You are on page 1of 2
AA O.0.3.UU VQlSo sroUl clit ABNA AL AMIR Contracting LLC Date: 22-05-2017 To, Environment, Health and Safety, Trakhees, Dubai, UAE. Compliance Letter ‘Subject: Compliance Letter for Compound 16Townhouses (G+2) at plot JVC11DFRPOO3 Dear Sir, ‘We hereby submit the compliance letter for the comments given by you for EHS inspection at plot JVC11DFRP003. Comments with compliance: 1. Major Further to the email from Mr Jagan on 24.05.2016, you are asked to provide a formal explanation on non-compliance of GB regulation. We are hereby enclosing the earlier communications for your reference. Answer: Consultant already submitted formal explanation, we have submitted the letter. 2. Major All construction works including electrical works, A/C works, toilet/ kitchen fitting works, hardseape/ landscape works, other mechanical works like pump installation etc. to be totally completed prior applying re-inspection. ‘Answer: All works are finished including pump installation 3. Major Balcony handrails/ balustrade to be fitted on all balconies and please note: The top of the balcony railing/parapet wall must at least 1.1 meter (1 100mm) from the finished floor level. (Up stand near the railings will be considered as the finished floor level). The clearance between vertical rods shall not be more than 100 mm, Horizontal bars for railing is not acceptable due to safety Tel: +9714 3477488 | Fax: +97143477070 | P.O. Box: 510, Dubai-U.A.E. abna@hagalamir.com, luzancom@emirates.net.ae, financehagroup@gmail.com / A (fO.O.3.0U UNQlLSoU jroll eli aN ABNA AL AMIR Contracting LLC reason. There must not be any horizontal or near horizontal elements 760mm above the floor, that facilitate climbing, any opening must not permit a 100mm sphere to pass through it. Therefore, the vertical balusters must not be more than 100 mm. Answ jalcony handrails are fixed as mentioned, 4. Major Horizontal railings fitted above the railings to be replaced with vertical railings or glass/ sheet to be provided on the first floor and second floor as discussed during the time of inspection. Answer: Horizontal railings replaced with vertical handrails. 5. Major Alleyway/ driveway work to be completed. Answer: Alleyway works are completed 6. Major Nakheel sewage discharge NOC to be submitted. Answer: Nakheel Discharge NOC has been obtained and submitted in email 7. Major Gate provided on the cat ladder to be raised to one meter from the FFL. Answer: Gate has been raised as discussed on site. 8. Major Cage to be provided to the cat ladder, the bottom of the cage to be 2.1 meter from the FFL. Answer: Cage provided to cat ladder as discussed on site. Fax: +9714 3477070 | P.O. Box: 510, Dubai-U.A.E. Tel: +9714 3477488 abna@hagalamir.com, luzancom@emirates.net.ae, financehagroup@gmail.com

You might also like