You are on page 1of 4

PROJECT SCHEDULE

PROJECT: REPLACEMENT OF PIPE IN MPPL


MACHINERY DEPLOYMENT SCHEDULE

S.No. Location Machinery Description

1 Khopoli Terminal Air Compressor, Tool & tackles for air pigging
2 Vashi Terminal Tool & tackles
3 Log. Dist.22344.88 Excavator
4 Log. Dist.22344.88 Welding Generator With Rectifier
5 Log. Dist.22344.88 Grinding Machine
6 Log. Dist.22344.88 Radiography Unit
7 Log. Dist.22344.88 Coating Unit
8 Log. Dist.38374.08 Excavator
9 Log. Dist.38374.08 Welding Generator With Rectifier
10 Log. Dist.38374.08 Grinding Machine
11 Log. Dist.38374.08 Radiography Unit
12 Log. Dist.38374.08 Coating Unit
IN MPPL
EDULE
Date of
Quantity Remarks
Deployment
1 10.05.2017 1100 CFM
10.05.2017
1 06.05.2017
1 11.05.2017
2 11.05.2017
1 12.05.2017
1 12.05.2017
1 06.05.2017
1 11.05.2017
2 11.05.2017
1 12.05.2017
1 12.05.2017
PROJECT SCHEDULE
PROJECT: REPLACEMENT OF PIPE IN MPPL
MACHINERY DEPLOYMENT SCHEDULE

S.No. Location Manpower Description Quantity

1 Khopoli Terminal Engineer 2


2 Khopoli Terminal Riggers 4
3 Vashi Terminal Riggers 4
3 Log. Dist.22344.88 Engineer 1
4 Log. Dist.22344.88 Civil Labour 4
5 Log. Dist.22344.88 Civil Labour 8
6 Log. Dist.22344.88 Welder 2
7 Log. Dist.22344.88 Fitter 1
8 Log. Dist.22344.88 Grinder 1
9 Log. Dist.22344.88 Riggers 6
10 Log. Dist.38374.080 Engineer 1
11 Log. Dist.38374.080 Civil Labour 4
12 Log. Dist.38374.080 Civil Labour 8
PPL
LE
Date of
Remarks
Deployment
10.05.2017
10.05.2017
10.05.2017
06.05.2017
06.05.2017
06.05.2017
11.05.2017
11.05.2017
11.05.2017
11.05.2017
06.05.2017
06.05.2017
06.05.2017