LARSEN & TOUBRO LIMITED

CONSTRUCTION GROUP

PROJECT: 330MW COMBINED CYCLE POWER PLANT AT DOCUMENT NO. DATE


PILLAIPERUMANALLUR 2206- 6-Jun-17
DESIGNED CHECKED PAGE
WORKSHOP BUILDING
STRUCTURE: RPS/SPK ASR
DESIGN OF FOOTING Footing ID 14-8

Axial Load, P = 4.9 Tons


Moment About X- direction, Mx = 5.000 Tm
Moment About Z- direction, Mz = 5.000 Tm
Width of Footing, Bx = 1250 mm
Length of Footing, Lz = 1250 mm

Thickness of Footing, D = 300 mm


Breadth of Column, bx = 300 mm
Depth of Column, Dz = 300 mm

Clear Cover to Main Reinforcement = 50 mm


Net Safe Bearing Capacity = 25 T/m2

Weight of Footing = 1.25 x 1.25 x 0.3 x 2.5 = 1.172 Tons

Total Vertical Load = 4.9 + 1.172 = 6.072 Tons

Diameter of Main Reinforcement = 10 mm

Effective Depth = 300 - 50 - 10/2 = 245 mm


3.886 34.606 M 20

Fe 415
load factor 1.5

-26.834 3.886

Central Strip (Average Pressure)


LARSEN & TOUBRO LIMITED
CONSTRUCTION GROUP

PROJECT: 330MW COMBINED CYCLE POWER PLANT AT DOCUMENT NO. DATE


PILLAIPERUMANALLUR 2206- 6-Jun-17
DESIGNED CHECKED PAGE
WORKSHOP BUILDING
STRUCTURE: RPS/SPK ASR
Maximum Pressure Under Footing

= (6.072 / ( 1.25 x 1.25 ) ) = 34.606 T/m2

+ ( 5 x 6 / ( 1.25 x 1.25 x 1.25)) >25 T/m2

+ ( 5 x 6 / ( 1.25 x 1.25 x 1.25)) (Not Safe)


Minimum Pressure Under Footing

= (6.072 / ( 1.25 x 1.25 ) ) = -26.834 T/m2

- ( 5 x 6 / ( 1.25 x 1.25 x 1.25)) < 0 T/m2

- ( 5 x 6 / ( 1.25 x 1.25 x 1.25)) (Not Safe)

STRUCTURAL DESIGN

Maximum Bending Moment at the face of the column


= 7.572 x (0.625 -0.15 ) x ( 0.625 -0.15 ) / 2

+ ( 34.606 - 7.572 ) x (0.625 -0.15 ) = 2.887 Tm

x ( 0.625 -0.15 ) / 3

0.707 N/mm2

Percentage Steel Required, (Min = 0.12%) = #VALUE! %


Area of Steel required = #VALUE! mm2

Provide 10 dia. bars @ 200 mm c/c bothways #VALUE!

Area of steel Provided = 393 mm2


Percentage Steel Provided = 0.160 %

Maximum Permissible Shear Stress, c = #VALUE! N/mm2


LARSEN & TOUBRO LIMITED
CONSTRUCTION GROUP

PROJECT: 330MW COMBINED CYCLE POWER PLANT AT DOCUMENT NO. DATE


PILLAIPERUMANALLUR 2206- 6-Jun-17
DESIGNED CHECKED PAGE
WORKSHOP BUILDING
STRUCTURE: RPS/SPK ASR

CHECK FOR BENDING SHEAR

This is checked @ a dist. of d = 245 mm from col. face

Shear Force at this section


= ( (13.594 + 34.606 ) / 2 ) x (0.475 - 0.245 ) = 5.543 Tons

Shear stress = 1.5 x 5.543 x 9.8 x 1000/(1000 x 245) = 0.333 N/mm2

#VALUE! #VALUE!

#VALUE!

CHECK FOR TWO - WAY SHEAR

Two-Way Shear is checked @ a dist. of d/2 = 122.5 mm

from the face of the column

Maximum Permissible Shear stress

= 0.25 x sqrt ( fck ) = 0.25 x sqrt( 20 ) = 1.118 N/mm2


Total Punching Shear Force =

= ( 1.25 x 1.25 - 0.545 x 0.545 ) x 0.25 = 4.719 Tons

x ( 34.606 + 10.583 ) x 0.5

Punching Shear Stress =

= 1.5 x 4.719 x 9.8 x 1000 / (545 x 245 ) = 0.130 N/mm2


<1.118 (Safe)

Therefore the footing is safe in Two - way Shear

10 dia. bars @ 200 mm c/c


Pressure Distribution

1.250

1.125

1.000

0.875 0.000
0.125
0.750 0.250
0.375
0.625 0.500
0.625
0.500 0.750
0.875
0.375 1.000
1.125
0.250 1.250

0.125

0.000
0.25

0.75
0

0.125

0.375

0.5

0.625

0.875

1.125

1.25
Length Z (m)

Length X (m)
Pressure Along X-X Axis

(Length Factor)
15

10

0
Pressure (T/Sq. m.)

0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 0.55 0.60 0.65 0.70 0.75 0.80 0.85 0.90 0.95 1.00

-5

-10

-15

-20

-25
Pressure Along Y-Y Axis

(Length Factor)
15

10

0
Pressure (T/Sq. m.)

0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 0.55 0.60 0.65 0.70 0.75 0.80 0.85 0.90 0.95 1.00

-5

-10

-15

-20

-25