properties in Accra, Ghana. African Journal of Agricultural Research Vol. 3 (3),
Mainoo, N. (July 2006). Ecological Approaches to Vermicomposting for Peri-Urban Market Gardens and
Household farms in Accra, Ghana: Evaluating Indigenous Knowledge Frameworks as a Tool. AGROPOLIS
Manoo, N. (other Names) RETScreen Workshop report. KITE-Natural Resources Canada. April 2004
24 | P a g e
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
Mainoo, N. (Names) LPG Rural Energy Challenge Workshop report. KITE- UNDP-World Liquid Petroleum Gas
Association (WLPGA). October 2003.
Other Languages
25 | P a g e
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
APPENDIX B: CV MICHAEL APPIAH ASARE (DIRECTOR OPERATIONS)
SUMMARY
A trained civil engineer with vast experience in both structural and building engineering services (MEP). I have
been part of a team of engineers and consultants providing design, supervision and commissioning services for
world class projects.
Bsc. Honours in Civil Engineering- Kwame Nkrumah University of Science and Technology
2002-2007
Work Experience: 2013 to DATE CORRECT PLUMBING AND ENGINEERING SERVICES LIMITED
Operations Director
a. Overseeing all operations concerning residential, commercial and light industrial plumbing and
related engineering services.
b. Training new personnel including plumbers and new staff
c. Ensuring that all works comply with international best practice
d. Providing highest-quality customer service to all clients
Generally responsible for operating and maintaining building services and systems. This position also allowed me
to assign and supervise the daily activities of a team of engineers.
26 | P a g e
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
a. Plumbing services
b. Wet and dry fire fighting systems.
c. Ventilation and air conditioning systems(VRV)
2. Responsible of planning, coordinating and directing the daily activities of the building services staff.
3. Perform the tasks of establishing and maintaining corrective maintenance and emergency response service.
4. Responsible for preparing and administering budgets to include tracking expenditures, forecasting
expenditures, approving purchases and monitoring contract funds.
5. Monitor job sites, equipment and facilities including the approval of completed work and coordinating work
orders.
6. Handle the tasks of receiving bids from contractors, monitoring work and supervising the inspection of work
performed by contractors.
7. Responsible for evaluating and implementing operational policies and procedures.
8. Preparing reports on daily activities, work progress, accidents and material reports.
Structural Engineer
Part of architectural and structural engineering team that designed and supervised construction of Trasacco
valley luxury houses and Villaggio primavera apartments.
Responsibilities included.
1. Structural design and supervision of all works at various sites.
2. Preparation of rolling programme for the structural works.
3. Performance of all required structural tests.
28 | P a g e
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016