You are on page 1of 7

REYNALDO V.

SIMOY

POSITION APPLIED FOR > ERECTOR RIGGER

PERSONAL PROFILE

Date of Birth : June 8, 1966

Nationality : Filipino

Sex : Male

Status : Married

Name of Spouse : Maridel L. Simoy

Name of Children : Wishnie Marie L. Simoy

Tinshie L. Simoy

Gwenth L. Simoy

Piorey Aurelio L. Simoy

Language Spoken : English, Tagalog & Visaya

SSS No. : 039219778-6

TIN No. : 127337084

PAG-IBIG No. : 00116646910

EDUCATIONAL ATTAINMENT

Elementary : Talisay Elementary School

1972-1978 Nonoc Island, Talisay, Surigao City

High school Jesus Cabsrus Catholic School

(undergraduate-SCHOOL CLOSED)

1978-1981 Nonoc Island, Talisay, Surigao City


SEMINARS/TRAININGS/TRADE TEST ATTENTED

1.General Installer (Instruction) test conducted by PHIL-ASIA Technical Consultant


& General Services,

Inc. held on May 30, 2007 at 2389 Tejeron St., Sta. Ana,Metro Mla., Phillippines

WORKS EXPERIENCE

June 21, 2011 to Nov 30, 2011 RIGGER FOREMAN

HAB SHAN 5 OIL & GAS PROJECT

KHARAFI NATIONAL CO

ABU DHABI, UAE

Job Description

Supervision works for the loading /


unloading of spool
materials to all area of works.
Supervision works of erection of vessels
and installation
of spool etc.

Jan 6, 2010 up to Dec 2010 - RIGGER

C C J V Clough curten joint venture

COPI KIKORI PAPUA NEW GUINEA

Job Description

Lifting of steel pipe piles, and pile driving


works
Pile driving of steel piles 48X30M. 25TONS
each. 60pcs.
Assemble of pile leader use for pile driving
works
Lifting of fabricated girder 40meter 57tons
2pcs.
Slinger and signal man of Heavy lifting works.

Jan 5,2009 to Jan, 5 2010 - WELDER LEADMAN


RUCS KONSULT CORPORATION

9Flr. Unit A-6 Francesca Tower Edsa Cor. Scout


Boromeo

Kamuning Quezon City Philippines

Job Description
Supervision of welding works
Supervision in the installation of structural
member of the billboards
such as catway, ladder, web member,
frames , columns, bracing etc.
Supervision of fabrication of structural
member of billboard.

June 24 2007 to July 26 2008 RIGGER FOREMAN

IREM SPA SAUDI ARABIA LTD.

PO Box 31634, Yanbu Industrial City

Saudi Arabia

-Job Description
Incharge of heavylift works such as column 1302 caustic
wash tower (250 tons)
Incharge of erection works such as
a. Deethanizer condenser (103 tons)
b. Column 1302 caustic wash tower (250 tons)
c. Gas Quench tower (67 tons)
d. Fropylene refrigerant condenser (84 tons
e. Four pcs. Spliter reboiler (111 tons)
Assist in assembling of tower liebherr crane
Incharge of hydro and air test of pipeline
Responsible for line checking of pipelines etc
Responsible for providing/ensuring safety
practice while carrying out
lifting and rigging works.

May 17, 2006 to Jan 12, 2007 - ERECTOR RIGGER CHARGE HAND

Consolidated Contractor International Company

QGX-II,Ras Laffan Qatar Gas Project, Doha Qatar

- Job Description
Responsible in the supervision of rigging works
( hauling, loading & unloading of construction materials )
Also do signalling works when a crane is use in lifting
works

Oct. 15, 1998 to April 12, 2006 Civil / Erector Rigger Foreman

O.M.LOPEZ CONSTRUCTION

160 LL. Bldg. , Panay Ave., corner EDSA,Quezon


City

- Job Description
Prepare work & manpower schedule base on actual site
condition
Supervise actual execution of works such rebar
fabrication, lay out
& installation

July 27, 1998 to Sept 30, 1998 - ERECTOR RIGGER FOREMAN

AG&P SUAL POWER PLANT PROJECT

Sual, Pangasinan

- Job Description
Supervision of rigging works such as transportation, lay
out and
Installation of various mechanical equipments, structural
steel,
pipes etc.
Prepare work and manpower schedule base on actual site
condition

May 3,1998 to July 25,1998 - ERECTOR RIGGER FOREMAN

AG&P RIOFIL-BATANGAS PROJECT

Calaca, Batangas

- Job Description
Supervise in the fabrication, lay out and installation of
structural
steel etc.
Coordinate with the engineers regarding scope of works,
site
condition and problem on the site which affect
accomplishments.

Feb 6, 1998 to April 25, 1998 - ERECTOR RIGGER FOREMAN


AG&P FGU HELIPAD PROJECT

Ayala, Makati City

- Job Description
Responsible in the supervision works of fabrication and
installation of structural steel (FGU Helipad)

May 15,1997 to Oct. 30, 1997 - STRUCTURAL FOREMAN

AG&P SERCO-IAL PROJECT

NAIA, Pasay City

- Job Description
Prepare material schedule base on actual job
accomplishment.
Supervision on all structural &civil works
Prepare work & manpower schedule base on actual site
condition.

Nov 4,1995 to March 15,1996 - ERECTOR RIGGER LEADMAN

AG&P NPC SIEMENS PROJECT

Sucat, Paranaque

- Job Description
Assist the foreman in the supervision of rigging works
Do signalling and slinging works

Jan 28,1994 to Oct 14, 1994 - STRUCTURAL LEADMAN

AG&P SAKAMOTO PROJECT

Bauan, Batangas

- Job Description
Incharge in the fabrication of structural steel, rebars &
formworks.
Assist the foreman in lay out & installation works

Nov 16, 1993 to Jan. 24, 1994 - STEELMAN

AG&P PSPC-LOBP PROJECT

Shell Depot, Pandacan, Manila

- Job Description
Fabricate & install rebar

Feb.12, 1989 to Aug. 14,1989 - ERECTOR RIGGER

AG&P ROBINSON GALLERIA PROJECT

EDSA, Ortigas Center

- Job Description
Act as signal and slinging man in the hauling of
construction materials.
Do the rigging works

Nov. 27, 1987 to Jan 15,1989 - CARPENTER

AG&P Manila Port Project

Tondo, Manila

- Job Description
Fabricate & install formworks.

CHARACTER REFERENCE:

1. Engr. Olympio M. Lopez Jr.


Manager/Owner
O. M. Lopez Construction
160 LL. Bldg., Panay Ave.,
Quezon City

2. Silverio Laneba
Security Guard
287 Alfonso Isidro St.,
Pasay City TEL# 4588527

3. Jefferson Dionson
Cadd Operator
O. M. Lopez Jr. Construction
160 LL. Bldg. Panay Ave. Q.C.

I hereby declare that all information stated herein is true and correct to the
best of my knowledge and belief.
REYNALDO VELASCO SIMOY

Applicant

You might also like