Professional Documents
Culture Documents
3 Kawat Beton Kg
4 Kawat Bronjong Kg
5 Kawat Duri Kg
6 Besi Beton Kg
7 Besi Beton Dia. 6 mm Kg
8 Besi Beton Dia. 8 mm Kg
9 Besi Beton Dia. 10 mm Kg
10 Besi Beton Dia. 12 mm Kg
11 Besi Beton Dia. 14 mm Kg
12 Besi Beton Dia. 16 mm Kg
13 Besi Beton Dia. 19 mm Kg
14 Besi Beton Dia. 22 mm Kg
15 Besi Beton Dia. 25 mm Kg
16 Besi Beton Dia. 32 mm Kg
17 Paku Campuran Kg
18 Paku Tripleks Kg
19 Paku Seng Kg
20 Paku Beton Kg
133,700.00
2,674.00
28,600.00
-
49,200.00
105,100.00
29,800.00
24,900.00
122,800.00
91,200.00
115,500.00
158,000.00
-
-
-
-
-
-
-
30,400.00
30,400.00
43,800.00
48,600.00
-
120,200.00
211,300.00
96,100.00
169,100.00
236,600.00
368,100.00
522,400.00
-
115,100.00
146,700.00
SPESIFIKASI
NO JENIS BAHAN MERK / MOFDEL SATUAN
UKURAN
1 2 3 4
172,000.00
203,700.00
-
277,000.00
350,400.00
-
39,200.00
45,500.00
45,500.00
84,800.00
102,500.00
130,300.00
194,800.00
222,600.00
-
5,700.00
5,700.00
8,200.00
12,000.00
17,100.00
37,300.00
48,700.00
37,500.00
-
6,500.00
6,100.00
4,800.00
7,300.00
7,300.00
-
96,100.00
125,200.00
194,800.00
327,600.00
1,213,100.00
SPESIFIKASI
NO JENIS BAHAN MERK / MOFDEL SATUAN
UKURAN
1 2 3 4
44,200.00
46,800.00
50,600.00
51,800.00
-
201,100.00
227,700.00
163,100.00
-
103,700.00
115,100.00
126,500.00
-
88,500.00
108,700.00
141,600.00
-
63,200.00
37,900.00
159,300.00
154,300.00
92,300.00
111,300.00
155,500.00
158,100.00
107,500.00
122,700.00
158,100.00
122,700.00
144,200.00
-
65,700.00
78,400.00
78,400.00
32,800.00
875,300.00
729,900.00
SPESIFIKASI
NO JENIS BAHAN MERK / MOFDEL SATUAN
UKURAN
1 2 3 4
85 Kaca Rayban 3 mm M2
86 Kaca Rayban 5 mm M2
87 Kaca Bening 3 mm M2
88 Kaca Bening 5 mm M2
89 Kaca Es/Kembang 3 mm M2
90 Kran (Kualitas Baik) Bh
91 Avour / Saringan Air Kotor Bh
92 Floor Drain Bh
93 Kloset Jongkok INA Bh
94 Kloset Jongkok TOTO Bh
95 Kloset Duduk / Lengkap INA Bh
96 Kloset Duduk / Lengkap TOTO Bh
97 Wastafel INA / TOTO Bh
98 Tempat Cuci 1 Lobang Bh
99 Tempat Cuci 2 Lobang Bh
100 IJUK Kg
101 Kunci Pintu Kualitas Sedang 1 Slaag Bh
102 Kunci Pintu Kualitas Baik 2 Slaag Bh
103 Grendel Jendela Bh
104 Grendel Pintu Bh
105 Kait Angin Bh
106 Engsel Jendela Kuningan Bh
107 Engsel Pintu Kuningan Bh
108 Lis Profil 5 cm M'
109 Profil Baja (Pabrikan) Kg
110 Plat Eiser M2
111 Besi Strip Kg
77,100.00
77,100.00
20,200.00
64,500.00
64,500.00
64,500.00
20,200.00
26,500.00
-
202,400.00
328,900.00
170,700.00
328,900.00
469,300.00
96,100.00
39,200.00
633,700.00
227,700.00
259,300.00
518,600.00
455,400.00
202,400.00
455,400.00
581,900.00
-
277,600.00
190,300.00
316,800.00
51,200.00
51,200.00
63,800.00
76,500.00
95,500.00
13,200.00
42,300.00
333,300.00
15,800.00
-
493,300.00
-
SPESIFIKASI
NO JENIS BAHAN MERK / MOFDEL SATUAN
UKURAN
1 2 3 4
NYM 3x4 mm M1
NYM 4x4 mm M1
NYM 4x6 mm M1
141 Lampu Pijar 5 Watt Bh
142 Lampu Pijar 10 Watt Bh
143 Lampu Pijar 25 Watt Bh
144 Lampu Pijar 40 Watt Bh
145 Lampu Pijar 60 Watt Bh
146 Lampu Pijar 75 Watt Bh
147 Lampu Pijar 100 Watt Bh
148 Lampu Jari-jari philips 14 Watt Bh
149 Lampu Jari-jari 25 Watt Bh
MINYAK / PELUMAS
150 Solar Pangkalan Liter
151 Bensin Premium Pangkalan Liter
152 Minyak Tanah Pangkalan Liter
153 Pelumas/Olie Kendaraan Roda 2 Top One Liter
Mesran Liter
Castrol Liter
154 Pelumas/Olie Kendaraan Roda 4 Top One Liter
Mesran Liter
155 Gemuk (Grase) 1/2 Kg
156 bak mandi fiber bh
157 0 bh
158 0 bh
159 0 bh
160 0 bh
161 0 0 M1
162 0 M1
PEMBULATAN
(Rp)
5
-
27,800.00
29,000.00
34,100.00
15,100.00
21,500.00
40,400.00
72,100.00
78,400.00
103,700.00
255,500.00
65,700.00
72,100.00
-
-
14,600.00
15,900.00
15,900.00
59,700.00
62,400.00
62,400.00
59,700.00
62,400.00
66,400.00
66,400.00
-
-
-
-
-
-
UPAH KERJA
Pekerja Terlatih
NO URAIAN KODE
A. PEKERJAAN PERSIAPAN
1 1 M' Pagar Sementara dari Kayu Tinggi 2 m A-01
2 1 M' Pagar Sementara Seng Gelombang Tinggi 2 m A-02
3 1 M' Pagar Sementara Kawat Duri Tinggi 1,80 m A-03
4 1 M2 Pengukuran dan Pasang Bouwplank A-04
13 1 M' Pagar Kawat Ayam Tiang Besi L50.50.5, tinggi 1 m' A-13
B. PEKERJAAN TANAH
1 Menggali 1 m3 tanah biasa sedalam 1 meter B-01
2 Menggali 1 m3 tanah biasa sedalam 2 meter B-02
3 Menggali 1 m3 tanah biasa sedalam 3 meter B-03
4 Menggali 1 m3 tanah keras sedalam 1 meter B-04
5 Menggali 1 m3 tanah cadas sedalam 1 meter B-05
6 Menggali 1 m3 tanah lumpur sedalam 1 meter B-06
Rekap - Hal 17
7 Mengerjakan 1 m2 stripping tebing setinggi 1 meter B-07
B-15
15 Mengurug 1 m3 sirtu padat untuk peninggian lantai bangunan
16 1 m3 Pasangan Batu Beronjong B-16
C. PEKERJAAN PONDASI
1 Memasang 1 m3 Pondasi Batu belah campuran 1 PC : 3 PS C-01
12 1 M' Pembuatan Tiang Pancang (40 x 40) cm, Beton Tulang C-12
13 1 M' Pembuatan Tiang Pancang (35 x 35) cm, Beton Tulang C-13
Rekap - Hal 18
16 1 Buah Memotong Tiang Pancang (40x40) cm Beton Bertulang C-16
17 1 M' Menyambung Tiang Pancang Beton Bertulang C-17
D. PEKERJAAN BETON
Membuat 1 m3 beton mutu f'c = 7,4 Mpa (K100), slump (122) cm,
1 D-01
w/c = 8,7
Membuat 1 m3 beton mutu f'c = 9,8 Mpa (K125), slump (122) cm,
2 D-02
w/c = 0,78
Membuat 1 m3 beton mutu f'c = 12,2 Mpa (K150), slump (122) cm,
3 D-03
w/c = 0,72
Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 Mpa (K100), slump
4 D-04
(3-6)cm w/c = 0,87
Membuat 1 m3 lantai kerja beton mutu f'c = 14,5 Mpa (K175), slump
5 D-05
(122)cm w/c = 0,66
Membuat 1 m3 lantai kerja beton mutu f'c = 16,9 Mpa (K200), slump
6 D-06
(122)cm w/c = 0,61
Membuat 1 m3 lantai kerja beton mutu f'c = 19,3 Mpa (K225), slump
7 D-07
(122)cm w/c = 0,58
Membuat 1 m3 lantai kerja beton mutu f'c = 21,7 Mpa (K250), slump
8 D-08
(122)cm w/c = 0,56
Membuat 1 m3 lantai kerja beton mutu f'c = 24 Mpa (K275), slump
9 D-09
(122)cm w/c = 0,53
Membuat 1 m3 lantai kerja beton mutu f'c = 26,4 Mpa (K300), slump
10 D-10
(122)cm w/c = 0,52
Membuat 1 m3 lantai kerja beton mutu f'c = 28,8 Mpa (K325), slump
11 D-11
(122)cm w/c = 0,49
Membuat 1 m3 lantai kerja beton mutu f'c = 31,2 Mpa (K350), slump
12 D-12
(122)cm w/c = 0,48
13 Membuat 1 m3 beton kedap air dengan storox - 100 D-13
14 Memasang 1m' PVC waterstop lebar 150 mm D-14
15 Memasang 1 m' PVC Waterstop lebar 200 mm D-15
16 Memasang 1 m' PVC Waterstop lebar 230 mm - 320 mm D-16
17 Pembesian 10 kg dengan besi polos atau besi ulir D-17
18 Memasang 10 kg kabel presstressed polos/strands D-18
Rekap - Hal 19
26 Memasang 1m2 bekisting untuk tangga D-26
27 Memasang 1 m2 jembatan untuk pengecoran beton D-27
35 D- 35
Membuat 1 m3 Kolom praktis beton bertulang (11 x 11) cm
36 D- 36
Membuat 1 m3 ring balok beton bertulang (10 x 15) cm
37 Pekerjaan Water Proofing D-37
38 Pekerjaan Water Proofing Membran D-38
Rekap - Hal 20
13 Memasang 1 M2 Dinding Conblock (CB-20) E-13
14 Memasang 1 M2 Dinding Conblock (CB-20) E-14
15 Memasang 1 M2 Dinding Conblock (CB-15) E-15
16 Memasang 1 M2 Dinding untuk Conblock (CB-10) E-16
17 Memasang 1 M2 Dinding Keramik artistik (10 x 20) cm E-17
Rekap - Hal 21
10 Membuat 1 m2 Plesteran 1 PC : 2 KP : 8 PP, tebal 15 mm F-10
24 Membuat 1 m2 Finishing siar pasangan dinding bata merah (=20 m') F-24
Membuat 1 m2 Finishing siar pasangan dinding conblock ekspose (=
25 8 m') F-25
Membuat 1 m2 Finishing siar pasangan dinding batu kali adukan 1
26 F-26
PC : 2 PP
27 Membuat 1 m2 Acian F-27
28 Membuat 1 m2 Acian Semen Instan F-28
G. PEKERJAAN ATAP
1 1 M2 Pasang Atap Genteng Palentong G-01
2 1 M2 Pasang Genteng Bubung Palentong G-02
3 1 M2 Pasang Roof Light Fibreglass (180 x 90)cm G-03
Rekap - Hal 22
8 1 M2 Pasang Atap Asbes Gelombang (1,50 x 1,05) x 4 mm G-08
H. PEKERJAAN PLAFOND
1 1 M2 Plafond Asbes (1,00 x 1,00) m, tebal 4 mm H-01
2 1 M2 Plafond Asbes (1,00 x 1,00) m, tebal 3,5 mm H-02
3 1 M2 Plafond Akustik (60 x 120) cm H-03
4 1 M2 Plafond Akustik (60 x 120) cm + Rangka Alluminium H-04
1 M2 Plafond Teakwood (60 x 120) cm, t = 4 mm + Rangka Kayu
5 H-05
Borneo super
6 H-06
1 M2 Plafond Teakwood 3 mm + Rangka Kayu Borneo Super
7 1 M2 Plafond Triplek 4 mm + Rangka Kayu Borneo Super H-07
I. PEKERJAAN LANTAI
Rekap - Hal 23
1 Memasang 1 M2 Lantai Ubin Granito ukuran 40 x 40 cm I-01
5 I-05
Memasang 1 M2 Lantai Keramik artistik (10 x 20) cm
6 I-06
Memasang 1 M2 Lantai Keramik artistik 10 x 10 cm atau (5 x 20) cm
7 Memasang 1 M2 Lantai Keramik corak 20 x 20 cm setara Mulia I-07
27 I-27
Memasang 1 m' plint vinyl karet ukuran (15 x 30) cm dengan perekat
28 Memasang 1 m2 floor hardener I-28
Rekap - Hal 24
29 I-29
Memasang 1 M' Plint Kayu kelas II tebal 2 cm, lebar 10 cm
30 Memasang 1 m' plint internal cove artistik ukuran (5 x 5 x 20) cm I-30
J. PEKERJAAN KAYU
1 J-01
Memasang dan membuat 1 m3 Kusen Pintu & Jendela Kayu kelas 1
Membuat dan memasang 1 m3 Kusen Pintu & Jendela Kayu kelas II
2 J-02
atau kelas III
3 Membuat dan memasang 1 m2 pintu klamp standar, kayu kelas II J-03
Membuat dan memasang 1 m2 pintu klamp sederhana, kayu kelas III
4 J-04
untuk gudang sementara
5 J-05
Membuat dan memasang 1 m2 daun pintu panel, kayu kelas I atau II
Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas I
6 J-06
atau II
Membuat dan memasang 1 m2 pintu dan jendela jalusi kayu kelas I
7 J-07
atau II
8 Membuat dan memasang daun pintu kayu lapis (plywood) rangkap, J-08
rangka tertutup kayu kelas II (lebar sampai 90 cm)
Membuat 1 m2 pintu plywood rangkap, rangka expose kayu kelas I
9 J-09
atau II
10 Memasang 1 m2 jalusi kusen, kayu kelas I atau II J-10
11 Memasang 1 m2 teakwood rangkap, rangka expose kayu kelas I J-11
Memasang 1 m2 teakwood rangkap lapis formika, rangka expose
12 J-12
kayu kelas II
Memasang 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II
13 J-13
dan III bentang 6 meter
14 Memasang 1 m3 konstruksi kuda-kuda expose, kayu kelas I J-14
15 Memasang 1 m3 konstruksi, gording kayu kelas II J-15
16 Memasang 1 m2 rangka atap genteng keramik, kayu kelas II J-16
Rekap - Hal 25
18 Memasang 1 m2 rangka atap sirap, kayu kelas II J-18
Memasang 1 m2 rangka plafond (50 x 100) cm, kayu kelas II atau
19 J-19
kelas III
20 Memasang 1 m2 rangka plafond (60 x 60), kayu kelas II atau kelas III J-20
Memasang 1 m' lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas
21 J-21
II
Memasang 1 m' lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas
22 J-22
II
Memasang 1 m2 rangka dinding pemisah ( 60 x 120) cm, kayu kelas
23 J-23
II atau III
Memasang 1 m2 dinding pemisah teakwood rangkap, rangka kayu
24 J-24
kelas II
Memasang 1 m2 dinding pemisah plywood rangkap, rangka kayu
25 J-25
kelas II
26 J-26
Memasang 1 m2 dinding lambrizing dari papan kayu kelas I
Memasang 1 m2 dinding lambrizing dari plywood ukuran (120 x 240)
27 J-27
cm
28 Memasang 1 m2 dinding bilik, rangka kayu kelas III atau IV J-28
K. PEKERJAAN BESI DAN ALUMINIUM
1 Memasang 1 Kg Besi Profil K-01
2 Memasang 1 Kg Rangka kuda-kuda baja WF K-02
3 Mengerjakan 100 kg pekerjaan perakitan K-03
4 Membuat 1 m2 Pintu besi plat tebal 2 mm rangkap rangka baja siku K-04
5 Mengerjakan 10 cm pengelasan dengan las listrik K-05
6 Membuat 1 m2 rangka jendela besi scuare tube (25 x 5) cm K-06
Rekap - Hal 26
20 Pemasangan 1 m2 Aluminium Composite Panel K-20
M. PEKERJAAN SANITASI
1 Memasang 1 buah closet duduk M-01
2 Memasang 1 buah closet jongkok M-02
3 Memasang 1 buah Urinoir M-03
4 Memasang 1 buah Wastafel M-04
5 1 Buah bak Mandi Fibreglass Volume 0,30 m3 M-05
6 Memasang 1 buah bak mandi bata merah volume 0,3 m3 M-06
Rekap - Hal 27
21 1 M' Grafel Beton U 30cm - 60cm M-21
22 1 M' Pasang Talang Plastik PVC U 15 cm (AW) M-22
23 1 M' Saluran Air Limbah Buis Beton 60 cm M-23
24 1 Buah Tangki Air Fiberglass Volume 1 M3 M-24
25 1 Unit Septictank 2 x 1,50 x 1,50 m + Rembesan M-25
26 1 Unit Septictank 1 x 1,50 x 1,50 m + Rembesan M-26
27 Pekerjaan Septictank Komunal (Bio Fill 5000 kap 3,6 m3) M-27
N. PEKERJAAN PENGECATAN
1 Mengikis/Mengerok 1 m2 Perawatan Cat Tembok Lama N-01
2 Mendempul dan Menggosok 1 m2 Kayu N-02
3 Mengecat 1 m2 Bidang Kayu Lama N-03
Mengecat 1 m2 bidang kayu baru ( 1 lps plamir, 1 lps cat dasar, 2 lps
N-04
4 cat penutup)
Mengecat 1 m2 bidang kayu baru ( 1 lps plamir, 1 lps cat dasar, 3 lps
5 N-05
cat penutup)
6 Melabur 1 m2 Bidang Kayu dengan Politur N-06
7 Melabur 1 m2 Bidang Kayu dengan Cat Residu N-07
8 Melabur 1 m2 bidang kayu dengan vernis N-08
Mengecat 1 m2 Tembok Baru (1 lps plamir, 1 lps cat dasar, 2 lps cat
9 N-09
penutup)
10 Mengecat 1 m2 Tembok Lama (1 lps cat dasar, 2 lps cat penutup) N-10
11 Mengecatan 1 m2 Plafond (3x) N-11
12 Memasang 1 m2 Wallpaper N-14
13
Mengecat 1 m2 Permukaan Baja dengan Meni Besi N-13
14 Mengecat 1 m2 Permukaan Baja dengan Meni Besi dan Perancah N-14
Mengecat 1 m2 Permukaan Baja Lapis Seng (Galbani) secara
15 N-15
Manual
16 N-16
Mengecat 1 m2 tembok bagian dalam (interior) (3x)
O. PEKERJAAN PERTAMANAN
1 1 Lubang (70 x 70 x 70) cm, tanam pohon pelindung tinggi 2m O-01
Rekap - Hal 28
KOEF
260,543.50
369,276.83
1,499,315.75
65,688.00
1,399,612.67
1,089,827.77
1,403,116.13
10,750.00
409,311.80
716,650.00
716,650.00
157,684.81
399,658.67
272,130.34
34,397.64
79,050.00
55,785.62
615,112.45
2,739,403.14
13,852,141.12
55,945.43
68,934.65
82,163.89
74,433.89
113,090.95
90,112.73
Rekap - Hal 29
4,129.73
24,495.98
18,648.48
41,297.26
335,902.37
190,132.89
237,227.80
152,078.18
337,277.03
765,202.29
1,023,074.24
960,685.69
917,441.08
887,034.99
845,366.74
697,148.35
892,989.04
862,517.45
675,713.22
3,219,621.42
1,004,990.55
1,082,948.21
803,675.36
1,121,888.15
129,280.32
Rekap - Hal 30
258,141.39
851,991.99
803,043.11
846,082.28
880,999.28
735,075.35
920,881.82
961,201.29
988,028.17
1,010,091.11
1,047,919.63
1,059,849.92
1,146,816.56
1,162,351.68
1,291,718.26
14,418.24
102,633.09
137,149.24
189,872.63
184,974.16
118,504.89
145,454.50
153,704.50
326,280.90
334,530.90
423,080.90
406,690.90
Rekap - Hal 31
308,810.83
87,502.91
4,699,862.47
5,810,862.85
9,601,085.22
7,286,343.63
6,580,015.66
6,322,274.39
6,829,447.05
82,156.50
103,316.98
507,089.15
132,817.83
291,098.80
280,008.48
274,209.85
140,146.98
140,838.93
132,824.43
391,921.73
388,674.53
309,432.77
114,732.44
203,817.53
194,784.18
Rekap - Hal 32
186,847.78
273,216.55
169,876.63
164,444.28
218,021.60
746,291.10
230,154.10
985,401.70
442,836.83
216,506.81
209,753.60
203,071.10
155,209.82
472,016.62
503,375.16
416,835.24
120,808.29
160,109.05
155,871.82
869,847.05
123,075.35
578,152.07
71,108.60
62,494.04
58,760.77
56,217.47
54,767.73
53,609.90
52,971.62
52,333.34
81,020.30
Rekap - Hal 33
51,206.46
46,622.52
47,147.31
83,641.29
67,700.41
75,196.65
73,339.54
71,719.88
65,811.42
35,135.65
141,752.16
141,752.16
117,002.16
43,149.95
25,471.87
12,218.87
53,666.18
32,194.41
30,987.71
63,019.49
112,433.56
75,686.95
50,562.14
52,718.14
47,384.47
50,276.48
Rekap - Hal 34
56,184.47
185,460.05
80,533.06
109,494.49
139,194.49
120,790.58
339,060.12
121,336.97
81,775.35
26,873.33
47,286.31
256,445.69
368,196.89
205,916.61
101,709.75
36,308.45
48,165.72
360,706.31
523,728.81
294,458.63
263,284.70
259,753.68
112,434.40
106,390.53
262,739.09
258,946.58
73,548.05
27,908.55
162,951.23
120,457.08
Rekap - Hal 35
910,552.65
1,300,966.33
64,810.09
73,417.32
214,406.56
337,642.43
204,899.34
165,885.33
188,495.88
190,984.45
282,665.33
548,281.82
199,129.94
154,848.98
656,272.78
164,201.22
896,567.65
653,980.63
266,012.26
270,601.28
27,537.62
99,981.56
126,919.08
136,954.48
47,579.60
34,617.50
123,900.97
188,604.98
Rekap - Hal 36
30,981.35
182,234.91
178,133.43
200,027.87
159,165.21
175,363.96
641,829.51
545,237.15
816,781.72
6,695,343.69
5,937,193.50
265,243.83
216,843.83
582,655.63
435,223.42
661,855.63
654,242.20
698,773.22
497,080.15
524,891.90
779,533.91
5,816,449.11
7,302,454.60
4,477,983.29
100,174.26
100,261.38
Rekap - Hal 37
480,728.57
142,128.57
143,678.03
68,599.00
68,327.74
144,076.31
326,122.12
414,066.43
283,016.71
115,857.06
131,869.48
30,837.27
28,516.88
86,163.86
1,601,036.77
124,670.69
556,634.75
874,983.31
555,145.83
667,884.50
687,260.68
55,058.58
575,658.01
3,079,566.11
656,442.03
770,234.86
141,229.24
819,885.99
136,821.41
97,043.56
Rekap - Hal 38
522,565.04
235,311.23
204,232.69
99,146.34
31,204.65
63,444.74
39,771.06
783,392.98
108,848.54
111,834.65
118,766.87
160,369.30
160,369.30
189,117.10
234,921.84
1,056,739.05
308,107.48
197,556.54
3,303,781.02
580,056.60
4,118,199.41
2,437,964.70
925,975.66
1,566,114.79
244,070.06
59,861.19
103,846.29
858,749.61
563,138.30
84,797.01
81,537.60
175,963.48
228,288.65
679,051.12
123,321.72
635,998.33
103,678.93
86,318.58
Rekap - Hal 39
102,961.86
150,883.51
382,620.55
680,522.25
13,042,987.22
7,475,548.17
16,623,947.43
13,159.79
12,483.11
41,612.85
46,696.84
63,446.26
42,571.31
21,360.29
49,415.84
37,643.06
24,954.41
115,894.97
57,244.77
27,555.11
57,244.77
45,679.28
63,997.52
110,995.99
74,936.92
34,999.03
12,941.20
Rekap - Hal 40
A. ANALISA HARGA SATUAN PEKERJAAN PERSIAPAN
Persiapan - Hal 41
Kayu 5/7 M3 0.0120 1,980,000.00
Paku Biasa 2"-5" Kg 0.0200 30,400.00
Kayu Papan 3/20 M3 0.0070 2,310,000.00
Pekerja Oh 0.1000 100,000.00
Tukang Kayu Oh 0.1000 130,000.00
Kepala Tukang Oh 0.0100 140,000.00
Mandor Oh 0.0050 150,000.00
Jumlah
Persiapan - Hal 42
Kayu Balok Terentang M3 0.1860 1,980,000.00
Paku Biasa Kg 0.3000 30,400.00
Semen Portland kg 18.0000 1,804.00
Pasir Beton M3 0.0300 318,180.50
Koral Beton M3 0.0500 412,500.00
Seng Gelombang BJLS 30 Lbr 1.5000 138,136.90
plywood 4mm Lbr 1.3500 259,809.90
Pekerja Oh 1.0000 100,000.00
Tukang Kayu Oh 2.0000 130,000.00
Kepala Tukang Oh 0.2000 140,000.00
Mandor Oh 0.0500 150,000.00
Jumlah
A-13 1 M' Pagar Kawat Ayam Tiang Besi L50.50.5, tinggi 1 m'
Kawat Ram Ayam Lbr 0.4340 22,117.43
Besi Siku L50.50.5 Kg 6.0660 52,800.00
Besi Pelat (1,2 x 3) mm Kg 0.0424 21,729.40
Baut bh 4.0000 1,164.08
Semen Portland kg 2.5000 1,804.00
Persiapan - Hal 43
Pasir Beton M3 0.0050 318,180.50
Koral Beton M3 0.0090 412,500.00
Pekerja Oh 0.3750 100,000.00
Tukang Batu Oh 0.1250 98,831.04
Kepala Tukang Oh 0.0120 140,000.00
Mandor Oh 0.0190 150,000.00
Jumlah
Persiapan - Hal 44
Pasir Beton m3 0.0740 318,180.50
Koral m3 0.1460 237,988.67
Semen Portland kg 45.0000 1,804.00
Pekerja Oh 0.3750 70,593.60
Tukang Batu Oh 0.1250 98,831.04
Kepala Tukang Oh 0.0120 112,949.76
Mandor Oh 0.0190 120,009.12
Jumlah
Persiapan - Hal 45
HARGA (Rp)
9,625.00
14,707.00
715.00
3,712.50
142,560.00
1,824.00
15,600.00
40,000.00
26,000.00
2,800.00
3,000.00
260,543.50
9,625.00
6,685.00
120,132.54
715.00
3,712.50
142,560.00
1,824.00
12,222.79
40,000.00
26,000.00
2,800.00
3,000.00
369,276.83
9,625.00
5,348.00
1,416,291.25
715.00
3,712.50
1,824.00
30,000.00
26,000.00
2,800.00
3,000.00
1,499,315.75
Persiapan - Hal 46
23,760.00
608.00
16,170.00
10,000.00
13,000.00
1,400.00
750.00
65,688.00
9,625.00
356,400.00
25,840.00
67,177.53
63,140.00
34,146.20
31,818.05
61,875.00
38,026.45
5,820.38
60,208.29
9,892.05
11,724.10
15,588.59
200,000.00
260,000.00
98,831.04
42,000.00
7,500.00
1,399,612.67
13,090.00
415,800.00
9,120.00
18,942.00
9,545.42
20,625.00
207,205.35
100,000.00
260,000.00
28,000.00
7,500.00
1,089,827.77
9,625.00
Persiapan - Hal 47
368,280.00
9,120.00
32,472.00
9,545.42
20,625.00
207,205.35
350,743.36
100,000.00
260,000.00
28,000.00
7,500.00
1,403,116.13
10,000.00
750.00
10,750.00
43,846.83
28,047.22
229,917.75
100,000.00
7,500.00
409,311.80
666,700.00
49,950.00
716,650.00
666,700.00
49,950.00
716,650.00
71,280.00
2,432.00
54,323.50
29,649.31
157,684.81
9,598.96
320,284.80
921.33
4,656.30
4,510.00
Persiapan - Hal 48
1,590.90
3,712.50
37,500.00
12,353.88
1,680.00
2,850.00
399,658.67
84,201.43
3,608.00
124,633.63
1,590.90
3,712.50
37,500.00
12,353.88
1,680.00
2,850.00
272,130.34
22,000.00
5,820.38
1,700.00
2,647.26
280.00
1,950.00
34,397.64
25,300.00
50,000.00
3,750.00
79,050.00
47,977.97
2,964.93
4,150.90
451.80
240.02
55,785.62
198,948.18
234,230.52
Persiapan - Hal 49
23,545.36
34,746.35
81,180.00
26,472.60
12,353.88
1,355.40
2,280.17
615,112.45
1,415,515.20
791,571.00
294,899.00
152,179.50
67,656.91
6,315.30
1,807.20
384.03
9,075.00
2,739,403.14
6,061,280.32
192,963.59
13,048.82
392,398.05
10,704.83
849,130.63
213,290.36
5,428,118.39
506,627.68
144,745.12
30,758.34
9,075.00
13,852,141.12
Persiapan - Hal 50
B. ANALISA HARGA SATUAN PEKERJAAN TANAH
52,945.20
3,000.23
55,945.43
63,534.24
5,400.41
68,934.65
74,123.28
8,040.61
82,163.89
70,593.60
3,840.29
74,433.89
105,890.40
7,200.55
113,090.95
84,712.32
5,400.41
90,112.73
3,529.68
600.05
4,129.73
23,295.89
1,200.09
24,495.98
18,648.48
35,296.80
6,000.46
313,524.20
21,178.08
1,200.09
335,902.37
12,221.55
91,056.53
80,006.87
56,474.88
39,532.42
4,517.99
9,600.73
190,132.89
22,451.44
104,650.34
56,474.88
39,532.42
4,517.99
9,600.73
237,227.80
139,689.00
10,589.04
1,800.14
152,078.18
316,628.40
17,648.40
3,000.23
337,277.03
407,891.88
226,994.63
105,890.40
19,766.21
2,259.00
2,400.18
765,202.29
Pondasi - Hal 55
Mandor Oh 0.0750
Jumlah
Pondasi - Hal 56
C-09 Memasang 1 m3 Batu Kosong (aanstamping)
Batu belah 15/20 cm m3 1.2000
Pasir Urug m3 0.4320
Pekerja Oh 0.7800
Tukang Batu Oh 0.3900
Kepala Tukang Oh 0.0390
Mandor Oh 0.0390
Jumlah
C-10 Memasang 1 m3 Beton Siklop, 60% beton campuran 1 Pc : 2Pb : 3kr + 40% Batu Belah
Batu belah 15/20 cm m3 0.4800
Semen Portland kg 194.0000
Pasir Beton m3 0.3120
Koral Beton m3 0.4680
Besi beton kg 126.0000
Kawat Beton Kg 1.8000
Pekerja Oh 3.4000
Tukang Batu Oh 0.8500
Kepala Tukang Oh 0.0850
Mandor Oh 0.1700
Jumlah
C-12 1 M' Pembuatan Tiang Pancang (40 x 40) cm, Beton Tulang
Pasir Urug m3 0.0190
Pasir Beton m3 0.0940
Koral Beton m3 0.1500
Semen Portland kg 1.2100
Besi Beton Kg 45.0000
Kawat Beton Kg 0.9000
Kayu Balok Terentang m3 0.0320
Paku Kg 0.1200
Minyak Bekisting Ltr 0.0900
Plamir Tembok Kg 0.2400
Pekerja Oh 1.0000
Pondasi - Hal 57
Tukang Batu Oh 0.6700
Kepala Tukang Oh 0.0670
Mandor Oh 0.0500
Jumlah
C-13 1 M' Pembuatan Tiang Pancang (35 x 35) cm, Beton Tulang
Pasir Urug M3 0.0160
Pasir Beton M3 0.0800
Koral Beton M3 0.1250
Semen Portland zak 0.9800
Besi Beton Kg 32.0000
Kawat Beton Kg 0.7000
Kayu Balok Terentang M3 0.0270
Paku Kg 0.1200
Minyak Bekisting Ltr 0.0900
Plamir Tembok Kg 0.2000
Pekerja Oh 0.8000
Tukang Batu Oh 0.5000
Kepala Tukang Oh 0.0500
Mandor Oh 0.0400
Jumlah
Pondasi - Hal 58
Pekerja Oh 2.7500
Kepala Tukang Oh 0.0700
Mandor Oh 0.2750
Alat Bantu Lot 0.3500
Jumlah
Pondasi - Hal 59
ndasi
HARGA SATUAN
HARGA (Rp)
(Rp)
292,312.17 350,774.60
1,804.00 364,408.00
227,641.34 110,406.05
70,593.60 105,890.40
98,831.04 74,123.28
112,949.76 8,471.23
120,009.12 9,000.68
1,023,074.24
292,312.17 350,774.60
1,804.00 294,052.00
227,641.34 118,373.50
70,593.60 105,890.40
98,831.04 74,123.28
112,949.76 8,471.23
120,009.12 9,000.68
960,685.69
292,312.17 350,774.60
1,804.00 245,344.00
227,641.34 123,836.89
70,593.60 105,890.40
98,831.04 74,123.28
112,949.76 8,471.23
120,009.12 9,000.68
917,441.08
292,312.17 350,774.60
1,804.00 211,068.00
227,641.34 127,706.79
70,593.60 105,890.40
98,831.04 74,123.28
112,949.76 8,471.23
Pondasi - Hal 60
120,009.12 9,000.68
887,034.99
292,312.17 350,774.60
1,804.00 164,164.00
227,641.34 132,942.54
70,593.60 105,890.40
98,831.04 74,123.28
112,949.76 8,471.23
120,009.12 9,000.68
845,366.74
292,312.17 350,774.60
90,530.00 15,390.10
330,000.00 56,100.00
227,641.34 77,398.05
70,593.60 105,890.40
98,831.04 74,123.28
112,949.76 8,471.23
120,009.12 9,000.68
697,148.35
383,460.00 460,152.00
1,804.00 110,044.00
90,530.00 13,307.91
227,641.34 111,999.54
70,593.60 105,890.40
98,831.04 74,123.28
112,949.76 8,471.23
120,009.12 9,000.68
892,989.04
383,460.00 460,152.00
1,804.00 73,964.00
90,530.00 11,859.43
227,641.34 119,056.42
70,593.60 105,890.40
98,831.04 74,123.28
112,949.76 8,471.23
120,009.12 9,000.68
862,517.45
Pondasi - Hal 61
383,460.00 460,152.00
261,270.17 112,868.71
70,593.60 55,063.01
98,831.04 38,544.11
112,949.76 4,405.04
120,009.12 4,680.36
675,713.22
383,460.00 172,557.00
1,804.00 349,976.00
318,180.50 99,272.32
237,988.67 111,378.70
70,593.60 169,424.64
98,831.04 79,064.83
112,949.76 9,035.98
120,009.12 14,281.09
1,004,990.55
261,270.17 4,964.13
318,180.50 29,908.97
237,988.67 35,698.30
1,804.00 2,182.84
16,500.00 742,500.00
23,281.50 20,953.35
2,444,557.50 78,225.84
24,057.55 2,886.91
19,401.25 1,746.11
56,263.63 13,503.27
70,593.60 70,593.60
Pondasi - Hal 62
98,831.04 66,216.80
112,949.76 7,567.63
120,009.12 6,000.46
1,082,948.21
261,270.17 4,180.32
318,180.50 25,454.44
237,988.67 29,748.58
1,804.00 1,767.92
16,500.00 528,000.00
23,281.50 16,297.05
2,444,557.50 66,003.05
24,057.55 2,886.91
19,401.25 1,746.11
56,263.63 11,252.73
70,593.60 56,474.88
98,831.04 49,415.52
112,949.76 5,647.49
120,009.12 4,800.36
803,675.36
261,270.17 3,892.93
318,180.50 23,481.72
237,988.67 28,035.06
1,804.00 89,284.47
16,500.00 709,500.00
23,281.50 20,953.35
2,444,557.50 78,225.84
24,057.55 2,886.91
19,401.25 1,746.11
56,263.63 13,503.27
70,593.60 70,593.60
98,831.04 66,216.80
112,949.76 7,567.63
120,009.12 6,000.46
1,121,888.15
1,078,774.00 126,216.56
70,593.60 2,823.74
120,009.12 240.02
129,280.32
Pondasi - Hal 63
70,593.60 194,132.40
112,949.76 7,906.48
120,009.12 33,002.51
66,000.00 23,100.00
258,141.39
21,729.40 333,980.88
16,500.00 100,089.00
42,682.75 93,902.05
98,831.04 98,831.04
70,593.60 141,187.20
120,009.12 24,001.82
30,000.00 60,000.00
851,991.99
Pondasi - Hal 64
D. ANALISA HARGA SATUAN PEKERJAAN BETON
D-02 Membuat 1 m3 beton mutu f'c = 9,8 Mpa (K125), slump (122) cm, w/c = 0,78
Semen Portland kg 276.0000 1,804.00
Pasir Beton m3 0.5914 318,180.50
kerikil kg 0.7496 4,290.00
Pekerja Oh 1.6500 70,593.60
Tukang Batu Oh 0.2750 98,831.04
Kepala Tukang Oh 0.0280 112,949.76
Mandor Oh 0.0830 120,009.12
Jumlah
D-03 Membuat 1 m3 beton mutu f'c = 12,2 Mpa (K150), slump (122) cm, w/c = 0,72
Semen Portland kg 299.0000 1,804.00
Pasir Beton m3 0.5707 318,180.50
kerikil kg 0.7533 4,290.00
Pekerja Oh 1.6500 70,593.60
Tukang Batu Oh 0.2750 98,831.04
Kepala Tukang Oh 0.0280 112,949.76
Mandor Oh 0.0830 120,009.12
Jumlah
D-04 Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 Mpa (K100), slump (3-6)cm w/c = 0,87
Semen Portland kg 230.0000 1,804.00
Pasir Beton m3 0.6379 318,180.50
kerikil kg 0.7607 4,290.00
Pekerja Oh 1.2000 70,593.60
Tukang Batu Oh 0.2000 98,831.04
Kepala Tukang Oh 0.0200 112,949.76
Mandor Oh 0.0600 120,009.12
Jumlah
D-05 Membuat 1 m3 lantai kerja beton mutu f'c = 14,5 Mpa (K175), slump (122)cm w/c = 0,66
Semen Portland kg 326.0000 1,804.00
Pasir Beton m3 0.5429 318,180.50
kerikil kg 0.7622 4,290.00
Pekerja Oh 1.6500 70,593.60
Tukang Batu Oh 0.2750 98,831.04
D-06 Membuat 1 m3 lantai kerja beton mutu f'c = 16,9 Mpa (K200), slump (122)cm w/c = 0,61
Semen Portland kg 352.0000 1,804.00
Pasir Beton m3 0.5221 318,180.50
kerikil kg 0.7637 4,290.00
Pekerja Oh 1.6500 70,593.60
Tukang Batu Oh 0.2750 98,831.04
Kepala Tukang Oh 0.0280 112,949.76
Mandor Oh 0.0830 120,009.12
Jumlah
D-07 Membuat 1 m3 lantai kerja beton mutu f'c = 19,3 Mpa (K225), slump (122)cm w/c = 0,58
Semen Portland kg 371.0000 1,804.00
Pasir Beton m3 0.4986 318,180.50
kerikil kg 0.7756 4,290.00
Pekerja Oh 1.6500 70,593.60
Tukang Batu Oh 0.2750 98,831.04
Kepala Tukang Oh 0.0280 112,949.76
Mandor Oh 0.0830 120,009.12
Jumlah
D-08 Membuat 1 m3 lantai kerja beton mutu f'c = 21,7 Mpa (K250), slump (122)cm w/c = 0,56
Semen Portland kg 384.0000 1,804.00
Pasir Beton m3 0.4943 318,180.50
kerikil kg 0.7696 4,290.00
Pekerja Oh 1.6500 70,593.60
Tukang Batu Oh 0.2750 98,831.04
Kepala Tukang Oh 0.0280 112,949.76
Mandor Oh 0.0830 120,009.12
Jumlah
D-09 Membuat 1 m3 lantai kerja beton mutu f'c = 24 Mpa (K275), slump (122)cm w/c = 0,53
Semen Portland kg 406.0000 1,804.00
Pasir Beton m3 0.4886 318,180.50
kerikil kg 0.7600 4,290.00
Pekerja Oh 1.6500 70,593.60
Tukang Batu Oh 0.2750 98,831.04
Kepala Tukang Oh 0.0280 112,949.76
Mandor Oh 0.0830 120,009.12
Jumlah
D-10 Membuat 1 m3 lantai kerja beton mutu f'c = 26,4 Mpa (K300), slump (122)cm w/c = 0,52
Semen Portland kg 413.0000 1,804.00
Pasir Beton m3 0.4864 318,180.50
kerikil kg 0.7563 4,290.00
Pekerja Oh 1.6500 70,593.60
Tukang Batu Oh 0.2750 98,831.04
Kepala Tukang Oh 0.0280 112,949.76
Mandor Oh 0.0830 120,009.12
D-11 Membuat 1 m3 lantai kerja beton mutu f'c = 28,8 Mpa (K325), slump (122)cm w/c = 0,49
Semen Portland kg 439.0000 1,804.00
Pasir Beton m3 0.4786 318,180.50
kerikil kg 0.7452 4,290.00
Pekerja Oh 2.1000 70,593.60
Tukang Batu Oh 0.3500 98,831.04
Kepala Tukang Oh 0.0350 112,949.76
Mandor Oh 0.1050 120,009.12
Jumlah
D-12 Membuat 1 m3 lantai kerja beton mutu f'c = 31,2 Mpa (K350), slump (122)cm w/c = 0,48
Semen Portland kg 448.0000 1,804.00
Pasir Beton m3 0.4764 318,180.50
kerikil kg 0.7407 4,290.00
Pekerja Oh 2.1000 70,593.60
Tukang Batu Oh 0.3500 98,831.04
Kepala Tukang Oh 0.0350 112,949.76
Mandor Oh 0.1050 120,009.12
Jumlah
D-43 Membuat 1 m3 kolom beton bertulang 12x12 kolom praktis (250kg besi + bekisting)
Kayu kelas III m3 0.4000 1,650,000.00
Paku 5-12cm kg 4.0000 24,057.55
Minyak bekisting ltr 2.0000 19,401.25
D-44 Membuat 1 m3 kolom beton bertulang 30x30 kolom praktis (175kg besi + bekisting)
Kayu kelas III m3 0.4000 1,650,000.00
Paku 5-12cm kg 4.0000 24,057.55
Minyak bekisting ltr 2.0000 19,401.25
Besi beton kg 175.0000 16,500.00
Kawat beton kg 4.5000 23,281.50
Semen portland kg 336.0000 1,804.00
Pasir beton m3 0.5400 318,180.50
Koral beton m3 0.8100 237,988.67
Kayu kelas II (balok) m3 0.1500 2,750,000.00
Plywood 9 mm lbr 3.5000 194,012.50
Dolken kayu galam btg 20.0000 24,200.00
Pekerja Oh 7.0500 70,593.60
Tukang batu Oh 0.2750 98,831.04
Tukang kayu btg 1.6500 105,890.40
Tukang besi Oh 2.1000 98,831.04
Kepala tukang Oh 0.4030 112,949.76
Mandor Oh 0.3530 120,009.12
Mandor
445,588.00
197,499.18
3,174.60
116,479.44
27,178.54
3,162.59
9,960.76
803,043.11
497,904.00
188,181.04
3,215.91
116,479.44
27,178.54
3,162.59
9,960.76
846,082.28
539,396.00
181,590.16
3,231.80
116,479.44
27,178.54
3,162.59
9,960.76
880,999.28
414,920.00
202,953.70
3,263.58
84,712.32
19,766.21
2,259.00
7,200.55
735,075.35
588,104.00
172,726.56
3,269.93
116,479.44
27,178.54
635,008.00
166,135.68
3,276.29
116,479.44
27,178.54
3,162.59
9,960.76
961,201.29
669,284.00
158,635.71
3,327.13
116,479.44
27,178.54
3,162.59
9,960.76
988,028.17
692,736.00
157,272.08
3,301.71
116,479.44
27,178.54
3,162.59
9,960.76
1,010,091.11
732,424.00
155,453.90
3,260.40
116,479.44
27,178.54
3,162.59
9,960.76
1,047,919.63
745,052.00
154,772.09
3,244.51
116,479.44
27,178.54
3,162.59
9,960.76
791,956.00
152,272.10
3,196.84
148,246.56
34,590.86
3,953.24
12,600.96
1,146,816.56
808,192.00
151,590.28
3,177.78
148,246.56
34,590.86
3,953.24
12,600.96
1,162,351.68
721,600.00
152,726.64
176,000.00
42,000.00
148,246.56
34,590.86
3,953.24
12,600.96
1,291,718.26
6,518.82
4,235.62
2,964.93
338.85
360.03
14,418.24
93,300.61
4,941.55
3,459.09
451.80
480.04
102,633.09
126,616.67
5,647.49
173,250.00
3,492.23
4,941.55
6,918.17
790.65
480.04
189,872.63
173,250.00
2,328.15
3,529.68
4,941.55
564.75
360.03
184,974.16
112,759.29
1,164.08
1,764.84
2,470.78
225.90
120.01
118,504.89
66,000.00
7,217.27
1,940.13
36,708.67
27,531.50
2,936.69
3,120.24
145,454.50
74,250.00
7,217.27
1,940.13
36,708.67
27,531.50
2,936.69
3,120.24
153,704.50
66,000.00
9,623.02
3,880.25
49,500.00
67,904.38
48,400.00
46,591.78
34,943.83
3,727.34
3,960.30
334,530.90
66,000.00
9,623.02
3,880.25
41,250.00
67,904.38
145,200.00
46,591.78
34,943.83
3,727.34
3,960.30
423,080.90
49,500.00
9,623.02
3,880.25
55,000.00
67,904.38
72,600.00
58,960.00
46,591.78
34,943.83
3,727.34
49,500.00
9,623.02
2,910.19
41,250.00
67,904.38
48,400.00
46,591.78
34,943.83
3,727.34
3,960.30
308,810.83
43,560.00
14,434.53
12,100.00
10,589.04
5,294.52
564.75
960.07
87,502.91
330,000.00
36,086.33
7,760.50
2,598,750.00
52,383.38
606,144.00
171,817.47
192,770.82
374,146.08
27,178.54
137,657.52
103,772.59
29,592.84
31,802.42
4,699,862.47
445,500.00
48,115.10
11,640.75
3,465,000.00
69,844.50
606,144.00
171,817.47
192,770.82
660,000.00
96,230.20
38,802.50
5,197,500.00
104,766.75
606,144.00
171,817.47
192,770.82
375,000.00
679,043.75
484,000.00
497,684.88
27,178.54
174,719.16
207,545.18
45,518.75
42,363.22
9,601,085.22
528,000.00
76,984.16
31,042.00
3,465,000.00
69,844.50
606,144.00
171,817.47
192,770.82
350,000.00
543,235.00
387,200.00
448,269.36
27,178.54
174,719.16
138,363.46
37,612.27
38,162.90
7,286,343.63
528,000.00
76,984.16
31,042.00
2,598,750.00
52,383.38
396,000.00
76,984.16
31,042.00
2,598,750.00
52,383.38
606,144.00
171,817.47
192,770.82
400,000.00
543,235.00
580,800.00
374,146.08
27,178.54
137,657.52
103,772.59
29,592.84
31,802.42
6,322,274.39
412,500.00
72,172.65
23,281.50
3,465,000.00
69,844.50
606,144.00
171,817.47
192,770.82
262,500.00
485,031.25
338,800.00
398,853.84
27,178.54
165,189.02
138,363.46
36,482.77
33,962.58
6,829,447.05
4,950.00
481.15
59,400.00
1,164.08
9,922.00
2,863.62
3,569.83
20,966.30
3,261.42
3,494.38
3,261.42
1,129.50
1,800.14
103,316.98
495,000.00
3,529.68
7,412.33
847.12
300.02
507,089.15
124,168.00
1,411.87
6,226.36
711.58
300.02
132,817.83
66,000.00
9,623.02
3,880.25
41,250.00
66,000.00
9,623.02
3,880.25
41,250.00
67,904.38
99,000.00
46,591.78
34,943.83
3,727.34
3,960.30
376,880.90
660,000.00
96,230.20
38,802.50
2,953,500.00
104,766.75
606,144.00
171,817.47
192,770.82
412,500.00
679,043.75
484,000.00
497,684.88
27,178.54
174,719.16
207,545.18
45,518.75
42,363.22
7,394,585.22
660,000.00
96,230.20
38,802.50
3,465,000.00
104,766.75
606,144.00
171,817.47
192,770.82
412,500.00
679,043.75
484,000.00
660,000.00
96,230.20
38,802.50
2,838,000.00
104,766.75
606,144.00
171,817.47
192,770.82
412,500.00
679,043.75
484,000.00
497,684.88
27,178.54
174,719.16
207,545.18
45,518.75
42,363.22
7,279,085.22
660,000.00
96,230.20
38,802.50
3,316,500.00
104,766.75
606,144.00
171,817.47
192,770.82
412,500.00
679,043.75
484,000.00
497,684.88
27,178.54
174,719.16
207,545.18
45,518.75
42,363.22
7,757,585.22
660,000.00
96,230.20
38,802.50
660,000.00
96,230.20
38,802.50
2,887,500.00
104,766.75
606,144.00
171,817.47
192,770.82
412,500.00
679,043.75
484,000.00
497,684.88
27,178.54
174,719.16
207,545.18
45,518.75
42,363.22
7,328,585.22
528,000.00
76,984.16
31,042.00
2,656,500.00
69,844.50
606,144.00
171,817.47
192,770.82
385,000.00
543,235.00
387,200.00
448,269.36
27,178.54
174,719.16
138,363.46
528,000.00
76,984.16
31,042.00
2,656,500.00
69,844.50
606,144.00
171,817.47
192,770.82
385,000.00
543,235.00
387,200.00
448,269.36
27,178.54
174,719.16
138,363.46
37,612.27
38,162.90
6,512,843.63
528,000.00
76,984.16
31,042.00
2,656,500.00
69,844.50
606,144.00
171,817.47
192,770.82
385,000.00
543,235.00
387,200.00
448,269.36
27,178.54
174,719.16
138,363.46
37,612.27
38,162.90
6,512,843.63
528,000.00
76,984.16
31,042.00
2,953,500.00
69,844.50
606,144.00
171,817.47
192,770.82
385,000.00
660,000.00
96,230.20
38,802.50
4,933,500.00
104,766.75
606,144.00
171,817.47
192,770.82
412,500.00
679,043.75
484,000.00
497,684.88
27,178.54
174,719.16
207,545.18
45,518.75
42,363.22
9,374,585.22
660,000.00
96,230.20
38,802.50
3,547,500.00
104,766.75
606,144.00
171,817.47
192,770.82
412,500.00
679,043.75
484,000.00
497,684.88
27,178.54
174,719.16
207,545.18
45,518.75
42,363.22
7,988,585.22
E-10 Memasang 1 M2 Dinding Batako Besar Pres uk. 8x20x30 adk 1pc :4ps
Batako Buah 13.0000 3,880.25
Semen Portland kg 12.0000 1,804.00
Pasir pasang M3 0.0380 227,641.34
Pekerja Oh 0.3000 70,593.60
Tukang Batu Oh 0.1000 98,831.04
Kepala Tukang Oh 0.0100 112,949.76
Mandor Oh 0.0150 120,009.12
E-26 Membuat 1 M2 Dinding Pemisah Teakwood Rangkap, Rangka kayu kamper medan
Kayu Balok kamper medan M3 0.0250 8,883,185.67
Paku biasa 2" - 5" kg 0.1500 24,057.55
Lem kayu Ltr 0.5600 45,010.90
Teakwood 120 x 240 x 0,4 cm Lbr 0.8600 182,371.75
Pekerja Oh 0.1500 70,593.60
Tukang Kayu Oh 0.4500 105,890.40
Kepala Tukang Oh 0.0450 112,949.76
Mandor Oh 0.0080 120,009.12
Jumlah
E-27 Membuat 1 M2 Dinding Pemisah Plywood Rangkap, Rangka kayu kamper medan
Kayu Balok kamper medan M3 0.0250 8,883,185.67
Paku biasa 2" - 5" kg 0.1500 24,057.55
Lem kayu Ltr 0.5600 45,010.90
Plywood 120 x 240 x 9 cm Lbr 0.8600 194,012.50
Pekerja Oh 0.2000 70,593.60
Tukang Kayu Oh 0.6000 105,890.40
Kepala Tukang Oh 0.0600 112,949.76
Mandor Oh 0.0100 120,009.12
Jumlah
139,430.32
59,441.80
20,715.36
45,885.84
19,766.21
2,259.00
3,600.27
291,098.80
139,430.32
47,896.20
21,170.64
45,885.84
19,766.21
2,259.00
3,600.27
280,008.48
139,430.32
40,048.80
23,219.42
45,885.84
19,766.21
2,259.00
3,600.27
274,209.85
69,715.16
25,923.48
9,105.65
22,589.95
9,883.10
1,129.50
1,800.14
140,146.98
69,715.16
25,932.50
9,788.58
22,589.95
9,883.10
69,715.16
17,462.72
10,243.86
22,589.95
9,883.10
1,129.50
1,800.14
132,824.43
326,872.26
23,091.20
7,967.45
21,178.08
9,883.10
1,129.50
1,800.14
391,921.73
326,872.26
19,844.00
7,967.45
21,178.08
9,883.10
1,129.50
1,800.14
388,674.53
247,630.5000
19,844.0000
7,967.4468
21,178.0800
9,883.1040
1,129.4976
1,800.1368
309,432.77
50,443.25
21,648.00
8,650.37
21,178.08
9,883.10
1,129.50
1,800.14
60,919.93
24,354.00
10,926.78
64,350.00
24,707.76
14,824.66
1,694.25
2,040.16
203,817.53
71,396.60
14,432.00
8,650.37
62,700.00
22,589.95
11,859.72
1,355.40
1,800.14
194,784.18
65,964.25
14,432.00
6,146.32
62,700.00
22,589.95
11,859.72
1,355.40
1,800.14
186,847.78
60,919.93
25,346.20
1,272.72
9,560.94
127,710.00
10.82
8.25
698.45
1,189.94
26,119.63
15,516.47
790.65
1,852.38
2,220.17
273,216.55
65,964.25
18,869.84
954.54
7,284.52
28,710.00
7.22
8.25
465.63
951.95
24,001.82
12,848.04
790.65
1,547.41
2,040.16
164,444.28
55,968.00
16,777.20
4,097.54
22,687.50
63,534.24
44,473.97
5,082.74
5,400.41
218,021.60
583,000.00
16,777.20
4,097.54
23,925.00
63,534.24
74,783.00
16,777.20
4,097.54
16,005.00
63,534.24
44,473.97
5,082.74
5,400.41
230,154.10
769,636.72
7,507.50
26,049.76
5,691.03
5,362.50
91,771.68
64,240.18
7,341.73
7,800.59
985,401.70
322,112.49
21,197.00
7,967.45
49,415.52
34,590.86
3,953.24
3,600.27
442,836.83
51,600.00
16,777.20
4,097.54
12,375.00
70,593.60
49,415.52
5,647.49
6,000.46
216,506.81
47,700.00
16,777.20
4,097.54
16,005.00
63,534.24
44,473.97
5,082.74
5,400.41
203,071.10
85,365.50
24,445.58
24,707.76
18,530.82
1,920.15
240.02
155,209.82
222,079.64
3,608.63
25,206.10
156,839.71
10,589.04
47,650.68
5,082.74
960.07
472,016.62
222,079.64
3,608.63
25,206.10
166,850.75
14,118.72
63,534.24
6,776.99
1,200.09
503,375.16
14,350.00
4,650.00
29,095.67
1,365.85
54,323.50
1,029.60
2,475.00
7,059.36
5,294.52
564.75
600.05
120,808.29
14,350.00
4,650.00
70,620.55
2,646.33
54,323.50
7,059.36
5,294.52
564.75
600.05
160,109.05
14,350.00
4,650.00
66,383.32
2,646.33
54,323.50
7,059.36
5,294.52
564.75
600.05
155,871.82
33,525.36
76,052.90
269.44
69.00
7,059.36
5,294.52
564.75
240.02
123,075.35
84,505.77
5,827.50
11.48
5.55
141,187.20
317,671.20
16,942.46
12,000.91
578,152.07
F-24 Membuat 1 m2 Finishing siar pasangan dinding bata merah (=20 m')
Semen portland kg 3.1080
Pekerja Oh 0.1500
Tukang Batu Oh 0.0750
Kepala Tukang Oh 0.0080
Mandor Oh 0.0080
Jumlah
HARGA SATUAN
HARGA (Rp)
(Rp)
1,804.00 27,969.22
227,641.34 3,642.26
70,593.60 21,178.08
98,831.04 14,824.66
112,949.76 1,694.25
120,009.12 1,800.14
71,108.60
1,804.00 18,444.10
227,641.34 4,552.83
70,593.60 21,178.08
98,831.04 14,824.66
112,949.76 1,694.25
120,009.12 1,800.14
62,494.04
1,804.00 14,027.90
227,641.34 5,235.75
70,593.60 21,178.08
98,831.04 14,824.66
112,949.76 1,694.25
120,009.12 1,800.14
58,760.77
1,804.00 11,256.96
227,641.34 5,463.39
70,593.60 21,178.08
98,831.04 14,824.66
112,949.76 1,694.25
120,009.12 1,800.14
56,217.47
1,804.00 9,351.94
227,641.34 5,918.67
70,593.60 21,178.08
1,804.00 7,966.46
227,641.34 6,146.32
70,593.60 21,178.08
98,831.04 14,824.66
112,949.76 1,694.25
120,009.12 1,800.14
53,609.90
1,804.00 7,100.54
227,641.34 6,373.96
70,593.60 21,178.08
98,831.04 14,824.66
112,949.76 1,694.25
120,009.12 1,800.14
52,971.62
1,804.00 6,234.62
227,641.34 6,601.60
70,593.60 21,178.08
98,831.04 14,824.66
112,949.76 1,694.25
120,009.12 1,800.14
52,333.34
1,804.00 10,391.04
82,300.00 246.90
227,641.34 29,593.37
70,593.60 25,413.70
98,831.04 11,859.72
112,949.76 1,355.40
120,009.12 2,160.16
81,020.30
1,804.00 5,412.00
90,530.00 452.65
227,641.34 4,552.83
70,593.60 25,413.70
330,000.00 2,970.00
90,530.00 814.77
227,641.34 2,048.77
70,593.60 25,413.70
98,831.04 11,859.72
112,949.76 1,355.40
120,009.12 2,160.16
46,622.52
330,000.00 2,310.00
90,530.00 633.71
227,641.34 3,414.62
70,593.60 25,413.70
98,831.04 11,859.72
112,949.76 1,355.40
120,009.12 2,160.16
47,147.31
1,804.00 24,592.13
227,641.34 6,146.32
70,593.60 28,237.44
98,831.04 19,766.21
112,949.76 2,259.00
120,009.12 2,640.20
83,641.29
1,804.00 18,703.87
227,641.34 7,056.88
70,593.60 18,354.34
98,831.04 19,766.21
112,949.76 2,259.00
120,009.12 1,560.12
67,700.41
1,804.00 15,009.28
227,641.34 7,284.52
70,593.60 28,237.44
1,804.00 12,469.25
227,641.34 7,967.45
70,593.60 28,237.44
98,831.04 19,766.21
112,949.76 2,259.00
120,009.12 2,640.20
73,339.54
1,804.00 10,621.95
227,641.34 8,195.09
70,593.60 28,237.44
98,831.04 19,766.21
112,949.76 2,259.00
120,009.12 2,640.20
71,719.88
330,000.00 2,970.00
90,530.00 814.77
227,641.34 4,097.54
70,593.60 31,061.18
98,831.04 21,742.83
112,949.76 2,484.89
120,009.12 2,640.20
65,811.42
1,804.00 9,351.94
227,641.34 5,918.67
70,593.60 10,589.04
98,831.04 7,412.33
112,949.76 903.60
120,009.12 960.07
35,135.65
1,804.00 902.00
227,641.34 2,959.34
1,804.00 18,040.00
4,290.00 64,350.00
70,593.60 31,767.12
98,831.04 22,236.98
112,949.76 2,597.84
120,009.12 2,760.21
141,752.16
1,804.00 18,040.00
2,640.00 39,600.00
70,593.60 31,767.12
98,831.04 22,236.98
112,949.76 2,597.84
120,009.12 2,760.21
117,002.16
1,804.00 7,793.28
227,641.34 1,365.85
70,593.60 21,178.08
98,831.04 9,883.10
112,949.76 1,129.50
120,009.12 1,800.14
43,149.95
1,804.00 5,606.83
70,593.60 10,589.04
98,831.04 7,412.33
112,949.76 903.60
120,009.12 960.07
25,471.87
8 m')
1,804.00 2,886.40
70,593.60 4,941.55
98,831.04 3,459.09
112,949.76 451.80
PC : 2 PP
1,804.00 11,437.36
227,641.34 2,731.70
70,593.60 21,178.08
98,831.04 14,824.66
112,949.76 1,694.25
120,009.12 1,800.14
53,666.18
1,804.00 5,863.00
70,593.60 14,118.72
98,831.04 9,883.10
112,949.76 1,129.50
120,009.12 1,200.09
32,194.41
2,328.15 4,656.30
70,593.60 14,118.72
98,831.04 9,883.10
112,949.76 1,129.50
120,009.12 1,200.09
30,987.71
HARGA SATUAN
HARGA (Rp)
(Rp)
1,705.00 42,625.00
70,593.60 10,589.04
105,890.40 7,941.78
112,949.76 903.60
120,009.12 960.07
63,019.49
7,760.50 38,802.50
1,804.00 14,432.00
227,641.34 7,284.52
70,593.60 28,237.44
105,890.40 21,178.08
112,949.76 2,259.00
120,009.12 240.02
112,433.56
93,126.00 55,875.60
24,057.55 1,202.88
70,593.60 9,883.10
105,890.40 7,094.66
112,949.76 790.65
120,009.12 840.06
75,686.95
83,600.00 29,260.00
19,800.00 2,376.00
70,593.60 9,883.10
105,890.40 7,412.33
112,949.76 790.65
120,009.12 840.06
50,562.14
66,000.00 26,400.00
19,800.00 2,376.00
70,593.60 9,883.10
105,890.40 7,094.66
112,949.76 790.65
120,009.12 840.06
47,384.47
57,200.00 29,172.00
19,800.00 2,376.00
70,593.60 9,883.10
105,890.40 7,094.66
112,949.76 790.65
120,009.12 960.07
50,276.48
44,000.00 35,200.00
19,800.00 2,376.00
70,593.60 9,883.10
105,890.40 7,094.66
112,949.76 790.65
120,009.12 840.06
56,184.47
74,933.84 157,361.06
1,164.08 6,984.45
70,593.60 5,929.86
105,890.40 13,236.30
112,949.76 1,468.35
120,009.12 480.04
185,460.05
5,044.33 55,487.58
4,950.00 89,100.00
70,593.60 10,589.04
105,890.40 7,941.78
112,949.76 903.60
120,009.12 960.07
109,494.49
6,600.00 118,800.00
70,593.60 10,589.04
105,890.40 7,941.78
112,949.76 903.60
120,009.12 960.07
139,194.49
90,021.80 90,021.80
24,057.55 4,811.51
70,593.60 14,118.72
105,890.40 10,589.04
112,949.76 1,129.50
120,009.12 120.01
120,790.58
80,670.40 242,011.19
24,057.55 1,202.88
90,200.00 19,483.20
227,641.34 7,284.52
15,003.63 15,003.63
70,593.60 28,237.44
105,890.40 21,178.08
112,949.76 2,259.00
120,009.12 2,400.18
339,060.12
83,347.77 83,347.77
100,110.45 65,071.79
24,057.55 481.15
70,593.60 8,471.23
105,890.40 6,353.42
112,949.76 677.70
120,009.12 720.05
81,775.35
23,281.50 6,286.01
24,057.55 962.30
70,593.60 10,589.04
105,890.40 7,412.33
112,949.76 903.60
120,009.12 720.05
26,873.33
29,877.93 29,877.93
70,593.60 10,589.04
105,890.40 5,294.52
112,949.76 564.75
120,009.12 960.07
47,286.31
164,522.60 164,522.60
14,630.00 292.60
70,593.60 10,589.04
105,890.40 79,417.80
112,949.76 903.60
120,009.12 720.05
256,445.69
276,273.80 276,273.80
14,630.00 292.60
70,593.60 10,589.04
105,890.40 79,417.80
81,865.51 90,052.07
14,630.00 585.20
70,593.60 7,059.36
105,890.40 105,890.40
112,949.76 1,129.50
120,009.12 1,200.09
205,916.61
121,770.00 85,239.00
12,416.80 248.34
70,593.60 8,471.23
105,890.40 6,353.42
112,949.76 677.70
120,009.12 720.05
101,709.75
143,550.00 143,550.00
24,057.55 4,811.51
70,593.60 14,118.72
105,890.40 10,589.04
112,949.76 1,129.50
120,009.12 120.01
174,318.78
174,319.00
27,161.75 135,808.75
24,057.55 4,811.51
70,593.60 14,118.72
105,890.40 10,589.04
112,949.76 1,129.50
120,009.12 120.01
166,577.53
166,578.00
H-05 1 M2 Plafond Teakwood (60 x 120) cm, t = 4 mm + Rangka Kayu Borneo super
Kayu Balok Borneo Super m3 0.0230 6,710,245.67
Paku Biasa 2" - 5" Kg 0.0600 24,057.55
Teakwood 120 cm x 240 cm x 0,4 cm Lbr 0.3900 182,371.75
Pekerja Oh 0.2700 70,593.60
Tukang Kayu Oh 0.4000 105,890.40
Kepala Tukang Oh 0.0400 112,949.76
Mandor Oh 0.0135 120,009.12
25,609.65
198.00
2,117.81
7,412.33
790.65
180.01
36,308.45
37,466.92
198.00
2,117.81
7,412.33
790.65
180.01
48,165.72
343,402.13
990.00
4,235.62
10,589.04
1,129.50
360.03
360,706.31
101,106.90
4,248.87
4,889.12
343,402.13
10,589.04
52,945.20
5,647.49
900.07
523,728.81
154,335.65
1,443.45
71,124.98
19,060.27
42,356.16
4,517.99
1,620.12
154,335.65
1,443.45
39,951.05
19,060.27
42,356.16
4,517.99
1,620.12
263,284.70
154,335.65
1,443.45
36,420.03
19,060.27
42,356.16
4,517.99
1,620.12
259,753.68
16,747.16
6,053.19
35,310.28
4,268.28
18,625.20
5,357.88
12,553.75
7,059.36
5,294.52
564.75
600.05
112,434.40
16,747.16
6,053.19
29,095.67
4,439.01
18,625.20
5,357.88
12,553.75
7,059.36
5,294.52
564.75
600.05
106,390.53
154,335.65
1,443.45
31,173.93
4,439.01
19,060.27
42,356.16
4,517.99
1,620.12
258,946.58
63,558.50
240.58
3,529.68
5,294.52
564.75
360.03
73,548.05
6,518.82
11,640.75
3,529.68
5,294.52
564.75
360.03
27,908.55
108,900.00
6,930.00
10,589.04
24,707.76
2,823.74
9,000.68
162,951.23
22,441.04
16,297.05
7,217.27
7,765.30
23,295.89
2,484.89
600.05
80,101.48
80,100.00
13,689.52
240.58
3,529.68
2,223.70
225.90
120.01
20,029.38
20,029.00
I-12 Memasang 1 M2 Lantai mosaik ukuran (30 x 30) cm, campuran spesi 1pc : 3ps
Mosaik buah 11.8700 33,000.00
Semen Portland Kg 14.1500 1,804.00
Pasir Pasang M3 0.0390 227,641.34
semen Warna Kg 2.0000 15,003.63
Pekerja Oh 0.7000 70,593.60
Tukang Batu Oh 0.3500 98,831.04
Kepala Tukang Oh 0.0350 112,949.76
Mandor Oh 0.0350 120,009.12
Jumlah
I-27 Memasang 1 m' plint vinyl karet ukuran (15 x 30) cm dengan perekat
Vinyl karet buah 1.760 60,500.00
Lem vinyl kg 0.080 31,042.00
pekerja Oh 0.080 70,593.60
Tukang Oh 0.080 98,831.04
Kepala tukang Oh 0.008 112,949.76
Mandor Oh 0.004 120,009.12
Jumlah
830,094.12
17,679.20
10,243.86
19,504.72
17,648.40
12,353.88
1,468.35
1,560.12
910,552.65
1,215,946.18
18,040.00
10,243.86
22,505.45
18,354.34
12,848.04
1,468.35
1,560.12
1,300,966.33
43,705.43
2,056.56
682.92
1,500.36
6,353.42
8,894.79
1,016.55
600.05
64,810.09
52,312.66
2,056.56
682.92
1,500.36
6,353.42
8,894.79
1,016.55
600.05
73,417.32
197,160.00
14,774.76
10,243.86
48,011.63
24,707.76
34,590.86
3,953.24
4,200.32
337,642.43
112,697.98
18,761.60
10,243.86
24,305.89
24,707.76
3,459.09
7,002.89
3,720.28
204,899.34
76,206.01 70620.561
18,040.00
10,243.86
22,505.45
24,707.76
3,459.09
7,002.89
3,720.28
165,885.33
98,816.55
18,040.00
10,243.86
22,505.45
24,707.76
3,459.09
7,002.89
49,500.00
14,774.76
10,243.86
24,305.89
49,415.52
34,590.86
3,953.24
4,200.32
190,984.45
50,820.00
17,679.20
10,243.86
65,565.88
74,123.28
51,886.30
5,986.34
6,360.48
282,665.33
391,710.00
25,526.60
8,878.01
30,007.27
49,415.52
34,590.86
3,953.24
4,200.32
548,281.82
42,558.12
25,526.60
8,878.01
30,007.27
49,415.52
34,590.86
3,953.24
4,200.32
199,129.94
69,828.84
18,040.00
10,243.86
590,246.56
34,223.81
12,000.91
16,801.28
1,920.15
1,080.08
656,272.78
98,175.00
34,223.81
12,000.91
16,801.28
1,920.15
1,080.08
164,201.22
769,636.72
14,774.76
10,243.86
9,752.36
49,415.52
34,590.86
3,953.24
4,200.32
896,567.65
540,724.71
18,625.20
49,415.52
37,061.64
3,953.24
4,200.32
653,980.63
144,375.00
27,006.54
49,415.52
37,061.64
3,953.24
221,969.00
10,864.70
10,589.04
15,883.56
1,694.25
9,600.73
270,601.28
17,418.83
36.08
682.92
1,500.36
4,235.62
2,964.93
338.85
360.03
27,537.62
86,762.39
90.20
728.45
4,501.09
4,235.62
2,964.93
338.85
360.03
99,981.56
106,939.69
2,056.56
682.92
375.09
6,353.42
8,894.79
1,016.55
600.05
126,919.08
116,600.00
2,056.56
682.92
750.18
6,353.42
29,150.00
1,028.28
341.46
195.05
6,353.42
8,894.79
1,016.55
600.05
47,579.60
13,512.84
2,056.56
682.92
1,500.36
6,353.42
8,894.79
1,016.55
600.05
34,617.50
106,480.00
2,483.36
5,647.49
7,906.48
903.60
480.04
123,900.97
154,000.00
8,471.23
11,859.72
13,553.97
720.05
188,604.98
8,580.00
715.00
8,471.23
11,859.72
1,355.40
37,895.00
2,056.56
682.92
1,500.36
52,945.20
74,123.28
8,471.23
4,560.35
182,234.91
127,395.33
22,764.13
17,648.40
7,501.82
2,823.74
300.02
178,133.43
149,289.77
22,764.13
17,648.40
7,501.82
2,823.74
300.02
200,027.87
108,427.12
22,764.13
17,648.40
7,501.82
2,823.74
300.02
159,165.21
124,625.87
22,764.13
17,648.40
7,501.82
2,823.74
300.02
175,363.96
494,499.06
22,764.13
17,648.40
7,501.82
2,823.74
300.02
545,237.15
396.55
114,400.00
1,862.52
970.06
17,461.13
658,889.73
12,000.91
8,471.23
1,129.50
1,200.09
816,781.72
88,728.41
22,532.40
9,560.94
22,505.45
24,707.76
3,459.09
7,002.89
3,720.28
182,217.21
J-02 Membuat dan memasang 1 m3 Kusen Pintu & Jendela Kayu kelas II atau kelas III
Balok kayu m3 1.2000
Paku 10 cm kg 1.2500
Lem kayu kg 1.0000
Pekerja Oh 6.0000
Tukang Kayu Oh 18.0000
Kepala Tukang Oh 1.8000
Mandor Oh 0.3000
Jumlah
J-04 Membuat dan memasang 1 m2 pintu klamp sederhana, kayu kelas III untuk gudang sementara
Papan kayu m3 0.0400
Paku 5 - 7 cm Kg 0.0500
Pekerja Oh 0.3500
Tukang Kayu Oh 1.0500
Kepala Tukang Oh 0.1050
Mandor Oh 0.0180
Jumlah
J-05 Membuat dan memasang 1 m2 daun pintu panel, kayu kelas I atau II
Papan kayu m3 0.0400
J-06 Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas I atau II
Papan kayu m3 0.0240
Lem kayu kg 0.3000
Pekerja Oh 0.8000
Tukang Kayu Oh 2.4000
Kepala Tukang Oh 0.2400
Mandor Oh 0.0400
Jumlah
J-07 Membuat dan memasang 1 m2 pintu dan jendela jalusi kayu kelas I atau II
Papan kayu m3 0.0640
Lem kayu kg 0.5000
Pekerja Oh 1.0000
Tukang Kayu Oh 3.0000
Kepala Tukang Oh 0.3000
Mandor Oh 0.0500
Jumlah
J-08 Membuat dan memasang daun pintu kayu lapis (Plywood) rangkap, rangka tertutup kayu kelas
cm)
Papan kayu m3 0.0250
paku 1 -2,5 cm kg 0.0300
Lem kayu kg 0.5000
Plywood tebal 4 mm uk (90 x 220) cm lbr 1.0000
Pekerja Oh 0.7000
Tukang Kayu Oh 2.1000
Kepala Tukang Oh 0.2100
Mandor Oh 0.0350
Jumlah
J-09 Membuat 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II
Papan kayu m3 0.0256
paku 1 - 2,5 cm Kg 0.0300
Lem Kayu Kg 0.5000
Plywood tebal 4 mm uk (90 x 220) cm Lbr 1.0000
Pekerja Oh 0.8000
Tukang Kayu Oh 2.4000
Kepala Tukang Oh 0.2400
Mandor Oh 0.0400
J-12 Memasang 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II
Papan kayu m3 0.0250
Paku 1 - 2,5 cm Kg 0.0300
Lem kayu Ltr 0.8000
Teakwood tebal 4 mm uk (90 x 220) cm Lbr 1.0000
Formika lbr 0.5000
Pekerja Oh 0.8500
Tukang Kayu Oh 2.5500
Kepala Tukang Oh 0.2550
Mandor Oh 0.0430
Jumlah
J-13 Memasang 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter
Balok kayu m3 1.1000
Besi strip tebal 5 mm kg 15.0000
Paku 12 cm kg 5.6000
Pekerja Oh 4.0000
Tukang Kayu Oh 12.0000
Kepala Tukang Oh 1.2000
Mandor Oh 0.2000
Jumlah
J-19 Memasang 1 m2 rangka plafond (50 x 100) cm, kayu kelas II atau kelas III
J-20 Memasang 1 m2 rangka plafond (60 x 60), kayu kelas II atau kelas III
Kaso-kaso (5 x 7) cm m3 0.0163
Paku 7 - 10 cm kg 0.2500
Pekerja Oh 0.2000
Tukang Kayu Oh 0.3000
Kepala Tukang Oh 0.0300
Mandor Oh 0.0100
Jumlah
J-21 Memasang 1 m' lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II
Papan kayu m3 0.0108
paku 5 cm dan 7 cm kg 0.1000
Pekerja Oh 0.1000
Tukang Kayu Oh 0.2000
Kepala Tukang Oh 0.0200
Mandor Oh 0.0050
Jumlah
J-22 Memasang 1 m' lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II
Papan kayu m3 0.0110
paku 5 cm dan 7 cm kg 0.0500
Pekerja Oh 0.1000
Tukang Kayu Oh 0.2000
Kepala Tukang Oh 0.0200
Mandor Oh 0.0050
Jumlah
J-23 Memasang 1 m2 rangka dinding pemisah ( 60 x 120) cm, kayu kelas II atau III
Balok kayu M3 0.0280
paku 5 cm dan 7 cm Lbr 0.1500
Pekerja Oh 0.1500
Tukang Kayu Oh 0.4500
Kepala Tukang Oh 0.0450
Mandor Oh 0.0080
Jumlah
HARGA SATUAN
HARGA (Rp)
(Rp)
3,300,000.00 3,630,000.00
18,625.20 23,281.50
45,010.90 45,010.90
70,593.60 494,155.20
105,890.40 2,223,698.40
112,949.76 237,194.50
120,009.12 42,003.19
6,695,343.69
2,860,000.00 114,400.00
18,625.20 931.26
70,593.60 24,707.76
105,890.40 111,184.92
112,949.76 11,859.72
120,009.12 2,160.16
265,243.83
3,300,000.00 132,000.00
atau II
3,300,000.00 79,200.00
45,010.90 13,503.27
70,593.60 56,474.88
105,890.40 254,136.96
112,949.76 27,107.94
120,009.12 4,800.36
435,223.42
atau II
3,300,000.00 211,200.00
45,010.90 22,505.45
70,593.60 70,593.60
105,890.40 317,671.20
112,949.76 33,884.93
120,009.12 6,000.46
661,855.63
2,860,000.00 71,500.00
24,057.55 721.73
45,010.90 22,505.45
259,809.90 259,809.90
70,593.60 49,415.52
105,890.40 222,369.84
112,949.76 23,719.45
120,009.12 4,200.32
654,242.20
atau II
2,860,000.00 73,216.00
24,057.55 721.73
45,010.90 22,505.45
259,809.90 259,809.90
70,593.60 56,474.88
105,890.40 254,136.96
112,949.76 27,107.94
120,009.12 4,800.36
2,860,000.00 171,600.00
24,057.55 3,608.63
70,593.60 47,297.71
105,890.40 211,780.80
112,949.76 22,589.95
120,009.12 40,203.06
497,080.15
3,300,000.00 82,500.00
24,057.55 721.73
45,010.90 13,503.27
182,371.75 182,371.75
70,593.60 56,474.88
105,890.40 254,136.96
112,949.76 27,107.94
120,009.12 4,800.36
524,891.90
yu kelas II
2,860,000.00 71,500.00
24,057.55 721.73
45,010.90 36,008.72
182,371.75 182,371.75
249,888.10 124,944.05
70,593.60 60,004.56
105,890.40 270,020.52
112,949.76 28,802.19
120,009.12 5,160.39
779,533.91
3,300,000.00 3,960,000.00
24,636.48 369,547.25
2,750,000.00 3,025,000.00
24,636.48 369,547.25
18,625.20 55,875.60
70,593.60 169,424.64
105,890.40 762,410.88
112,949.76 81,323.83
120,009.12 14,401.09
4,477,983.29
5,432,350.00 76,052.90
24,200.00 87.12
18,625.20 4,656.30
70,593.60 7,059.36
105,890.40 10,589.04
112,949.76 1,129.50
120,009.12 600.05
100,174.26
5,432,350.00 76,052.90
24,200.00 174.24
18,625.20 4,656.30
70,593.60 7,059.36
105,890.40 10,589.04
112,949.76 1,129.50
120,009.12 600.05
100,261.38
2,750,000.00 453,750.00
18,625.20 3,725.04
70,593.60 8,471.23
105,890.40 12,706.85
112,949.76 1,355.40
120,009.12 720.05
480,728.57
as III
5,432,350.00 88,547.31
18,625.20 4,656.30
70,593.60 14,118.72
105,890.40 31,767.12
112,949.76 3,388.49
120,009.12 1,200.09
143,678.03
II
3,300,000.00 35,640.00
18,625.20 1,862.52
70,593.60 7,059.36
105,890.40 21,178.08
112,949.76 2,259.00
120,009.12 600.05
68,599.00
II
3,300,000.00 36,300.00
18,625.20 931.26
70,593.60 7,059.36
105,890.40 21,178.08
112,949.76 2,259.00
120,009.12 600.05
68,327.74
II atau III
2,750,000.00 77,000.00
18,625.20 2,793.78
70,593.60 10,589.04
105,890.40 47,650.68
112,949.76 5,082.74
120,009.12 960.07
144,076.31
elas II
2,750,000.00 77,000.00
las II
2,750,000.00 77,000.00
18,625.20 2,793.78
259,809.90 223,436.51
45,010.90 25,206.10
70,593.60 14,118.72
105,890.40 63,534.24
112,949.76 6,776.99
120,009.12 1,200.09
414,066.43
3,300,000.00 23,100.00
18,625.20 1,862.52
7,760.50 1,164.08
70,593.60 42,356.16
105,890.40 190,602.72
112,949.76 20,330.96
120,009.12 3,600.27
283,016.71
) cm
259,809.90 103,923.96
24,057.55 1,202.88
70,593.60 1,764.84
105,890.40 7,941.78
112,949.76 903.60
120,009.12 120.01
115,857.06
27,937.80 41,906.70
5,432,350.00 76,052.90
18,625.20 223.50
55,900.00 167.70
70,593.60 7,059.36
K-04 Membuat 1 m2 Pintu besi plat tebal 2 mm rangkap rangka baja siku
Besi siku L 30.30.3 kg 15.0000 52,800.00
Besi Plat kg 32.8000 18,625.20
Kawat las kg 0.0500 42,682.75
Pekerja Oh 1.0500 70,593.60
Tukang Besi Oh 1.0500 98,831.04
Kepala Tukang Oh 0.1050 112,949.76
Mandor Oh 0.0520 120,009.12
Jumlah
1 1 UNIT Pasang partisi Alumunium, Daun partisi Multiplek rangka kayu Kamper
Bahan 7.6200 m' Kusen Alumunium Natural Uk 4" + u
1.3500 lbr Multiplek 9 mm
0.0300 m3 Kayu papan kamper medan
11.7000 m' List kayu profil 1 cm
0.1000 kg Paku biasa " - 1"
0.2500 kg Lem putih FOX
4.0000 bh Grendel jendela 2"
2.0000 bh Handle partisi
1.5400 m2 Cat kayu
4.8600 m2 Cat tembok
19,634.07
4,235.62
5,929.86
677.70
360.03
30,837.27
17,313.68
4,235.62
5,929.86
677.70
360.03
28,516.88
9,500.00
6,208.40
52,800.00
7,059.36
9,883.10
112.95
600.05
86,163.86
792,000.00
610,906.56
2,134.14
74,123.28
103,772.59
11,859.72
6,240.47
1,601,036.77
126,187.60
249,139.11
60,000.00
45,885.84
64,240.18
7,341.73
3,840.29
556,634.75
657,399.72
84,712.32
118,597.25
13,553.97
720.05
874,983.31
472,989.00
31,061.18
43,485.66
4,969.79
2,640.20
555,145.83
573,656.16
5,647.49
79,064.83
9,035.98
480.04
667,884.50
30,893.77
3,104.20
13,037.64
3,035.52
4,249.73
485.68
252.02
55,058.58
123,575.10
436,217.71
6,000.46
8,400.64
960.07
504.04
575,658.01
1,025,112.00
1,980,000.00
58,669.38
6,000.46
8,400.64
903.60
480.04
3,079,566.11
591,030.00
24,707.76
34,590.86
377,232.35
81,240.00
117,891.31
165,047.84
18,862.61
9,960.76
770,234.86
46,951.03
33,330.00
42,276.21
7,059.36
9,883.10
1,129.50
600.05
141,229.24
250,155.06
143,000.00
390,467.00
14,118.72
19,766.21
2,259.00
120.01
819,885.99
24,445.58
360.86
54,340.00
14,118.72
39,532.42
2,823.74
1,200.09
136,821.41
495,000.00
7,700.00
10,589.04
7,412.33
903.60
960.07
522,565.04
HARGA SATUAN
HARGA (Rp)
(Rp)
165,000.00 165,000.00
105,890.40 63,534.24
112,949.76 6,776.99
235,311.23
145,640.00 145,640.00
105,890.40 52,945.20
112,949.76 5,647.49
204,232.69
69,850.00 69,850.00
105,890.40 26,472.60
112,949.76 2,823.74
99,146.34
16,500.00 16,500.00
105,890.40 13,236.30
112,949.76 1,468.35
31,204.65
16,500.00 16,500.00
70,593.60 17,648.40
105,890.40 26,472.60
112,949.76 2,823.74
120,009.12 1,560.12
63,444.74
25,066.42 25,066.42
105,890.40 13,236.30
112,949.76 1,468.35
39,771.06
743,455.90 743,455.90
97,130.00 97,130.00
105,890.40 10,589.04
112,949.76 1,129.50
108,848.54
97,130.00 97,130.00
105,890.40 13,236.30
112,949.76 1,468.35
111,834.65
97,316.67 107,048.34
105,890.40 10,589.04
112,949.76 1,129.50
118,766.87
118,476.97 130,324.66
70,593.60 11,294.98
105,890.40 16,942.46
112,949.76 1,807.20
120,009.12 960.07
160,369.30
118,476.97 130,324.66
70,593.60 11,294.98
105,890.40 16,942.46
112,949.76 1,807.20
120,009.12 960.07
160,369.30
118,476.97 142,172.36
70,593.60 17,648.40
105,890.40 26,472.60
112,949.76 2,823.74
120,009.12 960.07
189,117.10
931,260.00 1,024,386.00
70,593.60 17,648.40
105,890.40 13,236.30
112,949.76 1,468.35
120,009.12 1,560.12
1,056,739.05
252,784.40 278,062.84
70,593.60 11,294.98
105,890.40 16,942.46
112,949.76 1,807.20
120,009.12 960.07
308,107.48
152,283.55 167,511.90
70,593.60 11,294.98
105,890.40 16,942.46
112,949.76 1,807.20
120,009.12 960.07
197,556.54
M-27 Pekerjaan Septictank Komunal (Bio Fill 5000 kap 3,6 m3)
1 m3 Galian tanah biasa sedalam 1 m m3 3.7000 55,945.43
Pek. Buangan tanah m3 2.5000 24,495.98
Pek. Pasangan bata merah 1/2 (bata) 1 PC :
4 PS m3 22.4900 140,838.93
Pek. Plat Beton K-225
- Beton K-225 m3 0.2500 1,458,042.74
- Besi U-24 kg 22.0700 16,500.00
- Bekisting m3 2.1600 1,650,000.00
Pek. Pas. Pipa PVC dia 2" + Accesoris m' 0.5000 228,288.65
Pek. Pas. Pipa PVC dia 4" + Accesoris m' 2.0000 679,051.12
Sambungan Pipa PVC dia 4" buah 8.0000 135,808.75
Pek. Pas Bio Fill 5000 kap 3.6 m3 buah 1.0000 973,911.71
Jumlah
2,775,154.80
166,509.29
232,958.88
108,714.14
1,242.45
19,201.46
3,303,781.02
311,972.10
10,824.00
2,276.41
70,593.60
148,246.56
16,942.46
19,201.46
580,056.60
3,009,521.90
902,856.57
10,824.00
2,276.41
70,593.60
98,831.04
11,294.98
12,000.91
4,118,199.41
1,462,078.20
175,449.38
541,200.00
2,276.41
84,712.32
143,305.01
16,942.46
12,000.91
2,437,964.70
388,025.00
127,068.48
266,843.81
432,000.00
216,480.00
68,292.40
59,400.00
423,561.60
296,493.12
33,884.93
36,002.74
1,566,114.79
112,397.91
31,688.71
18,040.00 10
13,886.12
18,027.64
26,825.57
18,777.90
2,146.05
2,280.17
244,070.06
19,096.00
1,226.72
2,959.34
28,739.72
4,235.62
2,964.93
338.85
300.02
59,861.19
59,290.00
34.22
7,071.68
12,747.91
6,270.48
9,883.10
6,918.17
790.65
840.06
103,846.29
235,763.99
67,180.06
79,376.00
15,934.89
26,853.92
26,400.00
19,090.83
225,899.52
100,313.51
169.42
1,920.15
563,138.30
55,875.60
2,541.37
5,929.86
677.70
216.02
19,556.46
84,797.01
55,875.60
2,541.37
5,929.86
677.70
216.02
16,297.05
81,537.60
128,979.51
2,541.37
5,929.86
677.70
216.02
37,619.02
175,963.48
509,399.22
5,718.08
13,342.19
1,524.82
492.04
148,574.77
679,051.12
79,157.10
5,718.08
13,342.19
1,524.82
492.04
23,087.49
123,321.72
600,662.70
2,117.81
29,649.31
3,388.49
180.01
635,998.33
90,797.85
562.50
705.94
9,883.10
1,129.50
600.05
103,678.93
74,000.00
705.94
9,883.10
1,129.50
600.05
59,290.00
15,210.58
185.81
6,943.06
9,013.82
705.94
9,883.10
1,129.50
600.05
102,961.86
73,336.73
24,445.58
10,589.04
39,532.42
2,823.74
156.01
150,883.51
268,616.77
31,688.71
371.62
13,886.12
18,027.64
26,825.57
18,777.90
2,146.05
2,280.17
382,620.55
388,025.00
141,187.20
108,714.14
112.95
19,201.46
23,281.50
680,522.25
310,205.93
55,911.82
2,002,778.96
4,366,481.93
377,936.35
937,410.63
932,424.08
1,687,908.75
125,877.21
27,955.91
826,959.77
2,183,240.96
188,968.18
468,705.31
1,554,040.13
843,954.38
47,529.39
906,936.40
135,397.50
139,689.00
26,294.04
7,475,548.17
206,998.08
61,239.95
3,167,467.45
364,510.69
364,155.00
3,564,000.00
114,144.33
1,358,102.25
1,086,470.00
973,911.71
16,623,947.43
N-04 Mengecat 1 m2 bidang kayu baru ( 1 lps plamir, 1 lps cat dasar, 2 lps cat penutup)
Cat Meni kg 0.2000 27,161.75
Plamir kg 0.1500 56,263.63
Cat dasar kg 0.1700 36,939.98
Cat Penutup 3x setara Sieve kg 0.2600 75,664.88
Pekerja Oh 0.0700 70,593.60
Tukang Kayu Oh 0.0090 105,890.40
Kepala Tukang Oh 0.0060 112,949.76
Mandor Oh 0.0025 120,009.12
Jumlah
N-05 Mengecat 1 m2 bidang kayu baru ( 1 lps plamir, 1 lps cat dasar, 3 lps cat penutup)
Cat Meni kg 0.2000 27,161.75
Plamir kg 0.1500 56,263.63
Cat dasar kg 0.1700 36,939.98
Cat Penutup 3x setara Sieve kg 0.3500 75,664.88
Pekerja Oh 0.0700 70,593.60
Tukang Kayu Oh 0.1050 105,890.40
Kepala Tukang Oh 0.0040 112,949.76
Mandor Oh 0.0025 120,009.12
N-09 Mengecat 1 m2 Tembok Baru (1 lps plamir, 1 lps cat dasar, 2 lps cat penutup)
Plamir tembok kg 0.1000 56,263.63
Cat dasar kg 0.1000 36,939.98
Cat Penutup 2x setara ICI kg 0.2600 75,664.88
Pekerja Oh 0.0200 70,593.60
Tukang cat Oh 0.0630 98,831.04
Kepala Tukang Oh 0.0063 112,949.76
Mandor Oh 0.0025 120,009.12
Jumlah
N-10 Mengecat 1 m2 Tembok Lama (1 lps cat dasar, 2 lps cat penutup)
Cat dasar kg 0.1200 36,939.98
Cat Penutup 2x kg 0.1800 75,664.88
Pekerja Oh 0.0280 70,593.60
Tukang cat Oh 0.0420 98,831.04
Kepala Tukang Oh 0.0042 112,949.76
Mandor Oh 0.0025 120,009.12
Jumlah
Mengecat 1 m2 Tembok Baru (1 lps plamir, 1 lps cat dasar, 2 lps cat penutup)
Plamir tembok kg 0.1000 56,263.63
Cat dasar kg 0.1000 36,939.98
Cat Penutup 2x setara Vinilex kg 0.2600 6,798.00
Pekerja Oh 0.0200 70,593.60
Tukang cat Oh 0.0630 98,831.04
Kepala Tukang Oh 0.0063 112,949.76
Mandor Oh 0.0025 120,009.12
Jumlah
2,270.72
10,589.04
300.02
13,159.79
3,849.21
776.05
329.05
2,823.74
3,953.24
451.80
300.02
12,483.11
8,439.54
6,279.80
12,863.03
4,941.55
7,941.78
847.12
300.02
41,612.85
5,432.35
8,439.54
6,279.80
19,672.87
4,941.55
953.01
677.70
300.02
46,696.84
5,432.35
8,439.54
6,279.80
26,482.71
4,941.55
11,118.49
451.80
300.02
14,279.32
10,942.31
9,312.60
5,929.86
1,807.20
300.02
42,571.31
13,580.88
7,059.36
720.05
21,360.29
17,209.50
2,250.55
465.63
275.00
11,294.98
15,812.97
1,807.20
300.02
49,415.84
5,626.36
3,694.00
19,672.87
1,411.87
6,226.36
711.58
300.02
37,643.06
4,432.80
13,619.68
1,976.62
4,150.90
474.39
300.02
24,954.41
21,535.39
9,002.18
275.00
34,397.64
42,682.75
7,760.50
24,707.76
18,530.82
1,920.15
204.02
95,805.99
2,716.18
201.77
1,411.87
19,766.21
2,259.00
1,200.09
27,555.11
2,716.18
201.77
11,000.00
17,648.40
22,236.98
2,541.37
900.07
57,244.77
37,250.40
423.56
5,929.86
1,355.40
720.05
45,679.28
25,221.63
1,406.59
201.77
17,648.40
14,824.66
1,694.25
3,000.23
5,626.36
3,694.00
1,767.48
1,411.87
6,226.36
711.58
300.02
19,737.67
5,098.50
275.00
34,397.64
2,328.15
14,118.72
29,649.31
3,388.49
1,200.09
90,455.90
5,098.50
275.00
2,000.00
2,328.15
14,118.72
29,649.31
3,388.49
1,200.09
58,058.27
5,626.36
3,694.00
13,256.10
2,117.81
9,339.53
1,073.02
456.03
35,562.86
HARGA SATUAN
HARGA (Rp)
(Rp)
31,192.55 2,495.40
70,306.34 70.31
106,365.41 106,365.41
70,593.60 1,764.84
120,009.12 300.02
110,995.99
31,192.55 2,495.40
70,306.34 70.31
70,306.34 70,306.34
70,593.60 1,764.84
120,009.12 300.02
74,936.92
31,192.55 1,247.70
70,306.34 70.31
32,029.14 32,029.14
70,593.60 1,411.87
120,009.12 240.02
34,999.03
31,192.55 1,247.70
18,643.83 8,389.72
70,593.60 2,823.74
120,009.12 480.04
12,941.20
PEKERJAAN : CUT/FILL
NO URAIAN KODE
A. PEKERJAAN PENGERUKAN SALURAN
I. ASUMSI
1 Pekerjaan pengerukan saluran dilakukan secara manual
2 Lokasi pekerjaan sepanjang jalan komplek perumahan
3 Kondisi existing jalan sedang/baik
4 Jam kerja efektif per hari Tk
5 Faktor Pengembangan bahan Fk
2 ALAT
- TRUCK 3/4 DUMP TRUCK
Kapasitas bak V
Faktor Efisiensi Alat Fa
Kecepatan rata-rata bermuatan v1
Kecepatan rata-rata kosong v2
Waktu siklus Ts2
'- waktu tempuh isi = (L/v1) x 60 T1
'- waktu tempuh kosong = (L?v2) x 60 T2
'- Lain-lain (bongkar muat) T3
Ts2
- ALAT BANTU
Diperlukan alat bantu kecil-kecil : sekop, keranjang, cangkul
dll
- TENAGA
Produksi menentukan : manual Q1
Produksi per hari = Tk x Q1 Qt
Koefisien tenaga / m3
'- Mandor = (Tk x M) /Qt
'- Pekerja = (Tk x P) /Qt
I. ASUMSI
1 Pekerjaan galian dilakukan secara mekanis
2 Lokasi pekerjaan sepanjang jalan komplek perumahan
3 Kondisi existing jalan sedang/baik
4 Jam kerja efektif per hari Tk
5 Faktor Pengembangan bahan Fk
2 ALAT
- BOLDUZER D5
Jarak operasi Lh
Panjang efektif blade b
Faktor efisiensi alat Fa
Total potongan/galian V
Kecepatan c
Jumlah lintasan n
Waktu siklus = (n x Lh) / c) x 1 jam) /1000 Ts
Kapasitas produksi / jam = (Lh x b V x Fa) / (Fk x Ts x n) Q1
Koefisien alat /m3 = 1/Q1
- EXCAVATOR PC 200
Kapasitaas Bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
- DUMP TRUCK
Kapasitas bak V
Faktor Efisiensi Alat Fa
Kecepatan rata-rata bermuatan v1
Kecepatan rata-rata kosong v2
Waktu siklus Ts2
'- waktu tempuh isi = (L/v1) x 60 T1
'- waktu tempuh kosong = (L?v2) x 60 T2
'- Lain-lain (bongkar muat) T3
Ts2
- ALAT BANTU
Diperlukan alat bantu kecil-kecil : sekop, keranjang, cangkul
dll
- TENAGA
Produksi menentukan : manual Q1
Produksi per hari = Tk x Q1 Qt
Koefisien tenaga / m3
'- Mandor = (Tk x M) /Qt
'- Pekerja = (Tk x P) /Qt
KOEF SATUAN
7.0000 jam
1.1000
5.0000 km
4.0000 m3
0.8300
30.0000 km/jam
40.0000 km/jam
10.0000 menit
7.5000 menit
35.0000 menit
52.5000 menit
4.3117 m3/jam
0.2319 jam
1.0000 lumpsum
4.3117 m3/jam
30.1818 m3
0.1160 jam
0.4639 jam
PANGAN)
7.0000 jam
1.2000
0.2000 km
25.0000 m
2.0000 m
0.8300
0.1500 m
3.0000 km/jam
4.0000 pp
0.0333 jam
38.9063 m3/jam
0.0257 jam
0.8000 m3
0.9500
0.8300
15.7700 m3/jam
0.0634 jam
4.0000 m3
0.8300
10.0000 km/jam
20.0000 km/jam
1.2000 menit
0.6000 menit
5.0000 menit
6.8000 menit
24.4118 m3/jam
0.0410 jam
1.0000 lumpsum
38.9063 m3/jam
272.3438 m3
0.2500 Orang
1.0000 Orang
0.0064 jam
0.0257 jam