GIVEN

, Degree , kN/m^3 SBC, h, m


Degree kN/m^2

15 30 16 0.5 150 4

CALCU
Ca Cp eq ht of surcharge loa force ( surcharge)
0.373 3.001 1.25 7.46

PREL DIM Calc


i BASE SLAB THICKNESS= 0.42 m
ii stem thickness base=
iii stem thickness top=
iv length of heel till front face= 2.03 m
v full length = 3.04 m
vi front proj of stem= 0.50 m
Stability check
i Overturning
force due to active pr Pr= 98.45362 kN/m width
Pr Sin Q= 25.48609 kN/m width
Pr Cos Q= 95.09771 kN/m width acting at
force due to surcharge pr = 7.45564 kN/m width acting at

s no force due to component Dist from heel


W1 117.47 kN 0.76 m
W1a 12.75 kN 1.630 m
W2 7.34 kN 0.617 m
W3 18.11 kN 1.925 m
W4 19.92 kN 1.740 m
W5 31.50 kN 1.500 m
W6 0.00 kN 2.000 m
P Sin Q 25.49 kN
= 232.58 kN

dist of resultant from heel=


dist of resultant from toe=
stablising moment=
Overturning moment=
FOS=

Soil pressure at footing base


R=W=
dist of R from heel=
ecentricity e, m=
Middle third dist=
qmax,min=
Stability against sliding
sliding force=
resisting force=
FOS=
Shear Key design

sliding force x 1.4/.9= 0.5xCpXSoil DensityX{(Depth of Footing-300

159.53 kN/m width =


0 =
a= 0.694
-2.594
Depth footing, m H Ht @ HEEL TOP concrete surcharge
ABOVE WALL, m weight, , load
kN/m^3 kn/m^2
1.25 5.25 0.5 25 20

Pt of Application
2.625

Provided 4
0.42 m
0.48 m
0.15 m
2.00 m
3.00 m
0.00 m
W6
1.25 0.00
N/m width
N/m width
N/m width acting at 1.92 m from base of fdn
N/m width acting at 2.625 m from base of fdn

moment @heel
89.27 kN-m/ m width
20.78 kN-m/ m width
4.52 kN-m/ m width
34.87 kN-m/ m width
34.67 kN-m/ m width
47.25 kN-m/ m width
0.00 kN-m/ m width

= 231.37 kN-m/ m width

0.99 m
2.01 m
466.36 kN-m/m width
201.71 kN-m/m width
2.08 >1.4 , Ok

232.58 kN
1.86
0.36 Ok, within middle third
0.500 m
133.66 kN/m^2 21.39 kN/m^2 Ok

102.55 kN/m width


116.29 kN/m width
1.02 Redesign Provide shear key

DensityX{(Depth of Footing-300mm,neglecting top 300mm-a,shear key dim)^2-(a,shear key dim)^2}+

a^2 a
24.01 45.61 116.2877942927
24.01 45.61 -43.24
m
m
0.15 W2 0.50

W1a

W3 W1
5.25 5.75
W4

0.48

W5 0.42

2.00
3.00
hear key dim)^2}+ * av soil pr x length of footing