You are on page 1of 129
'SBOQ for Railway Electrification and General Electrical works CR 4A, OLD eer serersrey [erzre7 feria Rall Vikas Nigar Litsited (A Government of India Enterprise) STANDARD BILL OF QUANTITIES FOR RAILWAY ELECTRIFICATION AND GENERAL ELECTRICAL WORKS FEBRUARY,2015 (BASE MONTH OF RATES 31.03.2013/ FOR NON-ADB CONTRACTS) VG ter aasrer Ferzr feito Rail Vikas Nigam Limited {st floor, August Kranti Bhawan Bhikaji_ Cama Place, R.K. Puram, New Delhi -110066 (Phone No. 011-26736196, 26738295, 26738395, 26738495 Fax No. 26182957, 26738193) No.2009/Elect/Standard BOQ/RE/Rev-1/125-B CPM/RE/RVNL/Pune GGM/E/DLI, SC, BPL, MAS, BBS, SBC, Raipur & Kolkata GM/Elect/RVNL/JHS at BPL. Manger/Elect/RVNL/Patna & Mumbai Dated: 02.2015 Sub:RVNL’s Standard Bill of Quantities for Railway Electrification and General Electrical Work. - RVNL vide letter no.2009/Elect/Standard BOQ/RE/Rev-I/125-B dt 29.01.2015 had issued the Standard specifications for Material and Works, Volume-II (Electrical Works) for both Railway Electrification & General Electrical Works. Accordingly, the Standard BOQs have been revised & rates have been updated upto 31.03.2013. x The rates mentioned are inclusive of all taxes and duties as on 31.03.2013 Therefore, while constructing the BOQ for ADB projects, the element of Excise Duty as on 31.03.2013 be deducted from the supply portion of each item 2 For item no. 33001, 33002, 33003 & 33021, 80% of the rate is to be considered as Supply portion. 4. The standard BOQs should be followed uniformly for preparation of Estimates, including Detailed Estimates and Preparation’ of BOQ for invitation ‘of works tenders, a In the Bill of Quantities, if any new item is required to be added, the same should ‘be incorporated at the end of the relevant Schedule, duly justifying the same and the rates may be got vetted from Associate Finance. G oO ° ° oO ° 6 o o o G ° oO G o Cc c G Go Cc o o G c oS cS c o c o c cS e c c c e we 6. While submitting Estimate/B0Q to the Corporate Office for approval/sanction, the following certificate should invariably be recorded in the forwarding letter by in- charge of the project(CPM/GGM/GM-Electrical) “No changes have been made in the description, unit and rate of items of the SBOQ, except for the following.” (i) ii) (iii) The rates of item no(s) : -.hiave been analysed and vetted by Finance and the same has been adopted in the BOQ. The ‘corresponding changes have been made in the Explanatory Notes. The rates incorporated should be extrapulated as on 31.03.2013, The rates being obtained for similar items of work on Zonal Railways in adjacent sections have been kept in view and any substantial deviation in the rates has been justified (if no such rate is available, In-charge of the ProjectElectrical may certify the same). New item No...... in Bill No....... and item No. in Bill No....... have been added for which rates have been analysed and vetted by Finance. 7. This supersedes previous SBOQ for General Electrical & Railway Electrification works. Any discrepancy which may come to notice and any suggestions in this regard may please be sent to the ED/Elect. 8. This is issued with the approval of CMD. (Le ae) BN? fo Copy to: 1 2. 3. 4, 5. (AK. Tyagi) GGMlElect./Project Secty to CMD for kind information of CMD. . DP, DF, DO, DPE, D/Vig, RVNL . ED's RVNL All CPM, GGM/GM/DGM ). JGM/Tender cell INDEX Page No. SN Deseription ae 1, [Preamble to SBOQ for Railway Electrification and General Electrical Works 1-9 2. (Standard Bill of Quantities [() |Schedule-16000(RE-General) 10-11 (i) Schedule-17600(Switching Post Building) 2 (il) |Schedule-19000(OHE-Ferrous Other than steel structure and 3 BPS (iv) |Schedule-20000(OHE - Non Ferrous ‘A’) 4 (W)_|Schedule-21000(OHE - Non Ferrous By % | (vi) |Schedule-24000(TSS) 16-18 (vil) (Schedule-27000(TSS-Spares) 19 (vill) |Schedule-28000(Tools & Plants) 20-24 (id) |Schedule-29000(SCADA) 22 (%) _|Schedule-30000(Common Items for OHE/TSS) 23 | (xi) |Scheduie-33000(General Electrical Works) a (24-34 3. | Explanatory “Notes for Railway Elirfication Works| 35-85 (Schedule-160000 to 30000) 4. | Explanatory Notes for General Electrical Works (Schedule-| 86-125 | 33000) $B0Q_for Rai ay Electr ation & General Electrical Works (Preamble) /February, 2015 Preamble to SBOQ for Railway Electrification and General Electrical Works General Instructions The bill of quantities (BOQ) shall be read in conjunction with the Instruction to bidders, General Conditions of Contract, Particular Conditions of Contract, Works requirements, Technical specifications & Drawings, Explanatory notes detailed after BOQs of RE & General Electrical works seperately, Payment conditions, pre-bid clarifications and Addenda and Corrigenda if any. The summary of schedules is as under: SN ‘Schedule No. Description 7 16000 RE-General 2 17000 ‘Switching Post Building 4 19000 ‘OHE - Ferrous other than steel structures and SPS. 5 20000 ‘OHE - Non Ferrous “A” 6 21000 ‘OHE - Non Ferrous 8° 9 24000 TSS 2 27000 TSS-Spares 13 28000 Tools & Plants 14 29000 ‘SCADA 5 30000 ‘Common Items for OHE/TSS 16 33000 ‘General Electrical Works The quantities given in the Bill of Quantities are estimated and provisional, and are given to provide a common basis for bidding. The basis of payment will be the actual quantities of work ordered and carried out, as measured by the Contractor and verified by the Engineer and valued at the rates and prices tendered in the priced Bill of Quantities, where applicable, and otherwise at: such rates and prices as the Engineer may fix within the terms of the Contract. The Surplus quantities, if any after execution & not required by Railway, as determined by the engineer during the progress of the work or at the completion of the work, shall be taken back by the contractor and the recovery of such material will be adjusted from the pending claims. Page 1 of 9 ' 001 $80Q_for Railway Electrification & General Electrical Works (Preamble) /February, 2015 10. In the Bill of Quantities, quantity and unit rates and thereby the amount against each tem have been indicated, From this, the estimated price of each bill has been worked out and indicated in the summary sheet in BOQ. The Bidder shall quote rates as percentage abovelbelow/at par for each schedule in the summary sheet. If no Percentage as above, below or at par is indicated for any particular bill, the same will be considered as percentage at par. The rates for each bill shall be written in indelible ink or type written in the summary sheet against each bill, in both words and figures, while clearly indicating whether the percentage quoted is above/below/at par over the estimated rate in the respective columns. The price for each bill shall accordingly be calculated and written against each bill in both words and figures. The total price, as the sum of prices of all bills shall be shown at the bottom of the summary sheet. The total price shall also be written in both words and figures. General directions and descriptions of work and materials are not necessarily repeated ‘or detailed in the Bill of Quantities. References to the relevant specifications and ‘sections of the contract documentation should be referred to before quoting rates in the Bill of Quantities. The rates and prices Bid in the priced Bill of Quantities shall, except as otherwise provided under the Contract, include all construction equipment, plant, labour, supervision, materials, erection, maintenance, insurance, profit, royalty, octroi, taxes and duties, together with all general risks, liabilities and obligations set out or implied in the Contract. ‘The rates are deemed to be inclusive of all lead (except as otherwise specifically Provided in the description of the particular item), lifts, ascend, descend, handling, rehandling crossing of nallah/streamsitracks any other obstructions. All enabling works for executing the work e.g. approach road to site, launching arrangements, procuring right of way, arrangement of water and electricity etc is to be arranged by the contractor at his own cost and deemed to be included in the quoted rates. Where a temporary tube well or any other water source are constructed by the contractor in the railway land for the purpose of taking power /water for construction Purposes, no charge would be recovered from the contractor but written permission will however, be obtained by the contractor from the Engineer who may, at his discretion, refuse such permission for such construction of temporary arrangement. The contractor shall also be required to restore the site to its proper condition as directed by the Engineer. Storage of Material: All the material at site will have to be properly stacked & stored so as to facilitate inspection. The material should be properly protected from the detrimental effects of nature and fire, theft etc. The contractor shall be responsible for watch & ward and any loss or deterioration on account of above shall lead to rejection of material and contractor has to replace the same at his own cost. All the disposable material should be disposed off outside the railway boundary at a designated place as directed by the Engineer. Page 2 of 9 002 $B0Q for Railway Electrific: 1". 12, 2 3. & General Electrical Works (Preamble) /February, 2015 __ The method of measurement of completed work for payment shall be in accordance with provisions in Works Requirements (Specifications) except as otherwise specifically provided in the description of item or particular bill of quantities or explanatory notes to the particular bill of quantities. Trees falling in the alignment or any other site of the works which belongs to the railways will be trimmed and stacked at a nominated place at his /their own cost as directed by Engineer and the same will be Railway/Employer’s property. Trees of the forest department will be trimmed and deposited in the nearest forest depot. No separate payment on this account shall be made to the contractor. Instructions for quoting by the bidders The prices for supply of materials and erection are in accordance with the technical specifications, approved drawings and designs. The contractor should note that no item of materials, equipment, fittings and components shall be supplied by the Employer. UNIT PRICE: i) The unit price indicated under “Supply” in the bills is the all inclusive price of materials and all incidental charges for transport, loading/unloading and handling etc ii) The price also include taxes, duties, levies (including octroi) applicable on Works contracts, insurance/bank guarantee/indemnity bond charges etc. ill) The prices also include provision for losses and wastages in transit and erection. iv) The price quoted also include RITES/RDSO representative inspection and testing charges unless otherwise specified in the bill of quantities or Technical Specification. in case of change of inspection from RDSO/RITES to RVNUCONSIGNEE, 1% of the cost of material will be deducted by RVNL as inspection charges. (¥)_ The unit price indicated under “Erection” in the bills should be inclusive of the cost of erection and testing and also include all cost of administration of the contract, insurance premia, banker's charges, cost of stamps/storage/loading/unioading and handling of materials and also include the cost of transportation which the contractor may incur for carriage of material to the site of works, The unit prices should also include cost of works and adjustment that may become necessary during or after the tests for commissioning ‘The whole cost of complying with the provisions of the contract shall be included in the items/bills provided in the BOQ and, where no items/bills are provided, the cost shall be deemed to be distributed among the rates and amount entered for related Items of Works, Page 3 0f 9 003 ‘$80Q_for Railway Electrific: & General Electrical Works (Preamble) /February, 2015 C. NOTES SPECIFIC TO PAYMENT: INVOICING PROCEDURE 1 All invoices shall be submitted with original. supporting documents or certified true copies of supporting documents wherever these are acceptable to the Engineer as per contract. Where copies of original documents are required in support of several invoices, true certified copies of the original documents may bbe forwarded to the Engineer, with his consent. Invoices shali be submitted only on the basis of provisions in Contract Agreement and prices. The quantities and measurement of works completed should be approved by the Engineer prior to the submission of invoices. For this purpose, the schedule ‘of quantities and measurement submitted by the ‘contractor for approval of the Engineer may be only up to the extent of work completed except in the case of payments on Provisional Acceptance. D. PAYMENT PROCEDURE ON ACCOUNT PAYMENT AGAINST SUPPLY OF MATERIAL, ‘On Account Payment will be made as described below: () “On Account Payment” shall be made for the iteris specified in detailed terms of payment of each schedule under clause No. 4.0 of this preamble. ‘On Account Payment’ shall be made to the extent of 85% of the accepted supply rate, after receipt, acceptance, accountal, proper storage and protection against loss, damage or deterioration on the items mentioned in each schedule. (i) ‘On Account Payment’ made to the contractor will subsequently be adjusted against progress payments and against payment due on provisional acceptance. (iv) All invoices shall be accompanied with the following, for the purpose of arranging ‘On Account Payment’ against the contract: a. Supplier's Delivery Challans, b. Inspection certificate granted by the authorized approved agency/Purchaser’s representative as per contract agreement. ©. Certificate of receipt of material at Contractor's depot/work sites duly accepted by the Engineer. d. Comprehensive Insurance Policy for supply and safe custody of material. e. Bank Guarantee issued by a Scheduled Bank of the equivalent amount for which On Account Payment is claimed. Such Bank Guarantee shall be released afier erection of the material and on certification by the Engineer. f. Quality assurance documents. Page 4of9 004 $80Q_ for Railway Electrification & General Electrical Works (Preamble) /February, 2015 2. PROGRESS PAYMENT AGAINST SUPPLY AND ERECTION OF MATERIAL: ‘On completion of each item of BOQ, the contractor shall receive payment to the extent of 95% of the supply and erection costs after making any recoveries and adjusting of On Account Payment, which may be due. 3, REMAINING 5% PAYMENT: The balance 5% of each item of the BOQ shall be paid to the contractor after commissioning of the portion of the work or handing over of the installation/material to the employers/Railways representative. This is applicable for all schedules, 4.0 PROCEDURE OF SCHEDULE WISE PAYMENTS. 4.1 Schedule 16000: (i) Schedule No. 16001 (Design & Drawing) ‘The payment shall be made as under: (a) 50% of Scheduled rates shall be paid after “in principle approval of design/drawings by RVNL". () 45% of Scheduled rates shall be paid after the submission & acceptance of as erected/ completion drawings by RVNL All other items except item No. 16001: (a) On Account Payment shall be made only for item Nos. 16009 & 16010 and as per terms and conditions given in clause No. D(1) under “Payment Procedure’. (b) The Progress Payment to the extent of 95% of all the items in the schedule shall be paid for the supply and erection prices after adjustment of "On Account payment” & other recoveries, if any, wherever applicable 4.2 Schedule 17000: i) 60% of the Schedule rate shall be paid on Casting of the Roof of the Switching Station Building, ii) 45% of the Schedule rate shall be paid on completion of the building in all respects and certification by the Engineer. 4.3 Schedule 19000: {i) On Account Payment will be made only for item No. 19004 and as per terms and conditions given in clause No. D(1) under “Payment Procedure”. Page 5 of 9 005 $80Q_ for Railway Electrification & General Electrical Works (Preamble) /February, 2015 Schedule No. 19003: On completion of erection of bracket assemblies, the contractor shail receive payment to the extent of 85% of prices for supply and erection of bracket assemblies. After final adjustment of OHE and SED checking, contractor shall receive another 10% payment”. The Progress Payment to the extent of 95% of all the items in the ‘schedule shall be paid for the supply and erection prices after adjustment of “On Account payment” & other recoveries, if any, wherever applicable. 4.4 Schedule 20000: (i) On Account Payment will be made only for item Nos. 20002 & 20003 and as per terms and conditions given in clause No. D (1) under “Payment Procedure”, (ii) Item No. 20001: On completion of erection of the items the contractor shall receive payment to the extent of 85% of the prices for supply and erection. The Progress Payment to the extent of 95% of all the items in the schedule shall be paid for the supply and erection prices after final adjustment of OHE and SED checking and after adjustment of “On Account payment” & other recoveries, if any, wherever applicable. 4.5 Schedule 21000: (i) On Account Payment will be made only for item Nos. 21003, 21004, 21005 & 21014 and as per terms and conditions given in clause No. D(1) under "Payment Procedure” (ii) The Progress Payment to the extent of 95% of all the items in the ‘schedule shall be paid for the supply and erection prices after adjustment of “On Account payment” & other recoveries, if any, wherever applicable. 4.6 Schedule 24000: (i) Item No. 24001 (Design & Drawing of TSS) (a) 50% of Scheduled rates shall be paid after the ‘in principle approval of design/drawings by RVNL" (b) 45% of Scheduled rates shall be paid after the submission & acceptance of as erected/ completion drawings by RVNL. Page 6 of 9 006 $B0Q_for Raitway Electrification & General Electrical Works (Preamble) /February, 2015 (ii) On Account Payment will be made only for item Nos. 24004 to 24014, 24032 to 24036 and as per terms and conditions given in clause No. D(1) under “Payment Procedure”. (ili) The Progress Payment to the extent of 95% of all the items in the schedule shall be paid for the supply and erection prices after adjustment of “On Account payment” & other recoveries if any wherever applicable except item:No. 24001 which will be paid as per (i) above. 4.7 Schedule 27000 & 28000: 95% of the accepted price shall be paid on receipt & accountal of material at site or Fequired destination after inspection and production of documents as listed below: (i) Supplier's Delivery Challans. (i) Inspection certificate granted by the authorized approved agency/Purchaser's representative as per contract. (iii) Certificate of receipt of material at Contractor's depot/work sites duly accepted by the Engineer. (iv) Quality Assurance Documents including Guarantee/Warrantee, if any. 48 Schedule 29000: (i) Item No. 29001 (Design & Drawing of SCADA) (2) 50% of Scheduled rates shall be paid after the ‘in principle approval of designidrawings by RVNL" (b) 45% of Scheduled rates shall be paid after successful completion of the work and handing over of the soft & hard copies of as erected/completion drawings & software to RVNL. {ii) On Account Payment shall be made only for item Nos. 29002 to 29005 & 29007 and as per terms and conditions given in clause No. D(1) under “Payment Procedure’. (iii) The Progress Payment to the extent of 95% of all the items in the ‘schedule shall be paid for the supply and erection prices after adjustment of “On Account payment” & other recoveries if any wherever applicable except item No. 29001 which will be paid as per clause (i) above. 4.9 Schedule 30000: (i) (2) On Account Payment shall be made only for item Nos. 30001 to 30003 and 30005 and as per terms and conditions given in clause No. D(1) under “Payment Procedure”. Page 7 of 9 007 ation & General Electrical Works (Preamble) /February, 2015 (b) The progress payment of the above items to the extent of 95% of the supply and erection prices shall be paid after adjusting of ‘On Account payment” & other recoveries. (ii) tem Nos. 30006, 30007: On completion of foundation work, the Contractor shall receive payment to the extent of 75% of the prices (for Supply and erection taken together) of foundation and another 20% after mast erection, muffing, backfilling etc. Item No. 30008: On completion of work, Contractor shall receive progress payment to the extent of 95% of the prices. (iv) Item No. 30009: On completion of erection of structures, the Contractor shall receive payment to the extent of 85% of the prices for supply and erection of structures and another 10% after erection of respective bracket assemblies/equipment. 4.10 SCHEDULE No, 33000 (General Electrical Works): () 85% of the accepted supply rate shall be paid on receipt of material at site, after inspection & against submission of an indemnity bond. (ii) Further payment of supply & erection cost to cover 95% of the total item cost shall be paid on completion of the work and on certification by the Enginéer after adjusting already paid amount & other recoveries if any. 5. FINAL SETTLEMENT On expiry of the defect liability period and issue of the taking over certificate of the entire installation, the Bank Guarantee for Performance security shall be released to the contractor after adjustment of any dues payable by the contractor. 6. RECOVERIES FROM THE CONTRACTOR All the recoveries for materials supplied and services rendered by the Purchaser to the Contractor and other refunds due’ from the Contractor shall be made by deductions from payments due to the Contractor covering the value of supply and erection in the progress payment and from payments due on provisional Acceptance. 7. TAXES AND DUTIES (i) All taxes, duties and levies (including octroi, works contract tax, service tax) arising ‘ut of the transactions between the contractor and his sub-contractor/Suppliers for this work will be deemed to be included in the accepted rates, unless otherwise specified in the BOQ or technical specification. Page 8 of 9 003 S80Q_for Railway Electrification & General Electrical Works (Preamble) /February, 2015 ‘Where the law makes it statutory for the Purchaser to deduct any amount towards sales tax or any other taxes on works contract, the ‘same shall be deducted and remitted to the concerned authority, 8. PRICE VARIATION Coefficients governing the adjustment.of changes in cost to be read with clause 13.8 of GCC applicable to various schedules are also included. Page 9 0f9 009 : $800 /February,2015 Bill of Quantities ‘Schedule 16000 RE- General : Ratefin Rs, Item No] SOR ITEM Description Unit . Supply| Erection Preparation ‘and submission of designs and drawings for JOverhead Equipment, Switching Station, Sectioning| 16001 | OHE-1 |diagram,Power supply diagram, Schematic diagram off Tkm | 996 | 14440 [Switching ‘Stations, Traction working rule diagram and Instructions etc. required for commissioning of OHE [Supply end Erection of targe Span wire (130 eq.mmi| including is fiings with insuators: 16002 | OHE-2 5) with Porcelain nsuators 100mm GD mir [ase | 36 (o) With Composite insulators 050mm CD ur _[ a5 [6 |Supply and Erection of materia for Termination of single d equi terminati one.g [Ponductor of overhead equipment o a terminating Wire (e) With Porcelain Insulators 1050mm CO Each | sort | 638 (o) With Composite insuiators 1050rm CO. Each | 4704 [538 Supply and Erection of materials for Termination of all Jakuminum 25 KV feeder conductor single (spider) including 16004 | OHE-« [feeder wire [@) with Porcelain insulators 1050mm CD. Mr [383 | 178 [@) With Composite Insulators 1050mm CD. mr [276 [116 [Supply end Erection of material for Termination of copper with fi feeder wie s6005 | ones {C088 feeder wih gantes including cross feeder wire (a) With Porcelain insulators 1050mm CO Set_| 24674 | 631 (o) With Composite Insulators 1050mm CO Set_| 22540 | 631 16006 | OHE-6 |Supply and Erection of Terminal boards in control cubicles, | Each | oes | 269 [Supply and Erection of won dad 240V AC and 110V D.C 16007 | OHE-7 board wih fuse box in control cubes seen |etene eee [Supply and Erection of Lead Acid Balteries 40 AH with toooe | one-s |Bspe cheno set | 142972] 5061 |Suppl. Erection, Ol Fitvation, Testing and Commissioning Jot 25 KV/240 Volt 5 KVA, LT supply ransformer with 25 KV| ]O. ©. fuse switch assembly, antcimbing device, post 16008 | OHE-8(2) linsulators, copper jumper and earth elecrode ete (a) With Porcelain Insulators 1050mm CD. Set_| sea72 | 0506 (e) Wath Composite Insulators 1050mm CD. Set] 57305 | 6586 Supply, Erection, oil Fitration, Testing ené Commissioning lof 25 Kvr240 Von, 25 KVA, LT supply transformer with 25} KV 0. 0. fuse switch assembly, anticimbing deviee ,post 16010 JOHE- 9(0)insulators, copper jumper and earth electrode ete: (a) With Porcelain insulators 1050mm CO Set_| 165808] 76387 (b) With Composite insulators 1050mm CD. Set | 164732 | 16367 16011 | OHE-10 |Modiication o existing OHE mr | 0 2 Page 1of2 16000 010 $809 /February,2015 Bill of Quantities , ‘Schedule 16000 RE: General : Ratefin Rs) Item No| SOR ITEM Description Unit ‘Supply| Erection 16012 | OWE-11 [Moning of switching statin ie, SPISSP and TSS wee, |_o | 2saos -12{a)| "eatifcaton of switching station bulking 6 per 16013 |OHE-12(0) er can | 0 | 21660 1014 fone-t2(|SeP0Y & Erection of Eating arengement at ewictinal x | vaaz0| asa Loading/Unioading transportation and handing over of all 10015 | OHE-*3 line of materials et, other than contractor meter fa eete eee o 46016 | OHE-14 [Extra on Erection rate of work under power block Page 2 of 2 O11 16000 $800 /February,2015 Bill of Quantities Schedule-17000 Switching Post Building Item No |SOR ITEM Description Unit Ona [Construction of Switching Station bulding, ROO work plastering, brick masonry, retaining wall, filing, 17001 | OHE-15 Compacting and leveling work ete as per ROSO| cacy | taoage standard drawing and supply and erection of name| board of switching station Extra for every 0.3 m or part there of higher plinth] 17001(@) |OHE-t5(a) over normal plinth height (On ground floor area only) | sqm] 174 fExira for every 0.3 m or part there of deeper 17001(b) | OHE-16(b)| foundations over normal depth (On ground floor area] sqm | 174 oni Extra for open foundation on poor soil having every| 10.3 m or part there of higher plinth over normal plinth} 17001(c) | OHE-15(c) height (On ground floor area only) ‘Sqm 331 17000 Page Loft 012 S80Q,/February,2015 Bill of Quantities ‘Schdute 19000 ‘OHE - Ferrous other than steel structures and SPS Rate (In Rs) tom wo | SOR Descrinion uni 7 Supply | Erection ‘T9007 | OHE-%6 [Supply and Erection of @ guy rod assembly. Each [_4651_| 722 ‘6002 |ORE-T7 [Supply and Erectonofpreteciveseréen on FOBHROBs |. | 2408 | 260 79003 | OHE-16 |Supply and Erection of bracket assembly with ineulators 3] lper OHE plan. (a) With Porcelain stay & bracket Insulators TO50mmCO |= | aaioa | 622 for Witn Composite stay & Bracket Tnsulaors TOSOmm CD [--23 | aa37 | ez 19004 | OHE-19 [Supply and Erection of regulating equipment (3 pulley type) 36605 | 2690 Iwith counter weight assembly for conventional OHE Each 19008 | OHE-20 [Supply and Erection of material for Termination of double JOverhead Equipment conductor [f@) With Porcelain Insulators 1080mm CD Each | 77ea_| 679 (@} With Composite insulators 100mm CO Each | 6617_|_ 679 18006 | OHE-27 [Supply and Erection of anti-creep with galvanized steel wire [@) With Porcelain Insulators 150mm CD Each [ 18268 _| 1908 ©) With Composite Insulators 1050mm CD Each | 15934 [1908 18007 | OHE-22 |Suppiy and Erection of a structure bond/ongiudinal bond 13039 | 4160 |ransverse and special bond: ea 119000 CEeeeeeEeeeeeteeeeete-eee-EEEt-CEEE eee c CCL Page 1 of 1 013 $800 /February,2015 Bill of Quantities ‘Schedule 20000 ‘OHE - Non Ferrous " Rate(in Rs) tem No | SOR ITEM Description Unit Supply | Erection [Supply and Erection of Over Head Equipment Le. Jcontact & catenary wire (exctuding cost of supply of lcontact & catenary wires), jumper wire, dropper wire, Jcontacticatenary clips, fasteners and all other material 20001 | OHE-23(@) required at turn outlovertaps/diamond crossings etc, | TKM o anna Final checking of OHE and adjustment, inspection to be done by tower wagon for commissioning of |conventional OHE. 20002 | OHE-23(b) {Supply of contact wire (HDGCC 107 Sq.mm) only. wt | 620859 | 0 [Supply of cadmium copper catenary wire (65 Sq, mm) 20003 | OHE-23(¢) only wt | 629859 | 0 Page of 1 20000 01% $800 /February,2015, Bill of Quantities ‘Schedule 27000 ‘OHE- Non Ferrous" ltom No ‘SOR ITEM Description Unit Rato(in Re) Supply | Erection 21001 OHE-24 [Supply and Erection of anti-creep with cadmium coppar| lcatenary wire, (@) With Porcelain insulators 1050mm CD Each 59520 | 3970 (©) With Composite Insulators 1050mm CD Each 53186 | 3970 21002 OHE-25 ‘Supply and erection of section insulator assembly and [associated fittings & fasteners for OHE with Bar Insulator (@) With Porcelain insulators 1050mm CD and Bar Insulator Each 64506 | Aza (6) With Composite Insulators 1050mm CD and Porcelain Bar insulator Each 3339 | 42a 21003 OHE-26 [Supply and Erection of PTFE type short neutral section assembly Each 751950 | 4349 21004 ‘OHE27 |Supply and Erection of 25 KV, SP leolators and with insulator withfwithout earth contact assembly: Each eesi2_| 4386 21008 OHE28 [Supply and Erection of 25 KV double pole isolator and |with insulator withAwithout earth contact assembiy: Each 703400 | 403 21006 OHE-29 [Supply and Erection ofall ypes of copper jumpers Each 3730 320 21007 OHE-30 |Sunply and Erection of insulated catenary cable m the Ispan under overline structure, Mtr 2634 @ 21008 OHE-31 [Supply of materials and erection of a large copper jumper} (160sqmm) between aluminium bus / OHE and cross feeder with all associated fitings: Each Tas 320 21008 OHE-32 [Supply and Erection of solid copper busbar 16 mm dia 1523 BB 21010 OHE-23 [Supply and Erection of all types of connectors for aluminium/copper bus bar requited for commissioning of switching stations with fasteners, Each “4081 38 21011 OHE-34 Dismantiing of faction structure, portals TTC and lassociated SPS by cutting: MT 0 797 21012 OHE-35 [Supply and Erection of safety tems 1 e Fire] Jextinguishers, set of fe bucket with stand and first aid) box, key box with suitable key chain, locks and other| misc items required for commissioning of switching| station, Set 0844 | 1796 21013 ‘OHE-36 [Supply and Erection of 25 KV AC OHE dango boardidanger board for height gauge, publicistaff caution| board and special boards required for commissioning off |OHE/SWSs Each im 107 21014 OHE-37 ISuppiy, Erection and commissionng of T@ht weigh section insulator assembly 25 KV as per drawing [n0.6.2758.0 RDSO spec.no, THSpectOHEILWOS1007 Each 265310 | 23882 21015 OHE-38 [Supply, installation and commissioning of ~ thal Imaintenance free earth as per RDSO specification No. ROSO/PE/SPECIPS/0109(REV.0)-2008 Each 0 324501 Page tof 2 015 21000 $800 /February,2015 Bill of Quantities Schedule-24000 TRACTION SUB-STATION Rate tem No | SOR ITEM Description Unit Supply | Erection (ins) | (in Rs) [Design and drawings for 220/27 or 132/27 KV 0 | 80242 24001 | TSS-1 Jor 110/27 KV traction sub-station including | Each lfeeding post and capacitor bank 24002 | TSS DELETED [Construction of baffle wall complete with 2430 7et 24003 | TSS-3 reinforcement, brick work, plastering etc Cum ‘Supply, erection, testing & commissioning of Beiri4 | S118 24004 | TSS-4(a) |132 KV double pole SF-6 gas circuit breakers | Eath with interlock Supply, erection, testing & commissioning of rd ED 24005 | TSS.4(p) |220 KV double pole SF-6 gas circult breakers | Each with interiock [Supply and erection of 132 KV double pole 235073 | 2220 24008 [TSS-_5(@)|islators (manually operated) pea [Supply and erection of 220 KV double pole 2807s | 2220 24007 |TSS-_ 50) solators (manually operated) al [Supply & erection of 132 KV current Torts | 1145 24008 | TSS-6(2) |ransformer assembly (400-200/5A) Lal [Supply & erection of 220 KV current Tarats | 4327 24009 | TSS-6() |ranstormer assembly (200-100/5A) "a [Supply & erection of 110 KV current 731038 | 1145 240088 | TSS-5(C) |rranstormer assembly (400-200/5A) ean [Supply & erection of 132 KV current 2ag611 | 1145 240088 | TSS-6(¢) |transformer assembly (1200-800-400/5-5-5A) | Each 24010 | 738-7 (a) [SUPPW & erection OF T2OKViighining avrestors)_- || T15309 | B17 2aot1 | 1987 io) [SUPAWS erection of 188 KV ighining arestors| | 116308 | i474 ri 045 | __81 2aot1A | TSS-7 (ey | HPA &erecion OB KV ghining aresiow: |_| a80as | B77 [Supply, erection, testing & commissioning of 308780 | 3594 24012 | TSS-8(a) |25 KV single pole Vacuum cicuit breaker with | Each intertocking of rating 1600 amps |Supply, erection, testing & commissioning of 359578 | 3504 24012A | TSS -8(b) |25 KV single pole Vacuum circuit breaker with | Each intertocking of rating 2000 amps Supply & erection of 25 KV curent ser63 | 473, 24018 | TSS -8(2) |yansformers (1500-750/5A) al | [Supply & erection of 25 KV current E3785 | 473 240554 | TSS (0) |vanctormers (3000-1500/5 Amps) ee [Supply & erection of 25 KV current aieas | 2790 240188 | TSS 90) lyanstormers (200-100/5A) ne Page 10f3 016 24000 $800 /February 2015 Bill of Quantities ‘Schedule-24000 7_ TRACTION SUB-STATION Rate tem No} SOR ITEM Description Unit [Supply ] Erection (ins) | (in Rs) 24014 | TSS-10 Supply, erection, testing and commissioning | Each [1477300] 9279 lof control & relay numeric panel suitable for |douible transformer traction sub -stations of [220/27 or 132/27 KV or 110/27 KV 24015 |TSS-11_|Supaly & erection of tubular aluminum bus | _Mir_| 417 2 lbars SOmm x 39mm dia 24016 | 199-12 [SHPPY 8 erection of Zebra ACER conductor |, | 257 7 [Supply & erection ofall type of connectors, 1585 | 20 24017 | TSS-13 bus splice & TEE connectors etc required for | Each |commissioning of TSS equipments [Supply & erection of copper jumper with fitings| 298 | oat 24018 | TSS-14 Jang fasteners required for TSS Each [Supply & erection of 1107132 KV support 2ao72 | 384 | 24018 | TSS-15(9) [insulators with fitings and fasteners Each |Suppiy & erection of 220 KV support insulators 24072 | 600 24020 | TSS-15(0) | ih stings and fasteners a 16 [SUPpIy & erection of 25 KV support insulators 2943_| 170 24024 | TSS-16 [vith fittings and fastener Each [Supply & erection of 110/132 KV termination e726 200 24022. | TSS-17(a) {with/without adjuster complete with disc Each linsuators, [Supply & erection of 220 KV termination 3728 306 24023. | TSS-17(b) |withiwithout adjuster complete with disc Each insulators [Supply & erection of low maintenance lead 612506 | 6736 24024 | TSS-18 acid batteries set with 2 nos. of suitable battery] Set lcharger [Supply & erection of 240Volt AC and 110V 22548 | 478 24025 | _TSS-19 |p Distribution boards in the control oom —_| Each 24026 | TSS-20_|Supply and erection of earth electrode Each | 1605 | 734 [Supply and erection of earth leads 75x @ mm 138 3 24027 | TSS-21_ [mild stee! fiat laid in the ground or exposed as | Mir site requriment |Supply and erection of earth leads 60 x6 mm cy a 24028 | TSS-22 [mild stee! fat laid in the ground or exposed as | Mtr per site requriment 2aaze | rss-20 [Spe ons erection of 8 SWG GI Wire for rari Eee 3 -24 {Supply and erection of Samm die MS rod for 133 3 24030 | TSS-24 [Supp 20 Mr 24000 Page 2 of 3 017 $800 /February,2015, Bill of Quantities Schedule-24000 TRACTION SUB-STATION {tem No SOR ITEM Description Unit Rate ‘Supply | Erection 24031 ] TSS-25 [Supply & erection of earth screen wire including termination (ins) | (In Rs) 169 a [Suppy. erection, testing & commissioning of 24032. | TSS-26(@) ]132/27 KV, 21.6/90.24 MVA, ONAN/ONAF, single phase traction power transformers. Each 24001345 | 184047 [Suppy, erection, testing & commissioning of 24033. | TSS-26(b) [220/27 KV, 21.6/30.24 MVA, ONAN/ONAF, single phase traction power transformers. Each 733695503 | 184047 [Suppy, erection, testing & commissioning of 240338 | TSS-26(c ) {110/27 KV, 21.6/30.24 MVA, ONAN/ONAF, single phase traction power transformers Each 17228475 | 184047 [Suppy, erection, testing & commissioning of 240338 | TSS-26(d) |132/27 KV, 30/42 MVA, ONAN/ONAF, single lphase traction power transformers Each 27838617 | 184047 24034 | TSS-27(0) [Supply and erection of 26 Kv double pole isolator 1600 Amp with insutators Each eores | 2127 240348 | TSS-27(0) Supply and erection of 25 Kv double pole isolator 3150 Amp with insulators Each 733680 | 2127 24035 | TSS-26(@) [Supply and erection of single pole isolator /1600 Amp with insulators. Each seu | 2127 24035A | TSS-26(0) [Supply and erection of single pole isolator 13150 Amp with insulators Each e7eze | 2127 24036 | TSS-29 Supply, erection, testing & commissioning of 126 KV shunt capacitor bank of 2400 KVAR rating at 25 KV including lowioss sereis reactor, 25 KV neutral current transformer, land other accessories etc., Each 2018998 | 42292 24037 | TSS-30 [Excavation of Earth to the depth of 2 meter |below ground level for burying 13mtrs long rail land connecting it as per RDSO drawing (Rail |will be supplied by RVNL) Each 0 284 NOTE: 1 Provision of cross track, control room building and approach road shall be made in the civil portion of, the estimate. 2, Provision of yard lighting and water jet pump shall be made in the general electrical portion of the estimate. Page 3013 018 24000 $800 /february,2015 Bill of Quantities ‘Schedule 27000 TSS Spares item No Description of item Unit | Ratetin as), 27001 _[SF-6 Gas Cylinder with filing arrangement Each 29590 27002 [25KV CB Bushing Each 31527 27003 _[interruptor Bushing Each 11298 27004 [Earth fault Relay Each 7208 27005 [Buchholz Relay Each 16140 27006 |Relay Testing Kit Set 146334 27007 [HRC fuse 2A, 4A, 10A, 15A, 32 Amp Set 1076 27008 | Transformer Of titre 28 27009 [Capacitor unit of capacitor bank Set 350265 27000 Page 1 of 2 013 $800 /February.2015, Ferree EEEEEEEEEEEEEEEEEEEE EE Bill of Quantiti SCHEDULE -28000 ‘Tools & Plants (OHE & PSI) tem No Description unit_[ Rate(in Rs.) 28001 __[Tivor 2577 ST Nos. 6572 28002 |Trfor 51737 Nos O16 28003 _[Pullit 37. ‘Nos 2285 28004 [Put it a4 T Nos. 3670 ‘28005 |Numinium Light weight metal conduit Plationn ladder | Nos lrotley 9453 28006 |Rail jumpers with clarips at both ends Nos 7023 28007 [Earthing discharge rod complete Nos 7228 28008 [Aluminium Straight adder extensive (11M) Nos 4693 Portable Electric Dril 21mm, single phase, 230V (for | Nos 28009. [Ariling) Rati Wott, Hitachi, Black & Decker makes only 9453 28010 [Fist 31d box led wih medicines 6s per standard Nos Ti 28011 Stretcher Nos Te Fire bucket (70 Lire) capaciy with one stand and cover | Nos 20012 _ |for set of 46 buckets at each switching staion/TSS 134 20018 _ |Ponabie tre extinguisher dy chem Powder (OU) | Nos 3882 28014 [Portable fre extinghuisher foam type (cap SLi) Nos 4226 28015 |D' Shackles set of on each (1 34", 616" 17) Nos 112 28016 _[Setof Stee! sing wits Eye each end of 2M & 3. Nos 1390 26017 [Micro meier Wilutoyo makel as required by Railway | Nos 750% 28018 [Bench Vice 6 Nos. THz 28019 [Canvass Tarpauin 12 mx tom Nos. 2224 TING AND MEASURING EQUIPMENTS "26020 |Insulation Megger 260V Nes 355 28021 [Binoculars Nos 356 Vernier Calipers Mitutoyo makel es required Nos 2e0z2 [xem ia feruirad by aa 28023 __ [Walkie Tale Sets (2W output) Nos S561 28024 [Digital Multimeter ‘Nos. 4448 28025 [Magic Pole ladder Nos: e672 (28026 [Drop out fuse puilrod Nos a2 ‘20027 | "72" Square dive socket set containing 19 sockats wih | Nos 6 atachments +112 26028 [Transformer of Aciay testing KE Nos S561 28028 [Motor operated insulation tester 5 Kv Nos. 2671 '26030__ [Pocket size cip on Tong tester Nos 1658 26031 [AC. Voltmeter 0- 750. ‘Nos 880 28032 [A.C Volimeter 0 - 500 V Nos 665. 26033 [Digital time interval meter 15 - 7000 seconds. Nos i112 "28034 insulation tester 25 KV Nos. 2780. 28035 [Earth tester Nos 4448 28036 Insulation Megger 500 V Nos 7228 26037 [Transformer OW BDV tesiing Rit Nos_| 14456 [28038 |125 Litre cap oi fitrtion plant Nos} 111207 28039 [Auto transformer 2 A capacity Nos 1668 Load cell tester suitabie for 40 AH and 200 AH battery | Nos 28040 ana Page tof? 020 28000 $800 /February.2015 28047 [emergency Telephone Nos 5005 [Spanner set doubie ended, 24 size 12 pieces set (6mm| — Set 28042 {to 42mm) Gedore or Tapraia make with ISI Mark 8347 "28043 |©OGeX or Similar 82 pieces sockel Set box epanners) | Set i: 26044 [Primary current injection testing kit (O- 3000 amps) | Each | 7e9736 28045 [Digill Insulation testing meter (5 KV Megae? Each_|__280875 —] 28046 [Digital earth resistance meter Each | 58123 ‘28047 [Thermal Imaging camera wih software Each | 7076933 28048 [Tan delta field test set Each | __786547 Supply, installation, testing & commissioning of GPS | Each based OHE monitoring & current collection system as 28049 per ROSO spec No. TVSPC/OHE/OLIVER/0060(01/08) or latest saat Page 2012 021 NOTE: The above lists provisional and may be updated as per zonal raiway of specific sectional requirement within about the same overal cost. eer 28000 $800 /February,2015 Bill of Quantities ‘Schedule-28000 SCADA Rate (In Rs) fem | sor item Description Unit - ‘Supply | Erection Preparation and supply of Design & 29001 |scana1 | Drawing for SCADA at RCC.TSS,SP.&SSP.| Jo | oo | 726096 29002 |scana2 | SUPPYVOISCADAequiaments & Sofware | 5. Ta719093| 9 for Rec. 29003 [SCADA-3(a)_|Supply of RTUs for FPITSS Each | 347973 | 0 29004 |SCADA-3(6)_|Supply of RTU for SP. Each | 223178 | 0 29005 |SCADA-3(¢)_|Supaly of RTUs for SSP. Each | 223778 | 0 vta)_|SUPAIY of Maintenance FreeiLow 29008 |SCADA-a)_vaimtanance pe Loed Ace hor. set | 192502] 0 29007 |SCADA-4(b)_|SuPply of UPS. : Set_| 198711 29008 [SCADA'S [Supply offumnture Set_| 1e6292 |Supply of Data logging Printer for Remote 2e009 fscapas —_|PuPal of Data Nos. | sio49 | 0 Erection, testing & commissioning charges 29010 JSCADA-7(a) [for items SCADA-2 to SCADA-6. Job o 436502 Integration of new SCADA system to 2a0rt |ScaDA-rt) |exeang eyetem at RCO. Job | 0 | 220828 Erection, integration, testing & 29012 |scapa-s(a) [commissioning for existing and new soo | 0 | 176661 lequipments for TSS. Erection, miegration, testing & 29013 |SCADA-8(b) commissioning for existing and new Job | 0 | e087 lequioments for SSP. Erection, integration, testing & 29014 |ScADA-8(c) [commissioning for existing and new so | 0 | ta7218 lequipments for SP Si E aC IS (AS 22016 [scan [Supp eT Essment and Componens eal gaia ae r cr 22016 |scanaio |S¥PPW Of Spl. & P (As perlistC) set | 453310 | 0 23000 Page Loft 022. $800 /February 2015, Bill of Quantities ‘Schedule 30000 ‘Common Schedule of OH SS ttem No ‘SOR iem Description Unit Rate(in Rs) ‘Supply Erection, 30001 cs [Supply and erection of 25 KV.1600 Amp] jvacuum tnterruptor Each 241008 2755 30002 cs2 [Supply and erection of 25 KV Potential [Trasformer Type-l or Type-lt Each 49iit 518 30003 cs3 [Supply and erection of 42 KV Lightning Arrestor] lwith surge monitor, counter and cable Each 47710 363, ‘30004 cs [Supply and installation of cables for SWS/TSS Mtr 137 1 30005 css [Supply, erection, oll fileration, testing 6] |commissioning of 25KV/240V 10 KVA Auxilary| |(LT) Supply Transformers. oil ype with DO tus [switch, anti cmbing device, pedestal insulators |copper jumper and earth electrode ete, [(@) With Porcelain insulators 1050mm CO Set 63719 [() With Composite Insulators 1050mm CD Set 62562 cs [Providing and laying of Concrete For Foundation lend Plinth In Other Than Hard and Rocky soil cum 3102 1004 30007 cs7 [Providing and laying of Concrete For Foundation land Plinth inal types of sols and soft rock. cum 3205 1493 30008 css Providing and laying of Reinforced Concrete for Pier/ColoumnPile, Cable Trench and Trench] ICover cum cso [Supply and erection of all types of galvanised Stee! Structures, Small Pars Steel etc 66552 2108 30010 cs-10 [Supply_end_ erection of Feng Panals, lUprights, Gate and Ant-Climbing device 1958 30011 cs-11 [Supply and erection of Aluminium Jumper with Fasiners Each 1540 163 30012 cs-12 [Supply and erection of Copper” Stipe Tar lequioment earthing Mtr 929 30013 8-13 [Supply and erection of Aluminium Gus Bar 36merx28ram Mtr 229 30014 cs14 [Supply and spreading of gravel ballast in the| [swich yard (TSS/SPISSP) ‘cum 30015 cs15 Dismanting of Redundant foundations wan] lcompressor powered machines/manually with contractors own men and material including consumables like Diese! Oil ete Nos. 1875 20016 cs16 INonthiy charges for one crane operator for fal time operation for one crane inchiding Monthly Jcharges for one Watch&Ward for one crane, Per.Month 18848 30017 cs17 [Supply and Erection of ant theft transformer 240| jwolv2.2 KV 5 KVA, with DO Fuse switch] Jexcavation of cable trench, laying of cables, Jearthing, jumpering, OG set ncluding dismanting lof above equipments each location 49677 34545 Page of 023 $800 /February,2015 ‘GENERAL SERVICES ELECTRICAL WORKS: ‘SCHEDULE -33000 Bill No.33 :GENERAL SERVICES ELECTRICAL WORKS ‘This schedule shall be read in conjunction with its Explanatory Notes and Technical Specifications for| detailed description for various items included therein. tem No. Description of ttems Unit Rate (in RS) ‘Supply | Erection SECTION - A= ELECTRIFICATION OF STAFF QUARTERS 33001 Electrification of statf quarter complete with point wirings, circuit wirings, [sub main wirings etc. with Fire Retardant (FR) PVC insulated, multstranded, Jcopper conductor, single core ceble on surface /in recessed PVC conduits, tong with provision of luminaries with lamps, call bell, ceiling & exhaust fans, distribution boards, loose wire box, geyser, energy meters in M.S. box including earthing with G.1. pipe electrode etc. as per Scale of fitings.and cable sizes, nos. of points permissible in each circuit and sub mainis etc-for leach type of quarter as indicated in Explanatory Notes, 7 Type -T quarter Each 23379 [Type =i quarter Each 24591 i) [Type - I quarter Each 30867 iv) [Type -IV quarter Each 57106 v) [Type -V quarter Each 78371 ¥) [Extra for stair case light point controlled with two nos, two way switches Each 502 ELECTRIFI ICATION OF GATE MAN LODGES AT LEVEL CROSSINGS 33002 [Electrification of gate man lodge complete with point wirings, circuit wirings jetc. with Fire Retardant (FR), PVC insulated, multistranded, copper Jconductor, single core cable on surface/in recessed PVC conduits including provision of luminaries with lamps, ceiling fan, distribution board, earthing |with G.lpipe electrode etc. as per Scale of fitings, Cable sizes, no. of lpoints permissible in each circuit and sub mains as indicated in Explanatory INotes. Each 0 | 14546 ELECTRIFI ICATION OF SERVICE BUILDINGS & PASSENGER SHELTER AND SHEI 33003 (i) Wiring for lighticeiting fanvexhaust tanvcall beltight plug/group etc. points linluding cicuit wiring, sub-main wiring with Fire Retardant (FR), PVC insulated, muitisranded, copper conductor, single core cable on surface/in ltecessed PVC conduits, distribution boards, sub distribution boards, earthing letc as required. Wiring shall be done as per sizes of cables, n0. of points [permissible in each circuit and sub main as. indicated in Explanatory Notes. Point 0 908 33003. (i) Iwiring for power plug point inctuding circuit wiring, sub main wiring, with Fire Retardant (FR) PVC insulated, mutistranded, copper conductor, single core |cable on surfacefin recessed PVC conduits, distribution boards, sub |distrbution boards, earthing with G.1 pipe electrode etc as required. |Wicing shall be done as per sizes of cabtes, no. of points permissible in each lcircuit and sub main as indicated in Explanatory Notes. Paint 0 1666 33003 (i) lExtra for provision of industrial type iron clad plug socket with 32A DP MCB lin M.S.B0x_ Point ° 485 Page 1 of 11 024. General Electrical Works $800 /February,2015 ‘item No. |Description of items Unit Rate (in Rs.) ‘Supply | Erection 33004 DELETED |SECTION -B :PROVISION OF LUMINARIES, FANS, WATER COOLERS ETC. 'Supply, installation, testing and commissioning of prewired 1x2Bwatt, 7-5, ‘33005 «) |e%e"9¥ efficient, surface type luminary with epoxy powder coated CRCA sheet stee! housing with feflector cover, complete with electronic ballast, T- [5 tube etc. & earthing etc. as required. No. i214 | 191 | Supply, installation, testing and commissioning of prewired 2x28watt, T-5, 33008 (ip [e°e*aY effcient, surface type tuminary with epoxy powder coated CRA sheet steel housing with reflector cover, complete with electronic ballast, T- 5 tube ete. & earthing etc. as required. 1657 | 414 |Supply, installation, testing and commissioning of prewired 2x28watt, T-5, lenergy efficient streetlight luminary , complete with T-5 tubes, electronic. batast etc.on bracket pipe of erected pole or on wall bracket of GI class "B* 33006 () [pipe & connections from junction box/overhead linelight point etc. to luminary with 1.5 sq.mm FRLS PVC insulated multistranded copper |conductor single core/three cable as instructed & earthing etc as required No. 2456 | 386 ‘Supply, installation, testing and commissioning of prewired 1x28watt, T-5, lenergy efficient street light luminary , complete with T-5 tubes, electronic ballast etc.on bracket pipe of erected pole or on wall bracket of Gt class “8” ‘33006 (i) |pipe & connections from junction box/overhead linellight point etc. to luminary with 1.5 sq.mm FRLS PVC insulated multistranded copper |conductor single core/three cable as instructed & earthing ete as required, No. 1703 | 426 |Supply, instattation, testing and commissioning of prewired 2x14 watt, T-5, leneray efficient street light ‘uminary complete with T-5 tubes, electronic ballast etc.on bracket pipe of erected pole or on wall bracket of Gl class "B* 33006 (ii) |pipe & connections from junction box/overhead linellight point etc. to luminary with 1.5 sq.mm FRLS PVC insulated multistranded copper |conductor single coreithree cable as instructed & earthing etc as required, 3132 | 783 [Supply installation, testing and commissioning of prewired 4x14 watt, T-5, lenergy effcient street light luminary , complete with T-5 tubes, electronic ballast etc on bracket pipe of erected pole or on wall bracket of GI class "B 33006 (v) [pipe & connections from junction box/overhead linefight point ete, to luminary with 1.5 sq.mm FRLS PVC insulated muttistranded copper |conductor single core/three cable as instructed & earthing etc as required. No. seto | 1452 |Supply, installation, testing and commissioning of prewired 4x24 watt, T-5, lenergy efficient street light luminary complete with T-5 tubes, electronic ballast etc on bracket pipe of erected pole or on wall bracket of GI class "B" 33006 (v) |pipe & connections from junction boxioverhead linelight point etc, to luminary with 4.5 sq.mm FRLS PVC insulated muttistranded copper conductor single core cable & earthing ete as required. 6207 | 1852 Page 2 of 11 025 General Electrical Works $800 /Febrvary,2015 Rate (in Rs) ‘Supply | Erection Supply, instalation, testing and commissioning of metal halide streetlight luminary complete with MH/HPSV lamp, on bracket pipe of erected pole or ga007 fonwall bracket of class"8°G.l.pipe_ & connections from junction Dox/overhead line! light point et. to luminary with 1.6 sq.mm FRLS PVC insulated mutistranded copper conductor, single corelthree cable as instructed & earthing etc as required © _[tx70wat. No. [ 4453 [699 (__ [tx 160 Watt No | 5196 | 815 [Supply instatiation, testing and commissioning of 230V A.C. ceiling fan with 33008 |d2uble ball bearing and suitable capacitor complete with wiing_with }.Ssqmm FR, PVC insulated, copper conductor, singlelthree core cable las instructed, etc. as required )__[1200 mm (without Regutator) No[ 1255 [196 ii) [1400 mm (without Regulator) No] 1363_[ 214 [Supply and fixing of stepped type, electronic fan regulator, 300 watts, on 33009 the existing phenolic laminated sheet cover plate/modular plate of switch No. | 256 87 box, including connections, testing & commissioning as required. |Supplying, installation, testing and commissioning of 11-23 watts, 250 volts, 33010 |2 pin, compact fluorescent lamp (CFL) complete with electronic ballastetc. | No. | 134 a as required. |Supplyng, erection, testing and commissioning of exhaust fan sultable fo 1, lphase, 220 volts, AC supply system complete with capacitor, louver e011 {Shutters grouting bots with nuts, making opening/modtication inthe wallto suit the size ofthe fan, making good the damages, connections with 1.5sq.mm, FR, PVC insulated, multistranded copper conductor, single core |Ithree cable as instructed, earthing etc, as required. (@__[AC exhaust fan 300 mm 800 1pm winiwthout fouver shutters No_| 2024 [317 [Supply, installation, testing and commissioning of seif contained drinking |water cooler 150 liters capacity complete with all connected standard fitings, 33012 accessories etc. and SKVA , wall mounted, |.C. controlled electronic auto-. | Each | 51938 | 8157 voltage corrector with time delay relay, connection to earthing system etc as| required. SECTION G: LT.SWITGH BOARDS AND FEEDER PILLAR [Supply, installation, testing & commissioning of cubical type, wall 33013 |rmounted, dust & vermin proof, LT switch board of different capacities, LT Switch Board 125 Amp comprising ofthe items indicated as under: i) Incoming CCB 125A, 4 pole, 35KA, fixed type (ios=100%Icu) - 1 No Oulgoing MCCB 63A, 250A, fixed type (les=100%eu) ~ 4 Nos fe |i) Quigong MCB 408, pole, 1KA. « 4 Nos nos. | ssees | ar7s liv) Outgoing MCB 32A, double pole, 10KA - 6 Nos \) Sleeved poxy coated copper bus-bar 250 A in bus bar chamber lv) CT's, Indication tights Page 3 of 11 General Electrical Works 026 Ele '$800,/February,2015 Item No. Description of items Unit Rate (in Rs.) ‘Supply | Erection © LT Switch Board 63 Amp comprising items indicated as under: Kd Incoming MCCB 63A, 4 pole, 35kA, fixed type (Ics=100%lcu) - 1 No |i) Outgoing MCCB 40A, 4 pole, 25KA, fixed type (Ies=100%lcu) ~ 3 Nos ii) Outgoing MCB double pole, 6-32A, 10kKA - 20 Nos iv) Sleeved/Epoxy coated copper bus-bar 200A in bus bar chamber |v) Indication Lights 50022 | 7999 33014 DELETED 33015 |Supply, installation, testing & commissioning of weather proof, L.T. feeder pillar of different capacities 0 LT Feeder Pillar 63 Amp comprising of the items indicated as under: () incoming MCCB 63A, 4 pole, 35KA, fixed type (Ios=100%Icu) - 1 No (i) Outgoing MCCB 40A, 4 pole, 25kA, fixed type (Ics=100%lcu) - 4 Nos (ii) Outgoing MCB double pole, 40, 10 KA. - 4 Nos (v) Sleeved/Epoxy coated copper bus-bar 200A in bus bar chamber (v) Indication lights No. 8776s | 9072 “ LT Feeder Pillar 125 Amp comprising of the items indicated as under; (i) Incoming MCCB 125A, 4 pole, 35kA (Ics=100%lcu) - 1 No i) Outgoing MCCB 63A, 4 pole, 25KA (les=100%Icu) - 4 Nos i) Outgoing MCB 40A, 4 pole, 10KA - 4 Nos liv) Outgoing MCB 324, OP, 10KA - 6 Nos (v (v) Modular igtal time switch and 3 phase contactor 63 A ~2 set (v) SieevediEpoxy coated copper bus-bar 250 in bus bar chamiver (iy indication ights No. 68042 | 10828 i) LT Feeder Pillar 250 Amp comprising of the items indicated as under: i) Incoming MCCB 250 A FP 36KA(I¢s=100%Icu) Fixed Type - 1 No i) Outgoing MCCB 125 A FP 35KA(les=100%lcu) Fixed Type - 2 Nos ii) Outgoing MCCB 63 Amps FP 25KA (les=100%Icu) Fixed Type - 4 Nos iv) Outgoing MCB 40 Amps FP 10 KA - 4 Nos lv) Outgoing MCE 32 Amps DP 10 KA - 6 Nos (vi) Modular cigital Time switch and 3 phase contractor 63A -- 2 set (vi) Steeved ! Epoxy coated Copper bus-bar 400 A in Bus Bar chamber (vl) Indication lights No, togss2 | 16788 33016 DELETED Page 4 of 11 027 General Electrical Works ‘$800 /February,2015 Item No. |Description of Items Rate (a RS.) ‘Supply [Erection [SECTION D: EXTERNAL ELECTRIFICATION WORKS 7 [Supply and erection of different length , swaged type steel tubular pole , complete with the following: 2) Double door, weather proof M.S. junction box (degree of protection not less than IP&4) complete with MCB 6 amps, copper bus bar for looping 4- core, 3 nos, LT cables and clamping with pole, as required. 33017 Jo) Casting of foundation with concrete of M10 grade and providing muffing jup to 300 mm above ground level.as required Ic) Erection of Gl pipe class '8' ISI marked up to junction box for passing cable, (Payment of G.. pipe shall be made against the relevant BOG item). [7 Meter tong pote with canopy ype single pipe bracket (forone luminary) | No. | 9677 | 1363 ’) [7 Meter long pote with canopy type double pipe bracket (fortwo luminaries) | No. | 8955 | 1407 ii) |9 Meter ong pote with canopy type single pipe bracket No. | 13025 | 2047 33018 [DELETED Supply and erection of GI pipe - class’ BIS! marked with accessories, 33019 including bends etc. for support of cable with erected poleirecessing in lwalloor/passing earth strip OR passing cable as required: 132 mm dia Meter 173, 28 i) [40 mm dia Weter | 206 | 32 )__[50 mm dia Meter | 267] 42 wy) [65 mm-cia eter | 337] 54 y) [80mm dia ‘Weter_| 448_[ 70 vi) [100mm dia Meter_|631_| 99 viy [150mm dia Meter [1027 [162 Supply, erection, testing & commissioning of control and distribution panel ssgozo [fo colour ight signaling supp in 25kV AC traction system as per RDSO |technical specifications No. TWSPC/PSI/CLS/0023 including latest lamenament [For 10kVA AT No. 47669 7487. [For 25kVA AT No 401421 | 15929 ELECTRIFICATION OF FOOT OVER BRIDGE Electrification of foot over bridge complete with 3.5 meter long, 50 mm cia, IG. pipe pole with GI pipe bracket, luminary with lamp, M.S. junction box, 33021 connection from junction box to luminary with 1.5 sq.mm, Flame Retardant | No | 0 | 6451 (FR), PVC insulated, copper conductor cable and connection to earthing system. ele. and as per scale of tings indicated in Explanatory Notes. Page Sof 11 028 General Electrical Works $800 /February,2015 Rate (in RS) ‘Supply [Erection Item No. |Description of Items Unit SECTION-E: POWER SUPPLY DISTRIBUTION ARRANGEMENT (Supply, installation, testing and commissioning of 11kV/415 Vol, DelialStar 33022 [SoMected, copper wound, power distribution transformer (outdoor type) |conforming to 'S:2026 (Latest Version }, complete with all accessories as required. @__ [100 kVA, No._| 172543 | 31565 i) [250 kVA No._| 279389 | 51112 (i) [500 kVA, No._| 359714 | 65806 (iv) _ [Esta for providing fencing 7enclesure for above Wem as indicated in 7 i Fy [Explanatory Notes. (W) Extra for construction of foundation for transformer installation as required | Cum | 3339 | 44 [Suppiy, erection, testing and commissioning ofS pole, T7kV, 400amps, gang} loperated switch complete with drop out fuses etc. as required, NOH eveete eee [Supply, installation, testing and commissioning of 11KV, 360 MVA, 630A 33024 |draw out type manually operated, 3 pane! HT VCB board complete with | set | 1143754) 209240 ICTs, PTs etc as required [Supply, installation , testing & commissioning of, 47 panel LT switch lboard comprising of following: i) Incoming ACB 800A, 4 pole, SOKA (manual draw out type) with CTR [400/54 -2 Nos i) ACB bus coupler 800A. 4 pole, SOKA (fixed type) - 1 No i) On load change over switch 400A, 4 pole, ullisation cat AC 23 - 1 No liv) Out going switch fuse unitfuse switch unit cat AC23 (TPN) with HRC 33025 fuses (250 Amp) - 4 Nos No. | 765235 | 75673 |v) Out going switch fuse unitfuse switch unit cat AC 23 (TPN) with HRC ltuses 125 Amp - 4 Nos. |v) Out going switch fuse unitfuse switch unit cat AC 23 (TPN) with HRC. ltuses 63 Amp - § Nos, vi) Sleeved/epoxy coated copper bus-bar - 800A for phases and 400A for neutral 33023 [Supply, erection, testing & commissioning of 20 panel LT switch lboard comprising of the followin \). Incoming ACB 800A. 4 pole, SOKA (manual draw out type) with CTR {B00/5A - 2 Nos i). ACB bus coupler 1600A, 4 pole, SOKA (fixed type) - 1 No i). On load change over switch 800A, 4 pole, cat AC 23. - 1 No. iv). Out going switch fuse unitfuse switch unt cat AC 23 (TPN) with HRC fuses 400 Amp) - 3 Nos $3026 lv), Out going switch fuse unitfuse switch unit cat AC 23 (TPN) with HRo | No. 1180859] 116773 ruses 250 Amp) - 4 Nos vi) Out going switch fuse unitfuse switch unit cat AC 23 (TPN) with HRC ltuses 125 Amp - 4 Nos. vi) Out going switch fuse unitfuse switch unit cat AC 23 (TPN) with HRC ltuses 63 Amp - 5 Nos. leevedlepoxy coated copper bus-bar - 160A for phases and 800A for neutral 33027_ [DELETED 33028 [DELETED Page 6 of 11 General Electrical Works 029 $800 /February,2015 Item No. Description of items Unit Rate (in Rs) Supply | Erection 33029 Supply, erection/fxing of Fire extinguishing equipments (ISI) Marked Rubber mat (ISI marked) ,G fre buckets filed with clean dry sandheld on free standing steel stand, First Aid Box with medicines (IS! marked) and associated materials,shock treatment chart on aluminum frame,Schematic oiagram of HTILT installation & transformer data on white hylem sheet with aluminium frame & fixing / providing in the sub stationarea as per details in lexplanatory notes. 44a9 | 7138 33030 |Supply, installation, testing and commissioning of OG set with acoustic Jenciosure, complete with AMF panel and all other accessories and [construction of plinth etc, oO 62.5 kVA DG set with 160 amp, 4-pole, MCCB SOKA (Ies=100%tcu), 250 |amps copper bus-bars, 4 pole contactors 250amp. Set 863493 | 85389 i) 60 KVA DG set with 250 amp, 4-pole MCCB 50 KA(Ics=100%lcu), 400, lamps copper bus-bars, 4 pole contactors 400amps Set 1967729] 135252 i) 1250 kVA DG set with 400 amp, 4-pole MCCB SOKA (I |copper bus-bars, 4 pole contactors 600amps. }0%Icu), 600 amp Set 1961462] 193966 33031 |Supply, erection, testing & commissioning of 125 KVAR Automatic Power |Factor Controller panel (capacitor bank) complete and connection with the main panel as per site requirement. No. 363114 | 35907 SECTION - EARTHING ARRANGEMENT 33032 Earthing with 3 meter long, 60 mm dia, Gi. pipe class earth electrode, l2dsing of charcoal or coke and sail, providing masonry enclosure and cover plate wth iting arrangement etc. including connections with 4mm G.L wire from earth electrode to switch board/electrical equipment as required. Job 1907 ] 300 33033, Earthing with 600mmx600mmx6mm thick G... earth plate, adding of |charcoal or coke and salt, providing masonry enclosure and cover plate with iting arrangement, watering pipe etc, as required aie | 332 33034 [Earthing with 600mmx600mmx3mm thick copper earth plate, adding of [charcoal or coke and salt , providing masonry enclosure and cover plate with lifting arrangement, watering pipe etc. as required. 372 | 587 EARTH CONNECTIONS: 33035(), {Supply and laying 25 mm x 6 mm G. |. strip at not less than 0.50 meter lbelow ground or in recess as required, Meter 43 8 330364) |Supply and toying 40 mm x 6 mm G.I. strip at not less than 0,60 meter below ground or in recess as required. Meter 70 " 33035(i) [Suppiying and fixing 40 mm x 5 mm copper strip on surface or in recess or lin 50 mm dia G.I. pipe as required, Meter 555 87 Page 7of 11 030 ‘General Electrical Works I! S800 /February,2015 iran not lndscaenceari Rate (in Rs) | tem No, [Description af tems Unit Sopply [Erection SECTION-G: CABLING ‘Supply, laying . 1.1 KV grade LT XLPE insulated armoured, aluminum 33036 [e2nductor cable , making good the damages, end terminations with aluminium crimping sockets/tugs, provision of cable route markers, testing fand commissioning etc, as required as per Technical specifications: | 2 Core 16 Sqmm Meter | 185_| 42 i) [2 core 25sq.mm ‘meter | 213 | 50 ii) [2 Core 70 Sq.mm Meter | 364] 58 i] 2.Core 185 Sqmm Meter_|~752_| 74 v) | 4 Core 16 Sq.mm Meter[ 238 | 53 vi) [36 Core 35 Sqmm ‘Meter |~337_| 54 vi)_[3.5 Core 70Sq.mm_ Meter_| 537 | 85 vii) [3.5 Core 120Sq.mm Meter |~ 648) 64 ix) [3.5 Core 1858q.mm. ‘Meter | s4e7_| 116 x) [3.5 Core 300Sq.mm Meter | 1923_| 90 x) [single core 400 sq.mm- a Meter | 618_| 98 xi|_ [Extra for provision of cable route marker No. | 226 [11 [SECTION -1: ELECTRIFICATION BY HIGH MASTS |Supply, erection, testing & commissioning of hot dipped galvanised , high Imast system complete with all accessories, foundation, carriage 33037 [2"Tengement suitable for 9 luminaries symmetrically arranged & control gear Jooxes and lighting finial etc, twin dome aviation abstruction lights, control Jpanel, multi core flexible copper conductor cable, connection to earthing system and fencing panel as per requirement. » ss Meter high mast system wth 6 nos, 400 watts MH luminaries and MH | 5 | 6s a4e 60664 » |e Meter high mast system with 9 nos, 2x400 watts MH luminaries ana MH | oo | aos 64685 [SECTION - Hi LAYING OF 17 KV/33 KV CABLES 33038 |SuPPly and laying of following sizes XLPE (E) insulated, armoured, Jaluminium conductor HT cable [11 ky, 3 core 70 sqmm Meter | 970_| 163 (il) 11 KV, 3 core 185 5q mmm ‘Meter | 1655_| 164 (i) [33 KV. 3.core 300 sq mm Meter [3679 | 173 (iv) [33 KV, 3 core 400 sq mm Meter | ~5189_| 173 33039_[DELETED a [Supply of outdoor type, heat shrinkable, end termination Kit, suitable Tor [following cable sizes XLPE(E) insulated, armoured aluminium conductor 33040 _|eable and making termination, connections with overhead conductor, testing |& commissioning ete. @) [Score 11 KV 70 to 165 eq mm No. | 7468_| 7173 (i) }3 core 33 KV 240 to 400 sq mm No._| 29425 | 2317 33047 [DELETED Page 8 of 1 031 General Electrical Works 5800 /February,2015 tom No. |Description of items Unit Rate (in Rs) ‘Supply [Erection 33042 |Supply and erection of pre-stressed, cement concrete (PSCC) double pole structure 8-11 meters long suitable for 330 KG working load with top section [200 mm X 105 mm and bottom section 410 mm X 140 mm complete with 4 Inos. channel cross arms & 2:nos. cross bracing angles, clamps, bolts, nuts |. galvanized stay set, anti climbing devices, Danger plates on the erected Ipole galvanised stay rod, casting of foundation for poles & stays etc. as required, No. 45127 | 4462 33043 |Supply and erection of 11 KV Porcelain Disc insulator complete with galvanised iron hardware etc. including terminating with 11KV / 33 KV Jovernead conductor and dismantelling, handing over works as required. No, 813 80 33044 (i) Supply and laying of 200 mm dia RCC hume pipe, IS! marked, NP-4 under the Railway track’road etc, digging of trench and back filling with lexcavated earth after laying of pipe and making good the damages as required. Meter 301 30 33044 (i) Supply and laying 200 mm dia RCC hume pipe, 1Simarked, NP-4 under tne Rallway track with trench loss method and making good the damages as required Meter 301 | 1210 |SECTION - J: PROVISION OF PUMPS 33045 [Supply, installation, testing & commissioning of submersible pump set suitable to operate on 3 phase, 415V, 60 Hz AC supply along with contro! panel etc complete for supplying water at suitable discharge and head as Jper site requirements, o 75 HP pump set Job 52052 | 6236 i) ‘SHP pump set Job 48492 | 4796 [SECTION - K: MISC. WORKS 33046 (Co-ordinationfiasoning and chasing with State Utiity Company for availing new electrical connection/augmentation of sanctioned load at stations, level crossings ete. inciuding applying for load, collection of estimates for loads, modification of power line crossings, arranging payment from RVNL, {depositing payment to State Utity Company, arranging release of load & lother related works. Payment to be made to SEB for new connection, load Jaugmentation, modification of power line crossings ete. shall be made by RVNL Each Location 0 5650 33047 Design and preparation of working & completion drawings of all HT/LT electrical installations of the project section where work is carried out such las platform lighting, internal electrification of staff quarters, level crossings, station building, offices, power line crossings, power supply distribution larrangements of stations /sub stations, electrification of sub-station buildings etc & approval from the competent author Job 0 | 116451 Page 9 of 11 032 General Electrical Works 5800 /February,2015 Item No. [Description of Items Unit Rate (in Rs.) Supply | Erection 33048 [Conducting check survey of the complete project section to compile details of all the existing LT, HT and EHT Power Line Electrical overhead ana lunderground poweritelegraphiciother lines running along or accross the track and recording measurements of horizontal distances of structures from the existing & proposed tracks, vertical clearances of conductors & quard bwire from ral level, angle of crossings wrt. track, height and type of towers/potes and preparation of lists as below: i) List of Overheac/Underground Crossings infinging and requiring modification. Proposes modification may also be indicated. i) List of Overnead/Underground Parallel Alignments infinging and requiting modification. Proposed modification may also be indicated ii) List of OvetheadiUnderground Crossings/Parallel Alignments in [conformity withthe rulesregulations and not requiring modification Job 0 | 91936 SECTION - L: GLOW SIGN BOARDS 33049 [Supply instalation, testing & commissioning of out door type, single side, Double side Glow sign boards/Pictorial signage boards with [suspension /side mounting/wall mounting type arrangements as required, |(Payment for Double sided glow sign board shall be made @ 150% of the rate of single sided glow sign boards) ‘Sq.Feet 236 36 [SECTION - M_BATTERY CHARGING & PRE - COOLING ARRANGEMENT 33050 [Supply installation, testing & commissioning of Silicon rectifier battery Jcharging set conforming to relevant IS (latest), suitable for operation on 3 Jphase 4 wire, 415 volts AC supply system, 125 Volts to 180 Volts DC output, 1200 Amps. capacity as per Tech. Specification including earthing, etc. as required, No. 79175 | 12435 33051 Fabrication, supply, installation, testing and commissioning of 110 volts [Battery charging point suitable for operation on 150 volts DC supply system including erection on MS channel, foundation ete complete. 2863 | 450 33052 |Fabrication, supply, instalation, testing and commissioning of , pre- cooling [point as per details given in explanatory notes. 7a7_| 1217 ISECTION - N: DISMANTLING WORKS. 33053 Dismantiing of wiring installations of buildings, sheds, quarters ete. complete lwith tuminaries, fans, cistribution boards, L.T. Panels and associated cables including accountal,stocking, transportation and handing over of released Imaterials to Electrical department as directed by the Engineer and making ltemporary arrangements if required, Each Stattory gate lodges 0 5358 33084() [Dismantling of eracted pole/overhead conductor, Gl wire, cross arm lbrackets, insulators, stay, luminary etc including accountal , stocking, handing over the released material to railway’s authorized official as instructed by the Engineer and making temporary arrangements if required No. 33054 (i) IDismanting of Sub-Station equipments such as transformers, DG Set, HT & ILT Panels, cables etc. at site including transporting, stocking and handing lover to Electrical department as instructed by the Engineer and making temporary arrangements if required. Job 0 | 10715 Page 10 of 11 033 General Electrical Works $800 /February,2015 Iter No. [Description of tems Unit Rate (in Ra) Supply Erection [SECTION -0 : (NAL Works) 33085 () Provision of temporary lighting arrangement with 1x40 watt F.L. tube light fitings/CFL fitings Mood lighthalogen fitings and pedestrai/celling fans, Idesert coolers in temporary tents, buildings, goomties, on tracks, in yard jarea including wiring, cabling, earthing etc.as directed by the Engineer and las per site requirement for pre/postiduring non - interlocking period, including providing stand by D.G set of suitable capacity and deployment of staff for operation of DG set as per site requirement. Note: Normal power supply may be used, up to sanctioned load, if [surplus available at site. Per day 16073 33055. (i) [Extra for operation and maintenance of temporary wiring installations, |replacement of consumables, supply of diese! oil, lub oll etc for operation of DG set ete. Per day 3189 33086 |Suppiy, installation, testing and commissioning of A.C.Unit, complete with JLCD display corctess remote suitable for 1-phase 230 # 10% voltage AC Jsupply including supply & instalation of 5 KVA, wall mounted, .C. controlled electronic auto voltage corrector (a) [2.0 Tonne window type AC (Not less than 3 star energy rating) 31108 2143 1} 11.5 Tonne split type AC_(5 star rating) ae 30562 243 33057 |Supply & erection of G.1 Octogonal pole including digging of pit, making foundation with cement, sand & concrete in ratio 1:2:6, muffin, [accomodating G.I. Pipe in foundation for cable loop-in-loop out of suitable size as required D IS meters long 6598 7693 [7 meters long 33] ‘9562 72347 ii) |Adgitional cost of single arm bracket suitable for street ight foaure 288 7 iv) [Additional cost of double arm brackel suitable for streetlight fixture wat 33058 |Supply instatation testing & commissioning of cubical type mast mouted, ldust & vermin proof, L.T control switch board conforming to 1S:8623, |(atest version), complete. ja) with TPN MCCB 2A, 35KA, fixed type (cs=100%lcu) - 1 No b) copper busbars 200A (for 5 KVA AT) No 8723 2144 fa) with TPN MCCB 63A, 35KA, fixed type (Ios=100%Icu) ~ 1 No b) copper busbars 200A(for 10 KVA AT) No 10217 2507 fa) with TPN MCCB 150A, 36KA, fixed type (Ios=100%cu) - 1 NO i) No 12138 2879 [b) copper busbars 300A (for 25 KVA AT) Page 11 of 11 034 General Electrical Works SBOQ_for Railway Electrification & General Electrical Works (Explanatory Notes)/February,2015 EXPLANATORY NOTES OVER HEAD EQUIPMEN’ SOR ITEM OHE-1 PREPARATION AND SUBMISSION OF DESIGNS AND DRAWINGS FOR OVERHEAD EQUIPMENT SWITCHING STATION, SECTIONING DIAGRAM, POWER SUPPLY DIAGRAM, SCHEMATIC DIAGRAM OF SWS, TRACTION WORKING RULE DIAGRAM AND TIONS etc REQUIRED FOR COMMISSIONING OF OHE ‘The price shall cover preparation and submission of overhead equipment plans indicating location of structures in stages, and preparation of aif drawings and designs relevant to the tendered works and required to be finalized by the Contractor. The price shall include the following: (i) Preparation and submission of pegging plans layout plans incorporating span, height, chainage, curves, gradients, type of masts/portals, foundations, ATD locations, stagger, location of cut-in-insulators, signal locations ete, making minor modifications with the approval of the Employer/Engincer to the layout of the structures and overhead equipment, if necessary. (i) Preparation and submission of cross section drawings and structure erection drawings for each structure location. (ii) Choice of type and size of foundations to suit soil and loading conditions (iv) Preparation and submission of long section drawings of overhead equipment where such drawings are required including detailed study of over line structures such as foot over bridges, road over bridges ete. for maintaining the specified height of contact wire and requisite clearances, (¥) Preparation and submission of other designs and drawings including drawings of small parts steel work (other than those for which RDSO standard drawings are available) and detailed designs for LT. Supply Transformer stations, design of OHE structures for bridges etc (vi) Supply of requisite number of copies of Bonding Plan drawings. (vii) Design, preparation and submission of switching station drawings including survey, investigation of soil bearing pressure from NABL accredited agency, preparation of cross section drawings, preparation of general arrangement drawings, detailed layout of equipment, bus-bar connections and insulators, layout of earthing system and earth connections, cable ran layout, detailed designs and drawings for steel ‘work and structural support, excluding the ones for which supply is made by the Employer/Engineer, suitable concrete plinths for equipment and drawings for equipments, components, fitting and materials. supplied by the Contractor. The price shalt include supply of requisite number of copies of all drawings, including completion drawi (viii) Preparation, supply and fixing of Sectioning / Schematic / TSWR diagram boards for stations / Cabins / SWS / RCC and 25 Kv AC Traction Station Working Rule instructions including supply & fixing of shock treatment chart ete. (ix) Supply of requisite no- of soft (in Auto Cad) and hard copies of all drawings, including ‘completion/approved/as erected drawings for OHE and Switching stations. 035 $80Q_for Railway Electrification & General Electrical Works (Explanatory Notes)/February,2015 NOTES FOR MEASUREMENTS: For the purpose of payment against this item, the length of track shall be measured as under := 1, General: By the difference in the chainages of the length wndler consideration, as incorporated in the layout plans. 2. Turnouts: The track taking off shall be deemed as starting from the SRJ of the Turnout 3. Cross-over’s: The length of track shall be taken as the: difference in the chainages of the toes of switches of the two turnouts constituting the crossover. 4. Diamond crossing with or without slips: The two tracks crossing each other shall be measured independently as per note ] above as though there were no crossing, No extra payment shail be provided for slip poinns. 5. Dead ends and tops of loops: The lengths for payment under this iteni shall be up to the chainage of anchor mast of the terminating OHE. 6. Feeders and return feeders from grid sub-station to feeding station: This item will also be applicable independently in case of feeders / return feeders / conductors from grid sub-station to overhead equipment feeding stations or in a case of feeders / conductors running on independent structures (not supporting OHE) along or across tracks. In such a case the length of line to be considered for purpose shall be measured by (a) ihe distance between the center of gantries of the grid sub-siation and feeding stations in case of feeder / return feeders / conductors line from grid sub-station, or (0) by the distance between the center line of the two structures to which the feeders / return feeders / conductors are anchored in case of feeders running along the track if such feeder / return feeders / conductors are rumring completely on independent structures or (c) by the distance between the center of the two structures supporting the OME on either side of the first and last independent structure or (d) in case of feeders / return feeders / conchictors running along the track supporting OHE. 7. No extra payment shall be made for any revision/changes/Modification in OHE/PS! drawings on account of changes in ESP/SIP/L-section etc. SOR ITEM OHE-2 SUPPLY AND ERECTION OF A LARGE SPAN WIRE (130 Sq.mm) INCLUDING ITS FITTINGS WITH INSULATORS: ‘The price shall cover supply of all components including large span wire, . adjusters, terminal fittings and mast attachments required to attach a large span wire or a Head span wire or Cross span wire or Steady span wire or a Support span wire for supporting contact wire only, at both ends, to traction masts/structures or special brackets, solid core insulators The price shall cover erection of all components including mounting arrangements, span wire, 9 Ton solid core insulators and ail small part steel work if any. 036 $B0Q_for Railway Electrification & General Electrical Works (Explanatory Notes}/February,2015 SOR ITEM OHE-3 SUPPLY AND ERECTION OF MATERIALS FOR TERMINATION OF SINGLE CONDUCTOR OF OVERHEAD EQUIPMENT OR A TERMINATING WIRE WITH INSULATORS: The price shall cover supply of all material necessary for the termination of single conductor of overhead equipment or terminating wire on a traction mast or structure, all SPS work as required including appropriate mast anchor fittings, clevis assembly, adjuster, anchor double straps, ending clamp for the catenary or contact wite or terminating wire and fittings including 9-lonne insulators. The price shall cover erection of all materials including 9-tonne insulator assembly and terminating wire, if any. Note: In case of “V" type anchorage is adopted for terminating a single conductor such an arrangement would be counted as two off under this item for the purpose of Payment, SOR Item QHE-4 SUPPLY AND ERECTION OF MATERIALS FOR TERMINATION OF ALL ALUMINUM 25 KV FEEDER (SPIDER) INCLUDING FEEDER WIRE WITH 9- TONNE INSULATORS: The price shall cover supply of all materials required for the termination of an all- aluminum 25 KV feeder (SPIDER), all SPS work as required including appropriate mast anchor fittings, adjuster, strain clamp and fittings including feeder wire and-9- tonne insulators. The price shail cover erection of all materials including 9-tonne insulators assembly, SOR Item OHE-5 SUPPLY AND ERECTION OF MATERIAL FOR TERMINATION OF COPPER CROSS FEEDER WITH GANTRIES INCLUDING CROSS FEEDER WIRE, WITH 9-TONNE INSULATORS: ‘The price shall cover the supply of all materials required for termination of copper cross feeder wire (37/2.25mm HDBC) all SPS work as required including appropriate mast anchor Gitting (3231), 18mm single clevis (5040), 9-tonne adjuster (5020-2), feeder ending clamp (1130), double clevis (3010) and other components as necessary including feeder wire (37/2.25 mm HDBC) and 9- tonne insulator assembly. The price shall also cover the ercetion of all these materials/components. including 9 ton insulator and termination of cross feeder at either ends. Fittings/Components required for termination of one cross feeder at both ends constitute one set, SOR Item OHE-6 SUPPLY AND ERECTION OF TERMINAL BOARDS IN CONTROL CUBICLES: The price shall cover supply and erection of a wall mounted terminal boards with six numbers of two way terminal blocks for connecting the cables from the outdoor equipment of a switching station as per RDSO Drawing. 037 $80Q_for itway Electrification & General Electrical Works (Explanatory Notes)/February,2015 SOR Hem OHE-7 SUPPLY AND ERECTION OF AN IRON CLAD 240V AC AND IOV D.C. BOARD WITH FUSE BOX IN CONTROL CUBICLES: ‘The price shall cover supply and erection of a 15, 240V, A.C. iron clad 4 way fuse box and a 15A, 110V DC iron clad two way fuse box on the walbinside the remote control cubicles. The fuse boxes shall be complete with four fuses and two fuse carriers’ and bases respectively. SOR Hem QHE-8 SUPPLY AND ERECTION OF LEAD ACID BA’ BATTERY CHARGERS: The price shall cover supply and erection of 110V, 40AH, lead acid batteries with two no. of suitable batlery chargers for 110V 40 AH lead acid battery complete with stand of approved design, accessories, .tool board. with hydrometer, thermometer, connecting lead and plug for connection to. 230V AC supply to the battery charger. The price for erection shall include installation and-connecting up of the battery, filling up of electrolyte, initial/final charging, mounting of the charger in position and connecting it up t 230V AC distribution board including the cost of connecting cables. \OR item OHE-9(a) & (b) SUPPLY, ERECTION, OIL FILTRATION, TESTING AND COMMISSIONING OF 25 KV/240 VOLT, 5/25 KVA, LT SUPPLY TRANSFORMER WITH 25 KV D.O. FUSE SWITCH ASSEMBLY, ANTICLIMBING DEVICE, INSULATOR, COPPER JUMPER AND EARTH ELECTRODES ete The price shall cover Supply of 25KV/240V, 5/25 KVA LT supply transformer with suitably filled transformer oil, DO fuse assembly (including fuse carrier) and all other mounting accessories, SPS as required at site, as per the RDSO’s latest specification and erection of the same complete with terminal connectors on a mast or gantry. The price shall also be applicable for transformers mounted on steel pedestals at switching stations also. The price shall cover supply and erection of an enameled mumber plate of approved design. The price shall also cover oit filtration and pre- commissioning tests as approved by the Employers or Engineer. The contractor shall make his own arrangement for oil filtration equipments, as well as power supply required for the same. All necessary tools, equipments, instruments required for carrying out oil filtration/checks/tests/commissioning shall be arranged by the contractor. The price shall also cover supply & erection of a DO fuse switch assembly complete with all mounting accessories, post/pedestal insulator for DO fase switch assembly. The price shall also cover on a lump sum basis the supply and erection of anti- climbing device consisting of galvanized stee! fixtures mounted on the masts below the transformer. The price shall also cover supply and erection of conductor! jumper wires and the supply of all components including parallel clamps, bi-metallic and Aluminium- copper Al-Cu strips wherever required. The price shall also. cover the erection of complete jumper assembly including conductor/jumper wire to- be provided between the Over Head Equipment and L.T. Transformers, drop out switch ‘ assembly. CRIES 40 AH WITH 038 $B0Q_for lway Electrification & Gener The price shall also cover supply and erection of an earthing station with @ single pipe embedded into the ground by driving or otherwise complete with protective concrete box and lugs suitable for directly connecting two mild steel flats of minimum size 50 mm x6 mm and copper earthing strip 25X3 mm at LT side earthing point to mast. The price shall not include cost of and supply and provision of structure bond connecting LT transformer with structure and then to rails which will be paid for under item OHE-22. NOTE: ].Contractor at his own cost shall do the replacement of the transformer oil on account of testing and leakages during the warranty period. SOR Item OHE-10 MODIFICATION TO EXISTING OVERHEAD EQUIPMENT: The item price covers all inclusive cost of all the associated works of OHE modification including transfer, dismantling/erection, _slewing/re- slewing/readjustment, extension of OHE by providing splices or otherwise ete of all the components of OHE including brackets, insulators, feeder wire/retumn conductor, terminations, ATDs, isolators, traction bonds eross over OHE etc in a particular length of track except items which are excluded specifically under this schedule. The price shall cover transfer of overhead equipment to a bracket assembly on a new mast or support and dismantling of the existing erected bracket assembly from old mast or support, supply and provision of a multiple cantilever cross arm wherever required and erection of bracket assemblies on the multiple cantilever cross arm, and consequent adjustment to overhead equipment required such as re- spacing of droppers, leveling etc. The price shal) not include supply and erection of an additional bracket assembly, which will be paid for under item OHE-18, Dismantling of masts/portals/TTC/DA are covered under item OHE-34. The price shall also cover the re-adjustment of the head span polygon to enable the additional equipments to be suspended from the head span. Payment for the suspension of additional overhead equipment shall be made for under item OHE-2 as extra to this item. The price shall also cover the cost of dismantling of overhead equipment including terminations, auto tensioning devices, guy rod assemblies, anti-creep, suspension assemblies, super masts, feeder, return conductor, section insulator, an isolator, single or gang operated, including dismantling of connections fo the overhead equipment, a pedestal/ pin insulator including dismantling of jumper connections and traction bonds if any, temporary slewing or lowering of erected OHE adjusted and/or unadjusted to ground for special works and restoration and readjustment of the equipment after completion of special works and associated small parts steel work. $80Q_for Railway Electrification & General Electrical Works {Explanatory Notes)/February,2015 ‘The price shall also cover the cost of splicing of terminated overhead equipment for 4 extension and consequent adjustment of the affected equipment. The extended overhead equipment shall be deemed as starting from the centre line of the structure preceding the old terminating structure and the extended overhead equipment shall be paid for under item OHE 23 (a). The price under this item shall cover various modifications required to be carried out to the existing overhead equipment, under power block, on account of electrification of the section provided such modifications are not on account of non-compliance of specifications, approved drawings-and instructions given by the Employer for the execution of the work from time to time, during the progress of the work. = All the prices are on a flat rate all inclusive basis and cover only the important and ‘most frequent type of modifications required to compensate the contractor for the work involved. No extra payments shall be admissible for any other associated work, minor’ modifications, which may be necessary in'the course of work. All work done shail be paid for at normal rates as per BOQ. In all these cases, the dismantled equipment shalt be handed over by the contractor to the Employer's Engineer at the Employer's godown/depot as required by Engineer. The cost of loading / unloading and transportation shall be paid under item OHE-13. e Where prices under this item are applicable, the contractor shall finalise the quantities of work jointly with the Engineer before taking the work in hand NOTES: 1 In case modification / dismantling is carried out at particular location ic. dismantling of an isolator, bracket assembly, pin/ post insulator, guy rod ctc., for the purpose of payment, half of the span on both ends will be considered, 2. Alllclaims under this item have to be supported by the following certificate to be furnished by the contractor on the connected bill. a), The modifications are not on account of non-compliance of specifications approved and instructions given by the Engineers for execution of works. b) The quantities of work involved for modification have been finalised jointly with the Engineer-in-charge before taking the work in hand. ©) The dismantled materials shall be/has been handed over to Engineer’s/Railway's. representative 3. The price of SPS work complete with bolts & muts wherever required, is not included.in the item and will be payable under Item CS-9. $B0Q_for Railway Electrifica n & General Electrical Works (Explanatory Notes)/February,2015 SOR Item OHE-11 MANNING OF SWITCHING STATION INCLUDING TSS: ‘The prices shall cover the payment/wages to the staff to be deployed at each switching station including TSS as directed by Employer's Engineer on flat rate basis per month per location. Manning shall be done round the clock. The staff, holding minimum ITI qualification, shall be deployed in each shift. They shall be fully conversant with operation of various equipments installed in the switching, station. The staff shall be deployed after test and trial by Employer/Engineer and on issue of competency certificate. The staff deployed shall act im accordance with instructions / directions given by Traction Power Controller (TPC)/representative of Employer. The staff shall not leave the working place (Switching station) in any ‘case without permission of Employer's representative, The price shall cover conveyance charges to the staff for going and coming to the working place. The period of manning shall be decided by the Employer during the execution of contract and manning shall commence on receipt of intimation in writing from the Employer one month in advance. Note: Unit ofthe item shall be ‘per month each location’. SOR Item OHE-12(a) ELECTRIFICATION OF SWITCHING STATION (SP/SSP) BUILDING AS PER SPECIFICATION: ‘The price shal! cover all cost of supply, erection, testing and commissioning of wiring work as per approved wiring diagram, Wiring work shall be done in accordance with IE rules, 1S-732, RVNL tech specifications The various activities involved in the work are as follows:- i) Fixing of PVC conduits in recess on wall and drawing of wires for circuit and point wiring, ii) Provision of MS switch boxes of appropriate size concealed in wall ‘at appropriate height with modular PVCifibre sheet for fixing of switches, plugs etc iii) Provision of main board and distribution boards and connection thereof. iv) Provision of light fittings, exhaust fan, outdoors huminaries complete with tubes and lamps. v) Provision of earthing station and _ connection between earthing station to main board with the help af 8 SWG GI wires. Earthing work shall be done in accordance with IS: 3043/1987. vi) Materials. such as light fittings, ceiling fan, exhaust fan, switches, sockets, ceiling rose, socket outlets alf shall be with ISI mark and shall be one of the make mentioned in technical specification. Light fittings shall be 1X28W TS energy efficient or equivalent LED fitting as decided by engineer. All switches, plug points and’ sockets shall be modular type. Ceiling fan and. exhaust fan shall have min 3 star energy rating, vii} Provision of switches, sockets out lets, ceiling roses on respective switch boards and points in appropriate numbers and connection thereof. viii) Provision of 150 watts HPSV street light fitting/other energy efficient Juminaries with better luminosity as decided by engineer, complete in alk respect including lamp on the wall of the building. 041 $B0Q. for Railway Electrification & General Electrical Works (Explanatory Notes)/February,2015 ix) After completion of wiring work necessary testing of wiring — and earthing station shall be done and results submitted to the site-in-charge duly signed by representatives of both the contractor and purchaser. Note: - Scale of fitting shall be as pet latest RDSO guidelines and RVNL | specifications, Drawing/fittings shall be got approved by the Engineer before taking up the work SOR Mem OHE-12(b) ‘SUPPLY & ERECTION OF EARTHING ARRANGEME! SWITCHING STATION ‘The price shall cover supply and erection of an earth bus, earthing stations with a single pipe embedded into the ground by driving or otherwise complete with protective concrete box & higs suitable for directly connecting two mild stee! flats of minimum size SOmm x 6mm. TAT. The price shall also cover supply of all materials including 50 mm x 6 mm mild steel flats for providing earth bus. The price shall also cover erection of earth bus either buried at a depth of 300 mm below ground level painted with 02 coats of red ‘oxide zine chromate primer and 02 finishing coats of bitumen or fixed on wooden guities on walls. It shall include connecting the earth bus to earth electrodes and to various floor-or-wall-mounted equipment’s or structures to be earthed and also connections to non-track-circuited rails, wherever required. It shall also cover the cost of making recesses in concrete foundation blocks for floor or cubicles and covering them up. The connection of earth strips to each other shall be made either by riveting or by welding. The connection of earth strips to various equipment, structures or fencing post shall be made with G.l. bolts and nuts and spring washers/locknuts ‘The price shall cover supply and erection of 8 SWG G.l. wite used for earthing for all LT electrical equipments including remote control cubicles and fencing panels. Price shall also cover measuring and painting of earth values of all the earth pits, combined earth value ete as per standard SOR Item OHE-13 LOADING/UNLOADING TRANSPORTATION AND HANDING OVER OF ALL TYPE OF MATERIALS ETC, OTHER THAN CONTRACTOR MATERIAL The price shalt cover loading/nloading and transportation charges to (from) sitedepot and handing over of material (if required) for all type of steel structures, portals, copper! aluminum conductors, SPS, CBs, BMs, ATs, PTs, CTs, LAs and other clectrical equipments etc. into/ffom BFR/ wailer/ truck for other than contractor's material for the completion of the present work as instructed by the engineer. SOR Item OHE-14 EXTRA ON ERECTION RATE OF WORK UNDER POWER BLOCK: Only for preparing Estimate purpose. 042 SB0Q for Railway Electrification & General Elect al Works (Explanatory Notes}/February,201S SOR item OHE-15, 15(a). (b), (©) CONSTRUCTION OF SWITCHING STATION BUILDING, RCC WORK, PLASTERING, BRICK MASONARY, RETAINING WALL, FILLING, COMPACTING AND LEVELLING WORK PITCHING WORK ete, & SUPPLY AND ERECTION OF NAME BOARD FOR SWITCHING STATION. The price shall cover the construction of Control room of SP/SSP building and will include labourferection and material cost for the entire work all inclusive including following works: i). RCC, PCC, masonry work, including earthwork, leveling, stone pitching in high embankment (if required). ii) RCC work in plinth, lintels, chhajja, Roof slab. iii) Pre-cast RCC Slab, RCC jali. iv) Cement conerete in flooring and cable trenchs. ¥) Brick masonry in walls, vi) Plastering works. vii) Provision of Doors, Windows, Grills, Rolling shutters, Water pipe line , Ventilators and painting thereof. viii) White washing and colour washing and painting of doors/windows, ix) Acid proof or painting of floor and wall in battery room. x) Supply and spreading of stone metal shall be payable under CS-14, xi) Provision of RCC pipe etc. xii) Any other item of work required to complete the work which has not been mentioned/included above shall also be done by the contractor and nothing extra shall be paid for the same, Construction of Switching station shall be done as per RDSO’s drawing No: ET1/C/0067(Mod- B) or latest and Technical specifications. ‘The price shall cover the provision of all shuttering, frame works, arrangement of ‘water, all tools and plants required for the work, consumable, materials etc. ‘The materials used for the work such as brick, sand, stone aggregates, steel for door frame, grill / rolling shutters; RCC Pipe shall be of best quality in accordance with Railway's specification, The price shall cover the cost of conereting required for foundation with 40 mm stone ballast rammed in layers of 15 mi-thick in cement and sand ratio 1:4:8, RCC ‘work for construction of column, brick work, retaining wall drainage etc required for building. ‘The price shall also cover the provision of opening.on the wall of suitable size, for installation of exhaust fan in the battery room. The price shall also cover the cost of supply and erection of name board for switching station. The payment shall be on uniform basis. The price shall also include: supply of necessary clamps, nuts, and bolts etc, required for the erection of the boards. Name boards shall be made in bi-lingual or Hindi/English and vernacular language. The boards to be supplied shall be as per the standard size and standard specification of RDSO/Railways, $B0Q_ for Railway Electrification & General Elect However, Keeping in view local soil type and-its bearing pressure, firm may adopt different design for foundation’plinth adhering to the min inside dimensions as per RDSO drawing and taking prior approval of the engineer. No extra payment is payable for such redesigned basic structure except as detailed under 15(a) to (c). ‘SOR Item OHE-16 SUPPLY AND ERECTION OF A GUY ROD A‘ ‘The price shall cover supply and erection of a guy rod assembly of various lengths for traction masts/Portals/TTC, feeder line towers or supports ete complete with mast guy rod fittings, guy rod with adjustments and parts to be grouted in the anchor block. The price shall not include the cost of supply and erection of a dwarf or stub mast with anchor plates drilled and welded in position, where required for anchorage, and smail paris steel work, complete with bolts and nuts etc., if any for attaching the mast guy rod fitfings to the mast/structure which shall be paid for _separately under the relevant item, ‘COMPONENTS REQUIREMENT MBLY: Rly. 1d No. Description of components Qty. for unit 1 2 3 3232 Mast guy rod fitting (welded) complete Toff with 4 short bolts, nuts, lock nuts and washers for attachment to mastlS.P.S including appropriate fittings 5001/3001-1 | Anchor bolts (complete with nuts, lock ~ TSet | or nuts and split pins) 5001-3 3002 Guy rod stirrup Tol 3008 or 5005 o 5006 Puy od with nt ‘washer and split pin off or 5070 or 5071 5007-1 ‘Anchor v" bolt Z Toit 3008 ‘Anchor loop Toff 5220 Guy rod double strap assembly Voffor 2off (as required ) NOTE: oH at 1. In case the Contractor desires to adopt a different design for guy rod assembly, the same shall be indicated by him in the Tender and the components required should be clearly listed under this item as deviation, 2. Supply and erection of guy rod assembly at anticreep portals will also be paid for under this item. 044 '$B0Q_ for Railway Electrification & General Electrical Works (Explanatory Notes)/February,2015 eee SOR Item OHE-17 SUPPLY AND ERECTION OF PROTECTIVE SCREEN ON FOBS/ROBS: The price shall cover the cost of supply and erection of protective screen on ROBS/FOBs/—etc. The price shall cover the cost of all material required for fabrication of protective screen including MS Angle, Tee, expanded metal (Jali), Gl sheet, paints, suitable fixtures for fixing on the ROB/FOB etc. The price shall also include the labour cost for fabrication, erection on ROB/FOB and painting. The fabrication and erection work shall be done as per RDSO Drg.. No. ETI/C/0088 (07/09) Rev-H. SOR Item OHE-18 SUPPLY AND ERECTION OF BRACKET ASSEMBLY WITH INSULATORS AS PER OHE PLAN: ‘The price shall cover on a flat rate basis for supply and erection of any bracket assembly on a traction mast or support or drop arm and shall include those on high/low level platform, in the vieinity of tumouts, over bridges or over-laps and at locations with reduced encumbrance or terminating wires. The price shall include the cost of supply of all components including galvanized stee! tube, dropper wires and small paris steel work complete with bolts and nuts etc., if any. The price shall cover erection of all components including solid core insulators and dropper wires, small parts steel work, if any. However, this does not include the anticreep arrangement at masts/ structures. ‘The price shall include the cost of following components: Ry. Id No. Description of components Qty. ] 2 for unit i z 3 3020 ‘Mast fiting for hook insulator with 2 off| 1 set bolts, nuts, lock muts and washers of 16 mm dia. | 2400 Tubular stay arm assembly (including | 1 set | alvanised stee! tube) 21107 Catenary suspension bracket assembly or [Toff 2130/2380___| hook bracket E i 1160 Suspension clamp Toff (as quired) 2120721407 | Bracket tube assembly complete with tube | set 2040/2080 | cap and sleeve where required (including galvanised stee! tube). 3070-12 Mast bracket fitting assembly including 2| 1 set off bolts, nuts, lock nuts and washers of 16 mm for attachment to structure or to small part steel work. : 2150-1 & Register arm hook assembly complete with | I off 2160-1 Dolts, nuts and lock nuts. 2420. oF Register arm assembly or raised register arm| 1 set 2430. assembly (including galvanised stecl__ : 045 $80Q_for Railway Electrification & General Electrical Works (Explanatory Notes}/February,2015 tube). 2270-4 or 5,| Register arm dropper assembly. including. 1 set 2460 Style-02_| dropper wire complete with bolts, nuts etc. or 2470 Style - 02 2390/25407 | BFB steady armor bent steady arm (As 2520 Stee festtetH bequited) 7360/2490-2 | 25mm steady arm drop bracket/clamp -lo- 1220/1370/-1 | Contaci wire swivel clip or raised register | 1 off arm 2550-12 ‘Anti wind clamp AS ay required ‘Tmm/Smm inclined copper/steed dropper} AS (on girder bridges use stec! wire droppers) [required Bracket insulator/Stay arm insulator ‘The price is also applicable for the provision of any additional fitting & required to support an additional OHE on a single bracket assembly payable under this item. ‘The price shall include supply of alt extra fittings including the double contact wire swivel clip SOR Item OHE-19 SUPPLY AND ERECTION OF REGULATING EQUIPMENT (3 PULLEY TYPE) WITH COUNTER WEIGHT ASSEMBLY FOR CONVENTIONAL OBE: ‘The price shalt cover supply and erection of a 3-Pulley type counter weight assembly including 9 ton adjuster with double stiap assembly and normaVanti-theft guide tube assembly, the supply of regulating equipment, provision of adequate length pipe on Hex-Tie rod at crossovers and short tension length ATDs wherever required and stainless. steel wire rope required for the regulating equipment, anti slipping device assembly (Spacer Angles as per RDSO DRAWING NO. ‘TVDRG/OHEYATD/RDSO/00009 and smail part steel work, if any. The price shall also cover adjustment of the entire regulating equipment, The price shall not include supply and erection of termination, which will be paid under SOR item OHE-20. SOR ITEM OHE-20 SUPPLY AND ERECTION OF MATERIAL FOR TERMINATION OF DOUBLE OVERHEAD EQUIPMENT CONDUCTOR WITH INSULATORS: ‘The price shall cover supply of alt material necessary for the yoked termination of two overhead equipment conductors on a traction mast or structure , including all SPS such as appropriate mast anchor fittings, clevis assembly , two adjusters, ending clamps for catenary and contact wires, anchor double strap assembly, equalizing/compensating plates, and double eye distance rods (if required) and fittings and terminating wire ,if any including.9- ton insulators assembly The price shall also cover erection of all materials with 9ton insulator? 046 SBOQ_for Railway Electrification & General Electrical Works (Explanatory Notes)/February,2015 SOR Item OHE-21 ‘SUPPLY AND ERECTION OF ANTI CREEP WITH GALVANIZED STEEL WIRE INCLUDING INSULATORS. The price shall cover supply of all materials for an anti-creep including adjusters, galvanized steel wire, mast anchor fittings at its terminations on either side of structures, ending clamps, fittings and including 9- ton insulators assembly conforming to RDSO specification, The price shall cover erection of all materials including 9- ton insulator assembly ‘with small parts steet work, if any. Rly. Id No. | Description of components Qty. for uni 1 2 3 : Galvanized steet wire (19/2.50mm [As required 1360 Steel wire ending clamp oft 5020-17 9 -ton adjuster 2off 5020-2 3030) ‘Anchor double strap assembl As required 3010/5040_| ~~ Clevis assembl : 2off 3231 ‘Mast anchor fitting with bolts, nuts etc._| 2 sets 1170 ‘Double suspension clamp z 1 off Less 1160_| Suspension clamp © loft [si83 Double eye distance rod ‘As required] NOTE -L.ln case the anti-creep extends beyond one span on either side of anti creep center, payment for the supply and erection. of extra length shall be paid additionally at the rate of 20% of the rate per extra span, SOR ITEM QHE-22 SUPPLY AND ERECTION OF A STRUCTURE BOND/ A LONGITUDINAL BOND/ TRANSVERSE AND SPECIAL BOND: The price shall cover supply of alt materials including mild steel flats size 40 x 6 mm required to provide all kinds of bonds such as a structure bond connecting a traction mast or structures to the nearest non-track-circuited rail, or earth electrode, including all fastenings at both ends. The price shall include shaping and drilling of the bond and erection of all materials including provision of heat shrinkable PVC tube for structure bond under track circuit rail. This would also cover connection of ~carthing terminals of equipments like LT Transformers with structure and then to rails as per relevant drawings. ‘The price shall cover provision of connection of buried rails to running rail as per RDSO drawing No. ETVOHE/G/0S306 & shall include supply, fabrication, and erection of all connections (including drilling at both ends) and refilling of buried rail pit SBOQ_for Railway Electrification & General Electrical Works (Explanatory Notes)/Februat 2015 The price shall cover the supply of all materials including mild steel flats size 40 x 6 mm, fasteners etc. required to provide longitudinal bond / transverse bonds connecting to rails at the rail joint at the locations to be specified by the Employer. The price shall include shaping and drilling of the bond and erection of all ‘materials including the bonds. ‘The price shall also cover the supply of all materials including mild steel flats size 40 x 6 mm to provide special bonds at level crossings, foot over/road over bridgelprotective screen, girder bridge, metallic sheds, fencing. etc. for which the location will be specified by the Employer. The price shall include shaping and drilling of the bond and erection of all materials including the bond. The item covers the new bonds to be provided inthe yard due to modifications involved as pet revised bonding plan of the station, SOR ITEM OHE 23 (a) SUPPLY AND ERECTION OF OVER HEAD EQUIPMENT. ie. CONTACT AND CATENARY WIRE (EXCLUDING COST OF CONTACT AND CATENARY — WIRES), JUMPER WIRE, — DROPPER WIRE, CONTACT/CATENARY CLIPS, FASTENERS AND ALL OTHER MATERIAL REQUIRED AT TURN OUT/OVERLAPS/DIAMOND CROSSINGS etc FINAL CHECKING OF OHE AND ADJUSTMENT, INSPECTION TO BE DONE BY TOWER WAGON FOR COMMISSIONING OF CONVENTIONAL OHE. The price shall cover supply & erection of complete overhead equipment with all components and wire and conductors including contact wire, catenary wire droppers, all types of jumpers including anti-theft jumpers (50/65/105 sq mm), and _ terminating wires at turn outs/ overlaps/ diamond crossings/ cross overs etc, if any. [Excluding the cost of contact & Catenary which will be paid under Item No. 23(b) & (c)]. The price shall also cover supply & erection of vontact wire as false contact wire (if demanded by zonal Railways in place of insulated catenary wire) under overline structures with all associated components {Cost of contact wire shall be payable under SOR OHE 23(b). Provision of insulated catenary shall be payable under OHE-30)} Provision of long cross type G-jumper on parallel run side instead of cross-over/tum out ide as per RDSO drawing No ETVOHE/G/0214? Rev ‘C’ or latest shall be ensured. The price shall also cover supply of all components including dropper clips, parallel clamps for jumpering and splices (where their use is approved), dropper wire, jumper wire and terminating wire/small parts steel works complete with bolts and nuts ete. for attachment of number plates to mas/structure, if any. The price shall include provision of enameled/tetto reflective mumber plates, cnameled/retro reflective sigma boards on masts before stop signals, different types of boards required to be provided as per ACTM (caution/waming, DJ ON/OFF, DJ ON/OFF for MEMU, 500m, 250m neutral section boards, unwired section, engine stop board, power block limit board ete on traction masts or structures. Sigma marking/boards shall be provided before signals. on OHE masts/structures as per Rly Board letter no 2001/Elect(G)/170/1 pt di.7.5.2012 as decided by engineer. The price shall also include the cost of painting the setting distance of masty/structures, rail level on masts/structures, stenciling of symbol for direction of emergency telephone socket and Y marking at BWA locations as per temperature and local instructions. This price also. includes supply and ercetion of different type caution waming boards on OHE structure, 048 Ry. 1d No. Description of components 4 z 7040-2 or | Contact wire paralol clamp small SK5BH1 & SK5752 or SK576 & ‘SK-535/2 or 1041- 3 TTBOISKET2 | Contact wire dropper eli 107) & SK-572/22 7192 Catenary dropper clip complete with bolls, nufs ete. 7507 Enameled number plates complete with 2 Galva ‘MS. bolts m 10x38/30, nuts. ard lead washer for m 40 bolts but excluding SPS for altachment of umber plate to masts/siructures. Contact mire ending clamp F20 | Gaienany ending camp 1140 Large span wire clamp (130) | 5020-175020-2 | Adjuster 5030 “Anchor double strap assembly BO TSTOZ Compensating platerqualizing plate, All the warning boards provided on OHE structure shall be of retro reflective type as per latest Rly. Board/RDSO guidelines. Similarly structure Number plates. on OHE ‘mast at specific locations should be retro reflective types as per latest Rly. Board/RDSO guidelines. Separate D) close Boards to be provided for MEMU/EMU wherever required for MEMU/EMU operation. The price shall cover supply of all components required: for a pull-off arrangement to Pull one equipment only including head-span mast fittings complete with M.S. angle, equalizing plate assembly, steady-arm, catenary wire dropper clip, contact wire swivel clip and fittings including solid core insulators. The price shall cover erection of all components including solid core insulators, small jumper wire, large jumper wire and ‘conductors, ‘The price shait cover supply and erection of all additional fittings required including the supply of required conductors/jumper wires, in case the pull off pulls more than one ‘equipment. The price shall cover finat checking, adjustment and inspection- of OBE by tower car. Further details are given in Section 5 Chapter 2 of Volume-1 of bid document 049 $B0Q_for Railway Electrification & General Electrical Works (Explanatory Notes)/February,2015 SORITEM OHE 23 (b) SUPPLY OF HDGCC 107 SQ MM COPPER CONTACT WIRE ‘The price shall cover the cost of supply of hard drawn grooved continuous cast copper Contact wire 107 sq mm for overhead equipment. The cost of erection of contact wire shall be payable under Item No, 23(a). Reconciliation of material should be done as per ‘actual use taking into account anchor and overlap. The measurement will be from centre Jine of anchoring mast. Unused contact wite pieces/drums shalt be on the contractor account SOR ITEM OHE-23 (c) SUPPLY OF 65 SQ MM COPPER CATENARY WIRE The price shall cover the cost of supply of stranded copper catenary wire for overhead equipment. The cost of erection of catenary wire shall be payable under Item No, 23(a). Reconciliation of material should be done as per actual use taking into account anchor and overlap. The measurement will be from centre line of anchoring mast, Unused catenary wire pieces/drums shall be on the contractor account, ITEM OHE-24 SUPPLY AND ERECTION OF ANTI CREEP WITH CADMIUM COPPER CATENARY WIRE INCLUDING INSULATORS. The price shall cover supply and erection of all materials for anti-creep including cadmium copper catenary wire, adjusters, mast anchor at its terminations on either side of structure, ending clamps & fittings, 9 ton insulators assembly and SPS work if any. The price shall cover erection of all materials for anti-creep including 9 ton insulators assembly and SPS work if any. RDSO drawing No. THDRG/OHE/GENL/RDSO/00001/120 REV ‘0° or latest, Ref ETVOHE/G/02111 Rev-A dt.23.10.2012 or latest is 10 be followed for use of catenary wire in place of GI wire at ACC locations in polluted aree as decided by zonal Railways. $80Q_for Railway Electrification & General Electrical Works (Explanatory Notes)/February,2015, ‘SOR ITEM OHE-25 ‘SUPPLY AND ERECTION OF A SECTION INSULATOR ASSEMBLY WITH INSULATORS AND ASSOCIATED FITTINGS & FASTENERS FOR OHE: The price shall cover supply, erection and adjustment of all components required for a standard section insulator assembly (serving both the overhead equipment conductors) including 9 ton insulator, bar insulator special droppers ete. for supporting the equipment and all terminal fittings for conductors and the section insulator assembly, dropper wires as required, Rly. Id No. Description of components Qty. for unit 1 2 3 1120/or SK/436 or 1122 | Catenary ending clamp off 1 & 1123 1192/ETHOHE/SK/333 | Catenary dropper clip assembly _| As required 6170 Parallel clamp for double contact | 12 off wire 6180 Section insulator dropper Beets assembl 6100 Section insulator assembl Tobe supplied bythe 6020 9 ton insulator assembly contractor 6i10 Bar insulator =do- SOR ITEM OHR-26 SUPPLY AND ERECTION OF PTFE TYPE SHORT NEUTRAL SECTION ASSEMBLY: The price shall cover supply, erection and adjustment of PTFE type short neutral sections assembly. The price shall also cover supply and erection of, all fittings for contact and catenary wire as necessary including supply of required dropper wire. SUPPLY AND ERECTION OF 25 KV S.P ISOLATORS WITH INSULATOR WITH) WITHOUT EARTH CONTACT ASSEMBLY, WITH/WITHOUT INTERLOCK: The prices shall cover supply and erection of isolator switches of approved make 1250 Amp capacity, complete with arcing homs, operating rods, operating rod guides, and mounting base including supply and erection of 25 KV Solid Core Post and Operating rod insulator. The price shall also cover supply and erection of a number plate of approved design, supply and erection of small parts steel work comptete with bolis and nuts etc. for support of each isolator and for support of operating rods.on gantries/ masts, jumper connectors and post insulator to support jumper. The price shal! also cover supply and erection of pad lock, integral lock and interlock if required. The price excludes provision of pipe electrode earthing. ‘Note: Payment of jumper shalt be payable under SOR item OHE-29 051 Electrification & General Electrical Works (Explanatory Notes)/February,2015 SOR JTEM OHE-28 SUPPLY AND ERECTION OF 25 KV DOUBLE POLE ISOLATOR WITH INSULATOR WITH/WITHOUT EARTH CONTACT ASSEMBLY WITH/ WITHOUT INTERLOCK: The price shalt cover supply and erection of a double pole isolator 1250 Amp capacity complete with mounting base, operating rod, operating rod guides required for the operation of the isolator, jumper connectors. The price shall also cover supply and etection of alluminium-copper strips, a padlock, integral lock and interlock if required, a number plate of approved design for each isolator, supply and erection of small parts steel works for support of isolators and for support of operating rods on gantries masts including supply and erection of 25 KV Solid Core Post and Operating rod insulator. The price shall also cover for supply and erection of an earth contact assembly in the isolator. The price shall cover the cost of supply and erection of 3 x 25 mm copper connections between earth contact assembly and the structures. The price shall cover supply and erection of an inter locking mechanism on an isolator along with small parts steel if any, to permit working of two or more isolators. The price excludes provision of pipe electrode earthing. Note: 1. All Isolators are to be supplied with required numbers of 25 kV operating rod insulators with complete accessories and small parts steel. Isolator key box of appropriate size shall be provided for at each station on the section, one number at the nearby OHE depot in charge of the section and one number at SSP/SP, as desired by the Engineer at site. 2. Payment of jumper shall be payable under SOR item OHE-29 SOR ITEM QHE-29 SUPPLY AND ERECTION OF ALL TYPES OF COPPER JUMPERS : The price shall cover the supply of large jumper wire size 105 sq. mmr (19/7/1.02mm), small copper jumper size 50 sq. mm (19/1.80mm), 65 sq. mm Cadmium copper conductor, 5 mm dia, dropper wire made of annealed 100% pure copper conductor as per RDSO’s spec No. ETVOHE/3 (2/94) with ‘A’ & °C’ Slip No.1 and on a flat rate basis, the supply of all components and fittings required for providing a flexible, and bolted type terminal connectors wherever required for connection, including supply of parallel clamps, bi-metallic and alumiaum-copper strips, wherever required, and bolted type terminal connectors wherever sequired ‘The prices shall also cover the erection of the complete jumper assembly including jumper wire, The price shall not, however, be applicable for jumper connections already inchided under a particular item (e.g. OHE-23, OHE-9(a) & (b), CS-3, CS-5 ete), but shall be applicable for any jumper connection in any combination between feeders, isolators and booster stations. Continuity jumper at boom anchor anti-creep will be payable under this item. 052 tion & General Electrical Works (Explanatory Notes)/February,2015 SOR ITEM OBE-30 ‘SUPPLY AND ERECTION OF INSULATED CATENARY CABLE IN THE, SPAN UNDER OVER-LINE STRUCTURE: ‘The price shall cover supply of insulated catenary wire, catenary wire splice (1090) for each location and requited dropper clip and erection of the same for each location, The prices shall also cover erection and adjustment of special droppers wherever required. The insulated catenary wire to be supplied shall be as per RDSO’s specification No. TUSPC/OHE/INSCAT/0000 (04/00) or latest. The work shall be executed in accordance with-drawing No.ETUOHEY SK/570. The price shall also cover the cutting of existing Catenary wire, supply and erection of all materials and components including adjustment of dropper wires. Insulated catenary is to be provided under all ROBY/FOB 2s per RDSO maintenance instruction No. TWMI/0036 (09/99) Rev ‘0 as directed by RVNLJ Zonal Railway. RITEM OHE-31 SUPPLY OF MATERIALS AND ERECTION OF A LARGE COPPER JUMPER (160 SQMM) BETWEEN ALUMINIUM BUS/OHE AND CROSS FEEDER WITH ALL ASSOCIATED FITTINGS: This jumper shall be provided between 36 mm aluminium bus/OHE and the copper cross feeder at SSP, SP and FP. The price shall cover the supply of 160 sq. mm flexible copper jumper wire made of annealed stranded 100% pure copper conductor as per RDSO’s spec No. ETVOHE/3 (294) with A & C Slip No.1 or latest, all components and fittings required for providing a flexible copper jumper 160 sq. mm and connection between 36 mm aluminium busv‘OHE & copper cross feeder including terminal connector 19 mm multiple hote bolted type (1009), parallel clamp (1050-3) aluminium-copper bimetallic strips fasteners ete The price shalt also cover the erection of the complete jumper assembly including jumper wire, connectors and fasteners et. SOR ITEM OHE-32 SUPPLY AND ERECTION OF SOLID COPPER BUSBAR 18 MM DIA: The price shall cover supply and erection of solid copper bus bar 18 mm and its terminal connector. The price shall include bending and shaping of bus bar. SOR ITEM OHE-33 SUPPLY AND ERECTION OF ALL TYPES OF CONNECTORS REQUIRED FOR ALUMINIUM/COPPER BUS BAR REQUIRED FOR COMMISSIONING OF SWITCHING STATIONS WITH FASTENERS. The price shall cover supply and erection of solid copper bus bar junction and connectors of various type specified including bolts, nuts ete, required at junction or termination of aluminum bus barsisolid copper bus bar etc. 053 'SBOQ_for Railway Electrification & General Electrical Works (Explanatory Notes)/February,2015 SOR ITEM OHE-34 DISMANTLING OF TRACTION STRUCTURES, PORTALS, TTC AND ASSOCIATED SPS BY CUTTING The price shall cover on flat rate basis dismantting of OHE structures or portals by cutting the same from the top of the foundation and handing over the same to the Employer's Depot. The price shall also include dismantling of drop arms and booms of the portal and their all associated fittings like SPS, bonds etc. Crane charges for the purpose are included in the flat rate. The transportation of dismantled structures shall be payable under item no OHE-13. SOR ITEM OHE-35 SUPPLY AND ERECTION OF SAFETY STEMS i, e. FIRE EXTINGUISHERS, SET OF FIRE BUCKET WITH STAND AND FIRST AID BOX, KEY BOX WITH SUITABLE KEY CHAIN, LOCKS AND OTHER MISC ITEMS REQUIRED FOR COMMISSIONING OF SWITCHING STATION: ‘The price shall cover supply and erection of fire extinguishers, as per details given below including mounting arrangements, Each set would consist of following and each of 4litre capacity. i, CO-2type_—- O1 Nos. ‘The fire extinguishers supplied shall be of approved brand and as per relevant specification, The price shall also cover supply and erection of standard first Aid box of made of GI Sheet with pad lock as approved by the Employer. The list of items/medicines to be supplied along with in the first aid box shall be obtained from employer/engineer. ‘The price shall cover supply and erection of six number of fire buckets with stand of standard size, cover shed, and locking arrangement as per standard practice of concerned Railway and as approved by the Employer. The price shall also covers Supply and installation of key box in SSP/SP with suitable key chains and locks, associated registers of appropriate size in printed profarma (if required in newly electrified section and as per local Railway practice), 1 no wooden stool of appropriate size,1 no steel arm cushion chair, gum boots- I pair, rubber gloves- I pair etc as directed by Employer/Engineer in charge. The key box shall be of teak wood plank made of size J2inchesx 18 inchesxS inches. SOR ITEM QHE-36 SUPPLY AND ERECTION OF 25 KV AC DANGER BOARD/DANGER BOARD FOR HEIGHT GAUGE, PUBLIC/ STAFF CAUTION AND SPECIAL BOARDS BOARD REQUIRED FOR COMMISSIONING OF OHE/SWSs. ‘The payment under this item shall cover supply and erection of 25 KV AC danger board, danger board for height gauge, public’ stafY caution boards and special boards oon uniform basis as decided by the engineer. Purchaser will advise the requirement of the various types of boards and location to contractor. The above payment shall also include supply of necessary clamps, nuts, and bolts etc., required for the erection of the boards. Caution boards shall be made in bi-lingual or Hindi/English and vernacular language, where ever required and same will be advised (o contractor. The various types of above boards to be supplied shall be as per the standard size and standard specification of Raitways/RDSO. 054 for Railway Electrific ion & General Electrical Works (Explanatory Notes)/February,2015 This item shall also cover specia} caution boards to be provided on all departmental vehicles, track machines, platform shelters as per Railway board letter No. 2009/RE/I6I/4 FTS-748 dtd.26-08-14 as per directions of the engineer. SOR ITEM OHE-37 SUPPLY, ERECTION AND COMMISSIONING OF LIGHT WEIGHT SECTION INSULATOR ASSEMBLY 25 KV AS PER DRAWING NO.6.2758.0 RDSO SPEC.NO. TI/SPEC/OHE/LWDS1/007 ‘The price shalk cover supply, erection and commissioning of light weight section insulator assembly of 25 KV including all accessories as per drawing no. 6.27580 RDSO spec. No. TUSpec/OHE/LWDSV007 SOR ITEM OHE-38 SUPPLY, INSTALLATION AND COMMISSIONING OF THE MAINTENANCE. FRE EARTH AS — PER RDSO_ SPECIFICATION. NO. ‘RDSO/PE/SPEC/PS/0109(REV.O)-2008 INCLUDING ALL MATERIALS ete. The price shall cover supply, erection and commissioning of a maintenance free earth system as per RDSO specification no. RDSO/PE/SPEC/PS/0109(REV.O)-2008.The price shall cover the cost of al the materials required for the earthing system including bond strip size 40x6 mm and civil works. The price shall include the testing of earth value and painting the particulars on the concrete box. as decided by the engineer. 055 ‘SBOQ_for Railway Electrification & General Electrical Works (Explanatory Notes)/February,2015 ee TRACTION SUBSTATION SOR ITEM TSS-1 DESIGN AND DRAWINGS FOR 220/27 or 132/27 KV or 110/27 KV TRACTION SUB-STATIONS INCLUDING FEEDING POST AND CAPACITOR BANK: ‘The price shall cover on a flat rate basis for preparation and submission of design and drawings per sub-station, new or existing, including provision of additional bay, for erection of transformer and associated equipments, replacement of existing transformer with new one, augmentation of existing bus bars and various type of connectors and terminals, per feeding station in addition to site survey, investigation of soil bearing pressure and soil resistivity, preparation and submission of cross section drawings, preparation and submission of general arrangement drawings, detailed layout of equipment, bus-bar connections and insulators, layout of cable trenches outdoor and inside the control room, layout of earthing system and earth connections, layout of earth screen wire, design of supporting. structures for 132 KV/27 kV equipments, detailed designs and drawings for steel work and structural support, suitable concrete pedestals, and foundation plinths for equipment and drawings for equipments, components, fittings and materials and approval of the same by the Employer. The prices shall also cover on a flat rate basis for preparation of all designs and drawings required in connection with supply, erection, testing and commissioning of Shunt Capacitor equipment at the traction sub-stations. The price shall cover on a flat rate basis cost of site survey, investigation of soil bearing pressure and soil resistivity, preparation of cross section drawings, general arrangement drawings, detailed layout of equipments, bus bar connections and insulators, layout of cable trenches out door and inside the control room, earthing system and earth connection layout, and design of supporting structures, The price shall also include supply of requited number of copies in soft and hard copies in Auto Cad with one tracing on RTF paper of designs, drawings, technical booklets of proposed/approved and completion drawings (as erected) per substation, feeding station and capacitor bank as mentioned in the tender specifications. The price shall also cover supply of associated maintenance/record registers of appropriate size in printed-pro-farma (if required in newly electrified section and as per local Railway practice) etc as directed by Employer/Engineer in charge. NOTE: The design for Oil Soak pit and drain water sump will also be got approved from the Employer. SOR ITEM TSS-2 : DELETED $80Q_for Railway Electrification & General Electrical Works (Explanatory Notes)/February,2015 CONSTRUCTION OF BAFFLE = WALL == COMPLETE = WITH REINFORCEMENT, BRICK WORK, PLASTERING ETC.: The price shall cover excavation and, construction of brick baffle wall as per RDSO Drg. No. ETV/C/0213 for wind pressure upto 112.5 kgf/sqm.. The price shall include supply of steel for reinforcement and other materials. The price shall also include bending/binding and laying of reinforcement, shoring, shuttering and scoff-folding arrangement, required for the construction of baffle wall and its curing. ‘The price shall include dismantling of all connected temporary arrangements, back filling required and removal of soil. The price shall also include the plaster (12mm thickness with cement mortar 1:4 mix) on the baffle wall. The price shall also include dismantling of alt connected temporary arrangements and removal of soil. The price shall inclade the cost of cement also, For RCC baffle wall as per RDSO Drg. No. ETI/C/0214 for wind pressure upto 150 kgf/sqm, the payment shall be made under CS-8. Note for TSS-3 (1) The prices under this item shall be the same for any shape or size of concrete blocks, & brick wall. In calculating the individual volume of concrete and brick wall fraction of a cubic meter beyond the third decimal shall be rounded off to the nearest third decimal, (2) For purpose of computation of volume of concrete and brick wall under this iter, the volume of steel work embedded in the foundation block or muff shall be ignored. (3). The prices shall include cost of embedded drain pipes, conduits for cable or earthing flats wherever necessary. (4) Dowel bars in special foundations and nominal reinforcement in other foundations will be necessary. Such nominally reinforced in other foundation will be payable under Item TSS-3. The steel for nominal reinforcement and dowel bars will be supplied by the Contractor and the concrete mixture in such a case shall be same as, for the normal foundations ie. 1:3:6. (8) Ateach Traction substation one number Oi soak pit for main transformer and one Grain water sump for the cable trenches will be provided by the contractor. SOR ITEM TSS-4 (a) SUPPLY, ERECTION, TESTING & COMMISSIONING OF 132 KV DOUBLE POLE SF-6 GAS CIRCUIT BREAKER WITH INTERLOCK: ‘The price shalt cover erection of 132 kV double pole SF-6 Gas Circuit Breakers, complete with operating mechanism, all fittings and accessories including terminal connectors, The price shall cover grouting the supporting frame and Mechanism box on the foundation block and mounting of other accessories in their respective places. It shall also cover the testing and commissioning of the Circuit Breaker. The price shall e also cover the supply and erection of an enamelled number plate. The Contractor shall make his own arrangement for filling of the SF-6 gas and power supply requised for testing purpose. All necessary tools, equipments, instruments required for carrying out necessary checks, tests and commissioning shall be arranged by the Contractor. ‘The price shalt cover erection of an Interlocking Mechanism on an Isolator to permit working of an Isolator and or earthing blade assembly in a desired sequence. The price shall include supply and erection of interlock for Circuit Breaker. 057 geese pune $B0Q_for Railway Electrification & General Electrical Works (Explanatory Notes}/February,2015 SOR ITEM TSS-4 (b) SUPPLY, ERECTION, TESTING & COMMISSIONING OF 220 KV DOUBLE POLE SF-6 GAS CIRCUIT BREAKER WITH INTERLOCK: Same as for item TSS-4(a) except that the price shall cover supply, erection, testing & commissioning of 220 KV Double Pole SF-6 gas Circuit Breaker with Interlock. SOR ITEM TSS-5(a) SUPPLY AND ERECTION OF 132 KV DOUBLE POLE ISOLATORS (MANUALLY OPERATED): The price shall cover supply & erection and connecting of a 132 KV Double Pole Jsolator with a manually operated mechanism complete with mounting base and all accessories required for its operation including terminal connectors. The price shall include supply and erection of an enamelled number plate and padlock. The price shall include mounting of the Isolator and the operating rod in position and their alignment for smooth and trouble free operation. The prices shall also include the cost of 132 kV solid core post insulator, operating rod and earthing blade assembly for 132 kV | Isolators. SOR ITEM TSS-5(b) SUPPLY AND ERECTION OF 220 KV DOUBLE POLE ISOLATORS (MANUALLY OPERATED): Same as for item TSS-5(a) except that the price shall cover supply and erection of 220 KV Double Pole Jsolators (Manually operated). SOR ITEM TSS-6(a) SUPPLY & ERECTION OF 132 KV CURRENT TRANSFORMER ASSEMBLY (400-200/5A): The price shall cover supply & erection and commissioning of a 132 kV Current ‘Transformer (400-200/5A) complete with all fittings and accessories including terminal Connectors. It shall also include mounting of the transformer in position, and supply and erection of an enamelied number plate as per the drawing ETVPSUP/7528, SOR ITEM TSS-6(b) SUPPLY & ERECTION OF 220 KV CURRENT TRANSFORMER ASSEMBLY. (200-100/5A): Same as for item TSS-6(a) except that the price shall cover supply and erection of 220 KY Current Transformer assembly (200-100/5A). SOR Item TSS- 6(¢) SUPPLY & ERECTION OF 110 KV Current Transformer (400-200/SA): ‘Same as for item TSS-6(a) except that the price shall cover supply and erection of 110 KV Current Transformer assembly (400-200/5A), SOR Item TSS- 6(¢) SUPPLY & ERECTION OF 132 KV CURRENT TRANSFORMER ASSEMBLY (1200-800-400/5-5-5A Same as for item TSS-6(a) except that the price shall cover supply and erection of 132 KV Current Transformer assembly (1200-800-400/5-5-5A) as per RDSO’s specification ETUPSV/117 (7/88) with A&C Slip no 1 to 9. 058 '$BOQ_for Railway Electrification & General Electrical Works (Explanatory Notes)/February,2015 SOR ITEM TSS-7(a) SUPPLY & ERECTION OF 120 KV LIGHTNING ARRESTOR: The price shail cover supply & erection and connecting up of a 120kV Lightning arrestor with surge counters and leskage current monitor complete with all fittings and accessories including terminal connector. It shall also include mounting of the Lightning arrestor in position and supply and erection of enamelfed number plate. SOR ITEM TSS-7(b) SUPPLY & ERECTION OF 198 KV LIGHTNING ARRESTOR Same as for item TSS-7(a) except that the price shall cover supply and erection of 198 KV Lightning Arrestor. SOR Item TSS- 7(¢) SUPPLY, ERECTION, LIGHTNING ARRESTOR Same as for item TSS-7(a) except that the price:shall cover supply and erection of 96 KV Lightning Arrestor, SOR ITEM TSS -8(a SUPPLY, ERECTION, TESTING & COMMISSIONING OF 25 KV SINGLE POLE VACUUM CIRCUIT BREAKER WITH INTERLOCKING: ‘The price shall cover supply and erection of 25 kV Vacuum Circuit Breaker (1600 Amp Rating) complete with operating mechanism, all fittings, and accessories including terminal connectors. The price shall cover grouting the supporting frame and mechanism box on foundation block and mounting of other accessories in their respective places. It shall also cover, testing and commissioning of the circuit breaker. The price shall also cover the supply and erection of an enamelled number plate. The Contractor shall make his own arrangement for power supply required for testing purpose. The price shall also include supply of interlocks and shall be applicable individually for each, Circuit Breaker. The supply of vacuum circuit breaker shall be as per RDSO specification No. TVSPC/PSV/CB/0000 with A&C slip No. 1 to 5 or latest. TING & COMMISSIONING OF 96 KV, SOR Item TSS- 8(b) SUPPLY, ERECTION, TESTING & COMMISSIONING OF 25 KV SINGLE POLE VACUUM CIRCUIT BREAKER (2000 Amps rated current) WITH INTERLOCKING: Same as SOR item TSS-8{a) except current rating of CB shall be 2000 amps with relevant RDSO specifications, SOR ITEM TSS -9(a) SUPPLY & ERECTION OF 25 KV CURRENT TRANSFORMERS (1500- 750/54): ‘The price shall cover supply & erection and connecting of a 25 kV Current Transformer (ratio. 1500-750/5A) complete with all fittings and accessories including terminal connectors. It shall include mounting of the transformer in position and supply and erection of an enamelled number plate. The price shall also- include the cost of small parts steel work if any. 059 $80Q_for Railway Electrification & General Electrical Works (Explanatory Notes)/Februal SOR Item TSS-9(b) SUPPLY & ERECTION OF 25 KV CURRENT TRANSFORMERS (3000- 1500/5A): Same as TSS-9(a) except rating of CT shall be 3000-1500/5A. SOR Item TSS- 9¢) Supply & erection of 25 kV Current Transformers (200-100/5A): Same as TSS-9(a) except rating of CT shall be 200-100/5A as per RDSO’s specification ETUPSV/90(6/95) Rev. 4(Jan'03). SOR ITEM T$S-10 SUPPLY, ERECTION, TESTING AND COMMISSIONING OF NUMERICAL. CONTROL & RELAY PANEL SUITABLE FOR DOUBLE TRANSFORMER ‘TRACTION SUB -STATIONS OF 220/27 or 132/27. KV or 110/27 KV: ‘The price shall cover supply, erection, testing and commissioning of Controk & Relay Panel complete with RDSO approved Numerical Type protective relays for Control, monitoring and protection in the traction sub-station comprising of 132 and 25 KV circuit breakers, 25 KV interrupters and 132/25 Kv single phase transformers, sub- station equipments, 25 KV over head equipment (OHE) feeders, shunt capacitor banks and transmission ines (if applicable) as per RDSO specification No ‘TVSPC/PSVPROTCT/6070 (9/08) with latest version. ‘The prices shall also include protective relays for 132 Kv and 25 Ky circuit breakers, interrupters, isolators complete with all wiring, control switches, meters, protective and auxiliary relays, mimic panels and suitable size rubber mat in front and back etc. including erection , alignment, grouting and earthing of the panel in position and all ‘connection for its commissioning. The control panel shall cater for a TSS having two bays of HV & LV side associated equipments along with 02 feeder circuit breakers. SOR ITEM TSS-11 SUPPLY & ERECTION OF TUBULAR ALUMINUM BUS BARS 50MM X 39MM DIA: ‘The price shall cover supply and erection per meter length of $0x39mm dia. Aluminum tube to serve as bus bar or equipment to equipment bus bar connection in the traction sub-station, wherever required. The price shall include bending, shaping and connecting, ‘clamping of the Aluminium tube to the equipment terminals! bus bar supports as required, NOTE: For purpose of payment for this item fraction of a meter in the total length used ‘at a sub-station shall be rounded off to the nearest meter (0:5 m and below being ignored). SOR ITEM 188-12 SUPPLY & ERECTION OF ‘ZEBRA’ ACSR CONDUCTOR: ‘The price shall cover supply and erection per meter length of 61/3.18 mm (ZEBRA ACSR) conductor to serve as bus bar.or equipment to-equipment bus bar connection in the traction sub-station, wherever required. The price shall include straightening, shaping and connecting / clamping of the conductor to the equipment terminals /bus bar supports as required; 060 NOTE: For purpose of payment, the length of aluminum conductor strung as bus-bar between gantries shall be taken as. horizontal distance between the interfaces of the gantries. The totaF length used at a sub-station shall be rounded off to the nearest meter (0.5 m and below being ignored). SOR ITEM TSS-13 SUPPLY & ERECTION OF ALL CONNECTORS, BUS SPLICE & TEE CONNECTORS ete REQUIRED FOR COMMISSIONING OF TSS EQUIPMENTS: ‘The price shall cover supply and erection of a busbar junction and connector of the type specified, including bolts, nuts, lock nuts, washers etc. required at the junction of bus bars. The price shall also include supply and erection of ALCU bimetallic strip, if required, to be provided at the junction, NOTE: 1) For purpose of payment for this item fraction of a meter in the total Jength used at a sub-station shall be rounded off to the nearest meter (0.5 m and below being ignored). SOR ITEM TSS-14 SUPPLY & ERECTION OF COPPER JUMPER WITH FITTINGS AND FASTENER REQUIRED FOR TSS: The price shall cover, on a flat rate basis, the supply and erection of jumper wire complete with all components and fittings required for providing a flexible copper jumper connection, including parallel clamps, bi-metallic and Aluminum -Copper strips, wherever required, and terminal or Tee clamps at either end, including jumper The price shall be applicable for any jumper connection in any combination between feeders, L.T. Transformers drop out switch, lightening arrestors for overhead equipments, isolators for overhead equipment and out going bus bars for switching stations. SOR ITEM TSS-15 (a) SUPPLY & ERECTION OF 110/132 KVKV SUPPORT INSULATORS WITH FITTINGS AND FASTENERS: The price shall cover supply and erection of 132. kV support insulators complete with fixing bolts, nuts and studs, Busbar jumper, clamps for clamping the busbar and SPS, if required SOR ITEMTSS-15 (b) SUPPLY & ERECTION OF 220 KV SUPPORT INSULATORS WITH FITTINGS AND FASTENERS: ‘Same as for item TSS-15(a) except that the price shall cover supply and erection of 220 KV Support insulators with fittings and Fasteners. 061 ‘$80Q_for Railway Electrification & General Electrical Works (Explanatory Notes)/February,2015 eee SOR ITEM TSS-16 SUPPLY & ERECTION OF 25 KV SUPPORT INSULATORS WITH FITTINGS. AND FASTENERS: The price shall cover the supply and erection of a 25 kV solid core post insulator to support Aluminum bus bars. It shall include supply of fixing bolts, nuts, locknuts, ‘washers and studs etc, It shall also cover-erection of all components required for the assembly including post insalator, Busbar jumper, clamps for clamping the busbar and SPS, if required. SORITEM TSS-17(a) SUPPLY & ERECTION OF 110/132 KV TERMINATION WITH/WITHOUT ADJUSTER COMPLETE WITH DISC INSULATO) ‘The price shall cover supply and erection of all materials for the termination of a single ACSR conductor (613.18 mm ZEBRA) strung between gantries/portals, including anchor fitings, single clevis assembly, adjuster, anchor double straps, string of 12 nos. of 280mm (11”) Dise Insulators, strain clamps and arcing ring and other fittings to complete the assembly. The assembly shall be of breaking strength of not less than 11500 kgf. SOR ITEM TSS-17(b) SUPPLY & ERECTION OF 220 KV TERMINATION WITH / WITHOUT ADJUSTER COMPLETE WITH DISC INSULATORS: ‘Same as for item TSS-17(a) except that the price shall cover supply and erection of 220 KV Termination with/without adjuster complete with suitable number of disc insulators. SOR ITEM TSS-18 SUPPLY, ERECTION AND COMMISSIONING OF LOW MAINTENANCE LEAD ACID BATTERIES SET WITH 2 NOs. OF SUITABLE BATTERY CHARGER: ‘The price shall cover supply and erection of a 110 V, 200 AH low maintenance type lead acid battery complete with stand as approved by engineer and accessories as mentioned in relevant specification and a too! board with thermometer, hydro meter. ‘The price for erection shalt include installation, connecting up, filling up of electrolyte, initial/final charging, and commissioning of the battery ‘The price for erection shall also inchide grouting of the chargers in position or ‘mounting it on the wall and connecting it to 240V single phase AC supply: SOR ITEM TSS-19 SUPPLY, ERECTION AND COMMISSIONING OF 240V AC AND 110 V D.C. DISTRIBUTION BOARDS INTHE CONTROL ROOM: The price shalt cover supply and erection of a 240V AC distribution board in the control room. It shall include the grouting of the framework of the distribution board in position or mounting it on the wall and-necessary connections. The price shall also cover supply and erection of a 110 VDC distribution board in the control room. The price shall inclade the grouting of the frame work of the distribution board in position of mounting it on the wall and necessary connections. 062 ‘$B0Q_for Railway Electrification & General Electrical We (Explanatory Notes)/February,2015 SOR ITEM TSS-20 SUPPLY AND ERECTION OF EARTH ELECTRODE: ‘The price shall cover supply and erection of an earth electrode, a typical drawing of which is included in RVNL’s technical specification. The price shall cover the provision of a protective concrete box with removable cover as shown in the drawing The price shall include the testing of earth value and painting the particulars on the box. SOR ITEM TSS-21 SUPPLY AND ERECTION OF EARTH LEADS 75.X 8.MM MILD STEEL FLAT LAID IN THE GROUND OR EXPOSED AS PER SITE REQURIMENT: The price shall cover supply and installation per meter length of 75x8mm mild steel flat, buried at a depth of 60cm below ground level. The price shall also cover connections of the stee! flats to the earth electrodes to constitute the main earth ring and to the earthed terminals of the 132/25 kV transformers ete, as required. The price shall also cover supply and installation per meter length of 75x8 mm mild steel flat, painted all-around with two coats of painting with red oxide and two coats of colour grass green shade-218 of IS:5 passing through cable trench or exposed above ground level. The price shall also cover the connections of the steel flats to the earth electrodes, to constitute the main earth ring and to the earthed terminals of the various equipments as required. SOR ITEM TSS -22 SUPPLY AND ERECTION OF EARTH LEADS 50 X6 MM MILD STEEL FLAT LAID IN THE GROUND OR EXPOSED AS PER SITE REQURIMENT: ‘The price shall cover supply and installation per meter length of SOx6mm mild steel flat buried at a depth of 60cm below ground level. The price shall also cover connections of the steel flats to the main earth ring and to the steel structures and metallic frame work/ terminals of various equipments, as required. The price shall cover supply and: installations per meter length of 50x6 mm mild steel flat painted all around with two coats of painting with red oxide and two coats of colour grass green shade-218 of IS:5 passing through cable trench or exposed above ground level. The price'shall also cover the connections of the steel flats to the main earth ring and (0 the steel structures and metallic frame work/terminals of various outdoor equipments as required. SOR ITEM TSS-23 SUPPLY AND ERECTION OF 8 SWG G.1. WIRE FOR EARTHING: ‘The price shall cover supply, shaping and erection of 8 SWG G.I wire per metre used for earthing of control panels, LT, AC and DC distribution boards, battery chargers, etc. at sub-station control rooms. The requirement of fencing pane! earthing to the nearest fencing upright shall also be included and paid for under this item. 063 a $B0Q_for Railway Electrification & General Electrical Works (Explanatory Notes}/February,2015 SOR ITEM TSS -24 SUPPLY AND ERECTION OF 32 MM DIA MS ROD FOR EARTH MAT: The price shall cover supply and installation per meter length of bare mild stee! rod of dia 32mm to be buried at a depth of 60cm, below the ground level to form the earthing grid & connected to earth electrodes, The price shall also cover jointing of the MS, rods to form earthing grid and connection to MS. flats for system earthing. NOTE FOR SOR ITEM TSS-21,22,23 and 24: For the purposes of payment, fraction of a meter in the total fength of earth lead of each type used at a substation shall be rounded off to the nearest metre (0.5m and below being ignored). SOR ITEM TSS -25 SUPPLY & ERECTION OF EARTH SCREEN WIRE INCLUDING TERMINATION: ‘The price shall cover supply and stringing per meter length of 19/2.5mm (70 Kg/mm2) galvanized stetl stranded wire. It shall include the supply and erection of suitable terminations using strain clamps adjuster (on one side only) etc. It shall also include connecting by means of suitable terminal spades, the end of the earth screen wire to the main members of the columns of portals gantries across which these wires are strung or to SOx6mm MS. flat carth leads, For purposes of payment the clear span between the structures on which earth wire is run shall be adopted. The clear span will be rounded off to the nearest meter (0.5m and below being ignored). SOR ITEM TSS-26 (a) SUPPY, ERECTION, TESTING & COMMISSIONING OF 132/27 KV, 21.6/30.24 MVA ONAN/ONAF, SINGLE PHASE TRACTION POWER ‘TRANSFORMERS: The price shall include the cost of supply, erection, testing and commissioning of transformer with all accessories, 132 and 25 KV side bushings, cooling fans etc as per latest RDSO specifications. Price includes loading, unloading of transformer and bringing it to the erection site for commissioning. The Contractor shall bring the transformer on to its correct position on the foundation and erect all the accessories, check up the alignment and make connections of HV and LV terminals to the 132 kV and 27 KV busbars. The Contractor shall carry out oil filtration and pre-commissioning tests as approved by the Employer and commission the transformers strictly in accordance with the instructions of the transformer manufacturer or his commissioning Engineer at site to the complete satisfaction of the Employer. The Contractor shall be held responsible to ensure that the work is carried out to the highest standards, in accordance with the relevant codes of practice and any special conditions/guidelines/requirements as laid down by the manufacturer of the transformer are properly complied with. Contractor shall notify the manufacturer regarding likely date of commissioning, one month in advance, so that the manufacturer can depute his representative if so desired by him at his own cost, for warranty obligation purposes, Notwithstanding availability of manufacturer's representative or otherwise, it shall be contractor's responsibility to ensure that the equipment is commissioned as per laid: down procedure. However, in case of any extra cost being incurred in this regard, due to- delay on the part of the Contractor the same shall be recovered from the Contractor. The Contractor shall make his own arrangements for oil filtration equipment as well as power supply required for the same. All necessary tools, equipment, i struments, required for carrying out necessary checks and tests and commissioning of the transformer shall be arranged by the Contractor. 064 $80Q_for Railway Electrif jon & General Electrical Works (Explanatory Notes)/February,2015, SOR ITEM TSS-26 (b) SUPPY, ERECTION, TESTING & COMMISSIONING OF 220/27 KV, 21.6/30.24 MVA ONANIONAF, SINGLE PHASE TRACTION POWER TRANSFORMERS: Same as for item TSS-26(a) except that the price shall cover supply, erection, testing and commissioning of 220227 KV, 21.6/30.24 MVA ONAN/ONAF, single phase Traction Power Transformer. SOR Mem TSS- 26(c) SUPPY, ERECTION, TESTING & COMMISSIONING OF 110/27 KV, 21.6/30.24 MVA ONAN/ONAF, SINGLE PHASE TRACTION POWER TRANSFORMERS: Same as for item TSS-26(a) except that the price shall cover supply, erection, testing and’ commissioning of 110/27 KV, 21.6/30.24 MVA ONANIONAF, single phise ‘Traction Power Transformer.TThe transformer should be as per RDSO specification No. ETUPSVI18 A&C-10 or latest. SOR Item TSS- 26(d) SUPPY, ERECTION, TESTING & COMMISSIONING OF 132/27 KV, 30/42 MVA_ONAN/ONAF, SINGI Same as for item TSS-26(a) except that the price shall cover supply, erection, testing and commissioning of 132/27 KV, 30/42 MVA ONAN/ONAF, single phase Traction Power Transformer as per RDSO Specification No.TVSPC/PSV30TRN/2070 or latest with latest amendments. SOR ITEM TSS-27(a) SUPPLY AND ERECTION OF 25 KV DOUBLE POLE ISOLATORS (1600A) WITH INSULATORS: ‘The price shall cover the supply and erection, alignment and connecting up 25 kV Double Pole Isotator (1600Amp capacity) complete with mounting base, operating rod, operating mechanism and all accessories required for its smooth and trouble free operation. The price including solid core Post Insulator, operating rod insulator etc. Price shall also cover supply and erection of an enamelled number plate and a pad lock for each Isolator, Bus bar connector provided for making connection to Isolator terminal pad shall be paid under Item TSS-13. SOR Item TSS- 27(b) SUPPLY AND ERECTION OF 25 KV DOUBLE POLE BUS COUPLER ISOLATORS (3150A) WITH INSULATORS: Same as for item TSS-27(a) except that the DP isolator shall be of 3150 amps capacity. SOR ITEM TSS-28(a) ‘Supply & erection of 25 kV Single Pole Isolators (1600A) with insulator: Same as for item TSS-27(a) except that the price shall cover supply and erection of, single pole Isolator 1600 amps capacity instead of double pole Isotator : 065 sB0Q_for lway Electrification & General Elect ical Works (Explanatory Notes)/February,2015 SOR Item TSS-28(b) SUPPLY & ERECTION OF 25 KV SINGLE POLE ISOLATORS (3150A) WITH. INSULATORS : Same as for TSS-27(a) except that the price shall cover supply and erection of single pole Isolator of 3150 amps capacity instead of double pole Isolator. SOR ITEM TSS-29 Supply, Erection, Testing & Commissioning of 25KY shunt capacitor bank of 2400 KVAR’ rating including low loss series reactor, 25KV Neutral Current ‘Transformer (NCT) ete. The lump sum price shall cover supply, erection, testing and commissioning of 2400 KVAR (ie.6600 KVAR at 40 KV) shunt capacitor bank at Traction substations, complete with capacitor unit internal fuses, discharge devices, rack insulator assembly, interconnector between units, insulators, suitable earthing lugs including terminal connectors and other material and hard ware required for satisfactory working of the unit, It shall also include mounting of the capacitor bank on the supporting structures and its connecting up to other equipments. Payment for supporting structures shall be made under item no CS-9 of schedule 30. The contractor shall carry out pre- ‘commissioning tests-as approved by the purchaser and commission the shunt capacitor bank strictiy in accordance with the instructions of the shunt capacitor bank manufacturer or his commissioning Engineer at site to the complete satisfaction of the purchaser. The contractor shall be held responsible to ensure that the work is catried out to the highest standards, in accordance with relevant code of practice and any special conditions! guidelines! requirements as laid down by the manufacturer of the shunt capacitor bank are properly complied with. The contractor shall notify the manufacturer regarding likely date of commissioning, one month in advance so that the manufacturer can depute his representative, if so desired by him, at his own cost, for warranty obligation purposes. Notwithstanding availability of manufacturer's representative oF otherwise it shall be contractor's responsibility to ensure that the equipment is commissioned as per laid down procedure. All necessary tools, equipments, instruments required for carrying out necessary checks and commissioning of the shunt capacitor ‘bank shall be arranged by the contractor. ‘The price shail cover supply, erection & connecting up of series reactor suitable for 6600 KVAR rating (at 40KV) capacitor bank complete with all fittings and accessories including connectors. It shall include mounting of the series reactor in position. ‘The price shall cover supply, erection of 25kv neutral current transformer for protection of the capacitor bank. The price shall also cover connecting of neutral current transformer with capacitor bank and control and relay panel, It shall also cover ‘mounting of the neutral current transformer on the supporting frame. ‘The price shall cover connecting up of control panel with protective andauxiliary relays for circuit breakers, instrument transformers and capacitor bank as per RDSO latest specifications with all wirings control switches and mimic diagram. LEDs annunciation labels, alarm cancellation push buttons and local/remote switches. It shall also include cost of wiring/terminal blocks required for providing the facility of remote operation. The price for erection shall include alignment and grouting of the panels in positions and all necessary connection to bring the control panel in operation. It shall also include the cost of connecting the frame of each control panel to the carth bus inside the control room and suitable size rubber mat in front and back, The price of controt and relay panel for shunt capacitor bank is included in TSS-10. 066 ical Works (Explanatory Notes)/February,2015 SOR Item TSS. EXCAVATION OF EARTH TO THE DEPTH OF 2 METERS BELOW GROUND LEVEL FOR BURYING 13 METERS LONG RAIL. ‘The price under this item shall cover the cost of excavation of earth 13 meters in length and two (02) meters.in depth below ground level. The price shall also cover the cost of burying 13 meters long rail and connecting it with mat in TSS as per latest RDSO drawing (Rail will be supplied by RVNL). The price shall also cover the cost of Joading, unloading and transportation to site of work of rail 067 |sB0Q_ for Railway Electrification & General Electrical Works (Explanatory Notes)/February 2035, SCHEDULE 29000 (SCADA) 1. Supply, erection, testing, protocol of hardware, software, communication cable, colour codes of cable and various parameters of each of the schedule item, shall conform to RDSO's Specification No. TUSPCIRCC/SCADA/O}30/Rev.1 (04/2014) or latest with up to date amendment issued by. RDSO and shall be obtained by the contractor. SCADA shall be suitable to match and interface with-existing SCADA of RCC centre. Data transfer speed of Traction SCADA system should be rin 9600 bps as per RDSO instructions No, TWIN/022(02/10) Rev 0. 2, The complete SCADA system: shall be supplied, erected and commissioned through Railway's approved vendors. The vender's list is updated by RDSO/CORE Allahabad and shall be valid for the contractual period, Vendors under trial period shall not be considered for this project. 3. Supply of furniture as per RDSO specifications equipments and components (List B) and supply of special tools and plants (List C) as per the schedule rate shall be done in consultation with the Engineer/RVNI- at sitefRCC Centre. Items and costs are as per explanatory notes under relevant items. 4, ‘The work of SCADA of Supply, Erection, Testing & Commissioning including maintenance & Warrantee shall govern by RDSO’s Specification No. TVSPC/RCC/SCADAJO130/Rev.1 (04/2014) or latest. SOR Mem SCAD: Preparation and supply of Design & Drawing for SCADA at RCC, TSS, SP & SSP. Price shall cover the cost of Design & Drawing for SCADA and shall give all details of various items of equipment at remote contro} center and the controlled stations with updated equipment numbering and shall comply with details of RCC center corresponding mimic panel, the various interface with the main computer and the monitor/console on which traction power controllers will monitor status and execute the commands and ensure correct execution and tele-signals from control centre to various remote controlled posts and vice-versa, The drawing shalt show the details. of TSSs, SPs & SSPs with details. of RTUs, layout of equipments, cable colour codes, tag numbers, terminals numbers, in addition to various tele- ‘commands & tele-signals and panel indication. Al] drawings shall be got approved by the clientiengineer and Railways before commencement of execution. All the ‘as erected” drawing & design in soft copies in CDs and hard copies six numbers of each drawing shall be handed over to the purchaser for final approval. 068 Supply of SCADA equipment at RCC. The lump sum price shall include the supply of standard Supervisory Control and Data Acquisition system as per RDSO’s Specification No. TUSPC/RCC/SCADA/0130/Rev.1 (04/2014) or latest with up to date amendment issued by RDSO. There shall be two work station (first of 3 PCs and second of 2 PCs) and main & standby computer and FEP process. ‘The price shalt include supply of one supervisory console PC, one coloured LAPTOP (Dual Core Intel Pentium Processor at 3.2 GHz or Higher) and associated MODEMS for remote SCADA monitoring through a DOT Link as per RDSO specification. The price shall also include the cost of any steel cabinets required for housing the equipments and also the material required for internal wiring and mounting the cabinets in the position. The cost shall also cover testing of the system at the manufacturer's works. The latest version of hardware shall be considered at the time of supply. The price shall also cover the license fee for the supply and installation of Standard Electric Traction SCADA software. The successful bidder has to purchase this from the RDSO approved supplier for standard software as per RDSO Specification No. TVSPC/RCC/SCADA/O130/Rev.1 (04/2014) or latest. SOR Item SCADA-3(a) Supply of RTUs for FP/TSS. The price includes the cost of RTU supplied for the controlled posts and shall include necessary transducers, summation CTs, PT, supply change over arrangement, digital/analog modules, limit setting, modems, CPU cards. Power supply, surge arrestors, relay and contactors etc. at Traction Sub-stations and feeding post for different analog parameters and measurements. A tentative list of different telecommands, telesignals and measurands are given in annexure as per RDSO’s Specification No. TUSPC/RCC/SCADA/O130/Rev.1 (04/2014) or latest. SOR Item SCADA:3 (b) Supply of RTUs for SP. ‘The price shall cover supply of RTUs for SP. The details given in Item SCADA-3(a) above are’ applicable to the SP also except that the different analog parameters and measurands required have to be suitable for SP. SOR Item SCADA-3 (c) Supply of RTU for SSP. ‘The price shall cover supply of RTUs for SSPs. The details given in Item SCADA-3(a) above are applicable to the SSPs also, the different analog parameters and measurands required have to be suitable for SPs. sB0a allway Electrific n & General Electrical Works (Explanatory Notes)/February,2015 SOR Item SCADA-4(a) Supply of maintenance free type Lead Acid Battery ‘The price shall cover supply of Maintenance Free or low maintenance (if former not available in approved list) Lead Acid type Battery of 1FOV DC with adequate Amp. Hour capacity to work with UPS. The battery shall meet the requirements as RDSO's standard specification No. TYSPCIRCC/SCADA/O130/Rev.1 (04/2014) or latest and shall be complete with all parts and accessories including stand, terminal board and accessories required for its efficient operation. SOR Item SCADA-4 (b) Supply of UPS The price shall cover supply of duak on-line UPS of 5 KVA capacity suitable to: work in standalone mode at remote control centre, so as to meet the requirements, as enumerated in T/SPC/RCC/SCADA/0130/Rev.} (04/2014) or latest. The price shall not include the cost of Batteries which is covered under item SCADA-4(a}above. R Item SCAD, Supply of furniture ‘The lump sum price shall cover the supply of furniture at work st work independently and shall meet requirement as mentioned in RDSO standard specification No. T/SPC/RCC/SCADA/O130/Rev.1 (04/2014) or Jatest, The price shall also include furniture for switching posts as per requirement. ‘SOR Jtem SCADA-6 Supply of Data logging Printer for control centre ‘The price shalt cover, supply of diagnostic data logging printer, 2 nos. of HP Desklet, 1125C/Ink jet A3 size coloured and two DOT Matrix (132 column) A3 size printer for the section suitable to work as input output terminal to computer for data logging purposes. The price shall also cover ‘the equipment (printer server etc.) needed to put these printers on LAN or latest printer, standard accessories suitable to work with the existing data Jogger at RCC, complete with spare black and colour ink cartridge, connecting power plug and cable to connect the data logger. 070 'S8OQ_for Railway Electrification & General Electrical Works (Explanatory Notes)/February,2015 ee ——eee SOR Item SCADA-7 (a Erection charges for items SCADA-2 to SCADA ‘The price shall cover the cost of erection of various items of equipments the supply of which is covered under above mentioned items at remote control center and the controlled stations. The cost of erection. shall cover the cost of transportation of equipments, their positioning, fixing and their alignment for smooth trouble free operation. The price shall also cover the cost of inter connecting cables, laying of cable in trenches of approved size, wiring connection to batteries, UPS, surge artestors, operator's console etc, and all other works necessary for proper functioning of the equipments. ‘The price for erection shall also include carrying out liasion with software supplier or at the site work to finalise any matching details between the RCC software and the hardware vendor. The price for erection shall also include the cost of adjustments, testing after erection at site, testing to work all items or. equipments specified, imegration and .commissioning as considered necessary by the purchaser. The price for erection shall also cover all cost of administration of the contract, insurance premia, bankers charges for guarantee cost stamps, loading and untoading, handling of the ‘materials. and for any road transport which the contractor use to carry the materials between their depot and site of work. It shall also include cost of erection of separate earthing, if required as per RDSO standard specification No. TYSPCIRCC! SCADA/0130Rev.1 (04/2014) or latest ‘The price shall include complete finishing work at Remote Control Centre, TSS, SP & SSPs to the satisfaction of the Employer. SOR Item SCADA-1(b) Integration of new SCADA system to existing system at RCC. ‘The price shalt cover the integration of entire new SCADA system with existing SCADA system at RCC. This shall also include the cost of any hardware and software required to complete the work. The item covers the administrative work of supply, transport, execution of contractual items of work, liasoning, testing and commissioning as per specified protocol mentioned in. RDSO__ standard specification No. TWSPCIRCC/SCADA/O130/Rev.1 (04/2014) or latest as well as for the cilicient working of complete SCADA installation and trouble free commissioning of the above work in all respects. SOR Item SCADA-8 Erection, integration, testing & commissioning for existing and new equipments (a) TSS RTU () SSP RTU (¢) SP RTU ‘The price shall cover the adjustment charges (modification/upgradation in existing RTUs and SCADA system) required during the execution and final testing on RTUs at TSS, SP & SSP with remote control centre for final commissioning. O71 5800 for Railway Electrification & General Electrical Works (Explanatory Notes}/February 2015 SOR Mem SCADA-9 Supply of Equipment and Components (List B) Schedule of item for spare equipments and components ‘SeNo. Description Qty. Unit 1_| Transducers: i) Current 1 ‘Nos ii) Voltage 1 Nos. iii) Power Factor 2 Nos. 2.__| 8 Port serial Card I Nos. 3.__| Contactors/Interposing Rela 28 Nos. 4. [RETI Modules : i) PR-80 (Power supply module) z Nos. ii) CPU Module 2 ‘Nos. iii) DO Module 3 Nos, iy) AI Module 1 Nos. ‘v) DI Module 3 Nos. vi) Modem Card 1 Nos. i vii) Input conditions PCB, 3 Nos. viii) Cat UV/PT fase fail Module 6 Nos. ix) CVT 1 Nos. —_}x) DC-DC convertor, 1 Nos. ‘S_[Key Board i Nos. 6. | Power Supply Unit for servers 1 Nos. FEP a 7, [Power Supply Unit for Work 7 Nos. | Station 8,_ [18 GB wide ULTRA2SCEHDD | 1 Nos. ‘9. [20GB IDE HDD 1 Nos. 10, | 16 port 10/100 Ethemet LAN 1 Nos, HUB TI,__| Surge Arrestor (Set oF 3) 1 Nos. Note: The above list is provisionatand may be updated as per zonal railway or specific sectional requirement within averall'cost. 072 $80Q_ for Railway Electrification & General Electrical Works (Explanatory Notes)/February,2015 SOR Item SCADA-10 ‘Supply of Special T&P (List C) List of Maintenance Too!s and Instrument for SCADA system Sr.No. Description ___ Oty. 1 4-1/2Digit Multi meter MECO Modet 235 4 Nos. MK-IE 2. ‘Tong Tester 2 Nos. - 3. Electrician Plier 8” 3 Set 4. Electrician Plier 6”, 3 Set 5.___| Cutting Plier 3.Nos. 6. Nose Plier 3 Nos. 7.__[ 1G. Extractor 3 Nos. 8 Card Extenders Nos. 9. Level meter — APLAB Model 2031A 2Nos.. 10.__| Wire Stripper T Nos, 1__[ Fault Analyser z T Nos. 12.__| Dual trace oscilloscope (0-30 Mhz) 2 Nos. 3B. ‘Remote Terminal Test Unit (In P-IV Laptop 2 Nos, Computer kif) é 14,___| Tool kit consisting of = : Eee fH a) Brief Case 1 Nos. ) Stripper & Cutter I Nos. ‘¢) Crimping Tool I Nos. 4) Screw Driver Kit (6 Blades) 1 Nos. €) Screw Driver Kit (I Set Start type 6 T Nos. Blades) TD Desolding Pump TNos, g) Brush (To clean the RTU) 1 Nos. /h) Soldering wire (18 SWG) 100 gms. i) Solder Sucker L 3 Nos. _ |) Soldering Iron i 3 Nos. k) Nose Plier 1 Nos. 1) Spanner T Nos. | 073 $80Q_for Railway Electrificati & General Electrical Works (Explanatory Notes)/February,2015 COMMON ITEMS OHE/TSS SOR Item CS-1 SUPPLY AND ERECTION OF 25 KV VACUUM INTERRUPTER: ‘The price shall cover supply of a 25-Kv AC 50 Hz Single Pole, Outdoor type 1600 Amp rating vacuum interrupter with all accessories and components 2s per RDSO's latest Specification at site and erection of the same with supporting framework and terminal ‘connectors with interlock ‘The price for erection shall include preparation of its foundation alignment and grouting of the interrupter on its foundation block and mounting of accessories, if any in their respective positions. The price shall also cover supply and erection of enameled number plates. All necessary tools, equipments, instruments, including power supply required for carrying out necessary checks, tests and commissioning shall be arranged by the contractor. ‘The supply of vacuum interruptor shall be as per RDSO specification No. ETUS/PSV167(09197) with A&C slip No. 1 & 2. SOR Hem SUPPLY AND ERECTION OF A 25 KV POTENTIAL TRANSFORMER TYPE- TOR TYPE -: The price shall cover supply and erection of a 25 KV Potential transformer Type-1 or Type -II complete with all fittings and accessories as per relevant latest specification, including terminal connectors and fixing bolts. The price for supply and erection shall include proper alignment of the transformer in position, The price shall also cover the supply and erection of an enameled number plate and fixing bolts. The price shall not include the cost of any small parts steel work. SOR Item CS-3 SUPPLY AND ERECTION OF A 42 KV LIGHTNING ARRESTOR: The price shall cover supply and erection of a 42 kV lightning arrestor complete with all fittings and accessories as per relevant latest specification including terminal ‘connectors. The cost of erection shall include proper alignment of the lighting arrestor in position. The price shall cover supply and erection of cadmium copper jumper (65), which witl be paid under item OHE-29. The price shall not include the cost of any small part steel work. The price shall also include supply and erection of surge counter with leakage current monitor along with cable (unarmored PVC insutated copper cable size 35 Sq. mm 1100 volts grade). The surge counter shall be mounted on the structure at a convenient height as. per. Specification No. ETV/PSWV71 revision-1(1/87), A&C slip No.1 to 7 or latest. 074

You might also like