Radiographic Testing Report

Client Job No.: Aries Job No.: RT 1448


JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 01 Density: 2.0 - 4.0

Inspection Date: 28.10.2016 Geometric Unsharpness: 0.13

Job location/Place: RAK Screens (front&back): 0.125mm


ECO-2 SUPPORTING TUBE TO EVP
Item Description: SUPPORTING TUBE
No. of Exposure: 3

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 20 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): NIL Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
16Mo3 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
44.5
SP-ECO-2 42 W-1 o/dX5mm
A NSD
B NSD

44.5
SP-ECO-2 33 W-2 o/dX5mm
A NSD
B NSD

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:28.10.2016 Date:28.10.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root U14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 01A Density: 2.0 - 4.0

Inspection Date: 28.10.2016 Geometric Unsharpness: 0.13

Job location/Place: RAK Screens (front&back): 0.125mm


ECO-2 SUPPORTING TUBE TO EVP
Item Description: SUPPORTING TUBE
No. of Exposure: 2

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 20 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): 2 Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
16Mo3 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
44.5
SP-ECO-2 25 W-2 o/dX5mm
A P
B P

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:28.10.2016 Date:28.10.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root U14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 02 Density: 2.0 - 4.0

Inspection Date: 28.10.2016 Geometric Unsharpness: 0.13

Job location/Place: RAK Screens (front&back): 0.125mm

Item Description: SCREEN TUBE TO SUPPORTING TUBE No. of Exposure: 8

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 20 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): NIL Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
16Mo3 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
44.5
ST-SPT 10 W-1 o/dX5mm
A NSD
B NSD

44.5
ST-SPT 40 W-1 o/dX5mm
A NSD
B NSD

44.5
ST-SPT 48 W-2 o/dX5mm
A NSD
B NSD

44.5
ST-SPT 50 W-1 o/dX5mm
A NSD
B NSD

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:28.10.2016 Date:28.10.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root U14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 02A Density: 2.0 - 4.0

Inspection Date: 28.10.2016 Geometric Unsharpness: 0.13

Job location/Place: RAK Screens (front&back): 0.125mm

Item Description: SCREEN TUBE TO SUPPORTING TUBE No. of Exposure: 2

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 20 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): NIL Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
SA 210 Gr A1 to SA 423 CC2494-1 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
44.5
ST-SPT 35 W-2 o/dX5mm
A FILM MISSING RS
B NSD

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:28.10.2016 Date:28.10.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root U14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 03 Density: 2.0 - 4.0

Inspection Date: 28.10.2016 Geometric Unsharpness: 0.13

Job location/Place: RAK Screens (front&back): 0.125mm


SCREEN TUBE TO DUMMY SUPPORTING
Item Description: TUBE
No. of Exposure: 4

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 20 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): NIL Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
16Mo3 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
44.5
ST-DST 19 W-2 o/dX5mm
A NSD
B NSD

44.5
ST-DST 52 W-1 o/dX5mm
A NSD
B NSD

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:28.10.2016 Date:28.10.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root U14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 03A Density: 2.0 - 4.0

Inspection Date: 28.10.2016 Geometric Unsharpness: 0.13

Job location/Place: RAK Screens (front&back): 0.125mm


SCREEN TUBE TO DUMMY SUPPORTING
Item Description: TUBE
No. of Exposure: 2

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 20 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): 1 Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
16Mo3 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
44.5
ST-DST 39 W-1 o/dX5mm
A TI
B P,TI

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:28.10.2016 Date:28.10.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root U14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 04 Density: 2.0 - 4.0

Inspection Date: 28.10.2016 Geometric Unsharpness: 0.13

Job location/Place: RAK Screens (front&back): 0.125mm


EVP SUPPORTING TUBE TO SH 1
Item Description: SUPPORTING TUBE
No. of Exposure: 8

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 20 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): NIL Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
16Mo3 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
44.5
SP-ECO-2 86 W-2 o/dX5mm
A P
B NSD

44.5
SP-ECO-2 94 W-1 o/dX5mm
A NSD
B NSD

44.5
SP-ECO-2 101 W-1 o/dX5mm
A NSD
B NSD

44.5
SP-ECO-2 112 W-2 o/dX5mm
A P
B NSD

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:28.10.2016 Date:28.10.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root U14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 05 Density: 2.0 - 4.0

Inspection Date: 29.10.2016 Geometric Unsharpness: 0.13

Job location/Place: RAK Screens (front&back): 0.125mm


ECO-2 SUPPORTING TUBE TO EVP
Item Description: SUPPORTING TUBE
No. of Exposure: 4

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): NIL Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
16Mo3 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
44.5
SP-ECO-2 7 W-1 o/dX5mm
A NSD
B NSD

44.5
SP-ECO-2 12 W-2 o/dX5mm
A NSD
B NSD

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:29.10.2016 Date:29.10.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root U14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 5A Density: 2.0 - 4.0

Inspection Date: 29.10.2016 Geometric Unsharpness: 0.13

Job location/Place: RAK Screens (front&back): 0.125mm


ECO-2 SUPPORTING TUBE TO EVP
Item Description: SUPPORTING TUBE
No. of Exposure: 2

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): 2 Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
16Mo3 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
44.5
SP-ECO-2 18 W-1 o/dX5mm
A P
B P

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:29.10.2016 Date:29.10.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root U14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 06 Density: 2.0 - 4.0

Inspection Date: 29.10.2016 Geometric Unsharpness: 0.13

Job location/Place: RAK Screens (front&back): 0.125mm

Item Description: BENT TUBE TO ECO 1 COIL (INLET) No. of Exposure: 6

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): NIL Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
16Mo3 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
BT-ECO-1 5 W-2 38.1 o/dx3.6mm A NSD
B NSD
C NSD

BT-ECO-1 9 W-2 38.1 o/dx3.6mm A P


B NSD
C P

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:29.10.2016 Date:29.10.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root U14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 07 Density: 2.0 - 4.0

Inspection Date: 29.10.2016 Geometric Unsharpness: 0.13

Job location/Place: RAK Screens (front&back): 0.125mm

Item Description: BENT TUBE TO ECO 1 COIL (INLET) No. of Exposure: 6

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): NIL Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
16Mo3 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
BT-ECO-1 13 W-1 38.1 o/dx3.6mm A NSD
B NSD

BT-ECO-1 16 W-2 38.1 o/dx3.6mm A P


B P

BT-ECO-1 20 W-1 38.1 o/dx3.6mm A NSD


B NSD

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:29.10.2016 Date:29.10.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root U14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 08 Density: 2.0 - 4.0

Inspection Date: 29.10.2016 Geometric Unsharpness: 0.13

Job location/Place: RAK Screens (front&back): 0.125mm

Item Description: SCREEN TUBE TO SUPPORTING TUBE No. of Exposure: 4

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): NIL Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
SA 210 Gr A1 to SA 423 CC2494-1 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
44.5
ST-SPT 22 W-1 o/dX5mm
A NSD
B NSD

44.5
ST-SPT 35 W-2 o/dX5mm
A NSD
B NSD

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:29.10.2016 Date:29.10.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root U14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 09 Density: 2.0 - 4.0

Inspection Date: 29.10.2016 Geometric Unsharpness: 0.13

Job location/Place: RAK Screens (front&back): 0.125mm


SCREEN TUBE TO DUMMY SUPPORTING
Item Description: TUBE
No. of Exposure: 2

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): NIL Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
16Mo3 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
44.5
ST-DST 4 W-2 o/dX5mm
A NSD
B NSD

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:29.10.2016 Date:29.10.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root U14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 09A Density: 2.0 - 4.0

Inspection Date: 29.10.2016 Geometric Unsharpness: 0.13

Job location/Place: RAK Screens (front&back): 0.125mm


SCREEN TUBE TO DUMMY SUPPORTING
Item Description: TUBE
No. of Exposure: 2

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): 2 Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
16Mo3 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
44.5
ST-DST 14 W-1 o/dX5mm
A P
B P

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:29.10.2016 Date:29.10.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root U14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 10 Density: 2.0 - 4.0

Inspection Date: 29.10.2016 Geometric Unsharpness: 0.13

Job location/Place: RAK Screens (front&back): 0.125mm


EVP SUPPORTING TUBE TO SH1
Item Description: SUPPORTING TUBE
No. of Exposure: 4

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): NIL Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
16Mo3 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
44.5
SP-ECO2 61 W-1 o/dX5mm
A NSD
B NSD

44.5
SP-ECO2 72 W-1 o/dX5mm
A NSD
B NSD

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:29.10.2016 Date:29.10.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root U14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 11 Density: 2.0 - 4.0


Geometric
Inspection Date: 31.10.2016 0.13
Unsharpness:
Job location/Place: RAK Screens (front&back): 0.125mm
FRONT WALL UPPER MIDDLE PANEL TO UPPER
Item Description: PANEL
No. of Exposure: 6

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): NIL Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
SA 210 Gr A1 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
44.5
FWUMP-UP 18 W-2 A P
o/Dx4.5mm
B P

44.5
FWUMP-UP 24 W-1 A NSD
o/Dx4.5mm
B NSD

44.5
FWUMP-UP 30 W-2 A P
o/Dx4.5mm
B P

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:31.10.2016 Date:31.10.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root 14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 11A Density: 2.0 - 4.0


Geometric
Inspection Date: 31.10.2016 0.13
Unsharpness:
Job location/Place: RAK Screens (front&back): 0.125mm
FRONT WALL UPPER MIDDLE PANEL TO UPPER
Item Description: PANEL
No. of Exposure: 8

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): 8 Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
SA 210 Gr A1 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
FWUMP-UP 10 W-1 44.5 A P,RU/C
o/Dx4.5mm B P,RU/C

FWUMP-UP 38 W-1 44.5 A P


o/Dx4.5mm B P

FWUMP-UP 45 W-2 44.5 A P


o/Dx4.5mm B P

FWUMP-UP 55 W-1 44.5 A P


o/Dx4.5mm B P

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:31.10.2016 Date:31.10.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root 14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 12 Density: 2.0 - 4.0


Geometric
Inspection Date: 31.10.2016 0.13
Unsharpness:
Job location/Place: RAK Screens (front&back): 0.125mm
RH SIDE WALL UPPER MIDDLE PANEL TO
Item Description: UPPER PANEL
No. of Exposure: 2

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): NIL Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
SA 210 Gr A1 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
RH-SWUMP-UP 47 W-2 44.5 A P
o/Dx4.5mm B P

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:31.10.2016 Date:31.10.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root 14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 13 Density: 2.0 - 4.0


Geometric
Inspection Date: 03.11.2016 0.13
Unsharpness:
Job location/Place: RAK Screens (front&back): 0.125mm
LH SIDE WALL UPPER MIDDLE PANEL TO
Item Description: UPPER PANEL
No. of Exposure: 12

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): 12 Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
SA 210 Gr A1 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
LH-SWUMP-UP 16 W-3 44.5 A LOF
o/Dx4.5mm B LOF

LH-SWUMP-UP 29 W-1 44.5 A LOP


o/Dx4.5mm B LOP

LH-SWUMP-UP 35 W-3 44.5 A LOP


o/Dx4.5mm B LOP

LH-SWUMP-UP 34 W-1 44.5 A LOF


o/Dx4.5mm B LOF

LH-SWUMP-UP 40 W-3 44.5 A LOP,P


o/Dx4.5mm B LOP,P

LH-SWUMP-UP 48 W-1 44.5 A LOP


o/Dx4.5mm B LOP

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:03.11.2016 Date:03.11.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root 14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 14 Density: 2.0 - 4.0


Geometric
Inspection Date: 03.11.2016 0.13
Unsharpness:
Job location/Place: RAK Screens (front&back): 0.125mm
RH SIDE WALL UPPER MIDDLE PANEL TO
Item Description: UPPER PANEL
No. of Exposure: 4

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): NIL Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
SA 210 Gr A1 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
RH-SWUMP-UP 29 W-4 44.5 A EP
o/Dx4.5mm B EP

RH-SWUMP-UP 28 W-2 44.5 A P


o/Dx4.5mm B P

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:03.11.2016 Date:03.11.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root 14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 14A Density: 2.0 - 4.0


Geometric
Inspection Date: 03.11.2016 0.13
Unsharpness:
Job location/Place: RAK Screens (front&back): 0.125mm
RH SIDE WALL UPPER MIDDLE PANEL TO
Item Description: UPPER PANEL
No. of Exposure: 6

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): 6 Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
SA 210 Gr A1 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
RH-SWUMP-UP 17 W-4 44.5 A P
o/Dx4.5mm B P

RH-SWUMP-UP 35 W-4 44.5 A ELONGATED POROSITY


o/Dx4.5mm B ELONGATED POROSITY

RH-SWUMP-UP 30 W-2 44.5 A P


o/Dx4.5mm B P

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:03.11.2016 Date:03.11.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root 14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 15 Density: 2.0 - 4.0


Geometric
Inspection Date: 03.11.2016 0.13
Unsharpness:
Job location/Place: RAK Screens (front&back): 0.125mm
SIDE WALL BOTTOM PANEL TO BOTTOM
Item Description: MIDDLE PANEL
No. of Exposure: 6

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): NIL Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
SA 210 Gr A1 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
LH-SWBP-BMP 12 W-7 44.5 A NSD
o/Dx4.5mm B RD

LH-SWBP-BMP 25 W-7 44.5 A P


o/Dx4.5mm B P

LH-SWBP-BMP 40 W-8 44.5 A P


o/Dx4.5mm B P

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:03.11.2016 Date:03.11.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root 14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 15A Density: 2.0 - 4.0


Geometric
Inspection Date: 03.11.2016 0.13
Unsharpness:
Job location/Place: RAK Screens (front&back): 0.125mm
SIDE WALL BOTTOM PANEL TO BOTTOM
Item Description: MIDDLE PANEL
No. of Exposure: 2

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): 2 Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
SA 210 Gr A1 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
LH-SWBP-BMP 32 W-7 44.5 A LOP,P
o/Dx4.5mm B LOP,P

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:03.11.2016 Date:03.11.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root 14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 16 Density: 2.0 - 4.0


Geometric
Inspection Date: 04.11.2016 0.13
Unsharpness:
Job location/Place: RAK Screens (front&back): 0.125mm
ROOF PANEL TO FRONT WALL UPPER
Item Description: HEADER
No. of Exposure: 12

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): NIL Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
SA 210 Gr A1 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
RP-FWUH 1 W-1 44.5 A P
o/Dx4.5mm B P

RP-FWUH 20 W-2 44.5 A RC,P


o/Dx4.5mm B RC,P

RP-FWUH 25 W-1 44.5 A P


o/Dx4.5mm B P

RP-FWUH 28 W-2 44.5 A P


o/Dx4.5mm B P

RP-FWUH 50 W-1 44.5 A P


o/Dx4.5mm B P

RP-FWUH 61 W-1 44.5 A P


o/Dx4.5mm B P

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:04.11.2016 Date:04.11.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root 14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 16A Density: 2.0 - 4.0


Geometric
Inspection Date: 04.11.2016 0.13
Unsharpness:
Job location/Place: RAK Screens (front&back): 0.125mm
ROOF PANEL TO FRONT WALL UPPER
Item Description: HEADER
No. of Exposure: 2

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): 2 Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
SA 210 Gr A1 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
RP-FWUH 55 W-2 44.5 A P
o/Dx4.5mm B P

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:04.11.2016 Date:04.11.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root 14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 17 Density: 2.0 - 4.0


Geometric
Inspection Date: 04.11.2016 0.13
Unsharpness:
Job location/Place: RAK Screens (front&back): 0.125mm

Item Description: REAR WALL UPPER PANEL TO ROOF PANEL No. of Exposure: 14

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): NIL Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
SA 210 Gr A1 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
RWUP-RP 10 W-1 44.5 A P
o/Dx4.5mm B P

RWUP-RP 15 W-3 44.5 A P


o/Dx4.5mm B P

RWUP-RP 18 W-1 44.5 A P


o/Dx4.5mm B P

RWUP-RP 25 W-3 44.5 A P


o/Dx4.5mm B P

RWUP-RP 35 W-1 44.5 A P


o/Dx4.5mm B P

RWUP-RP 41 W-3 44.5 A NSD


o/Dx4.5mm B NSD

RWUP-RP 50 W-1 44.5 A NSD


o/Dx4.5mm B NSD
Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:04.11.2016 Date:04.11.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root 14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 17 Density: 2.0 - 4.0


Geometric
Inspection Date: 04.11.2016 0.13
Unsharpness:
Job location/Place: RAK Screens (front&back): 0.125mm

Item Description: REAR WALL UPPER PANEL TO ROOF PANEL No. of Exposure: 4

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): 4 Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
SA 210 Gr A1 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
RWUP-RP 41 W-3 44.5 A P
o/Dx4.5mm B P

RWUP-RP 50 W-1 44.5 A ELONGATED POROSITY


o/Dx4.5mm B ELONGATED POROSITY

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:04.11.2016 Date:04.11.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root 14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 18 Density: 2.0 - 4.0


Geometric
Inspection Date: 08.11.2016 0.13
Unsharpness:
Job location/Place: RAK Screens (front&back): 0.125mm
SIDE WALL BOTTOM PANEL TO BOTTOM
Item Description: MIDDLE PANEL
No. of Exposure: 8

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): 8 Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
SA 210 Gr A1 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
LH-SWBP-BMP 52 W-8 44.5 A LOF
o/Dx4.5mm B LOF

LH-SWBP-BMP 60 W-8 44.5 A ELOGATED P


o/Dx4.5mm B ELOGATED P

LH-SWBP-BMP 62 W-8 44.5 A LOF, P


o/Dx4.5mm B LOF, P

LH-SWBP-BMP 32 W-7 44.5 A LOF, P


o/Dx4.5mm B LOF, P

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:08.11.2016 Date:08.11.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root 14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 19 Density: 2.0 - 4.0


Geometric
Inspection Date: 08.11.2016 0.13
Unsharpness:
Job location/Place: RAK Screens (front&back): 0.125mm
LH SIDE WALL UPPER MIDDLE PANEL TO
Item Description: UPPER PANEL
No. of Exposure: 4

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): NIL Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
SA 210 Gr A1 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
LH-SWUMP-UP 16 W-3 44.5 A P
o/Dx4.5mm B P

LH-SWUMP-UP 20 W-1 44.5 A P


o/Dx4.5mm B P

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:08.11.2016 Date:08.11.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root 14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 19A Density: 2.0 - 4.0


Geometric
Inspection Date: 08.11.2016 0.13
Unsharpness:
Job location/Place: RAK Screens (front&back): 0.125mm
LH SIDE WALL UPPER MIDDLE PANEL TO
Item Description: UPPER PANEL
No. of Exposure: 2

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): 2 Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
SA 210 Gr A1 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
LH-SWUMP-UP 29 W-3 44.5 A P
o/Dx4.5mm B P

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:08.11.2016 Date:08.11.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root 14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 20 Density: 2.0 - 4.0


Geometric
Inspection Date: 11.11.2016 0.13
Unsharpness:
Job location/Place: RAK Screens (front&back): 0.125mm
LHSIDE WALL MIDDLE TO UPPER MIDDLE
Item Description: PANEL
No. of Exposure: 2

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): NIL Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
SA 210 Gr A1 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
LH-SWM-UMP 11 W-2 44.5 A P
o/Dx4.5mm B P

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:11.11.2016 Date:11.11.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root 14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 20A Density: 2.0 - 4.0


Geometric
Inspection Date: 11.11.2016 0.13
Unsharpness:
Job location/Place: RAK Screens (front&back): 0.125mm
LHSIDE WALL MIDDLE TO UPPER MIDDLE
Item Description: PANEL
No. of Exposure: 10

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): 10 Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
SA 210 Gr A1 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
LH-SWM-UMP 47 W-4 44.5 A P
o/Dx4.5mm B P

LH-SWM-UMP 36 W-2 44.5 A LOF,P


o/Dx4.5mm B LOF,P

LH-SWM-UMP 43 W-1 44.5 A LOF


o/Dx4.5mm B LOF

LH-SWM-UMP 44 W-1 44.5 A P


o/Dx4.5mm B P

LH-SWM-UMP 46 W-4 44.5 A P


o/Dx4.5mm B P

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:11.11.2016 Date:11.11.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root 14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 21 Density: 2.0 - 4.0


Geometric
Inspection Date: 11.11.2016 0.13
Unsharpness:
Job location/Place: RAK Screens (front&back): 0.125mm
RH SIDE WALL MIDDLE TO UPPER MIDDLE
Item Description: PANEL
No. of Exposure: 6

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): NIL Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
SA 210 Gr A1 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
RH-SWM-UMP 3 W-3 44.5 A P
o/Dx4.5mm B P

RH-SWM-UMP 11 W-3 44.5 A P


o/Dx4.5mm B P

RH-SWM-UMP 25 W-3 44.5 A P


o/Dx4.5mm B P

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:11.11.2016 Date:11.11.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root 14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 21A Density: 2.0 - 4.0

Inspection Date: 11.11.2016 Geometric Unsharpness: 0.13

Job location/Place: RAK Screens (front&back): 0.125mm


RH SIDE WALL MIDDLE TO UPPER MIDDLE
Item Description: PANEL
No. of Exposure: 6

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): 6 Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
SA 210 Gr A1 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
RH-SWM-UMP 37 W-3 44.5 A P
o/Dx4.5mm B P

RH-SWM-UMP 43 W-3 44.5 A LOF


o/Dx4.5mm B LOF

RH-SWM-UMP 48 W-3 44.5 A LOP


o/Dx4.5mm B LOP

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:11.11.2016 Date:11.11.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root U14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 22 Density: 2.0 - 4.0


Geometric
Inspection Date: 12.11.2016 0.13
Unsharpness:
Job location/Place: RAK Screens (front&back): 0.125mm
TUBE ABOVE ECO2 SUPPORTING TUBE O/L
Item Description: HEADER
No. of Exposure: 12

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): NIL Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
SA 210 Gr A1 to 16Mo3 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
TA-ECO-2STO/LH 20 W-6 44.5 A P, RD
o/Dx5mm B P, RD

TA-ECO-2STO/LH 32 W-6 44.5 A P


o/Dx5mm B P

TA-ECO-2STO/LH 42 W-6 44.5 A P


o/Dx5mm B P

TA-ECO-2STO/LH 68 W-6 44.5 A P


o/Dx5mm B P

TA-ECO-2STO/LH 76 W-6 44.5 A P


o/Dx5mm B P

TA-ECO-2STO/LH 78 W-6 44.5 A P


o/Dx5mm B P , RC

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:12.11.2016 Date:12.11.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root 14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 23 Density: 2.0 - 4.0


Geometric
Inspection Date: 12.11.2016 0.13
Unsharpness:
Job location/Place: RAK Screens (front&back): 0.125mm
TUBE ABOVE ECO2 SUPPORTING TUBE O/L
Item Description: HEADER
No. of Exposure: 6

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): NIL Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
SA 210 Gr A1 to 16Mo3 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
TA-ECO-2STO/LH 84 W-6 44.5 A P
o/Dx5mm B P

TA-ECO-2STO/LH 88 W-6 44.5 A P


o/Dx5mm B P

TA-ECO-2STO/LH 100 W-6 44.5 A P


o/Dx5mm B P

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:12.11.2016 Date:12.11.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root 14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 23A Density: 2.0 - 4.0


Geometric
Inspection Date: 12.11.2016 0.13
Unsharpness:
Job location/Place: RAK Screens (front&back): 0.125mm
TUBE ABOVE ECO2 SUPPORTING TUBE O/L
Item Description: HEADER
No. of Exposure: 6

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): 6 Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
SA 210 Gr A1 to 16Mo3 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
TA-ECO-2STO/LH 15 W-6 44.5 A ELONGATED POROSITY
o/Dx5mm B ELONGATED POROSITY

TA-ECO-2STO/LH 58 W-6 44.5 A ELONGATED POROSITY


o/Dx5mm B ELONGATED POROSITY

TA-ECO-2STO/LH 114 W-6 44.5 A P


o/Dx5mm B P

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:12.11.2016 Date:12.11.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root 14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 24 Density: 2.0 - 4.0


Geometric
Inspection Date: 12.11.2016 0.13
Unsharpness:
Job location/Place: RAK Screens (front&back): 0.125mm

Item Description: DUMMY SUPPORTING TUBE ABOVE ECO2 No. of Exposure: 14

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): NIL Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
SA 210 Gr A1 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
DST-TA-ECO-2 12 W-2 44.5 A P , RC
o/Dx5mm B P , RC

DST-TA-ECO-2 26 W-2 44.5 A P


o/Dx5mm B P

DST-TA-ECO-2 28 W-1 44.5 A P


o/Dx5mm B P

DST-TA-ECO-2 30 W-1 44.5 A P


o/Dx5mm B P

DST-TA-ECO-2 71 W-4 44.5 A NSD


o/Dx5mm B NSD

DST-TA-ECO-2 81 W-2 44.5 A P


o/Dx5mm B P

DST-TA-ECO-2 82 W-3 44.5 A P


o/Dx5mm B P
Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:12.11.2016 Date:12.11.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root 14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276-

Report Number: REPORT - 25 Density: 2.0 - 4.0


Geometric
Inspection Date: 12.11.2016 0.13
Unsharpness:
Job location/Place: RAK Screens (front&back): 0.125mm

Item Description: DUMMY SUPPORTING TUBE ABOVE ECO2 No. of Exposure: 10

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
QHSE/P11/CNDT/JP49 RT
areas are repaired): NIL Aries Procedure # : API 650 REV.04
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
SA 210 Gr A1 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
DST-TA-ECO-2 84 W-3 44.5 A P
o/Dx5mm B NSD

DST-TA-ECO-2 85 W-2 44.5 A NSD


o/Dx5mm B P

DST-TA-ECO-2 86 W-3 44.5 A NSD


o/Dx5mm B P

DST-TA-ECO-2 88 W-2 44.5 A TI


o/Dx5mm B TI

DST-TA-ECO-2 90 W-3 44.5 A P


o/Dx5mm B P

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:12.11.2016 Date:12.11.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root 14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276

Report Number: REPORT - 26 Density: 2.0 - 4.0


Geometric
Inspection Date: 14.11.2016 0.13
Unsharpness:
Job location/Place: RAK Screens (front&back): 0.125mm
FRONT WALL MIDDILE PANEL TO UPPER MIDDLE
Item Description: PANEL
No. of Exposure: 14

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
areas are repaired): NIL Aries Procedure # : Aries - RT - 01 - Rev.4
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
SA 210 Gr A1 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
FWMP-UMP 15 W-2 44.5 A P
o/Dx4.5mm B P

FWMP-UMP 25 W-1 44.5 A NSD


o/Dx4.5mm B NSD

FWMP-UMP 22 W-2 44.5 A P


o/Dx4.5mm B P

FWMP-UMP 30 W-2 44.5 A NSD


o/Dx4.5mm B NSD

FWMP-UMP 38 W-1 44.5 A NSD


o/Dx4.5mm B NSD

FWMP-UMP 50 W-1 44.5 A NSD


o/Dx4.5mm B NSD

FWMP-UMP 58 W-2 44.5 A NSD


o/Dx4.5mm B NSD
Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:14.11.2016 Date:14.11.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root 14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276

Report Number: REPORT - 27 Density: 2.0 - 4.0


Geometric
Inspection Date: 14.11.2016 0.13
Unsharpness:
Job location/Place: RAK Screens (front&back): 0.125mm
TUBE ABOVE ECO-2 TO SUPPORTING TUBE O/L
Item Description: HEADER
No. of Exposure: 6

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
areas are repaired): NIL Aries Procedure # : Aries - RT - 01 - Rev.4
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
SA 210 Gr A1 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
TA-ECO-2ST O/LH 15 W-6 44.5 A NSD
o/Dx5mm B NSD

TA-ECO-2ST O/LH 58 W-6 44.5 A P


o/Dx5mm B P

TA-ECO-2ST O/LH 114 W-6 44.5 A P


o/Dx5mm B P

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:14.11.2016 Date:14.11.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root 14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276

Report Number: REPORT - 28 Density: 2.0 - 4.0


Geometric
Inspection Date: 14.11.2016 0.13
Unsharpness:
Job location/Place: RAK Screens (front&back): 0.125mm
ECO-2 SUPPORTING TUBE TO EVP SUPPORTING
Item Description: TUBE
No. of Exposure: 4

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
areas are repaired): NIL Aries Procedure # : Aries - RT - 01 - Rev.4
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
SA 210 Gr A1 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
SP-ECO-2 18 W-1 44.5 A P
o/Dx5mm B P

SP-ECO-2 25 W-2 44.5 A P


o/Dx5mm B P

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:14.11.2016 Date:14.11.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root 14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276

Report Number: REPORT - 29 Density: 2.0 - 4.0


Geometric
Inspection Date: 14.11.2016 0.13
Unsharpness:
Job location/Place: RAK Screens (front&back): 0.125mm

Item Description: SCREEN TUBE TO DUMMY SUPPORTING TUBE No. of Exposure: 4

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
areas are repaired): NIL Aries Procedure # : Aries - RT - 01 - Rev.4
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
SA 210 Gr A1 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
ST-DST 14 W-1 44.5 A P
o/Dx5mm B P

ST-DST 39 W-1 44.5 A P


o/Dx5mm B P

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:14.11.2016 Date:14.11.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root 14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276

Report Number: REPORT - 30 Density: 2.0 - 4.0


Geometric
Inspection Date: 14.11.2016 0.13
Unsharpness:
Job location/Place: RAK Screens (front&back): 0.125mm

Item Description: SUPPORTING TUBE TO TUBES ABOVE ECO2 No. of Exposure: 12

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
areas are repaired): NIL Aries Procedure # : Aries - RT - 01 - Rev.4
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
SA 210 Gr A1 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
ST-TA-ECO-2 5 W-2 44.5 A NSD
o/Dx5mm B NSD

ST-TA-ECO-2 14 W-1 44.5 A P


o/Dx5mm B P

ST-TA-ECO-2 20 W-2 44.5 A P


o/Dx5mm B NSD

ST-TA-ECO-2 32 W-2 44.5 A P


o/Dx5mm B P

ST-TA-ECO-2 41 W-2 44.5 A TI


o/Dx5mm B TI

ST-TA-ECO-2 56 W-2 44.5 A P


o/Dx5mm B P

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:14.11.2016 Date:14.11.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root 14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276

Report Number: REPORT - 31 Density: 2.0 - 4.0


Geometric
Inspection Date: 14.11.2016 0.13
Unsharpness:
Job location/Place: RAK Screens (front&back): 0.125mm

Item Description: RH-SIDE WALL MIDDLE UPPER PANEL No. of Exposure: 6

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
areas are repaired): NIL Aries Procedure # : Aries - RT - 01 - Rev.4
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
SA 210 Gr A1 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
RH-SWM-UMP 37 W-2 44.5 A P
o/Dx4.5mm B P

RH-SWM-UMP 43 W-1 44.5 A P,TI


o/Dx4.5mm B P,TI

RH-SWM-UMP 48 W-3 44.5 A P


o/Dx4.5mm B P

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:14.11.2016 Date:14.11.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root 14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276

Report Number: REPORT - 32 Density: 2.0 - 4.0


Geometric
Inspection Date: 16.11.2016 0.13
Unsharpness:
Job location/Place: RAK Screens (front&back): 0.125mm

Item Description: EVAPORATOR I/L HEADER TO BENT TUBE No. of Exposure: 14

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
areas are repaired): NIL Aries Procedure # : Aries - RT - 01 - Rev.4
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
SA 210 Gr A1 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
EVP-ILH-BT 29 W-2 44.5 A P
o/Dx4mm B P

EVP-ILH-BT 89 W-2 44.5 A NSD


o/Dx4mm B NSD

EVP-ILH-BT 30 W-2 44.5 A RU/C


o/Dx4mm B RU/C

EVP-ILH-BT 90 W-2 44.5 A P


o/Dx4mm B P

EVP-ILH-BT 150 W-2 44.5 A RD


o/Dx4mm B RD

EVP-ILH-BT 210 W-2 44.5 A P


o/Dx4mm B P

EVP-ILH-BT 31 W-2 44.5 A P


o/Dx4mm B P
Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:16.11.2016 Date:16.11.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root 14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276

Report Number: REPORT - 33 Density: 2.0 - 4.0


Geometric
Inspection Date: 16.11.2016 0.13
Unsharpness:
Job location/Place: RAK Screens (front&back): 0.125mm

Item Description: EVAPORATOR I/L HEADER TO BENT TUBE No. of Exposure: 14

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
areas are repaired): NIL Aries Procedure # : Aries - RT - 01 - Rev.4
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
SA 210 Gr A1 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
EVP-ILH-BT 91 W-2 44.5 A RD,P
o/Dx4mm B P

EVP-ILH-BT 151 W-2 44.5 A P


o/Dx4mm B P

EVP-ILH-BT 211 W-2 44.5 A P


o/Dx4mm B P

EVP-ILH-BT 271 W-2 44.5 A P


o/Dx4mm B P

EVP-ILH-BT 32 W-2 44.5 A NSD


o/Dx4mm B NSD

EVP-ILH-BT 92 W-2 44.5 A P


o/Dx4mm B P

EVP-ILH-BT 152 W-2 44.5 A EP,P


o/Dx4mm B EP,P
Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:16.11.2016 Date:16.11.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root 14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276

Report Number: REPORT - 34 Density: 2.0 - 4.0


Geometric
Inspection Date: 16.11.2016 0.13
Unsharpness:
Job location/Place: RAK Screens (front&back): 0.125mm

Item Description: EVAPORATOR I/L HEADER TO BENT TUBE No. of Exposure: 10

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
areas are repaired): NIL Aries Procedure # : Aries - RT - 01 - Rev.4
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
SA 210 Gr A1 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
EVP-ILH-BT 212 W-2 44.5 A P
o/Dx4mm B P

EVP-ILH-BT 272 W-2 44.5 A P


o/Dx4mm B P

EVP-ILH-BT 33 W-2 44.5 A NSD


o/Dx4mm B RC

EVP-ILH-BT 93 W-2 44.5 A P


o/Dx4mm B P

EVP-ILH-BT 153 W-2 44.5 A RC,P


o/Dx4mm B RC,P

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:16.11.2016 Date:16.11.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root 14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016
Radiographic Testing Report
Client Job No.: Aries Job No.: RT 1448
JOB DETAILS TEST METHOD DETAILS
Image Quality
Client: AYOKI CONTRACTING LLC ASTM 1A
Indicator(IQI):
Project/Vessel: GULF CEMENT COMPANY.RAK Sensitivity: As per ASME sec V- T276

Report Number: REPORT - 35 Density: 2.0 - 4.0


Geometric
Inspection Date: 16.11.2016 0.13
Unsharpness:
Job location/Place: RAK Screens (front&back): 0.125mm
EVAPORATOR BENT TUBE TO EVAPORATOR
Item Description: COILS(INLET)
No. of Exposure: 10

Weld Process : GTAW Exposure Time: 3 Mins


Post weld heatreatment (If
NO Source Type: IR.192
applicable) :

Surface Condition: AS CLEANED Source Activity: 19.7 Ci


X-ray tube (Voltage-
Stage of Examination: FINAL N/A
Current):
Number of Repairs (If Specific
areas are repaired): NIL Aries Procedure # : Aries - RT - 01 - Rev.4
EXPOSURE TECHNIQUES
Plate Single Wall Exposure Single wall viewing Single Film Isotope
Piping Double Wall Exposure Double wall viewing Double Film X-ray
Source to
Film Mfg & Source to Film
Material Type: Effective Focal Spot Size: object
Type/Designation Distance(mm)
Distance(mm)
SA 210 Gr A1 3.92 mm FUJI IX 50 450 500
Acceptance Criteria : B31.3
Film or Film
Pipe Dia/
Interval Grading
DRAWING NO; Joint# Welder ID# Thickness Observation #
Numbe Un
(t) Acc
r acc.
EVPBT-ECIL 29 W-1 44.5 A NSD
o/Dx4mm B NSD

EVPBT-ECIL 30 W-1 44.5 A P


o/Dx4mm B P

EVPBT-ECIL 31 W-1 44.5 A P


o/Dx4mm B P

EVPBT-ECIL 32 W-1 44.5 A P


o/Dx4mm B P

EVPBT-ECIL 33 W-1 44.5 A P


o/Dx4mm B P

Remarks:
ARIES MARINE
AYOKI TPI CONSULTANT
Prepared By Verified By

Name:ANCIL.K.DAVIS Name:EDWIN JOSE Name: Name: Name:

Designation:ASNT L IIDesignation:ASNT L IIDesignation: Designation: Designation:

Signature: Signature: Signature: Signature: Signature:

Date:16.11.2016 Date:16.11.2016 Date: Date: Date:


List of Abbreviations used in the report:
1. NSD No significant Discontinuty 6. P Porosity Crack11. C
2. EP Excess Penetration 7. CP Cluster Porosity Inclus12. I
3. SD Surface Depression 8. LOF Lack of Fusion 13. RC
4. FM Film mark 9. LOP Lack of Penetration Root 14. R/UC
5. S/M Screen mark 10. U/F Under fill Scatte15. SCP
Doc. Ref.: QHSE/P 11/CNDT/JP04/RT Job Procedure for Radiography Testing | Rev No: 05 | Date: 03 Jan 2016