Professional Documents
Culture Documents
2 Demolition of Wall
Front Entrance Wall 12 sqm.
Rear Entrance Wall 21 sqm.
Demolition/Creation of front window
1.3meter x 1.6meter 1 unit
11 Plumbing Works
ALS
1,000.00 4,920.00
160.00 6,720.00
160.00 15,680.00
750.00 9,000.00
350.00 4,200.00
6.00 3,828.48
250.00 9,500.00
600.00 600.00
1,200.00 11,400.00
150.00 12,300.00
700.00 8,400.00
700.00 14,700.00
1,050.00 1,050.00
3,500.00 3,500.00
2,800.00 2,800.00
3,500.00 3,500.00
2,500.00 2,500.00
6,000.00 6,000.00
50.00 800.00
350.00 1,050.00
160.00 608.00
160.00 960.00
250.00 3,750.00
250.00 19,250.00
750.00 8,662.50
600.00 22,464.00
178,142.98