You are on page 1of 6

RESUME

P E R S O N AL D ATA

Name : FILOMENO A ARNEJO

City Address : 29-C LOREGA ST. CEBU CITY

Prov. Address : SAN AGUSTIN,

Date of Birth : NOV. 14 1964

Place of Birth : CEBU CIY

Sex : MALE

Religion : ROMAN CATHOLIC

Height : 160 CM

Weight : 64 KGS

Citizenship : FILIPINO

PASSPORT # : VV 0567550

TEL. # :
Mobile# :

E D U C AT I O N AL ATAI N M E N T

Elementary School : ZAPATERA ELEMENTARY SCHOOL


Address : SIKATUNA STREET, Cebu City
Year Graduated : March 22 1977

Secondary : UNIVERSITY of the VISAYAS


Address : Colon Street, Cebu City
Year Graduated : March 15 1981

College : UNIVERSITY of the VISAYAS


Degree : Bachelor of Science in Mechanical Engineering (B S M E
GRADUATE)
Address : Colon Street, Cebu City
Year Graduated : March 11 1989

EMPLOYMENT HISTORY
Project : SAUDI ARAMCO GAS FACILITIES
Address ; KURSHANIYA K.S.A
Main Contractor ; HYUNDAI ENGG
Company : OLAYAN DESCON
Year of period : Jan 03 2011-July 20 2011
Position ; Supervisor piping

Job description : handle of propane area


: Erection and installations of spools
: Erections and installations of supports
: Preparations of work 3 days look ahead
: Scheduling of manpower

Project : SAUDI ARAMCO SHELL REFINERY (T/A 2010)


Address : JUBAIL INDUSTRIAL AREA K.S.A
Company : OLAYAN DESCON
Year of period : October 28 2010-November 20 2010
Position : Foreman piping/ Permit receiver

Job description : Assist of planning for T/A2010 shut down


: Weld mapping of isometric drawings of line defect for pre
Fabrication
: Take off of linear meter for required pipe length
: Insulations and Painting
: Encoding of progress report pre fabrication

Project : PETROKIMYA (T/A 2010)


Address : JUBAIL INDUSTRIAL AREA K.S.A
Company : OLAYAN DESCON
Year : Sept.20 2010 Oct.17 2010
Position : SUPERVIOR PIPING

Job description : Line checking of defective line as per giving the scope of
Work and then put the tagging
: Spading and blinding as per scope of work to battery limit
: Removing of insulations for lay out. Cutting the defective
Pipe and then fit-up the replacement pipe. Install new
insulations
: House Keeping of area before finish working hours

Project : SAUDI ARAMCO MOBILE REFINERY (T/A 2010)


Address : YANBU INDUSTEIAL AREA K.S.A.
Company : OLAYAN DESCON
Year : Jan 07 2010- May 17 2010
Position : Foreman piping/Permit receiver

Job description : INCHARGE to PSV Valves and Control valves


: Check the location of PSV VALVES and CONTROL
Put the corresponding Tagging as per scope
Blinding and spading the battery limit going unit area.
: Remove the PSV and Control valves to calibrate.
: Reinstall after finish calibration then check calibration
Sticker to approval of client
: Cleaning of face of flange and inspection of QC Dept.
: Reinstall the PSV and CONTROL valves
: HOUSE KEEPING
: Fabrication of supports to vertical vessels

Project : ABU DHABI GAS LIQUEFACTION COMPANY


LIMETED (ADGAS)
Address : RUWAIS ABU DHABI
Main Contractor : MEPI TECHNIP
Company : DESCON ENGINEERING COMPANY (Fabrication)
Year of Period : April 12 2009- July 28 2009
Position : Piping Inspector

Job description : final dimension of spools as per isometric drawing


: Physically check the fitting as per isometric bill of
Material
: Physically check the orientation of spools as per isometric
Drawing
: Check the latest new revision drawing

Project : SAUDI ARAMCO RIYAHD REFINERY


Address : RIYADH K.S.A
Company : OLAYAN DISCON
Year of period : Feb 18 2009- March 25 2009
Position : Piping Foreman
Job description : Column to opening the tray man way.
Check defective tray to change a new
: Speeding and blinding of nozzle of vessel
: box up of opening man way tray and manhole. Remove
Blinding of nozzle and then put the permanent gasket
Box up.

Project : SAUDI ARAMCO SHELL REFINERY (SHOTDOWN)


Address : JUBAIL K. S. A.
Company : OLAYAN DESCON
Year of period : Jan 08 2009 Jan 20 2009
Position : Piping Foreman

Job description : Handle of defective line from vessel to pipe rack


Checking the line where is defective pipe
Speeding and Blinding the line and shut off valve
Cutting the pipe where is defective to change new pipe
As per scope of test package of client
Perform of hydro test as per scope of test package.

Project : ALWAHA PDH/ PP


Address : JUBAIL K.S.A.
Main Contractor : TECHNIMONT
Company : OLAYAN DESCON
Year of period : Feb.03 2008 Dec 17 2008
Position : Piping Foreman

Job description : Responsibility of UTILITY AREA


Fire Fighting pumps, Compressor pumps;
Waste water storage tanks, Demiwater pumps to storage
Caustic soda pumps to storage; Transformer building unit
Withdraw all materials we need in isometric drawing.
Fabricate of all supports as per construction drawing
Fabricate and erected of structure
Supports for Sprinkler Fire alarm. Pipe rack east to
West erected all pipe and pipe support.

Project : New Doha International Air Port


Address : Doha Qatar
Main Contractor : Qatar Dredging Company
Company : International Engineering and Gen. Contracting
Year of period Feb. 01 2005 Nov. 18 2006

Position : FOREMAN

Job description : Correct loading and dispatch of selected rock grades to


the air port.
: Safety and health of all People in this area responsibility.
: Daily control of all selected under layer rock.
: Operate of Excavator 340BL Caterpillar Grasp to loading
of truck.
: Operate of Wheel Loader 966 G Caterpillar to collect the
selected rock travel to designated stock file

Project : J U P C Project
Address : JUBAIL, K S A
Main Contractor : Saudi Flour Daniel Company
Company : Al RHASAED Construction Company
Year of period : Nov. 18 2003 May 09 2004
Position : PIPEFITTER A

Job description : Erection and installation the first spool of pipe from
compressor Suction and Discharge.
: Checking the maximum allowable tolerance of vendor.
: Erection and installation the second spool of pipe Suction
and Discharge.
: Erection and installed of hanger support, spring can
support, pipe shoe w/ pad. Align of run pipe.
: Re-instatement of first spool pipe from compressor
suction and discharge. Assist of bolt tightening of
vendor. Compressors No: 1, 2, 3, and 4.
: Erection and Fit up expansion line, Utility line from
west to east pipe rack.
: Fabricate and fit-up the toe board plate flat form of
compressor building.

Project : Neat KHUFF Condensate Fractionation Plant Project.


Address : RHASTANURA, RHAHIMA K S A
Main Contractor : SNAMPROGETTI Construction Company
Company : DODSAL PTE, Ltd.
Year Period : Feb. 04 2002 July 02 2003
Position : FOREMAN
Job Description : Marking of weld joint and spool numbering on piping
isometric size, length of material issued by main
contractor.
: Material take- off from piping isometric in linear meter
on material size and schedule.
: Assist piping planning Engineer in material shortage of
spool.
: Update of drawing as per information from shop
fabrication to site.
: Preparation of the test package for testing line.
: Line checking for the hydro testing.

Project : ARAMCO, GOSPII, SPF PROJECT


Address : SHAYBAH, K S A
Main Contractor : BECTHEL CONSTRUCTION COMPANY
Company : Consolidated Construction Company PTE.
Year Period : August 14 1997 August 19 1998
Position : PIPEFITTER

Job Description : Site fabrication and installation of pipe diameter 12, 10


from north east pipe rack to pin fan cooler.
: Fabricate of all supports pipe guide, pipe clamp, pipe
shoe w/ pad, and hanger support.
: Fit-up and install of cement line pipe diameter 10 from
slippery to the centrifugal pump. Suction and
Discharge line and install all support.
: Install and erection of pipes small bore seamless,
stainless, carbon steam from header to the knock
out drum.
: Install all support.