Dia 1 0% 14% 14% S/.2,822.10 61% 61%
Dia 2 0% 20% 34% S/.486.40 11% 72%
Dia 3 0% 18% 52% S/.403.20 9% 80%
Dia 4 0% 25% 77% S/.498.20 11% 91%
Dia 5 0% 23% 100% S/.403.20 9% 100%
Dia 6
Dia 7
Dia 8
Dia 9 ANCLAJES
T O T A L 0% 100% S/.4,613.10 100% PLATINA1 UND
Curva "S"
Dia del Informe % Ejecucion % % Ejecucion % % Ejecucion %
Monto S/. Monto S/. Monto S/.
Programada Acumulado Programada Acumulado Programada Acumulado
Inicio 0% 0% 0%
Dia 1 0% 26% 26% S/.1,050.50 53% 53%
Dia 2 0% 30% 56% S/.258.50 13% 66%
Dia 3 0% 22% 78% S/.338.50 17% 83%
Dia 4 0% 22% 100% S/.338.50 17% 100%
Dia 5
Dia 6
Dia 7
Dia 8 ANCLAJES
Dia 9
Dia 9 ANCLAJES
T O T A L S/.0.00 0% 100% S/.1,872.23 100%
Dia 9 ANCLAJES
T O T A L S/.0.00 0% 98% S/.2,542.29 100%
RESUMEN ESCALERAS %
E1 100.00%
E2 100.00%
E3 100.00%
E4 98.00%
E5 98.00%
EM1 100.00%
EM2 100.00%
EM3 98.00%
E1 Dia 1 Dia 2 Dia 3 Dia 4
Compra del Material S/. 2,173.68 S/. 543.42
Preparacion del Material S/. 809.00 S/. 404.50 S/. 269.67
Soldado del Material S/. 404.50 S/. 269.67
Limpieza Mecanica S/. 269.67 S/. 404.50
Arenado S/. 404.50
Pintado
Costo S/. 2,982.68 S/. 1,352.42 S/. 809.01 S/. 809.00
% de Avance Prog. 16.6% 25.0% 25.0% 16.7%
Dia 5
S/. 404.50
S/. 404.50
S/. 809.00 S/. 6,762.11