You are on page 1of 28

COMPANY PROFILE

Correct Plumbing and Engineering Services, 2017


Table of Contents

CONTACT INFORMATION......................................................................................................................... 3
COMPANY PROFILE.................................................................................................................................. 3
ABOUT US ............................................................................................................................................... 3
SERVICES ................................................................................................................................................. 4
CODES AND STANDARDS ......................................................................................................................... 6
OCCUPATIONAL HEALTH AND SAFETY ..................................................................................................... 6
STAFF ...................................................................................................................................................... 7
KEY CONSULTANTS .................................................................................................................................. 8
STRATEGIC PARTNERS ............................................................................................................................. 9
CLIENT LIST .............................................................................................................................................. 9
REFERENCES .......................................................................................................................................... 10
WORK EXPERIENCE ................................................................................................................................ 11
APPENDIX A: CV NANA OSEI K. MAINOO (Director) ................................................................................ 19
APPENDIX B: CV MICHAEL APPIAH ASARE (DIRECTOR OPERATIONS) ................................................... 26

2|Page
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
CONTACT INFORMATION

Office Address Rm 1, 1st Floor,


C 127/21 Saflo Link,
Abelemkpe, Accra

Post PO BOX CT 2611,


Accra Ghana

Website www.correctplumbinggh.com

Email info@correctplumbinggh.com

Telephone Plumbing Services 027 868 2232 / 054 144 7158

Engineering Services 027 593 2322 / 020 433 8001

COMPANY PROFILE

Name of Company Correct Plumbing and Engineering Services Limited

Date of Incorporation 11th November, 2008

Directors Ing. Nana Osei Mainoo (MSc.,BChEng, MGhIE)

Dr. Joyce Aryee (FGhIE, OVC, FIPR)

Michael Asare (BScCiv)

ABOUT US

Correct Plumbing and Engineering Services Limited (CPES) is a reputable, Accra-based company,
providing world-class mechanical plumbing / civil engineering services. The company was
3|Page
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
formed and incorporated in 2008 in response to the demand for convenient and professional
plumbing and plumbing engineering services in Ghana.

CPESs services are delivered by a team of certified Plumbers, guided by International Codes
and Standards, and supervised by experienced and motivated Managers and Engineers. CPES
prides itself on its unwavering commitment to deliver expedient, high-quality plumbing and
plumbing engineering services at competitive prices. In addition, CPES emphasis on customer
care, creates a client-friendly atmosphere where transparency and accountability are an
integral part of the Clients experience.

SERVICES

Design and Installation of Domestic, Commercial and Industrial Plumbing Systems


Retro-fitting, repair and maintenance of mechanical plumbing Installations
Door-to-Door emergency plumbing services
Supply and Installation works for:

Items / Materials Brands / Manufacturers


Pumps Grundfos, DAB, Pedrollo, KSB, Bell and Gosset, Gould
Sanitary Appliances Duravit, Ideal Standard, Geberit, Roca, Ariston, Tredex
Fixtures Grohe, Hans Grohe, Krowne, T & S Brass, KWC, Advanced
Tabco
UPVC Pipes and Fittings Interplast, Duraplast, Wavin
HDPE Pipes and Fittings Interplast, Duraplast, Wavin
Copper / Brass Pipes and Pegler, Tyco, PPP, Pex
Fittings

4|Page
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
PPR Pipes and Fittings Interplast, Wavin
Steel Pipes and Fittings CRANE Energy, Angus, WATTS
Tanks HDPE (Polytank, Sintex), Glass Reinforced Plastic
Sectional Tank (Braithwaite Ltd), Galvanized Steel
Sectional Tank (Braithwaite Ltd)
Grease Traps / Interceptors Endura, Dormont, Zurn, Thermaco
Drains McAlpine, Wade, Drain Net, Oatey, Sioux Chief, Kohler,
Advanced Tabco, Josam, WATTS, Euro, Redi

Installation works (e.g. piping systems PVC, PE, HDPE, ABS, PPE, Copper, Aluminum,
Steel, process equipment etc.) suitable for domestic, commercial and industrial
structures.
Electro-mechanical installation for domestic, commercial and industrial pumping
applications (surface pumps - centrifugal vertical and horizontal; submersibles -
boreholes, sewage; dosing systems; hydro-pneumatic tanks; single-phase; 3-phase
systems)
Installation of piping systems for heating, ventilation and air-conditioning.
Installation, management and maintenance of plumbing systems and process
equipment for fluid systems (i.e. tanks, heat exchangers, boilers, pneumatic systems,
cooling water systems, fire protection, water treatment, waste water management and
effluent treatment, rainwater harvesting, grey - water recycling, vegetable oil extraction,
pharmaceuticals, food processing, etc.)
Erection of Glass Reinforced Plastic Sectional Tanks, Galvanized Steel Sectional Tank,
High Density Polyethylene Tanks, Erection Galvanized Steel Towers (6m, 9m and 12m)
for mounting overhead tanks

5|Page
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
Fire protection (external hydrants, fire rings, hose reels, fire hoses and sprinkler
systems)
Process and Piping system design.
Plumbing diagram drafting and interpretation.
Piping and Instrumentation diagram drafting and interpretation
Drainage works
Concrete coring services
General Earth and Civil works

CODES AND STANDARDS

International & Uniform Plumbing Codes American Society of Heating Refrigeration and
Air Conditioning Engineers Standards
Uniform Mechanical Code American Society of Mechanical Engineers
(ASME) Standards
National Fire Protection Association (NFPA) American Society of Testing and Materials
Standards (ASTM) Standards
International Fire Code International Building Code
Plumbing and Drainage Institute (PDI) American Water Works Association Standards
Standards
Ghana Standards Board Chartered Institute of Building Services
Engineers

OCCUPATIONAL HEALTH AND SAFETY

It is our policy to provide a workplace free from accidents, injuries and exposure to hazardous
chemicals; conserve natural resources and prevent pollution to protect the environment.
Employees are issued with Personnel Protective Equipment (PPE), to be worn at all times while
performing Company duties. Site supervisors will maintain safety awareness and supervision of

6|Page
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
work practices on a daily basis to insure employees perform all duties in accordance with
documented safety and basic procedures.

STAFF

Managing Director / Principal Engineer - Ing. Nana Osei Mainoo


Operations Director - Michael Asare

NAME NAME
1 James Kofi Asiedu - Logistics 14 Raymond Akorlie - Masonry Technician

2 Noah Ntim Appenteng - Junior Mechanical 15 Godson Agbesi - Lead Mechanical Technician
Technician

3 Albert Aguiar - Lead Mechanical Technician 16 Welbeck Aziagba - Lead Mechanical Technician

4 Abdullai Issah Akuka - Lead Mechanical 17 Samuel Senyo Gamor - Lead Mechanical
Technician Technician

5 Francis Saakwa - Mechanical Technician 18 Saviour Dogbey - Lead Mechanical Technician

6 Isaac Arthur - Mechanical Technician 19 Daniel Acquaye - Lead Mechanical Technician

7 Yaw Boadi - Mechanical Technician 20 Quaynor Daniel

8 Kweku Panyin - Mechanical Technician 21 Faisal Mohammed - Lead Mechanical Technician

9 Michael Tettey- Dapaah - Mechanical Technician 22 Godfred Owusu Kwafo - Lead Mechanical
Technician

10 Michael Appiah - Lead Mechanical Technician 23 Ebenezer Bentum - Lead Mechanical Technician

11 Mamudu Benner - Logistics 24 Paul Ayuba Shaibu - Junior Mechanical Technician

12 Edward Appiah - Mechanical Technician 25 Kwame Addo - Junior Mechanical Technician

13 Obed Bonney - Lead Mechanical Technician 26 Daniel Boakye - Junior Mechanical Technician

7|Page
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
NAME NAME
27 Joe K Amoah - Lead Logistics 36 Awatu, Philip Atsu - Senior CAD Technician

28 Joseph Mensah Gadese - Mechanical Technician 37 Nyarko, Lord Sackitey - Senior CAD Technician

29 Stephen Allotey Quaye - Mechanical Technician 38 Benjamin Botwe - Finance Manager

30 Frank Amartey - Mechanical Technician 39 Abdul-Wahid Abdul-Kadir - Book keeper

31 Reuben Tetteh -Lead Mechanical Technician 40 Efua Forson - Procurement Officer

32 Emmanuel Yartey - Junior Mechanical Technician 41 Lawrence Mawunyo Agblewornu - Mechanical


Estimator

33 Bismark Amoakwah - Mechanical Technician 42 Jones Ankrah - Electro-mechanical Technician

34 Isaac Kwadwo Osei - Junior CAD Technician 43 Emefa Francisca Kukah - Research & Development

35 Boamah, Sandra - Office Manager

KEY CONSULTANTS

Mr. Michael Assibey Mechanical Engineer


Mr. Kwaku Boateng Mechanical Engineer
Mr. Kwadwo Osei Civil Engineer
Mr. Robert Ativui Mechanical Engineer
Mr. Kofi Karikari Civil Engineer
Mr. Danny Shaar Electrical Engineer
Mr. David Grote Civil Engineer
Mr. Victor Mallet - Process Engineer / MBA
Mr. Kofi-Antwi Mainoo Civil/Environmental Engineer
Mr. Richard Awuku - Electro-Mechanical Technician

8|Page
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
STRATEGIC PARTNERS
Correct Engineering Group - is a full service Mechanical, Process, Environmental and Civil Engineering
company specializing in process water, drinking water and wastewater treatment applications. The
company also provides process plant operations, management and maintenance services.

Edidor Limited are the West African regional partner (excluding Nigeria), for U.K. engineering firm
Braithwaite Engineers, manufacturers of galvanized steel and glass reinforced plastic water tanks. They
have engaged in numerous water projects in Ghana.

JIT Investment - is a Construction Services Firm with investments in Plant and Equipment.

Grote Engineering - is a full service civil / environmental engineering consulting company. Their
expertise is design and installation of water and waste water infrastructure.

CLIENT LIST
In addition to our extensive domestic customer base, some of our corporate clients include:

Omega Capital Rainbow Premier Homes

UNIHA Wasser Technologie GmbH Veolia Water Technologies


Volta Capital Yolo Experiences
Imperial Homes Union Management Limited
Tullow Oil Ghana Hygeena Ghana Limited
StarBow Ghana Limited Distell Ghana Limited
Antrak Air (GH) Limited Labadi Beach Hotel
Primrose Gh Ltd Canel Management
Dredging International Vanguard Properties
Water Comfort Ghana Limited Rhapsody's Ghana
Zest Electric JHI Properties
Spaan Babcock Ghana Limited Davenport Developers / Finatrade Group
Domani Properties Broll Ghana Limited
Cassba Group Daisu Hospitality Gh Ltd

9|Page
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
Imperial Homes Accra Compost and Recycling Plant (ACARP)

Can West Wonda World

Chain Homes Michelleti

AISWAM Sierra

Armeniques Place Red House

REFERENCES
Kwame Abanquah Lance Batho
(Projects Manager) (Projects Manager)
IMPERIAL HOMES DAVENPORT DEVELOPERS LTD
No. 11A Noi Fetreke Street,Aiport Residential Finatrade Group, West Africa Office
Area 21 Spintex Road, Accra, Ghana
P.O. Box 5230,A/N Tel: +233 (0)302 819 101 /2/3, Mob: +233
Tel:233 (0)577 706555/ 233 (0) 244 203558 (0)544 325 642
Email: Email: lance.batho@finatradegroup.com
ekabanquah@imperialhomesghana.com

D.I. M. Majidi Evans Adzaho


(Projects Manager) (Maintenance Engineer)
UNIHA Wasser Technologie GmbH Labadi Beach Hotel
Oberfeldstrasse 8, 4020 Linz / Austria No 1 La Bypass, Kpeshie, Accra
Tel.: +43 / 732 / 66 38 37, Fax: +43 / 732 / 66 Tel: + 233 (0)302-772501, Mob: +233 (0) 24
18 70, Mob.: +43 / 699 / 15192356 434 3801
E-Mail: majidi@uniha.at Email: eadzaho@legacyhotels.co.za

10 | P a g e
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
WORK EXPERIENCE
Work experiences include but are not limited to the following:

Client Description Period


Effutu Municipal Design and costing of High Strength Fecal Waste 2013
Assembly Treatment Plant for Winneba City and Environs (With
Correct Engineering Group)
FKK SLamson Design and costing of High Strength Fecal Waste 2014
Treatment Plant for West Accra and Environs (With
Correct Engineering Group)

UNIHA Electro-mechanical Installation support and plant 2013 - Present


maintenance contract for 4 WTPs (2,000 cu.m/hr) in
Eastern Region, Ghana
Rainbow Premier Design and install mechanical plumbing system 2015 - Present
Homes (including water and waste water treatment) for 35
luxury apartment complex

Design and install mechanical plumbing system


(including water and waste water treatment) for 6
floor mixed use complex with commercial spaces on
ground, first and second floor, and 6 luxury
apartments on remaining floors

Concrete coring services 63mm to 170mm

11 | P a g e
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
Client Description Period
Volta Capital Supply and install mechanical plumbing for Yoo Mart 2014 - Present
Kasoa and Graphic Road Super Markets

Omega Capital Supply and install mechanical plumbing for Pinewood 2014 - Present
Terraces - 8 Townhouses and 10 Apartments at
Distell Ghana Supply and install mechanical plumbing systems for 2013
Limited distillation plant
Imperial Homes Install mechanical plumbing system for multiple luxury 2013 - Present
residential and commercial projects (Apartment
complexes, Town Houses and Office Complexes,
Hotels and Mansions)

12 | P a g e
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
Client Description Period
Labadi Beach Hotel Supply and install mechanical pipes, fittings and civil 2012 - 2013
works for fire ring pipelines, fire hydrants, fire hydrant
chambers and valve chambers.

Supply and install mechanical pipes and fittings for fire


hydrant pump suction and discharge pipelines

Supply and install mechanical pipes, fittings and civil


works for storm and waste water drainage piping and
access manholes; and mothballing existing manholes.

Supply and install mechanical pipes and fittings for


water distribution pump suction and discharge
pipelines

Supply and install contract for concrete platforms for


16 Air Condition units
Primrose Gh Ltd Design and install mechanical plumbing for 8 2012 - Present
residential townhouses and 1 commercial 5 floor
building

Concrete coring services 63mm to 170mm


Rivonia Design and installation supervision of mechanical 2012 - Present
plumbing for 4 residential High-Rise Apartments

13 | P a g e
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
Client Description Period
Davenport Supply and install mechanical plumbing for 2 2012 - 2015
Developers / commercial buildings and 2 warehouses.
Finatrade Group
Installation of 14m3 GRP ground tank (with Edidor Ltd)

Mechanical plumbing maintenance works for 3


commercial buildings

Concrete coring services 63mm to 170mm


Yolo Experience Supply and install mechanical plumbing for 2
restaurants with commercial kitchens

Concrete coring services 63mm to 170mm


Vanguard Design and install mechanical plumbing for two 10- 2012 - 2013
Properties floor luxury (18 apartments) blocks and 3 luxury
homes
Dredging Install and maintenance contract for 1,200 LPH 2012 - 2013
International Reverse Osmosis Plant
37 Military Hospital 500m3 ground tank and 250m3 tank on a 15m tower 2011
(with Edidor for the Ministry of Defense
Limited)
Asante and Co. Ltd Design and supervision of mechanical plumbing for 4 2011 - Present
luxury townhouses; design and install contract (1st
and 2nd fix) for 1 luxury townhouse

14 | P a g e
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
Client Description Period
Mantrac Ghana Maintenance woks for mechanical plumbing systems 2011 - 2012
for 1 commercial and 2 residential buildings in Accra.

Supply and install mechanical plumbing pipes and


fittings for Cooling Tower inlet, outlet and circulation
lines.
Kosmos Energy Mechanical plumbing maintenance works for 2 2010 2012
commercial and 6 residential buildings in Accra
Broll Mechanical plumbing maintenance for 102 residential 2011 - Present
apartments and townhouses in Accra
Tullow Oil Maintenance contract for Grease Trap servicing 2011 - Present

Maintenance contract for Sewage Treatment servicing 2015 - Present


Fasena Enterprises Mechanical plumbing design for water supply and 2010 2011
waste water treatment system for 5-storey office
complex.
Rhapsody's Ghana Mechanical plumbing maintenance works at 2011 - Present
restaurant
Trassaco Facilities Mechanical plumbing maintenance works for Villagio 2011 - 2012
Management Estate
Company
Kane Em Industries Design contract for cooling water system retrofit 2010

Design and install water circulation system for 2015 - Present


thermoplastic manufacturing line

15 | P a g e
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
Client Description Period
Labadi Beach Hotel 3 x 16m3 ground tanks installed to increase water 2010
(with Edidor storage capacity
Limited)
Union Management Maintenance works for 1 commercial and 3 residential 2010 2013
buildings in Accra
Walltech Ghana Ltd Installation contract for cooling water system (23 2009 2010
cu.m/hr) for hydraulic and welding machinery
Antrak Air Maintenance works for 2 commercial and 5 2009 Present
residential buildings in Accra
Ministry of Works 6 x 250m3 water tanks erected on Six 12m high water 2009
Housing and towers for the
Construction (with
Edidor Ltd)
Cassba Group Maintenance works for 2 commercial and 1 2009 Present
residential building in Accra
Coconut Grove Maintenance works for 1 commercial building in Accra 2010
Hotel, Accra
Domani Properties Maintenance works for rental buildings in Accra 2009 Present
Home Garden Maintenance works for rental buildings in Accra 2009 2011
Realtors
WaterHealth Ghana Install contract for 7 rural WTPs (3 cu.m/hr). 2009 2011
Ltd
Maintenance agreement for all water treatment plants
in Ghana. 2010 - 2011

Imperial Homes Maintenance Works for residential Apartments 2010- Present

16 | P a g e
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
Client Description Period
Can West Mechanical Plumbing Design for water supply and 2015- Present
waste water treatment for 5 storey office complex

Concrete coring services 63mm to 170mm

Chain Homes Mechanical Plumbing Design, installation of water 2015 - Present


supply and waste water treatment for residential
apartments

Sierra Mechanical Plumbing Design, installation of water 2016 - Present


supply and waste water treatment for residential
apartments

Concrete coring services 63mm to 170mm

Micheletti Pricing and installation of water supply, waste water 2015


treatment for residential apartment

Wonda World Mechanical design, pricing and installation of water 2015- Present
supply, drainage, storm water and waste water
treatment for 9 storey residential apartment

FNJ Installation of 120 cu.m GRP tank 2016

17 | P a g e
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
APPENDIX A: CV NANA OSEI K. MAINOO (Director)
Work Experience
Mar 2012 Present Managing Director / Lead Process & Environmental Engineer

Correct Engineering Group Limited, Accra, Ghana

Responsible for:

Providing general process engineering services


Design, review, install and commission water and wastewater treatment systems
Design, review, install and commission of process and instrumentation diagrams
Design, review, install and commission of HVAC systems

Notable achievements:

Contracted for the following:

Process Engineering Services for Accra Compost and Recycling Plant


Process Engineering Services for Sewerage Systems Ghana Limited
Design, costing, installation supervision and commissioning of on site waste
water treatment system for mixed use buildings for Davenport Developers
and Primrose Properties.
Design and costing of faecal sludge treatment plant for Effutu Municipal
Assembly.

Nov 2008 Present Managing Director / Lead Engineer

Correct Plumbing and Engineering Services Limited, Accra, Ghana

Responsible for:

Overseeing all operations concerning residential, commercial and light industrial


plumbing and related engineering services
Overall management of team of engineers and certified plumbers
Training new personnel including plumbers and new staff
Ensuring that all works comply with international best practice
Providing highest-quality customer service to all clients

Notable achievements:
Contracted for the following:

Design and costing of plumbing systems for residential and commercial buildings
for Rivonia Ltd, Arch Xenus Ltd., Imperial Homes, Primrose Properties, Davenport
Developers, Volta Capital, Pinewood Realty and many others.
Installing complete plumbing systems for residential and commercial buildings
Imperial Homes, Primrose Properties, Davenport Developers, Volta Capital,
Pinewood Realty, Asante & Associates and many others.
Renovating existing washrooms and bathrooms for Domani Properties, Broll,
Asante and Associates, Imperial Homes and many others
Overseeing defect liability period on 4 water treatment plants in the Eastern
Region for UNIHA/GWCL.
Installation and management of Reverse Osmosis Plants for Dredging
International
Installation of water cooling piping and cooling tower assembly for MANTRAC Gh.

Jan 2008 Jan 2011 Operations Manager

WaterHealth Ghana, Accra, Ghana

Responsible for:

Overall management of 6 WaterHealth Centers worth US$ 350,000.00 and


managing an annual operational budget of GHC 200,000.00
Oversight responsibility for new site construction, daily operation, maintenance
and field service activity
Leading a team of 30 operation and field service personnel
Training new personnel including operators and new staff
Maintaining quality control, safety standards and equipment/chemical
inventories
Producing weekly operational reports for head offices in India and USA

Notable achievements:

Supervised set-up and operation of filtration/Ultra-Violet based water purification


systems (65,000 liters per day) in rural communities:

Travelled extensively across rural Ghana researching viable sites


Conducted feasibility studies to evaluate suitability of communities based on pre-
selected criteria
Negotiated with community leaders and District/Municipal authorities for sites

20 | P a g e
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
After funding had been sourced, organized importation of treatment equipment
and pre-fabricated super-structure
Supervised construction of civil works and installation of treatment equipment
and initiated start-up operations
Recruited and trained operators from community
Set up and supervised standard operating procedures for operational safety,
collating data, conducting daily/weekly/monthly maintenance
Responsible for all technical activities including operations of treatment
equipment, repairs and maintenance etc. On 24 hour call to provide emergency
solutions for system breakdowns.

Designed specialized decentralized water treatment infrastructure to address specific


water supply problems in particular communities:

42 km raw water distribution pipeline, 4 booster pumps and 6 WaterHealth


Centers (21,000 liters per day) treating water from Vea Dam as alternative to
fluoride contaminated groundwater in Bongo District
120,000 liter per day Reverse Osmosis system for treating groundwater in urban
enclave (Ayidiki, Accra) to address frequent intermittent supply
Buoy for supporting raw water submersible pump on Volta Lake to address
seasonal variations in lake shoreline

Researched and introduced a process to reduce Manganese to levels adhering to


WHO standard;

Observed levels of manganese exceeding WHO drinking water safety standards in


treated water during routine monitoring of plant water quality
Convinced senior management to shut down water treatment plant based on
water quality results and new research regarding effects of exposure to acute
levels of manganese in children.
Researched cost-effective manganese removal solutions and assessed
adaptability to Ghana
Designed manganese ore filter bed and supervised installation and operation of
pilot-scale Manganese Removal Unit.
Collated and analyzed pilot trial data and used data to present senior
management with a more cost effective and efficient solution
Resulting manganese removal process now considered standard manganese
removal technology in WaterHealth Ghana and WaterHealth India. This has
resulted in approximate cost savings of US$ 20,000.00 per treatment plant.

Jun 2007 Nov 2007 Research Consultant

International Water Management Institute (IWMI), Accra, Ghana


21 | P a g e
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
Field and literature based research on human excreta recovery and reuse in Accra,
Ghana.

Aug 2003 Mar 2004 Project Officer

Kumasi Institute of Technology and Environment (KITE), Accra, Ghana

Energy policy research institute focusing on renewable and alternative energy

Jan 2002 to Aug 2002 Process Designer (Intern),

NOVA Chemicals, Capital and Projects Division, Corunna Site Ethylene Plant, Ontario,
Canada

Gained experience in plant safety, flammable liquids storage standards, mechanical


equipment sizing and petrochemical process simulation during an undergraduate
industry placement program at International Petrochemicals processing company listed
on TSE and NYSE

Sep 1999 to Jul 2010 Presenter (Vibe FM)

Academic Background

Aug 2004 Oct 2007 Masters of Science (MSc)

McGill University, Montreal, Canada

Faculty of Engineering

Department of Bio-resource Engineering

Thesis: Feasibility of low cost Vermicompost production in Accra, Ghana.

Received AGROPOLIS Award ($17,000) from the International Development


Research Council of Canada (IDRC) to conduct field and literature based research

22 | P a g e
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
Areas of research interest include: conversion of organic wastes with
saprophages - vermicomposting (composting using earthworms), decentralized
low-cost fecal waste management, biological waste water treatment and
greenhouse gas emissions from livestock in urban Sub-Saharan Africa.
Comprehensive research and analysis conducted on toxicology, contaminant
transport and contaminant remediation in soil and water
Relevant Courses taken: Biological Treatment of Organic Wastes, Biological Treatment of
Wastewaters, Principles in Toxicology, Advanced Soil Ecology, Environmental
Bioremediation, Environmental Data Analysis

Aug 1999 - Oct 2003 Bachelor of Engineering (B.Eng)

McGill University Montreal, Canada

Faculty of Engineering

Department of Chemical Engineering

Relevant Courses taken: Chemical Manufacturing Processes, Fluid Mechanics, Heat and
Mass Transfer, Separation Processes, Chemical Reaction Engineering, Process Design,
Process Control, Materials Engineering Biochemical Engineering, Water Treatment and
Pollution Control, Geo-Environmental Engineering, Environmental Systems,
Environmental Management.

Sept 1996 - May 1998 International Baccalaureate Diploma (IB)

United World College of the Atlantic (St Donats Castle), Wales, U.K.

Areas of study: Physics, Chemistry, Mathematics, English, German and Political Science

Grade: 40/45

Sept 1994 - May 1996 International General Certificate for Secondary Education (IGCSE)

SOS-Hermann Gmeinner International College, Tema, Ghana

Grade: Distinction

23 | P a g e
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
IT Skills

 Microsoft Office Applications (Word, Excel, PowerPoint, Project and Visio)


 Aspen Tech Pro-2
 Aspen Tech HYSYS
 AUTOCAD
 Certified RETScreen expert/trainer pre-feasibility analysis software for renewable
energy technologies.

Publications

Nana-Osei K. Mainoo, Joann K. Whalen, Suzelle Barrington and Luis Sampedro. Pilot-scale vermicomposting of

pineapple wastes with earthworms native to Accra, Ghana. Bioresource Technology, Volume 100, Issue 23,

December 2009, Pages 5872-5875.

Nana-Osei K. Mainoo, Joann K. Whalen and Suzelle Barrington. Vermicompost as a fertilizer for urban and peri-

urban farms: Perceptions of farmers in Accra, Ghana. Ghana Journal of Agricultural Science Vol 41, No 2, 2008.

Nana-Osei K. Mainoo, Joann K. Whalen and Suzelle Barrington. Earthworm abundance related to soil

physicochemical and microbial properties in Accra, Ghana. African Journal of Agricultural Research Vol. 3 (3),

pp. 186-194, March, 2008.

Mainoo, N. (July 2006). Ecological Approaches to Vermicomposting for Peri-Urban Market Gardens and

Household farms in Accra, Ghana: Evaluating Indigenous Knowledge Frameworks as a Tool. AGROPOLIS

International Development Research Centre of Canada (IDRC).

Manoo, N. (other Names) RETScreen Workshop report. KITE-Natural Resources Canada. April 2004

24 | P a g e
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
Mainoo, N. (Names) LPG Rural Energy Challenge Workshop report. KITE- UNDP-World Liquid Petroleum Gas
Association (WLPGA). October 2003.

Other Languages

 German (spoken and written)


 French (beginner)
 Twi and Ga (Ghanaian languages, spoken)

25 | P a g e
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
APPENDIX B: CV MICHAEL APPIAH ASARE (DIRECTOR OPERATIONS)
SUMMARY
A trained civil engineer with vast experience in both structural and building engineering services (MEP). I have
been part of a team of engineers and consultants providing design, supervision and commissioning services for
world class projects.

HIGHER EDUCATION AND FURTHER TRAINING


MBA Project Management -
Wisconsin International University College, Ghana.
On-going.

Bsc. Honours in Civil Engineering- Kwame Nkrumah University of Science and Technology
2002-2007

Work Experience: 2013 to DATE CORRECT PLUMBING AND ENGINEERING SERVICES LIMITED

Operations Director

a. Overseeing all operations concerning residential, commercial and light industrial plumbing and
related engineering services.
b. Training new personnel including plumbers and new staff
c. Ensuring that all works comply with international best practice
d. Providing highest-quality customer service to all clients

Work Experience: 2009 to 2013 METROPOLIS DEV. LIMITED

Deputy Head of MEP Department (Building Services), Villaggio Vista

Generally responsible for operating and maintaining building services and systems. This position also allowed me
to assign and supervise the daily activities of a team of engineers.

Duties and responsibilities

1. Design responsibilities include

26 | P a g e
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
a. Plumbing services
b. Wet and dry fire fighting systems.
c. Ventilation and air conditioning systems(VRV)

2. Responsible of planning, coordinating and directing the daily activities of the building services staff.
3. Perform the tasks of establishing and maintaining corrective maintenance and emergency response service.
4. Responsible for preparing and administering budgets to include tracking expenditures, forecasting
expenditures, approving purchases and monitoring contract funds.
5. Monitor job sites, equipment and facilities including the approval of completed work and coordinating work
orders.
6. Handle the tasks of receiving bids from contractors, monitoring work and supervising the inspection of work
performed by contractors.
7. Responsible for evaluating and implementing operational policies and procedures.
8. Preparing reports on daily activities, work progress, accidents and material reports.

2007 2009 - TRASACCO ESTATES DEV. CO. LTD.

Structural Engineer
Part of architectural and structural engineering team that designed and supervised construction of Trasacco
valley luxury houses and Villaggio primavera apartments.
Responsibilities included.
1. Structural design and supervision of all works at various sites.
2. Preparation of rolling programme for the structural works.
3. Performance of all required structural tests.

ACHIEVEMENTS AND AWARDS.


1. Best worker in design department for 2008
2. Outstanding performance award for 2012

Further Training in Trasacco Estates Development Company


- Building Contract management.
- Assertive training and conflict resolution.
27 | P a g e
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016
- Management technique.
- Timetable and planning in Microsoft project.

28 | P a g e
www.correctplumbinggh.com
Correct Plumbing and Engineering Services, 2008 - 2016

You might also like