You are on page 1of 1

20 mm

To drain the Grinding box into the Settling tray


open a hole in drawn position.

Float valve should be adjusted to a gap of 20mm


between the bottom of tray to float body when the
tray is empty and valve open.

280
200

MIN n50

Connect cable to control box contact.

Connect cable plug to "Pump Outlet"


placed on ESD rear arm panel. Electrical connection WRS
Use the included cable (no 204-0072-00) and

215

365
65
adapt a suitable plug (national standard) in open end.

0
Water connection WRS

203
Fill the system through "Water Inlet" connection.

3x M6

If needed, make M6 holes shown in above figure,


used to mount WRS on Grinding box.
Tools, drill and tap are included in (no 202-0221-00)
2 103 102 100 101 101 1

Date
202022800 2010-01-29
Rev.
High efficiency water recirculation system