Operation Section Manual pcr-5
2. Index
Sr. No. Title Page No
1.
Cover page
2.
Index
3.
Release Authorization
4.
Amendment Sheet
5.
Purpose
6.
IMS Objectives
7.
List of Reports to be submitted
8.
List of activities carried out by the section
9.
Work Instructions/Standard Operating Procedures
10.
Checklists
11.
Safety Instructions
12.
Significant Aspect & Controls Measures
13.
Significant Hazards & Control Measures
14.
Contextual Issues- Risk: Control Measures/Opportunities
15.
Improvement Projects Carried out, in progress and Planned
16.
List of log books at various location in unit-6
17.
List of manuals
18.
List of Files / Registers
3. RELEASE AUTHORISATION
This Sectional Manual is released under the authority of the Sectional Incharge,
Operation Unit 5 , CSTPS, Chandrapur and is a property of CSTPS, Chandrapur.
Signature :
Name : P W. RAMTEKE
5. Purpose
Purpose :
There is a common Shift Incharge Engineer. For Generation of Electricity Coal, Oil
& Water is required. Coal Stocks are maintained by CHP Staff. The Coal Handling
Plant Supplies Crushed Coal of size to the Coal Bunkers. The Bunker supplies coal
to the Coal Feeder which in turn supplies a regulated Supply of Coal to Pulveriser.
After pulverization the Coal is fed to the Boiler by means of Air Flow supplied by the
P.A. Fan. Boiler is filled with Treated Water Supplied by the WT Plant. Coal Burns
producing heat, which is taken up by the Water , which is converted to steam. Steam is
supplied to the Turbine, which rotates along with the Generator Producing Electricity.
Coal after burning leaves behind Ash in which the heat of the furnace gets partly
converted to molten slag which falls in the Bottom Ash Hopper and the rest remains in
the form of fly Ash which is separated from the flue Gas by the ESP.
The Temperature and Pressure of the steam is monitored by the PCR staff. The
Chemical Quality of Steam, Water, Coal and Oil is Monitored by the WT Plants.
Shift-Charge Engineers give OLC to LD Nagpur as per the coal quality and mill and
plant availability. LD Nagpur gives us load schedule hour wise every day. PCR staff
tries to maintain the load schedule. If Any Abnormality is observed in the plant and set
is required to be withdrawn it is informed to LD prior to withdrawal of set. Planned
outages are taken with permission from Director (Operation) Mumbai.
If any abnormality is observed in the plant/ Process shift-Charge Engineer tries to
solve the problem in his capacity. if it is beyond his capacity he approaches higher
authority S.E. (O), Dy CE, & CE . PCR and the local staff tries to maintain the
parameters as per the manufacturers recommendation.
Regarding housekeeping yearly cleaning contract is operated by Efficiency section.
Cleaning is checked by Operation staff and certified by the respective area
INCHARGE.
Defects of auxiliaries/ plant are raised by Shift Charge Engineer/ PCR Incharge/
Plant Incharge through computer to respective section. The defects are classified as
Urgent, Emergency, Short shut down, Overhaul, depending upon severity & isolation
of the equipment. The Maintenance staff takes permit from PCR and does the work.
After cancellation of permit & trial of equipment defect is eliminated from the computer
list.
All Operation staff attendance is marked by time Office. If somebody applies leave
timekeeper gives note to a person who is in spare shift. Leave Account, night shift
Account, OT register, attendance registers are maintained by time keeper.
Various training programs are arranged by the Chandrapur Training Center.
Training department maintains register in which names of candidates, which type of
training given is noted. Accordingly S.E. (O) sends names of employees to training
department as per the availability of staff.
OPERATION :
a) SHIFT INCHARGE: - Shift In charge is assisted by P.C.R. In charge
and Assistant Plant In charge and desk operators. All the operations in
P.C.R. and Plant are carried out as directed and sometimes under
intimation to shift in charge
F.O. /L.D.O. tankers are unloaded and oil is transported to oil storage tanks, in
OHP.
a) The Pressurizing pumps supplies LDO, FO oil as per requirement to
boiler with requisite Pressure and temperature.
b) One technician is posted to supervise the operation and maintain the
Pressure and temperature as directed by Assistant Plant In charge, Dy
E..E. Boiler Desk/ P.C. R. In charge
c) He works under the control of Boiler Basement In charge Junior
Engineer.
pumps and fans, Jacket cooling of instrument, service air and A.C. Compressors,
return water is re-circulated to ACW. Pump Suction sump.
To monitor NDCT level.
To monitor raw water through the Raw Water Pump House from Koradi Pond
No. 3 through 2 Nos. of pumps as per the requirement of Raw Water Pump House and
as per one day reservoir
To monitor the firefighting system
Also to monitors the Ash Water System
Technician is posted for the operation of pumps and supervises the system.
This Plant maintains the temperature of PCR, AVR Room, ESP,VFD for ID and UPS
Room for proper working of instruments, controls and computers.
Monitoring of Compressors, blowers, chilled water pumps are done by Turbine
basement incharge
Time Office
a) Maintains Attendance of all operation staff.
b) Maintains Leave records.
c) Sends Attendance statement to Administrative office.
d) Keeps Records of Overtime.
e) Sending notes for staff arrangement against leaves and for overtime.
Section is headed by timekeeper and one messenger in every shift.
Ambulance is available for 24 hrs at time office for any casualties during any
shift to move the patient to hospital in the colony.
6.IMS Objectives
Coal mills
Parameters to
be Monitored Daily Boiler desk
4 POG DPPR File
at Corporate (In night shift) Engineer
Level
Generating
DATA / Partial
DATA ENTRY Daily
5 loss , Tripping SAP DPPR T/G Desk Engineer
IN SAP (In every shift )
details & C/M
outage details
DATA ENTRY
Morning Daily
6 IN SAP SAP DPPR PCR I/C
Report (In Night shift )
A)
Reference Documented Monitoring & Remarks
Information Review (If any)
SN Activities Frequency (SOP/WI/Record-Files ,
Registers, Log books,
Checklist, SAP)
Running of boiler Performance
side aux Review in
Daily
1 Daily BHELs Operation Manual
Meeting, In
OCM, ORT
meeting
Running of turbine Daily BHELs Operation Manual Performance
2 side aux Review in
Daily
Meeting, In
OCM, ORT
meeting
I) AUXILLARY TRIAL
Sr. Page
Auxillary Schedule
No. No.
1 AC Seal Oil Pump Every Monday
2 DC Seal Oil Pump Every Monday
3 AC Lub Oil Pump Every Monday
4 DC Lub Oil Pump Every Monday
5 Drum Controller for DC LOP Monthly 2nd Friday
6 DG Set Load trial Every Monday
7 DC Lighting 2 & 4th Saturday
nd
I) AUXILLARY TRIAL
17 Water level in seal trough & bottom Overflow P.I. / Local I/c
ash hopper
18 Manual Auxiliary air dampers all 4 Open > 50% P.I. / Local I/c
corners
1. Use safety equipment/instrument like Safety shoes, Helmet, Goggles, Hand gloves,
Ear Plugs, Nose Mask.
2. Work under skilled labour/trainee.
3. Ensure to follow Permit system.
Control Measures:
SN Category Risk/Concerns
Action Initiated/to be carried out
Resources:
Miscommunication, errors
4 Incompetent/Inade Adequate Training
in work, repetition of work
quate Manpower
Resources:
Scarcity or not as Hamper the work result in Control over externally provides
5 per specification of delayed and inaccurate services through Supervision and
Material/Instrument work Documented Obligations
s/Consumables
10 Minor incidence & near miss report F-05 SHIFT I/C CABIN
file