Strategies to implement the build then sell housing delivery system in Malaysia
NorAini Yusof*, Mohd Wira Mohd Shaei, Sofri Yahya, Marwani Ridzuan
School of Housing, Building and Planning, Universiti Sains Malaysia, 11800 Penang, Malaysia

a b s t r a c t

Keywords: The Build Then Sell (BTS) system is a new housing delivery system introduced by the Malaysian
Build then sell government in which housing developers must complete a housing project before selling individual
Housing delivery system houses to buyers. This new system differs from the current Sell Then Build (STB) system, which allows
Housing developers
developers to sell houses and collect progress payments while housing is being built and thus is not yet
t for habitation. Even though the so-called BTS system is the norm in other developed countries, it is
still very much a foreign idea in Malaysia. In April 2007, the government announced that the BTS system
would run in parallel to the conventional STB system for trial period of two years, with a package of
incentives offered for developers who adopt BTS. Clearly, more work needs to be done before the BTS
system can become a reality. This paper explores strategies for facilitating the full implementation of BTS
in Malaysia. To accomplish this goal, a series of focus group interviews was conducted with all the main
stakeholders in the BTS system. A number of strategies to make the BTS implementation a success are
outlined and discussed.
2009 Elsevier Ltd. All rights reserved.

Introduction able to sell houses before they were built to obtain money to fund
construction or secure bridge nancing through joint venture
The housing industrys decades-old practice of Sell Then Build arrangements with banks, some developers managed to get away
(STB) allows developers to sell houses and collect payments after from completing their projects with few nancial consequences,
obtaining advertising permits from the Ministry of Housing and but at the expense of unsuspecting home-buyers.
Local Government (MHLG). The Real Estate and Housing Devel- The negative experience of abandoned projects during the
opers Association (REHDA), the umbrella body for property devel- economic recession in the 1980s and early 1990s provides proof that
opers in Malaysia, asserts that this system has successfully met the the STB system is susceptible to abuse by developers who choose to
backlog of housing needs for over 40 years and produced in excess take advantage of the system. During this period, there were many
of 3.5 million affordable housing units for all income groups in the complaints made by home-buyers about shoddy workmanship, late
country (New Straits Times, 10th October 2005). REHDA also claims delivery of houses, and abandoned projects. The rst case of an
that the time-tested STB system has successfully and efciently abandoned housing project was reported in 1983, during the
achieved the nations multi-pronged objectives of generating economic slump, a slump that precipitated a housing bubble in
economic growth, creating employment, and meeting the social other parts of the country. The situation was made worse by the fact
need to provide shelter to lower income people. that home-buyers made installment payments for these unnished
STB may have met its housing targets, but the system is not houses while simultaneously paying rent on their existing accom-
without aws. A review of housing provision performance in ve modations. Because of these problems, many stakeholders in the
years of Malaysian Plans revealed that, by and large, since the property industry have argued against continuing the STB system to
countrys independence, both the public and private sectors have protect the rights of home-buyers.
over-performed in supplying sufcient housing using the STB When the idea of implementing BTS was rst discussed by the
system. This was not the case, however, for the 4th and 5th government, many industry observers noted that few property
Malaysian Plans (a period between 1981 and 1990), in which both developers are ready and able to switch to BTS system, wherein
sectors performed badly, failing to meet set targets because of the developers are required to complete housing projects before selling
economic downturn. Nevertheless, because the developers were them. Under this model, risk is shared between developers and
their lending banks. In order to help spread the risks taken on by
developers under the BTS system, the National House Buyers
* Corresponding author. Tel.: 604 6532500; fax: 604 6576523. Association (HBA) proposed a system called the 10:90 model.
E-mail address: ynoraini@usm.my (Y. Nor Aini). According to HBA (2005), the 10:90 model compromises between

0197-3975/$ see front matter 2009 Elsevier Ltd. All rights reserved.
doi:10.1016/j.habitatint.2009.06.001
54 Y. NorAini et al. / Habitat International 34 (2010) 5358

the present progressive payment system of STB and the full BTS interests and needs can be captured and then utilized to develop
system. In the 10:90 model, house buyers must pay a deposit of 10 constructive alternative methods for implementing a BTS system
percent upon signing their Sale and Purchase Agreement (S&P), that can best meet the various parties interests and needs.
with the remaining 90% payable upon completion of the house and
the issuance of a Certicate of Fitness for Occupation (Akbal, 2006). Issues of STB and BTS systems in Malaysia
This system could help create a better image for the industry, as
only qualied developers would be allowed to participate in it. The government adopted the BTS system in response to the
Major industry players such as developers and REHDA, however, large number of abandoned housing projects that resulted from the
reacted negatively to this plan. They believed that BTS and the economic downturn combined with developers nancial short-
10:90 model were unnecessary for protecting home-buyers rights comings. The benets of BTS are clear home-buyers get the
against errant developers, claiming that the number of such chance to see built housing units, spot weaknesses, and gauge
developers is small. They claimed that responsible developers a units quality rather than simply betting on such issues based on
should not be punished with a BTS or 10:90 system because of a colored brochure, as is common under STB (New Straits Times, 1
others faults. September 2004).
Despite lengthy debates about the merits and possibilities of the The proposal to implement the BTS system is not new; the
BTS and 10:90 models, little research exists on how the new system system has been debated and studied over the past two decades.
or its variant might be implemented effectively. The few extant The Federation of Malaysian Consumer Associations (FOMCA)
studies tend to focus on the advantages, disadvantages and possible proposed the implementation of a BTS system as early as 1981
variants of the BTS system and the issue of the main players (Zulkii & Abdul Ghani, 2004). A decade later (in 1991), the then-
readiness to implement BTS (e.g., Nazihan, 2005; NorAini et al., Minister of Housing and Local Government, Dr Ting Chew Peh,
2007; NorAini et al., 2008). As such, a systematic study is necessary called for BTS implementation. The government responded by
to explore stakeholder views about what needs to be done before organizing seminars exploring the possibility of implementing BTS
the new system can be put into place. In particular, relatively little in Malaysia (Norakmarwati, 2003). In 1996, the government
research has focused specically on the formulation of strategies endorsed BTS, reected in the Seventh Malaysia Plan tabled in
that can increase the chances of successful implementation of the Dewan Rakyat by then-Prime Minister Dr Mahathir Mohamad
BTS or 10:90 models. (New Straits Times, 25 January 1999). In April 2007, the govern-
Thus, the main aim of this paper is to explore the stakeholders ment announced that either the BTS or the 10:90 system would run
opinions about the implementation of BTS in Malaysia, with the concurrently with the STB system for a two-year trial period. To
hope that these opinions would be subsequently taken into encourage developers to implement a BTS or 10:90 system, the
consideration in formulating strategies to implement the BTS government offered incentives to developers, including fast-track
system fully. For the purposes of clarity, this paper considers both approval (within four months) for BTS projects, a waiver of the
the BTS and the 10:90 system to be the same system. RM200,000 deposit for a housing developers license, and an
The various important stakeholders will be described thor- exemption from the low-cost house construction quota. Never-
oughly later in this paper. There is no doubt that there is strong theless, a developer can choose whether to follow the new BTS
support for BTS amongst a subset of Malaysian developers. They concept or the current STB concept (The Star, 23 June 2007), and
may be motivated by self-interest or as part of a business strategy to unfortunately, few developers have taken the governments offered
penetrate a highly competitive market. Housing advocates and incentives. One possible reason for developers reluctance may be
NGOs have also shown strong support, though their motives may the choice between the BTS, or 10:90, system and the old STB
be quite different. The governments support is not well expressed system. The STB system is preferable to developers, as it has been
apart from the incentives that it has offered. In the midst of all the practiced for over 50 years; developers did not want to take on the
debate, nancial institutions have steadfastly kept their silence. new systems risks. In fact, many developers are still unclear about
This might indicate that they have adopted a wait and see attitude how the new system will work, how it will be implemented, and
before deciding whether to support BTS. Developers, housing how to apply for the incentives. In addition, when the imple-
advocates, NGOs, the government and nancial institutions are the mentation of Malaysias BTS system was announced by then-
stakeholders whose motivations may be most apparent in terms of Deputy Prime Minister Najib Tun Razak, organizations such as
supporting or ghting the movement toward a BTS system. After REHDA and HBA expressed concern that many niggling issues must
discussing the stakeholders involved in BTS, the methodology be solved before the BTS system could be implemented.
employed will be discussed, followed by discussions on important
excerpts collected from focus group interviews held with the main Research methodology
stakeholders.
A purposive sampling method was employed to locate infor-
Dening stakeholders mation-rich key stakeholders for the purpose of this study:
respondents were selected according to a set of pre-determined
In broad terms, stakeholders are groups or individuals who are criteria, as suggested by Zikmund (2003). The criteria for selecting
involved or affected, directly or indirectly, by a system or program the stakeholders included experience in handling cases related to
(Atkinson et al., 1997). This includes groups or individuals whose the STB and BTS systems and knowledge of the Malaysian property
interests or quality of life is affected, positively or negatively, by the sectors. One of the advantages of purposive sampling is that it
decision to implement BTS. Housing developers and home-buyers narrows respondents down to specic types of people who can
are both considered stakeholders in the BTS system. Financial provide the desired information (Sekaran, 2003). In total, three
institutions are also stakeholders, as they are involved in providing BTS-adopting developers organizations, two social activists, two
loans to the developers and buyers. Other stakeholders include consumer organizations, three local authorities, one ministry at the
the government, professional bodies, and social activists. Taken federal level, a developers association, a building contractor rm,
together, these stakeholders constitute the studys primary focus, as consultants of construction organizations and two professional
they represent the various interests and views with respect to BTS bodies participated in a series of focus groups held between May
implementation. By studying their perspectives, the stakeholders and August of 2008. Preliminary telephone conservations were
Y. NorAini et al. / Habitat International 34 (2010) 5358 55

made to the aforementioned organizations to secure their partici- 10:90, meaning that we only regulate 10:90. But 0:100 is better,
pation and identify suitable members or ofcers who are knowl- and this is not subject to the Act.
edgeable, have experience and are in the best position to provide
Participants have argued that proper procedures and guidelines
information regarding BTS and STB systems. Phone calls were then
should be developed for all BTS variants. Policy makers, especially
made to the identied individuals, followed by ofcial conrmation
the central government, state governments and local authorities,
letters. Several attempts were also made to obtain feedback from
should work together to facilitate and promote BTS implementa-
the National Bank of Malaysia (Bank Negara Malaysia) and the
tion. Administrative and procedural issues should be addressed, as
Association of Banks of Malaysia (ABM), but these institutions were
they play an important role in the implementation and smooth
either unable or unwilling to participate.
functioning of new systems.
Focus groups were conducted to obtain in-depth responses from
the stakeholders regarding the issues surrounding BTS imple-
mentation. The meetings were held face-to-face at the participants Revise the incentives plan
ofce or at a place determined by the participants. A discussion
guide, similar to the interview guide suggested by Patton (1990), The current incentives offered by the government for BTS
was developed to minimize variation and offer exibility in the adopters are only applicable to developers who use the 10:90
discussion. The key themes of the discussion were the organiza- model and thus will not help motivate developers to implement
tions roles in supporting BTS, their strategies or plans of action for other BTS models. The latest information from the MHLG showed
BTS implementation, and prospects for enhancing the image of the a negative response to the incentives, as only one application had
housing industry. Each focus group interview was tape-recorded been received to date. The low response rate means that the
and subsequently transcribed in full by student assistants into word incentives currently being offered are not attractive enough to
documents as quickly as possible. The transcriptions were then inuence developers to implement BTS. All BTS adopters in this
cross-checked by the interviewers to include written notes taken study stated that they did not apply for the governments incen-
during the meetings (if any) and to ensure accuracy. The results of tives. According to one BTS adopter:
earlier focus groups served as a guide for topics to emphasize or It (the incentive) doesnt matter because our Ministry says one
include in later focus groups. thing, but the authority is saying another thing, so there is no link.
The data were analyzed manually using content analysis,
following Miles and Huberman (1994). The transcribed data were Another BTS adopter replied in similar vein:
categorized using several codes. After eliminating or combining We never apply.why? First, the procedure.we are not very clear
code categories, the nal codes were organized according to (on it). Second, we cannot afford to wait. It will denitely take time
common themes to identify patterns and highlight important ideas. before the authority approves our application. But how long do we
Whenever necessary, diagrams were used to illustrate groupings of have to wait? We dont really know. I believe that the authority is
or relationships between the main themes. The analysis took not able to tell us either.
another two months to complete and involved at least four full time
students and research assistants. The remarks suggest that the current incentives offered by the
government have not been well received by developers. Even
developers who have adopted BTS seem to be willing to forego
Findings and discussion government incentives. Unclear procedures and uncertainty about
the application process made participants feel that the incentives
The housing industry involves many players, including consul- were not worth the time and effort required.
tants, local authorities, professionals, nancial institutions, and Consumer Organization A has urged the government to provide
others. BTS would be an ideal system for the property development more incentives, and the New Straits Times (2006) suggested that
industry if all industry players agreed to cooperate with one developers need greater motivation in order to fully embrace the
another. Based on several discussions with other players in the 10:90 BTS system. In our focus group meeting with Consumer
industry, several issues critical to the successful implementation of Organization A, the secretary general suggested three additional
BTS were identied. The following ndings come from the focus incentives that the government could offer to attract developers:
group interviews conducted with industry stakeholders. discount land premiums (i.e., give more than a 20% discount for the
conversion of agricultural land), special tax structures and lower
levy for foreign labor.
Implement mechanisms and policies to expedite Focus group participants agreed that these additional incentives
the implementation of the BTS system could increase the attractiveness of BTS. They were condent that
the additional incentives would attract small developers as well as
This point is agreed upon by many stakeholders in the industry. large ones.
To date, the government has not properly formulated a National
Housing Policy. This lack of proper policy can be seen as one of the
Improve the monitoring system through rules and regulations
primary weaknesses of the local housing industry. Many devel-
opers, especially those from developers organizations, think that
The existing rules and regulations of the Housing Developers Act
the government itself is still fuzzy on the idea of BTS and that the
have been amended several times over the years. These amend-
lines between the system and the government have not been
ments have been intended to ensure that laws protect the rights of
properly dened. The government has been said to have simply
home-buyers. Projects continue to be abandoned, however, and
thrown the idea around without preparing proper mechanisms for
many home-buyers continue to suffer because developers run away
implementation. For instance, the MHLG prepared guidelines for
without completing the projects. Therefore, one of the main goals
only the 10:90 model, not for other models. As an ofcer with the
of BTS implementation is to tackle the issue of abandoned projects.
federal government observed:
One question that arises with the new system is whether the
Why do we not have BTS 20:80 or 30:70? At this point, the country can solve the problem of abandoned projects and improve
government must state their position. At the moment, it is BTS housing quality in the process.
56 Y. NorAini et al. / Habitat International 34 (2010) 5358

It has been reported that the problem of abandoned projects is Straits Times, 15 July 2006). Under the current scenario, few
not merely a result of the conventional STB system. In fact, countries developers are willing to implement the BTS system. According to
like Australia, which also implements both BTS and STB, do not face consumer organizations and local activists, if the political will
similar abandoned project problems. This is because existing laws shown by the government were stronger, then BTS could become
complement the rights of the industrys major players. Australia the new housing delivery system in Malaysia. A representative of
also has an effective monitoring system that regulates who can one consumer organization observed:
become a developer or builder. The Australian government requires
It is impossible for the Ministry of Housing to force developers to
that developers and builders sit for an exam before obtaining their
adopt BTS, unless there is political will that urges all developers to
license. The case of Australia indicates that regardless of whether
adopt it. For instance, the Prime Ministers willpower will inuence
BTS or STB is used, a proper monitoring system is necessary to
the developers willingness to implement such a system.
ensure the housing delivery systems success.
Unfortunately, such a proper monitoring system does not exist This sentiment was echoed by one of the social activists who
in Malaysia. Flaws in the monitoring system and lack of enforce- participated in a focus group:
ment by authorities have led to many unscrupulous developers
If the government really wants the BTS system to be implemented,
taking advantage of loopholes and giving the industry a bad image.
they can do that by issuing a new circular like they did for other
A study of critical factors in the redevelopment of abandoned
issues. Take, for example, the issue of teaching Science and Math in
projects revealed that one reason for abandoned projects is the lack
English. The government was able to implement this by using their
of enforcement and control on the part of proper authorities
political power, despite receiving many protests from the public -
(Ibrahim, 2006).
especially the Nationalists.
A representative from Consumer Organization A pointed out:
However, political will alone will not be able to ensure the
we have seen that many buyers have suffered from the problem of
success of BTS implementation. The entire industry infrastructure
abandoned projects. It is rare to see irresponsible developers
must be in place to ensure the successful implementation of BTS.
brought to court or punished for their default because of lack of
enforcement by the government.
The role of nancial institutions in supporting BTS implementation
A participant from Professional Body A also expressed concern:
The issue is not whether current law is sufcient to protect the Most participants in the focus groups stressed the crucial role of
house buyers. It goes back to the issue of enforcement. nancial institutions in supporting BTS implementation. In the
existing STB system, developers nd it difcult to get funding from
The participant noted that there are many loopholes in the
nancial institutions. Thus, it is not surprising that most developers
current law and added:
believe that the BTS system makes the situation worse because
The regulations are already stated in the Act, but we do not know banks are not willing to bear the nancial risks involved in devel-
why they are not used, and why many of the checks and balances opment projects. Feedback from BTS adopters also revealed that
that you can actually enforce have not been enforced. they did not rely on banks to nance their BTS projects. In fact, they
complained that banks were not supportive. One developer
One example is an advertisement by a developer claiming free
commented:
legal fees, which means that the same lawyer is acting on behalf of
both the developer and purchaser. The participant from Profes- We have a lot of trouble dealing with banks. They dont under-
sional Body A expressed the view that the Ministry should not stand the concept. I feel the reason they are not supportive is that
allow that sort of advertisement because whenever there is they dont gain.
a conict of interest, the lawyer will act for the benet of whoever is
The other stakeholders agree that nancial institutions should
paying him or her, putting the home-buyers on the losing end of
show more commitment to encouraging developers to adopt the
the deal.
BTS or 10:90 systems. Consumer Organization A, for instance,
Though the above argument may be just one persons view, this
asserted that dealing with developers in the BTS or 10:90 systems
matter should be taken into consideration for the benet of the
would be a safer bet for banks, as every developer is required to
industry. In a newspaper report, the REHDA itself asked the MHLG
submit a feasibility study to the bank when applying for a loan.
to strengthen its monitoring system for developers (Berita Harian, 7
Ideally, banks would be dealing with developers with good nan-
April 2008). However, simply increasing the quantity of monitoring
cial positions and track records. In these cases, banks should be
will not ensure effective enforcement of housing regulations.
more proactive in assessing the viability of a project. As reported in
Enforcement should encourage developers (or their agents) to
the New Straits Times on July 15, 2006, the vice president of HBA
improve housing quality. This suggests the importance of the
said, With 10:90, the nancier will be able to operate in a more
governments role in promoting the positive image of the industry
secure environment, as it will have absolute control over loan
by having a proper monitoring system and strictly enforcing the Act
disbursement and full control of the collateral (p. 6).
and its regulations. Such actions will help restore public condence
in the monitoring system.
The role of professionals in supporting BTS implementation

Political will as the main driver of BTS implementation Professionals, such as architects, engineers, quantity surveyors,
and lawyers, play a vital role in the Malaysian housing industry.
Any new government policy needs strong political will from the These professionals are responsible for ensuring that housing
top of the administration to ensure its successful implementation. development projects are carried out appropriately based on
As far as BTS is concerned, developers have been given the choice of specic processes and procedures. They are subject to professional
implementing the system because the system has only been ethics and codes of conduct and thus should play a role in
approved in principle; the government still needs to discuss encouraging developers to adopt BTS. In reality, developers appoint
implementation with state governments and local authorities (New most of the professionals, creating potential conicts of interest.
Y. NorAini et al. / Habitat International 34 (2010) 5358 57

Professionals have to act as independent parties and must disclose 10:90 systems. Consumer Organization A, which claimed to
all information to those who rely on their opinions (i.e., home- represent the voice of Malaysian home-buyers, asserted that the
buyers). Under the current system, some professional misconduct environment has shaped the buyers mindset that STB is the only
was believed to contribute to the housing industrys problems. system available in the country. A representative of the same
Dishonest architects, for example, may approve project progress organization further noted:
even when developers do not meet specications (according to one
.not only are buyers not aware of the new system, but bankers
of the participants; a federal government ofcer). In addition, most
also have an incorrect mindset when it comes to BTS, as they are
lawyers prepare their documents during the pre-construction stage
bound to a system in which progressive payment is the only system
and will simply walk away if the project has been abandoned
they know.
(Consumer Organization B). A few participants highlighted this
issue during focus group interviews. For instance, in supporting the The secretary general of the same organization added that:
above argument, a member of Professional Body B admitted that
.only those people who have been burned, or experienced an
conicts of interest exist between themselves and developers,
abandoned project, understand and realize that they should buy
stating that:
a secondary house on the market or go for BTS or 10:90.
.there are developers who have always forced us to certify earlier
A participant from Professional Body A agreed with this opinion,
than necessary. They would like to make money earlier, and at
saying that the most powerful people inuencing BTS imple-
times architects bent to this pressure. So some architects had
mentation are the home-buyers themselves. Societys low level of
problems in these situations and got reprimanded.
awareness is evidence that the public is not exercising their rights.
Nevertheless, focus group interviews with professional bodies A The Malaysian public seems reluctant to realize the consequences
and B revealed that they believed that the BTS or 10:90 systems of what is going on in the housing industry and thus seems to
could help boost the housing industry. They also foresaw that the repeat the same mistakes by accepting whatever developers offer.
systems would minimize the industrys problems. In fact, Profes- Therefore, there is a need to educate people. As another member of
sional Body A addressed the Ministry of Housing in order to promote Professional Body A observed:
the BTS and 10:90 systems as the primary housing delivery systems
The government and other authorities can only do so much.in the
in the country. In terms of quality housing, Professional Body B
end the people must decide. If people dont want to listen and dont
believed that the entire housing delivery system ought to be
want to hear, the BTS system and the laws will only exist on paper.
revamped. To quote the President of Professional Body B:
This implies that it is time for society to become more educated in
.I think another aspect is BTS, which will raise quality because
order to revitalize the current housing delivery system. In addition,
buyers can see what they are getting and pay only then.because
the government should empower house buyers to protect them-
at that time the onus is back on the developer. If the developer
selves through education and knowledge. It is possible to establish
produces something that is lousy, he is not going to be able to sell it.
an institution that would act as an independent body to provide
He cant recover his cost. Our current system is that he sells the
reliable and credible data about housing developers, banks, insurers,
building before he even builds it. So, what else is there left for him to
and other aspects of the housing delivery system. This would agree
hang on to? He will say Thank you very much. I got my money
with Sommervilles (1998) work, which dened housing-related
already.
empowerment as a process by which people gain increased control
This indicates that some industry players agree that the BTS or over their housing situations. Specic means of empowerment
10:90 system would be more benecial for the housing industry include provision of information, passing of legislation, commitment
than the STB system. of resources, and transfer of management functions (ibid).

Conclusion
Market and society awareness of the BTS and 10:90 systems
The main purpose of the housing delivery system is to provide
Our previous ndings indicate that the developers readiness to
decent and affordable housing. While many believe that BTS is
adopt BTS is dependent on the market (NorAini et al., 2008).
a better system than the conventional STB system, its imple-
Affordability for buyers and the markets absorbency are both
mentation should incorporate the factors raised in this study to
important factors here. Our interviews with Consumer Organiza-
ensure acceptance by various stakeholders. The results of this
tions A and B revealed that most buyers are ready to pay slightly
studys analysis suggest that 6 major steps are needed in order for
higher costs as long as they are assured a high-quality house. This
BTS to be fully implemented. The rst 4 suggestions concern the
suggests that buyers can accept either the BTS or 10:90 system, as
role of the government in guaranteeing successful implementation
both reduce their risk when buying a house. Most people will be
of the BTS system. Specically, the government should establish
content if they are given the chance to examine the completed
proper mechanisms for BTS, revise the incentive plan, improve the
product (the house) before deciding to buy it. To quote one repre-
monitoring system, and garner political will. We also suggest that
sentative from Consumer Organization B:
other stakeholders, such as nancial institutions and professionals,
.Buyers will very happy and satised with the completed house, should help ensure successful implementation of BTS. Finally,
and it doesnt matter to them if they have to pay more to get awareness in society and the market is necessary for either the BTS
a higher quality house rather than take on higher risk by buying an or the 10:90 system to be a success.
incomplete one.
This statement coincides with the conclusions of Zan Yangs Acknowledgements
(2001) study, which suggested that Beijing buyers are willing to pay
more to protect themselves from low-quality construction. The authors acknowledge the research grant provided by the
Another point highlighted in the focus groups is the issue of National Property Research Coordinator (NAPREC) of Malaysia,
buyers (and, more generally, societys) awareness of the BTS or which was instrumental in supporting this paper.
58 Y. NorAini et al. / Habitat International 34 (2010) 5358

References New Straits Times (1999, January 25). Build and sell concept for housing under
study. Available from: http://www.hba.org.my/archive/focus/build_then_sell/
PG1.htm Retrieved 04.09.06.
Akbal, S. S. (2006, April 13). Zero defects roles and responsible. Property
NorAini, Y., Mohd Wira, M. S. & Sofri, Y. (2008). Assessment of the readiness of
Times 3.
private housing developers and nancial institutions to the BTS concept. Draft
Atkinson, A. A., Waterhouse, J. H., & Wells, R. B. (1997). A stake holder approach
Final Report of NAPREC Research Grant.
to strategic performance measurement. Sloan Management Review, 38(3),
NorAini, Y., Mohd Wira, M. S., & Sofri, Y. (2007). Build then sell models for housing
2537.
industry: a review. Journal of Valuation and Property Services, 7(1), 1119.
Berita Harian. (2008, April 7). Monitoring on developers should be stricter. Available
Norakmarwati, I. (2003). Build then sell concept: an alternative to solve house
from: http://www.bharian.com.my/CurrentNews/BH/Monday/Rencana/200804
buyers problems. Master of Science Dissertation, Universiti Sains Malaysia,
06224812/Article/ Retrieved 10 April 2008.
Penang, Malaysia.
HBA (2005, June). Sell then build or build then sell or 10:90 variant models for
Patton, M. Q. (1990). Qualitative evaluation and research methods (2nd ed.). London:
the housing delivery system. Paper presented at the housing Workshop:
Sage Publications Ltd.
National housing policy research, 2125 June, Universiti Sains Malaysia,
Sekaran, U. (2003). Research methods for business: A skill-building approach (4th ed.).
Malaysia.
New York: John Wiley & Sons, Inc.
Ibrahim, F. (2006). Critical factors for reviving abandoned housing projects.
Sommerville, P. (1998). Empowerment through residence. Housing Studies, 13(2),
Unpublished M.Sc thesis: Universiti Teknologi Malaysia (UTM), Malaysia.
233257.
Miles, M. B., & Huberman, A. M. (1994). Qualitative data analysis (2nd ed.). Newbury
Star. (2006, June 23). Package of perks for build then sell. Available from :http://
Park, CA: Sage.
www.hba.org.my/news/2006/606/package.htm Retrieved 08.09.07.
Nazihan, A. R. (2005). Build rst, sell later concept: a survey towards the perception
Zan Yang. (2001). An application of the hedonic price model with uncertain attribute:
and expectation from developers and nancial institutions. Bachelor of Science
the case of the peoples Republic of China. Property Management, 19(1), 5063.
Dissertation, Universiti Sains Malaysia, Penang, Malaysia.
Zikmund, W. G. (2003). Business research methods (7th ed.). United State of America:
New Straits Times (2004, September 1). Having a say in the Way we pay, p. 5.
Thomson South-Western.
New Straits Times (2005, October 10). Bid to further protect buyers. Available from:
Zulkii, E., & Abdul Ghani, S. (2004). Build then sell: an alternative to overcome
http://www.hba.org.my/news/2005/1005/bid.htm Retrieved 04.09.06.