Professional Documents
Culture Documents
Preventive Maintenance
Site Visit
APC SERVICE REPRESENTATIVE
Company: GRUPO ROEL Service Request Number: 19782.
Company Address: Colonia Alameda City, State, Country: Tgu, Francisco Morazan
Date of Service: 07-03-2017. Service Engineer: Luis Salazar
Service Start Time: Service End Time:
# Hours On Site Total Travel Time:
INSTALLING ELECTRICIAN:
Company Name: GRUPO ROEL
Electrician Name: Juan Carlos Nuez Telephone : 504-2239-3272
SERVICE BULLETINS: List all service bulletins completed during this Site Visit
Mantenimiento Preventivo y limpieza general
Revision de funcionamiento, revision de modulo de potencia, revision de alarmas.
Revision de parametros electricos.
Carga conectada del 30% tiempo de respald 02 Hora 29 Minutos.
AUTHORIZATION TO SERVICE/TEST UPS
Contact Signature: Ing. Hector Rodiguez
Silcon
Preventive Maintenance
Rev 13/03/2017 Site Visit Page 1 of 4
ASSET SERIAL NUMBERS AND FIRMWARE REVISIONS: Record below for each system component.
ENVIRONMENT:
1. The alarm cabling/computer interfacing has been disconnected. No
2. The fans are operating correctly (i.e., airflow/noise). Yes
3. The UPS has been shut down and all sources of power removed. N/A
4. The UPS is de-energized and safe to perform work on. N/A
UPS CHECKS--DISPLAY READINGS: Check the display readings for the following in Normal operation.
System Mode: Operando
Load Power % 100%
Mains 1 Voltage: L1 + L2: 48 L2 + L3: 208 L3 + L1: 208
Mains 2 Voltage: L1 + L2: L2 + L3: L3 + L1:
Normal Charging VA: Battery 1: 100% Battery 2:
Output Voltage: L1: 120 L2: 120 L3: 120
Mains Current: L1: L2: L3:
Battery Current:
Battery Load: 100%
Boost Charging VA: Battery 1: Battery 2:
Output Current: L1: O1,0 L2: OO,5 L3: O2,9
Output Pk Current: L1: L2: N/A L3: N/A
Output Frequency: 60 HZ
Battery Temperature: 23,6C
Battery Tank:
Silcon
Preventive Maintenance
Rev 13/03/2017 Site Visit Page 2 of 4
BATTERY PERFORMANCE CHECK:
1. Perform the battery monitor test and record the test time. N/A
2. Record the percent load on the UPS for the test. N/A
DISCHARGE TEST:
Record any comments in the space provided below (including results from the discharge test):
Se realizo mantenimiento preventivo del ups, el equipo esta operando sin alarmas
FINAL CHECKPOINTS:
1. The UPS has been placed in Normal operation. Yes
2. All signaling alarms to the UPS have been reconnected. N/A
3. All covers were replaced prior to turn the load back on to the UPS. N/A
4. The customer load has been returned to UPS power. N/A
5. A generator test has been run (if applicable to the system). N/A
6. The UPS has successfully tested with the generator (if applicable). N/A
Silcon
Preventive Maintenance
Rev 13/03/2017 Site Visit Page 3 of 4
PARTS REPLACED: List all of the parts replaced in the system.
Part Description Part Number Serial No. Rev No. Year/Wk Reason for Replace
N/A N/A N/A N/A N/A
Silcon
Preventive Maintenance
Rev 13/03/2017 Site Vist Page 4 of 4