Phenomenological Model of Production Acceleration in Oil Reservoir with
Sensitivity of Permeability and Aquifer Volume : Case Study of Field
Synthetic Rohmad Imam Hermawan1, Arda Tanjung1, Ari Wahyudi1, Berty S. Simanjuntak1, Derby Novaldi1, M. Elwin F.1, Ni Wayan S.1, Rahmat1, Sari Nurhasanah1, Sintya Fabiola1 1 STT Migas Balikpapan, Transad Km 8
Abstract
I. Introduction between the vertical and horizontal planes
Plan of Development is a plan to develop within a formation. This variation in one or more oil and gas field in an permeability in different planes or integrated way in order to produce the directions is known as anisotropic hydrocarbon reserves optimally by permeability. Anisotropic permeability is considering the technical, economics and especially important when dealing with HSE aspects. A field development is horizontal or partially penetrated wells divided into three main scenarios are since flow occurs in both the vertical and workover, infill well and water injection. horizontal planes. In general, it is not The proposed development of this field is uncommon to assume that the permeability an improvement plan of development on in the x-direction (kx) is close to that in the previous field. Therefore, the number of y-direction (ky). However, the permeability the addition of new wells or workover in the z-direction (kz) is typically follows the previous development plan. significantly different, usually less, than The term Workover refers to a variety of the horizontal permeabilities (kx and ky). remedial operations performed on a well to Thus, vertical radial flow is controlled by maintain, restore, or improve productivity. ky and kz (where x is the direction of the Workover operations can include such jobs horizontal wellbore) and horizontal radial as replacing damaged tubing, recompleting flow is controlled by kx and ky. To obtain to a higher zone, acidizing near-wellbore optimal results in the field development, damage, plugging and abandoning a zone, simulation reservoir needs to be done with etc. Careful analysis will determine if the the help commercial simulator. However, decline is abnormal or the result of normal for design a development scenario field, reservoir depletion. If deemed abnormal, it observations on reservoir model especially must be determined if the problem is in the the sensitivity of permeability and aquifer reservoir inflow system, the wellbore volume is necessary. From this analysis, outflow system, or both. Inflow problems we can determine the point or potential can be corrected with stimulation areas to be developed through multiple procedures such as acidizing, fracturing, scenarios. Then we can find economy scale, or paraffin treatments or by re- parameters were correlated strongly on perforating or additional perforating. production wells to facilitate the Outflow problem resolution may require preparation POD in the future. equipment changes, cleanouts, or chemical treatments. Infill well is adding new wells II. Methodology in an existing field within the original well patterns to accelerate recovery or to test III. Result and Discussion recovery methods. In reality most reservoirs are not homogeneous in terms of IV. Conclusion and Way Forward permeability (isotropic permeability). Usually perme ability varies significantly Reference 1. Plan of Development BPMIGAS 2. Schlumberger Well Control for 2003 Workover Operations 3. Petrowiki Glosary