MUNICIPALIDAD DISTRITAL DE

VINCHOS
HUAMANGA - AYACUCHO

PROYECTO: MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y


SANEAMIENTO DE LAS LOCALIDADES DE RANRACANCHA,
QOCHAPUNCO, CONCAHUAYLLA, ORCCUNCHUPA, TINCO, VILLA VISTA,
QASANCCAY, MUTUYNIYOCC, REMILLAYOCC, HUAYUNCHOCCLLO,
QANCCAYLLO, VIZCACHAYOCC, HUAYLLAPAMPA, ACCOMACHAY,
QASACRUZ, PUCALOMA Y QENHUAS DE LA COMUNIDAD DE VINCHOS,
DEL DISTRITO DE VINCHOS, PROVINCIA DE HUAMANGA AYACUCHO.

SOLICITUD DEL CERTIFICADO DE INEXISTENCIA

DE RESTOS ARQUEOLGICOS

MEMORIA DESCRIPTIVA

Enero, 2017

1
MODELO N 04
MEMORIA DESCRITIVA
1. NOMBRE DEL PROYECTO
MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y
SANEAMIENTO DE LAS LOCALIDADES DE RANRACANCHA,
QOCHAPUNCO, CONCAHUAYLLA, ORCCUNCHUPA, TINCO,
VILLA VISTA, QASANCCAY, MUTUYNIYOCC, REMILLAYOCC,
HUAYUNCHOCCLLO, QANCCAYLLO, VIZCACHAYOCC,
HUAYLLAPAMPA, ACCOMACHAY, QASACRUZ, PUCALOMA Y
QENHUAS DE LA COMUNIDAD DE VINCHOS, DEL DISTRITO DE
VINCHOS, PROVINCIA DE HUAMANGA AYACUCHO
2. ANTECEDENTES
La poblacin total en este distrito al 2007 es de 15,787 personas y tiene
un rea de 955.13 km. La fecha de creacin por ley de este distrito fue
el 12 de enero de 1857. El mbito del proyecto abarca 17 comunidades
que cuentan con una poblacin beneficia de 1988 habitantes y 497
familias; de los cuales slo el 75% cuentan con conexiones de agua y
no existe sistema de desage por ende vienen evacuando las aguas
servidas hacia las calles y quebradas., el 65% cuentan con letrinas
sanitarias de tipo pozo seco ventilado en mal estado, en tant o el 35%
restante no cuentan ni con letrinas sanitarias y defecan al aire libre y
sus aguas servidas evacuan a las calles.
El acrecentamiento poblacional y condiciones socioeconmicas en la
zona, han provocado la contaminacin de zonas urbanas y riachuelos
por no contar con saneamiento con letrinas; los mismos que se han
constituido en focos infecciosos traducido en un incremento en las
atenciones de casos de enfermedades Parasitarias y epidrmicas
atentando contra la salud pblica, por esta razn la Municipalidad
Distrital de Vinchos prioriza la urgente aprobacin del mencionado
proyecto para su posterior bsqueda de financiamiento y ejecucin de
la obra.
La Municipalidad Distrital de Vinchos, hace constar que el proyecto de
saneamiento se encuentra dentro del Plan Desarrollo Concertado del
Distrito de Vinchos 2013 al 2024 en primera prioridad, por ser una obra
de vital importancia para el distrito, priorizado y considerado en el

2
Presupuesto Institucional de Apertura del ao fiscal 2015. (Ver anexo).
En ese contexto la Municipalidad Distrital de Vinchos, mediante
consultora ha desarrollado el perfil del Proyecto Mejoramiento del
Servicio de Agua Potable y Saneamiento de las localidades de
Ranracancha, Qochapunco, Concahuaylla, Orccunchupa, Tinco, Villa
Vista, Qasanccay, Mutuyniyocc, Remillayocc, Huayunchoccllo,
Qanccayllo, Vizcachayocc, Huayllapampa, Accomachay, Qasacruz,
Pucaloma Y Qenhuas de la Comunidad de Vinchos, del Distrito de
Vinchos, Provincia de Huamanga Ayacuchoactualmente se encuentra
viable con cdigo SNIP N 341275 en el cual se propone una serie de
actividades orientadas a mejorar la prestacin de los servicios de
saneamiento.
Para la continuacin de la implementacin del modelo de intervencin,
la Municipalidad Distrital de Vinchos mediante la presente Consultora,
requiere contar con el Expediente Tcnico para la bsqueda de
financiamiento y su posterior intervencin, de modo tal que se optimice
el uso de la infraestructura existente de agua potablee instalacin de
saneamiento con los siguientes objetivos especficos:
Identificar la alternativa de solucin en agua y saneamiento a corto,
mediano y largo plazo.
Elaborar el Expediente Tcnico a nivel de ejecucin de Obra para la
infraestructura definida como solucin a las condiciones de agua y
saneamiento.

3. DESCRIPCION DEL PROYECTO


DESCRIPCION TECNICA DEL PROYECTO
INFRAESTRUCTURA DE ABASTECIMIENTO Y DISTRIBUCIN DE AGUA
POTABLE
Las obras que se van a ejecutar son:
CONSTRUCCION DE CAPTACION, LINEA DE CONDUCCION Y PLANTA
DE TRATAMIENTO DE AGUA POTABLE
OBRAS PROVISIONALES UND 1.00
Construccin e instalacin del cartel de identificacin de la obra de
3.60x2.40m, campamento provisional de la obra y el vestuario del personal
obrero.
TRABAJOS PRELIMINARES UND 1.00
Movilizacin de maquinarias, equipos y herramientas, sealizacin de obra

3
para seguridad, tranqueras de madera 1.20x1.10 m para desvi trnsito
vehicular, flete terrestre, control topogrfico durante la ejecucin

ESTRUCTURAS DE CAPTACION Y PRETRATAMIENTO


CAPTACION DE RIO DE BARRAJE FIJO UND 1.00
Consta de 01 captacin proyectada donde se realizaran: trabajos
preliminares: limpieza de terreno manual, movimiento de tierras: excavacin
manual en material suelto, nivelacin interior y apisonado manual, relleno
con material propio, eliminacin de material excedente aprox. 50m, obras de
concreto simple: solado de concreto E=10cm, concreto F'c=100kg/cm2,
concreto ciclopeo F'c=140 kg/cm2 + 30 % pm., obras de concreto armado:
acero de refuerzo Fy=4200 kg/cm2, encofrado y desencofrado de
estructuras: concreto F'c=175kg/cm2 preparado manualmente, vlvulas y
accesorios: vlvulas y accesorios en captacin.

DESARENADOR UND 1.00


Trabajos preliminares: limpieza de terreno manual, movimiento de tierras:
excavacin manual en material suelto, nivelacin interior y apisonado
manual, relleno con material propio, eliminacin de material excedente
aprox. 50m, obras de concreto simple: solado de concreto E=10cm, concreto
F'c=100kg/cm2, encofrado y desencofrado de estructuras, concreto
F'c=1400kg/cm2, obras de concreto armado: acero de refuerzo Fy=4200
kg/cm2, encofrado y desencofrado de estructuras: concreto F'c=175kg/cm2
preparado manualmente, revoques enlucidos y molduras: tarrajeo interior con
impermeabilizante, tarrajeo exterior con mortero 1:5, 1.5cm, pintura: pintura
de estructuras con esmalte (02 manos), juntas y tapajuntas: Water Stop de
P.V.C. de 6". provisin y colocado de junta, vlvulas y accesorios: vlvulas y
accesorios en desarenador.

SEDIMENTADOR Y PREFILTRO UND 1.00


Trabajos preliminares: limpieza de terreno manual, movimiento de tierras:
excavacin manual en material suelto, nivelacin interior y apisonado
manual, relleno con material propio, eliminacin de material excedente
aprox. 50m, obras de concreto simple: solado de concreto E=10cm, concreto
F'c=100kg/cm2, encofrado y desencofrado de estructuras, concreto
F'c=1400kg/cm2, obras de concreto armado: acero de refuerzo Fy=4200
kg/cm2, encofrado y desencofrado de estructuras: concreto F'c=175kg/cm2

4
preparado manualmente, revoques enlucidos y molduras: tarrajeo interior con
impermeabilizante, tarrajeo exterior con mortero 1:5, 1.5cm, pintura: pintura
de estructuras con esmalte (02 manos), filtros: filtro con arena, filtro con
piedra chancada, vlvulas y accesorios, vlvulas y accesorios en
sedimentador y pre-filtros

CERCO PERIMETRICO UND 1.00


Excavacin manual en material suelto, concreto ciclopeo F'c=140 kg/cm2 +
30 % PM., cerco perimtrico con alambre de pas, puerta de madera rolliza.

LINEA DE CONDUCCION PRINCIPAL Y OBRAS DE ARTE


LINEA DE CONDUCCION PRINCIPAL ML 6+561
Trabajos preliminares: limpieza de terreno manual, movimiento de tierras:
excavacin manual en material suelto, refine y nivelacin de fondo de zanja,
preparacin de cama de apoyo, relleno con material propio zarandeado,
relleno con material propio, suministro e instalacin de tuberas y accesorios:
tubera PVC SAP 2.5" C-10, tubera PVC SAP 2.5" C-15, prueba
hidrulica + desinfeccin, suministro e instalacin de accesorios en lnea de
conduccin.

CRUCE AEREO UND 1.00


Trabajos preliminares: limpieza de terreno manual, movimiento de tierras:
excavacin manual en material suelto, eliminacin de material excedente
aprox. 50m, nivelacin interior y apisonado manual, obras de concreto
armado: acero de refuerzo fy=4200 kg/cm2, encofrado y desencofrado de
estructuras, concreto f'c=210kg/cm2 preparado manualmente, revoques
enlucidos y molduras, tarrajeo exterior con mortero 1:5, 1.5cm, pintura:
pintura de estructuras con esmalte (02 manos), suministro e instalacin de
tuberas y accesorios: tuberia de fierro galvanizado 2", suministro e
instalacin de accesorios 2"

CAMARA ROMPE PRESION T-6 UND 1.00


Trabajos preliminares: limpieza de terreno manual, movimiento de tierras:
excavacin manual en material suelto, eliminacin de m aterial excedente
aprox. 50m, nivelacin interior y apisonado manual, obras de concreto
simple: solado de concreto E=10cm, concreto F'c=100kg/cm2, revoques
enlucidos y molduras: tarrajeo interior con impermeabilizante, tarrajeo

5
exterior con mortero 1:5, 1.5cm, carpintera metlica, tapa metlica estriada
0.60m x 0.60m x 1/4" incluido marco y pintura, tapa metlica estriada 0.60m
x 0.60m x 1/4" incluido marco y pintura, pintura: pintura de estructuras con
esmalte (02 manos), vlvulas y accesorios: vlvulas y accesorios en C.R.P.
Tipo 6 2.5".

VALVULA DE AIRE UND 2.00


Trabajos preliminares: limpieza de terreno manual, movimiento de tierras:
excavacin manual en material suelto, eliminacin de material excedente
aprox. 50m, nivelacin interior y apisonado manual, grava 1" - 1 1/2", obras
de concreto simple: encofrado y desencofrado de estructuras, concreto
f'c=175kg/cm2 preparado manualmente, revoques enlucidos y molduras:
tarrajeo interior con impermeabilizante, carpintera metlica: tapa metlica
estriada 0.50m x 0.50m x 1/4" incluido marco y pintura, vlvulas y
accesorios: vlvulas y accesorios en vlvula de aire 2.5".

VALVULA DE PURGA UND 2.00


Trabajos preliminares: limpieza de terreno manual, movimiento de tierras:
excavacin manual en material suelto, eliminacin de material excedente
aprox. 50m, nivelacin interior y apisonado manual, grava 1" - 1 1/2", obras
de concreto simple: encofrado y desencofrado de estructuras, concreto
f'c=175kg/cm2 preparado manualmente, revoques enlucidos y molduras:
tarrajeo interior con impermeabilizante, carpintera metlica: tapa metlica
estriada 0.70m x 0.70m x 1/4" incluido marco y pintura, vlvulas y
accesorios: vlvulas y accesorios en vlvula de Purga 2.5".

PLANTA DE TRATAMIENTO DE AGUA POTABLE


FILTRO LENTO UND 1.00
Trabajos preliminares: limpieza de terreno manual, movimiento de tierras:
excavacin manual en material suelto, nivelacin interior y apisonado
manual, relleno con material propio, eliminacin de material excedente
aprox. 50m, obras de concreto simple: solado de concreto E=10cm, concreto
F'c=100kg/cm2, encofrado y desencofrado de estructuras, concreto
F'c=1400kg/cm2, obras de concreto armado: acero de refuerzo Fy=4200
kg/cm2, encofrado y desencofrado de estructuras: concreto F'c=210kg/cm2
c/Maquinariae, revoques enlucidos y molduras: tarrajeo interior con
impermeabilizante, tarrajeo exterior con mortero 1:5, 1.5cm, pintura: pintura

6
de estructuras con esmalte (02 manos), filtros: filtro con arena, filtro con
grava, juntas y tapajuntas: Water Stop de P.V.C. de 6". Provisin y colocado
de junta, pintura: pintura de estructuras con esmalte (02 manos), vlvulas y
accesorios, vlvulas y accesorios en filtro lento.
CASETA DE CLORACION Y GUARDIANIA UND 1.00
ESTRUCTURAS
Trabajos preliminares: limpieza de terreno manual, movimiento de tierras:
excavacin para zapatas en terreno normal, excavacin de zanjas para
cimentacin en terreno normal, relleno manual con material propio en zanjas,
nivelacin y compactado con material de afirmado (E=0.10m), eliminacin de
material excedente aprox. 50m, obras de concreto simple: solado para
zapatas (E:0.10m) mezcla 1:12 C:H, cimiento mezcla 1:10 cemento-hormign
+ 30% P.G. 6", encofrado y desencofrado normal, sobrecimiento mezcla 1:8
cemento-hormign + 25% P.M. 4", obras de concreto armado: zapatas acero
Fy=4200kg/cm2, zapatas concreto 210 kg/cm2, columnas acero
Fy=4200kg/cm2, columnas encofrado desencofrado, columnas concreto 210
kg/cm2, vigas acero Fy=4200kg/cm2, vigas encofrado desencofrado, vigas
concreto 210 kg/cm2, losa aligerada encofrado desencofrado, losa aligerada
acero Fy=4200kg/cm2, losa aligerada ladrillo hueco de arcilla 12x30x30, losa
aligerada concreto 210 kg/cm2, muro y tabiques de albailera: muro de
ladrillo aparejo en soga m:1:1:4

ARQUITECTURA
Revoques enlucidos y molduras: tarrajeo primario mortero C:A 1:5, tarrajeo
en muro interior, tarrajeo en muro exterior, tarrajeo de columnas, tarrajeo de
vigas, cielo raso con mezcla C:A 1:5, vestidura de derrames con bordes
boleados m:1:2, pisos y pavimentos: encofrado y desencofrado normal,
vereda concreto 140 kg/cm2 E=10cm frotachado y bruado, falso piso
mezcla 1:10 E=10cm, piso de cemento pulido y coloreado mezcla 1:8
E=5cm, piso de cermico porcelanato serie esmaltado 0.30 x 0.30, bruas
segn detalle (1cmx1cm), contrazocalos y zcalos: contrazocalo cemento
s/colorear h=20cm mezcla 1:2 E=1.5cm (interiores), contrazocalo cemento
s/colorear h=30cm mezcla 1:2 E=1.5cm (exteriores), zocalo de ceramico
porcelanato, carpinteria de madera: puerta apanelada de madera tornillo,
puerta contraplacada con marco de madera tornillo: ventana de madera
tornillo, vidrios, cristales y similares: vidrios semidobles incoloro crudo,

7
pintura: pintura latex 2 manos en cielo raso, pintura oleo 2 manos en muros
interiores, pintura oleo 2 manos en muros exteriores, pintura oleo 2 manos
en vigas, pintura oleo 2 manos en columnas, pintura esmalte 2 manos en
contrazocalo de cemento h=20cm, pintura esmalte 2 manos en contrazocalo
de cemento h=30cm, juntas y tapajuntas: junta de dilatacion (asfltica) E=1":
cobertura: impermeabilizacion de techo con pintura asfaltica, viguetas de
madera p/fijar cobertura de teja andina, cobertura con plancha de teja andina
tipo eternit (1.14 x 0.72), adquisicin de mobiliarios para ambien te de
guardiana: adquisicin de mobiliarios para ambiente de guardiana .

INSTALACIONES ELECTRICAS
Sistema elctrico: salida para centros de luz (techo), salida para
interruptores, salida tomacorriente doble con lnea de tierra: cable elctrico
en circuitos de alumbrado, cable elctrico en circuitos de tomacorriente,
artefactos: art. fluorescente 1/36w (sim. josfel tp prisma), tableros elctricos
y estabilizadores: tablero de distribucin TD-01.

INSTALACIONES SANITARIAS DE AGUA


Sistema de agua fra: red de distribucin tubera de 1/2" PVC-SAP, TEE
PVC-SAP 1/2", codo PVC-SAP 1/2"X90, salida de agua FRIA-PVC: vlvula
de compuerta de bronce 1/2", aparatos sanitarios y accesorios: inodoro
tanque bajo, lavatorio ovalin, ducha cromada 1 llave incluye acceso rios

INSTALACIONES SANITARIAS DE DESAGE


Sistema de desage: salida de desage en PVC 4", salida de desage en
PVC 2", tubera de PVC SAL 4", tubera de PVC - SAL 2", codo PVC SAL
2"X45, YEE PVC SAL DE 4" con reduccin a 2", YEE PVC SAL 2", registro
de bronce 4", provisin y colocacin, sumidero de bronce 2", provisin y
colocacin, caja de registro: caja de registro de desage 12" X 24".

INSTALACIONES SANITARIAS TANQUE DE CLORACION


Sistema de entrada - PVC SAP, tanque de cloracin, sistema de salida - PVC
SAP, tanque de cloracin, sistema de limpia - PVC SAP, tanque de cloracin,
instalacin y suministro de tanque de cloracin

INSTALACION DE BIODIGESTEROS UND 1.00


Movimiento de tierras, excavacin manual en terreno normal, relleno con
material propio, eliminacin de material excedente aprox. 50m, grava 1" - 1

8
1/2", instalaciones sanitarias: tubera de PVC SAL 4", instalacin de
biodigesteros: suministro e instalacin de biodigestor, caja de registro de
desage 12" x 24", caja de registro de lodos de 24" x 24"

CONSTRUCCION CERCO PERIMETRICO UND 1.00


Excavacin manual en material suelto, concreto ciclopeo F'c=140 kg/cm2 +
30 % PM., cerco perimtrico con alambre de pas, puerta de madera rolliza.

LINEA DE CONDUCCION SECUNDARIO Y OBRAS DE ARTE


LINEA DE CONDUCCION SECUNDARIO ML 31+772
Trabajos preliminares: limpieza de terreno manual, movimiento de tierras:
excavacin manual en material suelto, refine y nivelacin de fondo de zanja,
preparacin de cama de apoyo, relleno con material propio zarandeado,
relleno con material propio, suministro e instalacin de tuberas y accesorios:
tubera PVC SAP 2.5" C-15, tubera PVC SAP 2.5" C-10, tubera PVC
SAP 2" C-10, tubera PVC SAP de 1.5", C - 10, tubera PVC SAP de 1", C -
10, tubera PVC SAP de 3/4", C - 10, prueba hidraulica + desinfeccin,
suministro e instalacion de accesorios en lnea de conduccin

CRUCE AEREO UND 2.00


Trabajos preliminares: limpieza de terreno manual, movimiento de tierras:
excavacin manual en material suelto, eliminacin de material excedente
aprox. 50m, nivelacin interior y apisonado manual, obras de concreto
armado: acero de refuerzo fy=4200 kg/cm2, encofrado y desencofrado de
estructuras, concreto f'c=210kg/cm2 preparado manualmente, revoques
enlucidos y molduras, tarrajeo exterior con mortero 1:5, 1.5cm, pintura:
pintura de estructuras con esmalte (02 manos), suministro e instalacin de
tuberas y accesorios: tuberia de fierro galvanizado 2", suministro e
instalacin de accesorios 2"
CAMARA ROMPE PRESION T-6 UND 20.00
Trabajos preliminares: limpieza de terreno manual, movimiento de tierras:
excavacin manual en material suelto, eliminacin de material excedente
aprox. 50m, nivelacin interior y apisonado manual, obras de concreto
simple: solado de concreto E=10cm, concreto F'c=100kg/cm2, revoques
enlucidos y molduras: tarrajeo interior con impermeabilizante, tarrajeo
exterior con mortero 1:5, 1.5cm, carpintera metlica, tapa metlica estriada
0.60m x 0.60m x 1/4" incluido marco y pintura, tapa metlica estriada 0.60m

9
x 0.60m x 1/4" incluido marco y pintura, pintura: pintura de estructuras con
esmalte (02 manos), vlvulas y accesorios: vlvulas y accesorios en C.R.P.
tipo 6 - 1.5", vlvulas y accesorios en C.R.P. tipo 6 - 1", vlvulas y
accesorios en C.R.P. tipo 6 - 3/4"

VALVULA DE AIRE UND 15.00


Trabajos preliminares: limpieza de terreno manual, movimiento de tierras:
excavacin manual en material suelto, eliminacin de material excedente
aprox. 50m, nivelacin interior y apisonado manual, grava 1" - 1 1/2", obras
de concreto simple: encofrado y desencofrado de estructuras, concreto
f'c=175kg/cm2 preparado manualmente, revoques enlucidos y molduras:
tarrajeo interior con impermeabilizante, carpintera metlica: tapa metlica
estriada 0.50m x 0.50m x 1/4" incluido marco y pintura, vlvulas y
accesorios: vlvulas y accesorios en vlvula de aire 2.5", vlvulas y
accesorios en vlvula de aire 1.5", vlvulas y accesorios en vlvula de aire
1", vlvulas y accesorios en vlvula de aire 3/4"

VALVULA DE PURGA UND 18.00


Trabajos preliminares: limpieza de terreno manual, movimiento de tierras:
excavacin manual en material suelto, eliminacin de material excedente
aprox. 50m, nivelacin interior y apisonado manual, grava 1" - 1 1/2", obras
de concreto simple: encofrado y desencofrado de estructuras, concreto
f'c=175kg/cm2 preparado manualmente, revoques enlucidos y molduras:
tarrajeo interior con impermeabilizante, carpintera metlica: tapa metlica
estriada 0.70m x 0.70m x 1/4" incluido marco y pintura, vlvulas y
accesorios: vlvulas y accesorios en vlvula de purga 2.5", vlvulas
y accesorios en vlvula de purga 1.5", vlvulas y accesorios en vlvula de
purga 1", vlvulas y accesorios en vlvula de purga 3/4"
CAMARA REPARTIDORA DE CAUDALES UND 16.00
Trabajos preliminares: limpieza de terreno manual, movimiento de tierras:
excavacin manual en material suelto, eliminacin de material excedente
aprox. 50m, obras de concreto armado: solado de concreto E=10cm,
concreto F'c=100kg/cm2, encofrado y desencofrado de estructuras, concreto
F'c=175kg/cm2 preparado manualmente, revoques enlucidos y molduras:
tarrajeo interior con impermeabilizante, tarrajeo exterior con mortero 1:5,
1.5cm, carpintera metlica, tapa metlica estriada 0.60m x 0.60m x 1/4"
incluido marco y pintura, pintura: pintura de estructuras con esmalte (02
10
manos), vlvulas y accesorios: vlvulas y accesorios en cmara repartidora
de caudales 2.5", vlvulas y accesorios en cmara repartidora de caudales
2", vlvulas y accesorios en cmara repartidora de caudales 1.5".

MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE EN


LA- LOCALIDAD
OBRAS PROVISIONALES UND 17.00
Construccin e instalacin del cartel de identificacin de la obra de
3.60x2.40m, campamento provisional de la obra y el vestuario del personal
obrero.

TRABAJOS PRELIMINARES UND 17.00


Movilizacin de maquinarias, equipos y herramientas, sealizacin de obra
para seguridad, tranqueras de madera 1.20x1.10 m para desvi trnsito
vehicular, flete terrestre, control topogrfico durante la ejecucin

RESERVORIO UND 17.00


Trabajos preliminares: limpieza de terreno manual, movimiento de tierras:
excavacin manual en material suelto, relleno con material propio,
eliminacin de material excedente aprox. 50m, nivelacin interior y
apisonado manual, obras de concreto simple: solado de concreto e=10cm,
concreto f'c=100kg/cm2, obras de concreto armado: acero de refuerzo
fy=4200 kg/cm2, encofrado y desencofrado de estructuras, concreto
f'c=210kg/cm2 preparado manualmente, revoques enlucidos y molduras:
tarrajeo interior con impermeabilizante, tarrajeo exterior con mortero 1:5,
1.5cm, vlvulas y accesorios: vlvulas y accesorios en reservorio 2",
pintura: pintura de estructuras con esmalte (02 manos), cerco perim trico:
excavacin manual en material suelto, concreto ciclopeo F'c=140 kg/cm2 +
30 % pm., cerco perimtrico con alambre de pas, puerta de madera rollizo.

LINEA DE ADUCCIN Y DISTRIBUCIN ML 30+966


Trabajos preliminares: limpieza de terreno manual, mov imiento de tierras:
excavacin manual en material suelto, refine y nivelacin de fondo de zanja,
preparacin de cama de apoyo, relleno con material propio zarandeado,
relleno con material propio, suministro e instalacin de tuberas y accesorios:
tubera PVC SAP 1" C-10, tubera PVC SAP 3/4" C-15, prueba hidrulica
+ desinfeccin, suministro e instalacin de accesorios en lnea de

11
conduccin.

CRUCE AEREO UND 2.00


Trabajos preliminares: limpieza de terreno manual, movimiento de tierras:
excavacin manual en material suelto, eliminacin de material excedente
aprox. 50m, nivelacin interior y apisonado manual, grava 1" - 1 1/2", obras
de concreto simple: encofrado y desencofrado de estructuras, concreto
f'c=175kg/cm2 preparado manualmente, revoques enlucidos y molduras:
tarrajeo interior con impermeabilizante, carpintera metlica: tapa metlica
estriada 0.50m x 0.50m x 1/4" incluido marco y pintura, vlvulas y accesorios
en vlvula de aire 2.5", vlvulas y accesorios en vlvula de control 1".

CAMARA ROMPE PRESION TIPO 7 UND 32.00


Trabajos preliminares: limpieza de terreno manual, movimiento de tierras:
excavacin manual en material suelto, eliminacin de material excedente
aprox. 50m, nivelacin interior y apisonado manual, obras de concreto
simple: solado de concreto E=10cm, concreto F'c=100kg/cm2, revoques
enlucidos y molduras: tarrajeo interior con impermeabilizante, tarrajeo
exterior con mortero 1:5, 1.5cm, carpintera metlica, tapa metlica estriada
0.60m x 0.60m x 1/4" incluido marco y pintura, tapa metlica estriada 0.60m
x 0.60m x 1/4" incluido marco y pintura, pintura: pintura de estructuras con
esmalte (02 manos), vlvulas y accesorios: vlvulas y accesorios en C.R.P.
tipo 7 - 1.

VALVULA DE CONTROL UND 43.00


Trabajos preliminares: limpieza de terreno manual, movimiento de tierras:
excavacin manual en material suelto, eliminacin de material excedente
aprox. 50m, nivelacin interior y apisonado manual, grava 1" - 1 1/2", obras
de concreto simple: encofrado y desencofrado de estructuras, concreto
f'c=175kg/cm2 preparado manualmente, revoques enlucidos y molduras:
tarrajeo interior con impermeabilizante, carpintera metlica: tapa metlica
estriada 0.40m x 0.40m x 1/4" incluido marco y pintura, vlvulas y
accesorios: vlvulas y accesorios en vlvula de control 1", vlvulas y
accesorios en vlvula de control 3/4".

VALVULA DE PURGA UND 65.00


Trabajos preliminares: limpieza de terreno manual, movimiento de tierras:

12
excavacin manual en material suelto, eliminacin de material exce dente
aprox. 50m, nivelacin interior y apisonado manual, grava 1" - 1 1/2", obras
de concreto simple: encofrado y desencofrado de estructuras, concreto
f'c=175kg/cm2 preparado manualmente, revoques enlucidos y molduras:
tarrajeo interior con impermeabilizante, carpintera metlica: tapa metlica
estriada 0.70m x 0.70m x 1/4" incluido marco y pintura, vlvulas y
accesorios: vlvulas y accesorios en vlvula de purga 1", vlvulas y
accesorios en vlvula de purga 3/4".

VALVULA DE AIRE UND 11.00


Trabajos preliminares: limpieza de terreno manual, movimiento de tierras:
excavacin manual en material suelto, eliminacin de material excedente
aprox. 50m, nivelacin interior y apisonado manual, grava 1" - 1 1/2", obras
de concreto simple: encofrado y desencofrado de estructuras, concreto
f'c=175kg/cm2 preparado manualmente, revoques enlucidos y molduras:
tarrajeo interior con impermeabilizante, carpintera metlica: tapa metlica
estriada 0.50m x 0.50m x 1/4" incluido marco y pintura, vlvulas y
accesorios: vlvulas y accesorios en vlvula de aire 3/4".

CONEXIN DOMICILIARIA E INSTALACION DE LAVADEROS


CONEXIN DOMICILIARIA RED UND 497.00
Movimiento de tierras: excavacin manual en material suelto refine y
nivelacin de fondo de zanja, preparacin de cama de apoyo, relleno con
material propio zarandeado, relleno con material propio, suministro e
instalacin de tuberas y accesorios: suministro y colocacin tubera PVC
SAP C-10 - DN 1/2, conexiones e instalacin de accesorios PVC =1",
conexiones e instalacin de accesorios PVC =3/4".
INSTALACION DE LAVADEROS UND 497.00
Movimiento de tierras: excavacin manual en material suelto, relleno con
material propio, eliminacin de material excedente aprox. 50m, obras de
concreto simple: concreto ciclopeo F'c=140 kg/cm2 + 30 % pm., obras de
concreto armado: acero de refuerzo Fy=4200 kg/cm2, encofrado y
desencofrado de estructuras, concreto F'c=175kg/cm2 preparado
manualmente: revoques enlucidos y molduras, tarrajeo con mortero 1:4, 1.5
cm. Pulido y coloreado, vlvulas y accesorios, suministro e instalacin de
accesorios en lavaderos.

13
INSTALACION DE UNIDADES BASICAS DE SANEAMIENTO CON
ARRASTRE HIDRAULICO
CONSTRUCCION DE SERVICIOS HIGIENICOS INTRADOMICILIARIOS
UND 497.00
Movimiento de tierras: excavacin manual en terreno normal, nivelacin
interior y apisonado manual, relleno con material propio, eliminacin de
material excedente aprox. 50m, grava 1" - 1 1/2", concreto simple: cimiento
corrido c:h. 1:10 + 30% PG, encofrado y desencofrado de estructuras,
concreto 1:8+25% PM para sobre cimientos, muros y tabiques: muro de
ladrillo aparejo en soga m:1:1:4,.revoques enlucidos y molduras, tarrajeo
primario mortero c:a 1:5, tarrajeo con mortero 1:4, 1.5cm. Pulido y coloreado,
pisos y pavimentos: falso piso de 4" de concreto 1:10, piso cermico
papelma blanco 30x30cm, emboquillado de piedra zcalos: zcalo cermico
papelma blanco 30x30cm, carpintera de madera: sum. e inst. de puerta de
calamina con marco de madera, ventana de marco de madera con malla
mosquetero, cobertura de calamina para letrina, instalaciones sanitarias:
sistema de desague, registros de bronce de 4", sumidero de bronce 2",
tubera de PVC SAL 4", tuberia de PVC SAL 2", ventilacin PVC SAL 2",
accesorios en redes de letrina: aparatos y accesorios sanitarios, inodoro
tanque bajo, lavatorio ovalin, ducha cromada 1 llave incluye accesorios,
sistema de agua fra: tubera PVC clase 10 - 1/2", vlvula de compuerta de
bronce 1/2", instalacin de biodigesteros: suministro e instalacin de
biodigestor, caja de registro de desag 12" x 24", caja de registro de lodos
de 24" x 24".
MITIGACION DE IMPACTO AMBIENTAL
Capacitacin a la comunidad beneficiaria, medidas de mitigacin ambiental:
limpieza general de areas de trabajo afectadas, medidas de control : letrinas
temporales, contenedor de residuos slidos

PLAN DE MONITOREO ARQUELOGICO


Implementacin de plan de monitoreo, gastos administrativos y tupa al MC,
elaboracin del plan de monitoreo e informe final, elaboracin del plan de
monitoreo e informe final

EFICIENTE CONOCIMIENTO DE EDUCACIN SANITARIA


Capacitacin a la comunidad beneficiaria, medidas de mitigacin ambiental:
limpieza general de areas de trabajo afectadas, medidas de control: letrinas

14
temporales, contenedor de residuos slidos
EFICIENTE GESTIN TCNICA Y ADMINISTRATIVA
CONFORMACION DE LA JASS UND 34.00
Elaboracin del plan operacional, elaboracin del estatuto de la organizacin
de la JASS

CAPACITACION A LA JASS EVENT 51.00


Capacitacin en operacin y mantenimiento del servicio, c apacitacin al
personal tcnico calificado de la JASS, capacitacin al personal
administrativo de la JASS

RESUMEN DE METAS PROYECTO


Metas Fsicas y Financieras del Proyecto.

Estn compuestas por los siguientes componentes


Mejoramiento y ampliacion del sistema de agua potable
Instalacin de unidades bsicas de saneamiento con arrastre hidrulico
Eficiente conocimiento de educacin sanitaria
Eficiente gestin tcnica y administrativa

4. UBIGEO

4.1 UBICACIN POLITICA

Localidades : Ranracancha, Qochapunco, Concahuaylla,


Orccunchupa, Tinco, Villa Vista, Qasanccay,
Qasanqay Alto (Mutuyniyocc), Remillayocc,
Huayunchoccllo, Qanccayllo, Vizcachayocc,
Huayllapampa, Accomachay, Qasacruz,
Pucaloma Y Qenhuas
Distrito : VINCHOS
Provincia : HUAMANGA
Departamento : AYACUCHO

4.2 DIRECCIN:
El rea de estudio est ubicada en zona urbana, as como en terrenos
de cultivo.

15
5. DESCRIPCION TECNICA DEL PROYECTO

5.1 Longitud, redes y franja de Servidumbre:

Linea de Conduccin Primario y Secundario


La Lnea de Conduccin primaria y secundaria est constituido por
36+909.69 ml y/o 36.909 km, a s mismo las redes de Distribucin
posee una longitud de 26+690.89 y/o 26.690 km. La Longitud total
de la lnea de conduccin y la red de distribucin suman 63+000.58
ml y/o 63.000 km. Estas redes cuentan con rea de servidumbre
1.00 ml y estn ubicados en ambas mrgenes de la red,
mediante tuberas que estarn enterradas en el subsuelo.
TOTAL DE RED
PERIMETRO
ITEM DESCRIPCION
(ML)
1 LINEA DE CONDUCCION PRINCIPAL 6,547.81
2 LINEA DE CONDUCCION SECUNDARIO 01 7,235.79
3 LINEA DE CONDUCCION SECUNDARIO 02 5,271.86
4 LINEA DE CONDUCCION SECUNDARIO 03 4,042.26
5 LINEA DE CONDUCCION SECUNDARIO 04 2,034.69
6 LINEA DE CONDUCCION SECUNDARIO 05 4,413.84
7 LINEA DE CONDUCCION SECUNDARIO 06 4,531.15
8 LINEA DE CONDUCCION SECUNDARIO 07 1,224.57
9 LINEA DE CONDUCCION SECUNDARIO 08 1,142.31
10 LINEA DE CONDUCCION SECUNDARIO 09 465.41
11 RED DE DISTRIBUCION - LOCALIDAD RANRACANCHA 1,838.84
12 RED DE DISTRIBUCION - LOCALIDAD QOCHAPUNCO 2,199.84
13 RED DE DISTRIBUCION - LOCALIDAD CONCAHUAYLLA 3,356.98
14 RED DE DISTRIBUCION - LOCALIDAD ORCCUNCHUPA 2,177.74
15 RED DE DISTRIBUCION - LOCALIDAD TINCO 1,770.99
16 RED DE DISTRIBUCION - LOCALIDAD VILLA VISTA 2,319.89
17 RED DE DISTRIBUCION - LOCALIDAD QASANCCAY 1,821.52
18 RED DE DISTRIBUCION - LOCALIDAD MUTUYNIYOCC 1,287.53
19 RED DE DISTRIBUCION - LOCALIDAD REMILLAYOCC 895.90
20 RED DE DISTRIBUCION - LOCALIDAD HUAYUNCHOCCLLO 266.75
21 RED DE DISTRIBUCION - LOCALIDAD QANCCAYLLO 1,657.84
22 RED DE DISTRIBUCION - LOCALIDAD VIZCACHAYOCC 681.06
23 RED DE DISTRIBUCION - LOCALIDAD HUAYLLAPAMPA 2,877.59
24 RED DE DISTRIBUCION - LOCALIDAD ACCOMACHAY 1,189.39
25 RED DE DISTRIBUCION - LOCALIDAD QASACRUZ 1,294.19
26 RED DE DISTRIBUCION - LOCALIDAD PUCALOMA 559.53
27 RED DE DISTRIBUCION - LOCALIDAD QENHUAS 495.31
LONGITUD TOTAL 63,600.58 ml

16
5.2 rea y permetro:

Planta de Tratamiento de agua y reservorio


Se realizara la construccin de una planta de tratamiento de agua
potable el cual abarcara un rea de 2,975.00 m2, con un permetro
de 240.00 ml, A si mismo se construirn 17 reservorios con un rea
de 35.59 m2 con un permetro de 17.48 ml, sumando un rea total de
reservorios 605.11 m2 con un permetro de 297.16 ml.
El rea total que se utilizara ser de 3580.11 m2 con un permetro de
537.16 ml.
TOTAL DE AREA Y PERIMETRO
AREA PERIMETRO
ITEM DESCRIPCION
(m2) (ml)
1 PLANTA DE TRATAMIENTO DE AGUA POTABLE 2,975.00 240.00
2 RESERVORIO - LOCALIDAD RANRACANCHA 35.59 17.48
3 RESERVORIO - LOCALIDAD QOCHAPUNCO 35.59 17.48
4 RESERVORIO - LOCALIDAD CONCAHUAYLLA 35.59 17.48
5 RESERVORIO - LOCALIDAD ORCCUNCHUPA 35.59 17.48
6 RESERVORIO - LOCALIDAD TINCO 35.59 17.48
7 RESERVORIO - LOCALIDAD VILLA VISTA 35.59 17.48
8 RESERVORIO - LOCALIDAD QASANCCAY 35.59 17.48
9 RESERVORIO - LOCALIDAD MUTUYNIYOCC 35.59 17.48
10 RESERVORIO - LOCALIDAD REMILLAYOCC 35.59 17.48
11 RESERVORIO - LOCALIDAD HUAYUNCHOCCLLO 35.59 17.48
12 RESERVORIO - LOCALIDAD QANCCAYLLO 35.59 17.48
13 RESERVORIO - LOCALIDAD VIZCACHAYOCC 35.59 17.48
14 RESERVORIO - LOCALIDAD HUAYLLAPAMPA 35.59 17.48
15 RESERVORIO - LOCALIDAD ACCOMACHAY 35.59 17.48
16 RESERVORIO - LOCALIDAD QASACRUZ 35.59 17.48
17 RESERVORIO - LOCALIDAD PUCALOMA 35.59 17.48
18 RESERVORIO - LOCALIDAD QENHUAS 35.59 17.48
AREA (m2) 3,580.11 537.16

5.3 rea y permetro:

Datum: World Geodesic System, Datum 1984 WGS84


Proyeccin: Universal Transversal Mercator, UTM.
Sistema de Coordenadas. Planas
Zona UTM: 18 Cuadricula: L
Carta Nacional de IGN: 27
Escala 1/100 000.

17
5.4 Cuadro de datos tcnicos:

Lnea de Conduccin Principal y Secundario

CUADRO DE DATOS TCNICOS


LINEA DE CONDUCCION PRINCIPAL
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
P-1 554,392.5334 8,531,150.9385
P-2 P-1 - P-2 554,516.0371 8,531,187.1287 128.70
P-3 P-2 - P-3 554,657.6707 8,531,247.5676 153.99
P-4 P-3 - P-4 554,755.3724 8,531,257.1830 98.17
P-5 P-4 - P-5 554,916.9646 8,531,298.3245 166.75
P-6 P-5 - P-6 554,999.9846 8,531,264.6955 89.57
P-7 P-6 - P-7 555,100.4639 8,531,169.4631 138.44
P-8 P-7 - P-8 555,129.1421 8,531,120.6185 56.64
P-9 P-8 - P-9 555,269.2242 8,531,058.6741 153.17
P-10 P-9 - P-10 555,382.6167 8,530,996.1294 129.50
P-11 P-10 - P-11 555,517.7086 8,530,973.0015 137.06
P-12 P-11 - P-12 555,764.5689 8,531,045.9653 257.42
P-13 P-12 - P-13 555,828.2525 8,531,131.2087 106.41
P-14 P-13 - P-14 556,041.8331 8,531,276.5359 258.33
P-15 P-14 - P-15 556,144.8430 8,531,287.1451 103.55
P-16 P-15 - P-16 556,325.3745 8,531,260.5285 182.48
P-17 P-16 - P-17 556,493.9213 8,531,259.4733 168.55
P-18 P-17 - P-18 556,738.3605 8,531,186.8909 254.99
P-19 P-18 - P-19 556,880.7935 8,531,169.7481 143.46
P-20 P-19 - P-20 558,169.9159 8,531,392.7311 1,308.27
P-21 P-20 - P-21 558,989.9219 8,531,647.8482 858.78
P-22 P-21 - P-22 559,470.7113 8,531,725.6919 487.05
P-23 P-22 - P-23 560,630.7466 8,531,848.6408 1,166.53
LONGITUD TOTAL (m) 6547.81

CUADRO DE DATOS TCNICOS


LINEA DE CONDUCCION SECUNDARIO 01
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
P-28 560,712.5764 8,531,819.5079
P-29 P-28 - P-29 561,795.0957 8,531,484.4821 1,133.18
P-30 P-29 - P-30 561,956.9681 8,531,418.3178 174.87
P-31 P-30 - P-31 562,080.5694 8,531,320.8870 157.39
P-32 P-31 - P-32 562,211.3099 8,531,180.4300 191.89
P-33 P-32 - P-33 562,325.2653 8,531,155.0644 116.74
P-34 P-33 - P-34 562,380.4472 8,531,006.7499 158.25
P-35 P-34 - P-35 562,545.2229 8,531,024.0528 165.68
P-36 P-35 - P-36 562,615.3819 8,530,953.8561 99.25
P-37 P-36 - P-37 562,631.4423 8,530,877.5113 78.02
P-38 P-37 - P-38 562,706.5414 8,530,799.9433 107.97
P-39 P-38 - P-39 562,886.3720 8,530,778.8120 181.07
P-40 P-39 - P-40 562,951.7304 8,530,861.6936 105.55

18
P-41 P-40 - P-41 563,399.2406 8,530,842.1574 447.94
P-42 P-41 - P-42 563,475.2254 8,530,959.0444 139.41
P-43 P-42 - P-43 563,513.9922 8,531,207.7215 251.68
P-44 P-43 - P-44 563,647.1270 8,531,227.0948 134.54
P-45 P-44 - P-45 563,772.6328 8,531,321.3432 156.95
P-46 P-45 - P-46 563,850.9830 8,531,304.7468 80.09
P-47 P-46 - P-47 564,031.7268 8,531,360.8435 189.25
P-48 P-47 - P-48 564,213.7905 8,531,384.6196 183.61
P-49 P-48 - P-49 564,321.3768 8,531,455.0830 128.61
P-50 P-49 - P-50 564,469.4009 8,531,600.8165 207.72
P-51 P-50 - P-51 564,650.7496 8,531,568.0592 184.28
P-52 P-51 - P-52 564,755.1188 8,531,642.8209 128.38
P-53 P-52 - P-53 564,893.9133 8,531,637.8813 138.88
P-54 P-53 - P-54 565,074.7988 8,531,737.9754 206.73
P-55 P-54 - P-55 565,267.1817 8,531,755.0923 193.14
P-56 P-55 - P-56 565,423.8687 8,531,699.8760 166.13
P-57 P-56 - P-57 565,702.1453 8,531,723.5532 279.28
P-58 P-57 - P-58 565,924.8329 8,531,679.9463 226.92
P-59 P-58 - P-59 566,016.9572 8,531,671.7834 92.49
P-60 P-59 - P-60 566,246.3275 8,531,614.5345 236.41
P-61 P-60 - P-61 566,698.4105 8,531,608.6875 452.12
P-62 P-61 - P-62 566,746.8670 8,531,565.9078 64.64
P-63 P-62 - P-63 566,908.5704 8,531,575.6313 162.00
P-64 P-63 - P-64 567,007.7843 8,531,518.0132 114.73
LONGITUD TOTAL (m) 7235.79

CUADRO DE DATOS TCNICOS


LINEA DE CONDUCCION SECUNDARIO 02
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
P-65 560,726.4506 8,531,815.3930
P-66 P-65 - P-66 560,805.6989 8,531,874.1749 98.67
P-67 P-66 - P-67 561,048.4915 8,532,138.7512 359.09
P-68 P-67 - P-68 561,414.9058 8,532,372.4256 434.58
P-69 P-68 - P-69 561,567.1205 8,532,527.1574 217.05
P-70 P-69 - P-70 561,805.9814 8,532,674.4976 280.65
P-71 P-70 - P-71 561,990.1770 8,532,848.0529 253.08
P-72 P-71 - P-72 562,224.6976 8,532,974.9718 266.66
P-73 P-72 - P-73 562,352.1081 8,532,966.4482 127.70
P-74 P-73 - P-74 562,475.3685 8,533,041.2763 144.20
P-75 P-74 - P-75 562,690.9822 8,533,223.1814 282.10
P-76 P-75 - P-76 562,802.9427 8,533,395.0924 205.15
P-77 P-76 - P-77 563,228.0577 8,533,065.7455 537.77
P-78 P-77 - P-78 563,509.6221 8,533,081.6797 282.01
P-79 P-78 - P-79 563,560.0848 8,532,946.3939 144.39
P-80 P-79 - P-80 563,651.7944 8,532,908.4316 99.26
P-81 P-80 - P-81 563,732.0508 8,532,990.4161 114.73
P-82 P-81 - P-82 563,840.5894 8,533,051.9986 124.79
P-83 P-82 - P-83 563,873.4963 8,533,106.9127 64.02
P-84 P-83 - P-84 564,099.9423 8,533,210.0175 248.81

19
P-85 P-84 - P-85 564,228.3347 8,533,208.8379 128.40
P-86 P-85 - P-86 564,519.6762 8,533,414.0833 356.38
P-87 P-86 - P-87 564,741.3445 8,533,485.2062 232.80
P-88 P-87 - P-88 564,845.7401 8,533,733.7411 269.57
LONGITUD TOTAL (m) 5271.86

CUADRO DE DATOS TCNICOS


LINEA DE CONDUCCION SECUNDARIO 03
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
P-89 562,886.3720 8,530,778.8120
P-90 P-89 - P-90 562,895.0273 8,530,749.8148 30.26
P-91 P-90 - P-91 563,178.9640 8,530,332.6775 504.60
P-92 P-91 - P-92 563,402.6788 8,530,235.3119 243.98
P-93 P-92 - P-93 563,528.3014 8,530,193.6242 132.36
P-94 P-93 - P-94 563,660.8226 8,530,035.2298 206.52
P-95 P-94 - P-95 563,685.5990 8,529,862.3582 174.64
P-96 P-95 - P-96 563,751.9694 8,529,760.3889 121.67
P-97 P-96 - P-97 563,867.5827 8,529,696.4978 132.09
P-98 P-97 - P-98 564,034.1078 8,529,524.2851 239.56
P-99 P-98 - P-99 564,093.4491 8,529,419.8154 120.15
P-100 P-99 - P-100 564,195.6965 8,529,362.5450 117.19
P-101 P-100 - P-101 564,271.9840 8,529,281.6207 111.21
P-102 P-101 - P-102 564,553.5378 8,529,165.8774 304.42
P-103 P-102 - P-103 564,690.7608 8,529,128.4264 142.24
P-104 P-103 - P-104 564,832.8937 8,529,035.2482 169.95
P-105 P-104 - P-105 564,937.1407 8,528,919.9625 155.43
P-106 P-105 - P-106 564,997.8953 8,528,904.8749 62.60
P-107 P-106 - P-107 565,214.0316 8,528,783.8206 247.73
P-108 P-107 - P-108 565,418.4292 8,528,599.4798 275.25
P-109 P-108 - P-109 565,547.8097 8,528,545.9693 140.01
P-110 P-109 - P-110 565,768.4377 8,528,494.6329 226.52
P-111 P-110 - P-111 565,949.0301 8,528,529.2435 183.88
LONGITUD TOTAL (m) 4042.26

CUADRO DE DATOS TCNICOS


LINEA DE CONDUCCION SECUNDARIO 04
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
P-112 564,650.7496 8,531,568.0592
P-113 P-112 - P-113 564,694.8325 8,531,505.0852 76.87
P-114 P-113 - P-114 564,726.5705 8,531,431.1219 80.49
P-115 P-114 - P-115 564,931.9965 8,531,225.0087 291.00
P-116 P-115 - P-116 565,004.1737 8,531,181.0990 84.48
P-117 P-116 - P-117 565,121.3456 8,531,040.0278 183.39
P-118 P-117 - P-118 565,169.7752 8,530,955.9923 96.99
P-119 P-118 - P-119 565,273.8270 8,530,852.1778 146.98
P-120 P-119 - P-120 565,409.9126 8,530,826.1534 138.55
P-121 P-120 - P-121 565,546.8124 8,530,777.5885 145.26
P-122 P-121 - P-122 565,672.5559 8,530,700.4070 147.54

20
P-123 P-122 - P-123 565,793.5364 8,530,533.3680 206.25
P-124 P-123 - P-124 565,966.8050 8,530,480.2581 181.23
P-125 P-124 - P-125 566,041.4362 8,530,479.0764 74.64
P-126 P-125 - P-126 566,218.9064 8,530,443.3908 181.02
LONGITUD TOTAL (m) 2034.69

CUADRO DE DATOS TCNICOS


LINEA DE CONDUCCION SECUNDARIO 05
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
P-127 565,267.1817 8,531,755.0923
P-128 P-127 - P-128 565,293.3404 8,531,899.1390 146.40
P-129 P-128 - P-129 565,281.6102 8,532,204.3461 305.43
P-130 P-129 - P-130 565,372.0585 8,532,317.9607 145.22
P-131 P-130 - P-131 565,418.1634 8,532,406.0115 99.39
P-132 P-131 - P-132 565,523.6174 8,532,509.2184 147.55
P-133 P-132 - P-133 565,616.2925 8,532,612.3972 138.69
P-134 P-133 - P-134 565,606.5499 8,532,731.0872 119.09
P-135 P-134 - P-135 565,693.5747 8,532,927.2915 214.64
P-136 P-135 - P-136 565,793.5046 8,533,043.2776 153.10
P-137 P-136 - P-137 565,911.6265 8,533,249.9432 238.04
P-138 P-137 - P-138 566,062.3255 8,533,362.6553 188.19
P-139 P-138 - P-139 566,152.6060 8,533,475.7419 144.70
P-140 P-139 - P-140 566,221.5815 8,533,676.8656 212.62
P-141 P-140 - P-141 566,287.8017 8,533,723.6698 81.09
P-142 P-141 - P-142 566,343.9469 8,533,792.7404 89.01
P-143 P-142 - P-143 566,359.1291 8,533,833.3199 43.33
P-144 P-143 - P-144 566,400.1116 8,533,897.1490 75.85
P-145 P-144 - P-145 566,457.1457 8,533,962.3375 86.62
P-146 P-145 - P-146 566,490.2180 8,534,101.6738 143.21
P-147 P-146 - P-147 566,502.4067 8,534,396.6083 295.19
P-148 P-147 - P-148 566,393.7557 8,534,766.1587 385.19
P-149 P-148 - P-149 566,390.0457 8,535,277.2164 511.07
P-150 P-149 - P-150 566,286.9599 8,535,715.4773 450.22
LONGITUD TOTAL (m) 4413.84

CUADRO DE DATOS TCNICOS


LINEA DE CONDUCCION SECUNDARIO 06
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
P-151 565,616.2925 8,532,612.3972
P-152 P-151 - P-152 565,726.7924 8,532,606.8024 110.64
P-153 P-152 - P-153 566,021.8033 8,532,674.6440 302.71
P-154 P-153 - P-154 566,147.7495 8,532,734.9655 139.65
P-155 P-154 - P-155 566,353.8810 8,532,686.5376 211.74
P-156 P-155 - P-156 566,556.4797 8,532,660.0662 204.32
P-157 P-156 - P-157 566,929.8381 8,532,596.6096 378.71
P-158 P-157 - P-158 567,066.9505 8,532,581.2499 137.97
P-159 P-158 - P-159 567,160.9566 8,532,642.4232 112.16
P-160 P-159 - P-160 567,373.3114 8,532,799.9316 264.39

21
P-161 P-160 - P-161 567,416.5729 8,532,746.9690 68.39
P-162 P-161 - P-162 567,451.7217 8,532,677.3831 77.96
P-163 P-162 - P-163 567,449.5704 8,532,618.6932 58.73
P-164 P-163 - P-164 567,558.0171 8,532,382.3150 260.07
P-165 P-164 - P-165 567,620.7588 8,532,333.6976 79.37
P-166 P-165 - P-166 567,783.3486 8,532,265.8936 176.16
P-167 P-166 - P-167 567,839.8180 8,532,233.0015 65.35
P-168 P-167 - P-168 567,911.0041 8,532,208.2533 75.37
P-169 P-168 - P-169 567,953.4062 8,532,201.3768 42.96
P-170 P-169 - P-170 568,047.2263 8,532,218.8008 95.42
P-171 P-170 - P-171 568,145.2418 8,532,257.9889 105.56
P-172 P-171 - P-172 568,224.2202 8,532,288.9209 84.82
P-173 P-172 - P-173 568,348.8404 8,532,351.2611 139.34
P-174 P-173 - P-174 568,473.2853 8,532,433.2674 149.04
P-175 P-174 - P-175 568,557.6459 8,532,467.4288 91.01
P-176 P-175 - P-176 568,674.8602 8,532,452.5193 118.16
P-177 P-176 - P-177 568,725.4831 8,532,462.3785 51.57
P-178 P-177 - P-178 568,940.9918 8,532,559.4764 236.37
P-179 P-178 - P-179 569,069.6044 8,532,716.0772 202.65
P-180 P-179 - P-180 569,197.8362 8,532,810.2523 159.10
P-181 P-180 - P-181 569,333.4676 8,532,934.3806 183.86
P-182 P-181 - P-182 569,403.4067 8,533,064.3541 147.60
LONGITUD TOTAL (m) 4531.15

CUADRO DE DATOS TCNICOS


LINEA DE CONDUCCION SECUNDARIO 07
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
P-183 567,373.3114 8,532,799.9316
P-184 P-183 - P-184 567,455.2099 8,532,865.8490 105.13
P-185 P-184 - P-185 567,563.0496 8,532,893.2480 111.27
P-186 P-185 - P-186 567,698.7465 8,532,945.9032 145.55
P-187 P-186 - P-187 567,776.2762 8,533,055.0255 133.86
P-188 P-187 - P-188 567,861.3492 8,533,125.6494 110.57
P-189 P-188 - P-189 567,921.0352 8,533,154.9321 66.48
P-190 P-189 - P-190 568,052.4371 8,533,276.5891 179.07
P-191 P-190 - P-191 568,110.3490 8,533,373.0532 112.51
P-192 P-191 - P-192 568,167.0303 8,533,515.8209 153.61
P-193 P-192 - P-193 568,232.5762 8,533,599.7884 106.52
LONGITUD TOTAL (m) 1224.57

CUADRO DE DATOS TCNICOS


LINEA DE CONDUCCION SECUNDARIO 08
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
P-194 566,473.9697 8,534,514.8205
P-195 P-194 - P-195 566,642.3712 8,534,604.9636 191.01
P-196 P-195 - P-196 566,730.8644 8,534,638.9349 94.79
P-197 P-196 - P-197 566,830.4577 8,534,809.9187 197.87

22
P-198 P-197 - P-198 566,863.0931 8,534,848.2917 50.37
P-199 P-198 - P-199 566,986.5191 8,534,924.7514 145.19
P-200 P-199 - P-200 567,078.3021 8,535,076.2770 177.16
P-201 P-200 - P-201 567,155.8121 8,535,131.0398 94.90
P-202 P-201 - P-202 567,226.0676 8,535,219.6987 113.12
P-203 P-202 - P-203 567,262.8687 8,535,288.3621 77.90
LONGITUD TOTAL (m) 1142.31

CUADRO DE DATOS TCNICOS


LINEA DE CONDUCCION SECUNDARIO 09
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
P-204 567,410.2381 8,532,871.6864
P-205 P-204 - P-205 567,482.9130 8,532,938.5670 98.77
P-206 P-205 - P-206 567,573.2940 8,533,085.5947 172.59
P-207 P-206 - P-207 567,580.4174 8,533,101.4441 17.38
P-208 P-207 - P-208 567,419.2782 8,533,173.8671 176.67
LONGITUD TOTAL (m) 465.41

Planta de tratamiento de agua potable

CUADRO DE DATOS TCNICOS


PLANTA DE TRATAMIENTO DE AGUA POTABLE
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
P-24 560,623.7903 8,531,830.2799
P-25 P-24 - P-25 560,636.4121 8,531,862.9248 35.00
P-26 P-25 - P-26 560,715.6926 8,531,832.2718 85.00
P-27 P-26 - P-27 560,703.0708 8,531,799.6269 35.00
P-24 P-27 - P-24 560,623.7903 8,531,830.2799 85.00
AREA (m2) 2975.00
PERIMETRO (ml) 240.00

Red de distribucin de las 17 localidades

CUADRO DE DATOS TCNICOS


RED DE DISTRIBUCION - LOCALIDAD RANRACANCHA
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
V-1 560,801.9598 8,531,791.1126
V-2 V-1 - V-2 560,854.1034 8,531,475.7576 319.64
V-3 V-2 - V-3 560,893.3089 8,531,328.2110 152.67
V-4 V-3 - V-4 560,984.3731 8,531,238.0073 128.18
V-5 V-4 - V-5 561,156.0526 8,531,189.2144 178.48
V-6 V-5 - V-6 561,534.3913 8,531,186.8333 378.35
V-7 V-6 - V-7 561,664.8691 8,531,186.0052 130.48
V-6 561,534.3913 8,531,186.8333
V-8 V-6 - V-8 561,535.5453 8,531,304.2735 117.45

23
V-9 V-8 - V-9 561,791.1792 8,531,303.1996 255.64
V-10 V-9 - V-10 561,869.8177 8,531,302.4765 78.64
V-9 561,791.1792 8,531,303.1996
V-11 V-9 - V-11 561,791.6718 8,531,402.5063 99.31
LONGITUD TOTAL (m) 1838.84

CUADRO DE DATOS TCNICOS


RED DE DISTRIBUCION - LOCALIDAD QOCHAPUNCO
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
V-1 563,250.4141 8,530,317.4747
V-2 V-1 - V-2 563,406.2300 8,530,240.6585 173.72
V-3 V-2 - V-3 563,419.5956 8,530,238.7326 13.50
V-4 V-3 - V-4 563,490.9176 8,530,234.3153 71.46
V-5 V-4 - V-5 563,576.8865 8,530,229.0224 86.13
V-6 V-5 - V-6 563,599.1434 8,530,235.0444 23.06
V-2 563,406.2300 8,530,240.6585
V-7 V-2 - V-7 563,400.9020 8,530,186.3670 54.55
V-4 563,490.9176 8,530,234.3153
V-8 V-4 - V-8 563,487.8810 8,530,188.0390 46.38
V-3 563,419.5956 8,530,238.7326
V-9 V-3 - V-9 563,422.0441 8,530,277.4316 38.78
V-10 V-9 - V-10 563,533.0080 8,530,376.6947 148.88
V-11 V-10 - V-11 563,582.2473 8,530,420.6347 65.99
V-12 V-11 - V-12 563,612.4962 8,530,447.8011 40.66
V-13 V-12 - V-13 563,739.5010 8,530,440.6661 127.21
V-14 V-13 - V-14 563,953.6782 8,530,628.2291 284.70
V-15 V-14 - V-15 563,968.2544 8,530,640.9951 19.38
V-16 V-15 - V-16 564,201.6653 8,530,743.4736 254.92
V-17 V-16 - V-17 564,227.2358 8,530,809.2093 70.53
V-10 563,533.0080 8,530,376.6947
V-18 V-10 - V-18 563,469.8780 8,530,447.5630 94.91
V-11 563,582.2473 8,530,420.6347
V-19 V-11 - V-19 563,619.3410 8,530,379.0410 55.73
V-14 563,953.6782 8,530,628.2291
V-20 V-14 - V-20 563,942.1655 8,530,641.0788 17.25
V-21 V-20 - V-21 563,972.1045 8,530,714.6346 79.42
V-22 V-21 - V-22 564,161.5474 8,530,795.5268 205.99
V-23 V-22 - V-23 564,196.4326 8,530,880.7650 92.10
V-24 V-23 - V-24 564,318.5888 8,530,937.2595 134.59
LONGITUD TOTAL (m) 2199.84

CUADRO DE DATOS TCNICOS


RED DE DISTRIBUCION - LOCALIDAD CONCAHUAYLLA
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
V-1 564,737.1985 8,531,414.0180
V-2 V-1 - V-2 564,617.8336 8,531,299.9989 165.07
V-3 V-2 - V-3 564,790.7872 8,531,118.9362 250.39
V-4 V-3 - V-4 564,727.9752 8,531,058.9373 86.86
V-5 V-4 - V-5 564,698.3778 8,531,030.6542 40.94

24
V-6 V-5 - V-6 564,607.0256 8,531,032.7467 91.38
V-7 V-6 - V-7 564,508.5207 8,531,035.0031 98.53
V-8 V-7 - V-8 564,445.1808 8,531,086.9085 81.89
V-2 564,617.8336 8,531,299.9989
V-9 V-2 - V-9 564,592.3660 8,531,275.1170 35.60
V-4 564,727.9752 8,531,058.9373
V-10 V-4 - V-10 564,830.0501 8,530,952.0672 147.79
V-6 564,607.0256 8,531,032.7467
V-11 V-6 - V-11 564,605.9057 8,530,983.8529 48.91
V-12 V-11 - V-12 564,573.6692 8,530,984.5681 32.24
V1-3 V-12 - V1-3 564,573.4239 8,530,973.5128 11.06
V-1 564,737.1985 8,531,414.0180
V-14 V-1 - V-14 564,799.1309 8,531,349.1819 89.66
V-15 V-14 - V-15 564,862.4424 8,531,347.7317 63.33
V-16 V-15 - V-16 564,858.9644 8,531,195.8931 151.88
V-15 564,862.4424 8,531,347.7317
V-17 V-15 - V-17 564,949.7668 8,531,357.4455 87.86
V-18 V-17 - V-18 564,989.9242 8,531,315.4083 58.14
V-19 V-18 - V-19 565,054.1058 8,531,248.2174 92.92
V-20 V-19 - V-20 565,093.2208 8,531,207.2687 56.63
V-21 V-20 - V-21 565,185.9802 8,531,110.1601 134.29
V-22 V-21 - V-22 565,129.8895 8,531,053.6888 79.59
V-23 V-22 - V-23 565,099.3143 8,531,072.0071 35.64
V-21 565,185.9802 8,531,110.1601
V-24 V-17 - V-24 565,270.8681 8,531,187.7831 363.17
V-25 V-24 - V-25 565,319.5223 8,531,234.0259 339.50
V-26 V-25 - V-26 565,337.2964 8,531,215.5640 285.07
V-17 564,949.7668 8,531,357.4455
V-27 V-17 - V-27 565,004.4868 8,531,409.7178 75.67
V-28 V-27 - V-28 565,172.8895 8,531,233.7946 243.53
V-29 V-28 - V-29 565,251.935 8,531,309.491 109.44
LONGITUD TOTAL (m) 3356.98

CUADRO DE DATOS TCNICOS


RED DE DISTRIBUCION - LOCALIDAD ORCCUNCHUPA
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
V-1 566,241.1569 8,530,438.4559
V-2 V-1 - V-2 566,386.5988 8,530,178.2538 298.09
V-3 V-2 - V-3 567,215.8247 8,529,944.5448 861.53
V-4 V-3 - V-4 567,372.8092 8,530,032.5268 179.96
V-5 V-4 - V-5 567,325.8611 8,530,116.3242 96.05
V-6 V-5 - V-6 567,472.5302 8,530,198.4662 168.10
V-7 V-6 - V-7 567,503.5092 8,530,308.6132 114.42
V-8 V-7 - V-8 567,571.9406 8,530,346.9220 78.42
V-4 567,372.8092 8,530,032.5268
V-9 V-4 - V-9 567,705.3590 8,530,218.8100 381.17
LONGITUD TOTAL (m) 2177.74

25
CUADRO DE DATOS TCNICOS
RED DE DISTRIBUCION - LOCALIDAD TINCO
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
V-1 565,735.7219 8,531,554.1463
V-2 V-1 - V-2 565,812.1499 8,531,440.1386 137.26
V-3 V-2 - V-3 565,907.7013 8,531,416.8276 98.35
V-4 V-3 - V-4 565,897.9148 8,531,375.4952 42.48
V-5 V-4 - V-5 565,948.0497 8,531,293.2225 96.34
V-6 V-5 - V-6 566,138.6319 8,531,247.9543 195.88
V-2 565,812.1499 8,531,440.1386
V-7 V-2 - V-7 565,888.8296 8,531,502.7226 98.98
V-8 V-7 - V-8 565,966.8411 8,531,483.7864 80.28
V-9 V-8 - V-9 566,009.2967 8,531,509.6569 49.72
V-10 V-9 - V-10 566,104.1726 8,531,486.6271 97.63
V-11 V-10 - V-11 566,223.2053 8,531,457.7337 122.49
V-12 V-11 - V-12 566,343.4579 8,531,531.0100 140.82
V-13 V-12 - V-13 566,423.8945 8,531,580.0242 94.19
V-11 566,223.2053 8,531,457.7337
V-14 V-11 - V-14 566,400.3809 8,531,437.5945 178.32
V-15 V-14 - V-15 566,439.9293 8,531,427.2827 40.87
V-16 V-15 - V-16 566,594.6687 8,531,173.3359 297.38
LONGITUD TOTAL (m) 1770.99

CUADRO DE DATOS TCNICOS


RED DE DISTRIBUCION - LOCALIDAD VILLA VISTA
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
V-1 567,007.7843 8,531,518.0132
V-2 V-1 - V-2 567,103.9650 8,531,491.7244 99.71
V-3 V-2 - V-3 567,242.1570 8,531,509.5934 139.34
V-4 V-3 - V-4 567,336.9400 8,531,535.9914 98.39
V-5 V-4 - V-5 567,365.7973 8,531,532.9154 29.02
V-6 V-5 - V-6 567,414.7320 8,531,527.6994 49.21
V-7 V-6 - V-7 567,562.0796 8,531,569.8043 153.25
V-8 V-7 - V-8 567,602.4444 8,531,562.7328 40.98
V-9 V-8 - V-9 567,599.7923 8,531,546.1172 16.83
V-10 V-9 - V-10 567,701.4208 8,531,404.7412 174.11
V-4 567,336.9400 8,531,535.9914
V-11 V-4 - V-11 567,384.4657 8,531,768.1942 237.02
V-12 V-11 - V-12 567,330.9713 8,531,771.5824 53.60
V-8 567,602.4444 8,531,562.7328
V-13 V-8 - V-13 567,839.3313 8,531,598.5969 239.59
V-14 V-13 - V-14 567,937.9942 8,531,659.4186 115.90
V-15 V-14 - V-15 567,957.9529 8,531,607.0452 56.05
V-16 V-15 - V-16 568,006.1840 8,531,625.4380 51.62
V-14 567,937.9942 8,531,659.4186
V-17 V-14 - V-17 567,927.3687 8,531,687.4725 30.00
V-18 V-17 - V-18 568,030.7748 8,531,726.9245 110.68
V-19 V-18 - V-19 568,192.9841 8,531,788.7643 173.60

26
V-20 V-19 - V-20 568,253.6118 8,531,761.6115 66.43
V-21 V-20 - V-21 568,412.7366 8,531,822.2934 170.30
V-22 V-21 - V-22 568,527.0909 8,531,771.2220 125.24
V-23 V-22 - V-23 568,610.2670 8,531,802.9410 89.02
LONGITUD TOTAL (m) 2319.89

CUADRO DE DATOS TCNICOS


RED DE DISTRIBUCION - LOCALIDAD QASANCCAY
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
V-1 565,354.6989 8,531,746.9958
V-2 V-1 - V-2 565,414.6406 8,531,710.4343 70.21
V-3 V-2 - V-3 565,705.1776 8,531,736.8884 291.74
V-4 V-3 - V-4 565,902.0309 8,531,712.3404 198.38
V-5 V-4 - V-5 566,302.5310 8,532,203.9760 634.12
V-6 V-5 - V-6 566,365.6849 8,532,285.0633 102.78
V-7 V-6 - V-7 566,443.5530 8,532,351.5241 102.37
V-5 566,302.5310 8,532,203.9760
V-8 V-5 - V-8 566,377.8450 8,532,144.1181 96.20
V-9 V-8 - V-9 566,447.2373 8,532,275.7994 148.85
V-10 V-9 - V-10 566,529.0638 8,532,223.3741 97.18
V-11 V-10 - V-11 566,557.4488 8,532,297.8349 79.69
LONGITUD TOTAL (m) 1821.52

CUADRO DE DATOS TCNICOS


RED DE DISTRIBUCION - LOCALIDAD MUTUYNIYOCC
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
V-1 565,694.8080 8,532,599.7339
V-2 V-1 - V-2 565,744.6924 8,532,600.9971 49.90
V-3 V-2 - V-3 565,929.8582 8,532,678.0384 200.55
V-4 V-3 - V-4 566,021.8033 8,532,674.6440 92.01
V-5 V-4 - V-5 566,034.3581 8,532,681.8621 14.48
V-6 V-5 - V-6 566,152.7338 8,532,482.6545 231.72
V-7 V-6 - V-7 566,131.6970 8,532,402.9027 82.48
V-8 V-7 - V-8 566,105.1297 8,532,302.2831 104.07
V-7 566,131.6970 8,532,402.9027
V-9 V-8 - V-9 566,244.8081 8,532,373.0372 116.99
V-10 V-9 - V-10 566,293.7772 8,532,401.6142 56.70
V-11 V-10 - V-11 566,326.7247 8,532,355.8969 56.35
V-12 V-11 - V-12 566,378.1198 8,532,392.6807 63.20
V-5 566,034.3581 8,532,681.8621
V-13 V-5 - V-13 566,074.1103 8,532,705.2459 46.12
V-14 V-13 - V-14 566,073.1067 8,532,719.9638 14.75
V-15 V-14 - V-15 566,106.1170 8,532,742.0917 39.74
V-16 V-15 - V-16 566,110.3976 8,532,781.9207 40.06
V-17 V-16 - V-17 566,137.7784 8,532,801.9472 33.92
V-18 V-17 - V-18 566,164.0409 8,532,766.0405 44.49
LONGITUD TOTAL (m) 1287.53

27
CUADRO DE DATOS TCNICOS
RED DE DISTRIBUCION - LOCALIDAD REMILLAYOCC
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
V-1 567,850.9360 8,532,221.4130
V-2 V-1 - V-2 568,002.9640 8,532,214.5684 152.18
V-3 V-2 - V-3 568,040.5054 8,532,248.8750 50.86
V-4 V-3 - V-4 568,042.8049 8,532,299.9508 51.13
V-5 V-4 - V-5 568,059.0320 8,532,314.7796 21.98
V-6 V-5 - V-6 568,241.7431 8,532,481.7475 247.51
V-7 V-6 - V-7 568,341.4162 8,532,477.2600 99.77
V-5 568,059.0320 8,532,314.7796
V-8 V-5 - V-8 568,000.0604 8,532,379.1934 87.33
V-9 V-8 - V-9 567,907.2893 8,532,383.2852 92.86
V-8 568,000.0604 8,532,379.1934
V-10 V-8 - V-10 567,946.4363 8,532,454.2970 92.28
LONGITUD TOTAL (m) 895.90

CUADRO DE DATOS TCNICOS


RED DE DISTRIBUCION - LOCALIDAD HUAYUNCHOCCLLO
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
V-1 567,473.0131 8,533,191.1635
V-2 V-1 - V-2 567,491.6818 8,533,172.1719 26.63
V-3 V-2 - V-3 567,595.4055 8,533,195.9606 106.42
V-1 567,473.0131 8,533,191.1635
V-4 V-1 - V-4 567,471.2345 8,533,198.9563 7.99
V-5 V-4 - V-5 567,542.2523 8,533,215.2029 72.85
V-4 567,471.2345 8,533,198.9563
V-6 V-4 - V-6 567,459.4473 8,533,250.4810 52.86
LONGITUD TOTAL (m) 266.75

CUADRO DE DATOS TCNICOS


RED DE DISTRIBUCION - LOCALIDAD QANCCAYLLO
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
V-1 568,233.7011 8,533,600.4777
V-2 V-1 - V-2 568,136.8697 8,533,847.8266 265.63
V-3 V-2 - V-3 568,169.9822 8,534,001.3900 157.09
V-4 V-3 - V-4 568,094.5027 8,534,134.4227 152.95
V-5 V-4 - V-5 567,970.7584 8,534,166.5298 127.84
V-3 568,169.9822 8,534,001.3900
V-6 V-3 - V-6 568,276.6167 8,534,063.2075 123.26
V-7 V-6 - V-7 568,558.9736 8,534,167.3637 300.96
V-8 V-7 - V-8 569,041.0706 8,534,387.8169 530.11
LONGITUD TOTAL (m) 1657.84

28
CUADRO DE DATOS TCNICOS
RED DE DISTRIBUCION - LOCALIDAD VIZCACHAYOCC
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
V-1 567,263.9964 8,535,289.0467
V-2 V-1 - V-2 567,227.6021 8,535,380.0614 98.02
V-3 V-2 - V-3 567,329.2842 8,535,426.1988 111.66
V-4 V-3 - V-4 567,364.3391 8,535,374.9473 62.09
V-3 567,329.2842 8,535,426.1988
V-5 V-3 - V-5 567,302.3454 8,535,485.5692 65.20
V-6 V-5 - V-6 567,329.3780 8,535,497.8350 29.69
V-2 567,227.6021 8,535,380.0614
V-7 V-2 - V-7 567,187.7094 8,535,500.7185 127.08
V-8 V-7 - V-8 567,154.4416 8,535,518.0290 37.50
V-9 V-8 - V-9 567,173.6213 8,535,554.8893 41.55
V-10 V-9 - V-10 567,224.3895 8,535,570.8920 53.23
V-11 V-10 - V-11 567,240.9470 8,535,518.4024 55.04
LONGITUD TOTAL (m) 681.06

CUADRO DE DATOS TCNICOS


RED DE DISTRIBUCION - LOCALIDAD HUAYLLAPAMPA
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
V-1 566,284.3171 8,535,736.3332
V-2 V-1 - V-2 566,294.3431 8,535,829.4524 93.66
V-3 V-2 - V-3 566,315.6763 8,536,057.2014 228.75
V-4 V-3 - V-4 566,612.8427 8,536,027.2617 298.67
V-5 V-4 - V-5 566,660.6930 8,536,063.5181 60.03
V-3 566,315.6763 8,536,057.2014
V-6 V-3 - V-6 566,322.6846 8,536,132.0208 75.15
V-7 V-6 - V-7 566,486.2657 8,536,116.6982 164.30
V-2 566,294.3431 8,535,829.4524
V-8 V-2 - V-8 566,208.2411 8,535,838.1271 86.54
V-9 V-8 - V-9 566,231.1407 8,536,069.6911 232.69
V-8 566,208.2411 8,535,838.1271
V-10 V-8 - V-10 566,095.3900 8,535,849.4970 113.42
V-11 V-10 - V-11 565,815.1599 8,535,724.4503 306.86
V-12 V-11 - V-12 565,591.3630 8,535,710.2702 224.25
V-13 V-12 - V-13 565,523.8414 8,535,714.5929 67.66
V-14 V-13 - V-14 565,465.3194 8,535,781.3750 88.80
V-15 V-14 - V-15 565,464.0367 8,535,855.4712 74.11
V-16 V-15 - V-16 565,620.1565 8,535,877.4021 157.65
V-10 566,095.3900 8,535,849.4970
V-17 V-10 - V-17 566,132.0517 8,535,949.3774 106.40
V-18 V-17 - V-18 566,150.0665 8,536,141.8893 193.35
V-19 V-18 - V-19 566,233.0026 8,536,210.2497 107.48
V-20 V-19 - V-20 566,236.7933 8,536,249.5979 39.53
V-21 V-20 - V-21 566,272.0261 8,536,278.6386 45.66
V-22 V-21 - V-22 566,299.4496 8,536,245.3678 43.12
V-23 V-22 - V-23 566,352.8032 8,536,289.9195 69.51
LONGITUD TOTAL (m) 2877.59

29
CUADRO DE DATOS TCNICOS
RED DE DISTRIBUCION - LOCALIDAD ACCOMACHAY
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
V-1 564,845.7401 8,533,733.7411
V-2 V-1 - V-2 565,029.3573 8,533,760.1457 185.51
V-3 V-2 - V-3 565,090.7694 8,533,833.2807 95.50
V-4 V-3 - V-4 565,131.3688 8,533,913.7523 90.13
V-5 V-4 - V-5 565,139.7966 8,533,960.6487 47.65
V-6 V-5 - V-6 565,295.6650 8,533,932.6376 158.37
V-5 565,139.7966 8,533,960.6487
V-7 V-5 - V-7 565,152.5158 8,534,031.4248 71.91
V-8 V-7 - V-8 565,018.3575 8,534,145.2902 175.97
V-9 V-8 - V-9 564,914.6877 8,534,082.0055 121.46
V-10 V-9 - V-10 564,690.7908 8,533,987.8515 242.89
LONGITUD TOTAL (m) 1189.39

CUADRO DE DATOS TCNICOS


RED DE DISTRIBUCION - LOCALIDAD QASACRUZ
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
V-1 562,905.9233 8,533,427.8858
V-2 V-1 - V-2 563,080.4360 8,533,523.9546 199.21
V-3 V-2 - V-3 563,275.2870 8,533,718.3385 275.23
V-4 V-3 - V-4 563,300.4367 8,533,728.4673 27.11
V-5 V-4 - V-5 563,375.8163 8,533,723.3359 75.55
V-6 V-5 - V-6 563,457.3943 8,533,795.4053 108.85
V-3 563,275.2870 8,533,718.3385
V-7 V-3 - V-7 563,302.4957 8,533,644.5318 78.66
V-8 V-7 - V-8 563,296.6693 8,533,571.6615 73.10
V-9 V-8 - V-9 563,467.3985 8,533,559.5230 171.16
V-7 563,302.4957 8,533,644.5318
V-10 V-9 - V-10 563,587.0995 8,533,624.3525 285.32
LONGITUD TOTAL (m) 1294.19

CUADRO DE DATOS TCNICOS


RED DE DISTRIBUCION - LOCALIDAD PUCALOMA
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
V-1 565,949.0301 8,528,529.2435
V-2 V-1 - V-2 565,941.4390 8,528,540.8452 13.86
V-3 V-2 - V-3 565,908.2257 8,528,547.2407 33.82
V-4 V-3 - V-4 565,850.4882 8,528,632.5167 102.98
V-5 V-4 - V-5 565,841.6221 8,528,645.6116 15.81
V-6 V-5 - V-6 565,751.4473 8,528,662.9756 91.83
V-7 V-6 - V-7 565,718.9069 8,528,640.9436 39.30
V-8 V-7 - V-8 565,642.0990 8,528,655.8870 78.25
V-9 V-8 - V-9 565,624.0962 8,528,643.7202 21.73
V-4 565,850.4882 8,528,632.5167
V-10 V-4 - V-10 565,932.0279 8,528,687.7244 98.47
V-11 V-10 - V-11 565,994.3904 8,528,675.8664 63.48
LONGITUD TOTAL (m) 559.53

30
CUADRO DE DATOS TCNICOS
RED DE DISTRIBUCION - LOCALIDAD QENHUAS
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
V-1 569,426.7955 8,533,091.4491
V-2 V-1 - V-2 569,434.9067 8,533,128.1552 37.59
V-3 V-2 - V-3 569,460.5141 8,533,245.0587 119.68
V-4 V-3 - V-4 569,467.4047 8,533,276.5539 32.24
V-5 V-4 - V-5 569,435.1425 8,533,326.5902 59.54
V-3 569,460.5141 8,533,245.0587
V-6 V-3 - V-6 569,529.2419 8,533,230.0040 70.36
V-2 569,434.9067 8,533,128.1552
V-7 V-2 - V-7 569,488.6301 8,533,116.4686 54.98
V-8 V-7 - V-8 569,589.7811 8,533,117.4273 101.16
V-9 V-8 - V-9 569,605.8218 8,533,128.9687 19.76
LONGITUD TOTAL (m) 495.31

Reservorios

CUADRO DE DATOS TCNICOS


RESERVORIO - LOCALIDAD RANRACANCHA
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
V-1 560,975.0700 8,531,245.9150 6.46
V-2 V-1 - V-2 560,987.1120 8,531,243.3570 5.51
V-3 V-2 - V-3 560,984.9300 8,531,233.0860 6.46
V-4 V-3 - V-4 560,972.8890 8,531,235.6440 5.51
AREA (m) 35.59
PERIMETRO (m) 17.48

CUADRO DE DATOS TCNICOS


RESERVORIO - LOCALIDAD QOCHAPUNCO
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
V-1 563,245.9480 8,530,322.9710 6.46
V-2 V-1 - V-2 563,257.9890 8,530,320.4130 5.51
V-3 V-2 - V-3 563,255.8080 8,530,310.1430 6.46
V-4 V-3 - V-4 563,243.7660 8,530,312.7010 5.51
AREA (m) 35.59
PERIMETRO (m) 17.48

CUADRO DE DATOS TCNICOS


RESERVORIO - LOCALIDAD CONCAHUAYLLA
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
V-1 564,733.6810 8,531,422.5450 6.46
V-2 V-1 - V-2 564,745.7220 8,531,419.9870 5.51
V-3 V-2 - V-3 564,743.5410 8,531,409.7160 6.46

31
V-4 V-3 - V-4 564,731.4990 8,531,412.2740 5.51
AREA (m) 35.59
PERIMETRO (m) 17.48

CUADRO DE DATOS TCNICOS


RESERVORIO - LOCALIDAD ORCCUNCHUPA
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
V-1 566,213.6100 8,530,452.0250 6.46
V-2 V-1 - V-2 566,225.4180 8,530,448.5470 5.51
V-3 V-2 - V-3 566,222.4520 8,530,438.4750 6.46
V-4 V-3 - V-4 566,210.6430 8,530,441.9530 5.51
AREA (m) 35.59
PERIMETRO (m) 17.48

CUADRO DE DATOS TCNICOS


RESERVORIO - LOCALIDAD TINCO
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
V-1 565,732.6740 8,531,561.1550 6.46
V-2 V-1 - V-2 565,744.4820 8,531,557.6770 5.51
V-3 V-2 - V-3 565,741.5160 8,531,547.6050 6.46
V-4 V-3 - V-4 565,729.7070 8,531,551.0830 5.51
AREA (m) 35.59
PERIMETRO (m) 17.48

CUADRO DE DATOS TCNICOS


RESERVORIO - LOCALIDAD VILLA VISTA
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
V-1 566,995.0100 8,531,527.8800 6.46
V-2 V-1 - V-2 567,006.8190 8,531,524.4020 5.51
V-3 V-2 - V-3 567,003.8530 8,531,514.3300 6.46
V-4 V-3 - V-4 566,992.0440 8,531,517.8080 5.51
AREA (m) 35.59
PERIMETRO (m) 17.48

CUADRO DE DATOS TCNICOS


RESERVORIO - LOCALIDAD QASANCCAY
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
V-1 565,378.7310 8,531,734.5280 6.46
V-2 V-1 - V-2 565,390.5400 8,531,731.0500 5.51
V-3 V-2 - V-3 565,387.5730 8,531,720.9780 6.46
V-4 V-3 - V-4 565,375.7650 8,531,724.4560 5.51
AREA (m) 35.59
PERIMETRO (m) 17.48

32
CUADRO DE DATOS TCNICOS
RESERVORIO - LOCALIDAD MUTUYNIYOCC
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
V-1 565,679.3390 8,532,616.0200 6.46
V-2 V-1 - V-2 565,691.1480 8,532,612.5420 5.51
V-3 V-2 - V-3 565,688.1810 8,532,602.4700 6.46
V-4 V-3 - V-4 565,676.3730 8,532,605.9480 5.51
AREA (m) 35.59
PERIMETRO (m) 17.48

CUADRO DE DATOS TCNICOS


RESERVORIO - LOCALIDAD REMILLAYOCC
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
V-1 567,861.1310 8,532,250.0880 6.46
V-2 V-1 - V-2 567,872.9400 8,532,246.6100 5.51
V-3 V-2 - V-3 567,869.9730 8,532,236.5380 6.46
V-4 V-3 - V-4 567,858.1650 8,532,240.0160 5.51
AREA (m) 35.59
PERIMETRO (m) 17.48

CUADRO DE DATOS TCNICOS


RESERVORIO - LOCALIDAD HUAYUNCHOCCLLO
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
V-1 567,416.3270 8,533,178.2260 6.46
V-2 V-1 - V-2 567,428.1360 8,533,174.7480 5.51
V-3 V-2 - V-3 567,425.1700 8,533,164.6760 6.46
V-1 567,413.3610 8,533,168.1540 5.51
AREA (m) 35.59
PERIMETRO (m) 17.48

CUADRO DE DATOS TCNICOS


RESERVORIO - LOCALIDAD QANCCAYLLO
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
V-1 568,231.3870 8,533,603.7230 6.46
V-2 V-1 - V-2 568,243.1950 8,533,600.2460 5.51
V-3 V-2 - V-3 568,240.2290 8,533,590.1730 6.46
V-4 V-3 - V-4 568,228.4200 8,533,593.6510 5.51
AREA (m) 35.59
PERIMETRO (m) 17.48

33
CUADRO DE DATOS TCNICOS
RESERVORIO - LOCALIDAD VIZCACHAYOCC
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
V-1 567,261.6600 8,535,292.2840 6.46
V-2 V-1 - V-2 567,273.4690 8,535,288.8060 5.51
V-3 V-2 - V-3 567,270.5030 8,535,278.7340 6.46
V-4 V-3 - V-4 567,258.6940 8,535,282.2120 5.51
AREA (m) 35.59
PERIMETRO (m) 17.48

CUADRO DE DATOS TCNICOS


RESERVORIO - LOCALIDAD HUAYLLAPAMPA
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
V-1 566,280.8100 8,535,739.3060 6.46
V-2 V-1 - V-2 566,292.6190 8,535,735.8290 5.51
V-3 V-2 - V-3 566,289.6530 8,535,725.7560 6.46
V-4 V-3 - V-4 566,277.8440 8,535,729.2340 5.51
AREA (m) 35.59
PERIMETRO (m) 17.48

CUADRO DE DATOS TCNICOS


RESERVORIO - LOCALIDAD ACCOMACHAY
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
V-1 564,837.5140 8,533,739.4180 6.46
V-2 V-1 - V-2 564,849.3220 8,533,735.9400 5.51
V-3 V-2 - V-3 564,846.3560 8,533,725.8680 6.46
V-4 V-3 - V-4 564,834.5470 8,533,729.3460 5.51
AREA (m) 35.59
PERIMETRO (m) 17.48

CUADRO DE DATOS TCNICOS


RESERVORIO - LOCALIDAD QASACRUZ
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
V-1 562,902.6160 8,533,435.0520 6.46
V-2 V-1 - V-2 562,914.4250 8,533,431.5740 5.51
V-3 V-2 - V-3 562,911.4580 8,533,421.5020 6.46
V-4 V-3 - V-4 562,899.6500 8,533,424.9800 5.51
AREA (m) 35.59
PERIMETRO (m) 17.48

34
CUADRO DE DATOS TCNICOS
RESERVORIO - LOCALIDAD PUCALOMA
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
V-1 565,951.8420 8,528,534.0580 6.46
V-2 V-1 - V-2 565,958.3690 8,528,523.6210 5.51
V-3 V-2 - V-3 565,949.4670 8,528,518.0530 6.46
V-4 V-3 - V-4 565,942.9390 8,528,528.4910 5.51
AREA (m) 35.59
PERIMETRO (m) 17.48

CUADRO DE DATOS TCNICOS


RESERVORIO - LOCALIDAD QENHUAS
LADO O DISTANCIA
VERTICE ESTE (X) NORTE (Y)
TRAMO PARCIAL (ML)
V-1 569,431.5500 8,533,091.3310 6.46
V-2 V-1 - V-2 569,428.4080 8,533,079.4290 5.51
V-3 V-2 - V-3 569,418.2560 8,533,082.1090 6.46
V-4 V-3 - V-4 569,421.3980 8,533,094.0110 5.51
AREA (m) 35.59
PERIMETRO (m) 17.48

6. ACCESO

Para llegar a la capital del distrito las salidas se dan desde la ciudad de
Ayacucho, desde el paradero pre determinado que ahora es el lugar Grifo
Ayacucho, la ruta Ayacucho Vinchos es 55 km. Aproximadamente, en un
tiempo aproximado de 1:30 horas, en colectivo y en movilidad particular en
un tiempo de una hora, se toma la va libertadores hasta lugar denominado
Casacancha va asfaltada y se toma el desvo margen derecha tambin
asfaltada unos 10.5 km aprox. Alrededor de 20 minutos se llega a la capital
de Vinchos.
En el siguiente cuadro podemos observar el acceso a puntos principales del
distrito de Vinchos con mayor frecuencia de transitabilidad.
Cuadro N 1: Vas de acceso.
DISTANCIA TIEMPO EN
TRAMO TIPO DE CARRETERA
(KILMETROS) (HORAS)
Ayacucho -
Carretera Asfaltada 42 0.45 hrs
Casacancha
Casacancha - Vinchos Carretera Asfaltada 13 0.15 hrs
Vinchos - Localidades Carretera Afirmada 25 0.45 hrs.
TOTAL 80.00 1.45 Hora

35
7. COLINDANCIA:
Por el Este con los Distritos de Socos y Chiara.
Por el Sur con los distritos de Los Morochucos y Chuschi, Provincia de
Cangallo.
Por el Norte con la Provincia de Angaraes, distritos de Santo Tomas de
Pata y Lircay.
Por el Oeste con la Provincia de Huaytar, Distrito de Pillpichaca.

8. PLANOS: