You are on page 1of 1

COAL BUSINESS IN COAL HANDLING COAL POWER PLANTS COAL MINNING

PAKISTAN
SINDH THAR COAL FIELD 13 Mining Blocks
Storage Area 118 MW : Fauji Fertilizer Bin Qasim Ltd (Port Qasim) (2017)
COAL IMPORTS 180,000 sq. yard 1320 MW
660 MW
: Shanghai Electric, China (Thar-Block 1) (2017)
: Port Qasim Energy (H) Ltd. (Port Qasim) Unit 1 (2017)
9100 sq. km | 175 Billion M.Tons Coal Reserves
million metric tonnes 660 MW : Port Qasim Energy (H) Ltd. (Port Qasim) Unit 2 (2018)
Storage Capacity 330 MW
330 MW
: Engro-Powergen Unit 1 (Thar-Block 2) (2018)
: Hub Power Co (Thar-Block 2). (2018)
Blocks Allocated for Projects
2.72 700,000 tons 330 MW : Thal Nova Power (Thar-Block 2) (2018) Block 1: Sino Sindh Resource Pvt. Ltd.(SSRL)
54.3% 1320 MW : Jamshoro Coal Power Plant (Jamshoro) (2018)
Karachi Port 330 MW : Engro-Powergen Unit 2 (Thar-Block 2) (2019) Block 2: Sindh-Engro Coal Minning Co. (SECMC)
1.03 Handling Capacity 660 MW : Lucky Electric Power Co. (Port Qasim) (2020) Block 5: UCG Project
20.7% Trust (KPT)
8 million tons per annum 350 MW : Siddiqsons Ltd (Port Qasim) (2020)
1320 MW : Oracle Coal Fields (Thar-Block 6) (2021) Block 6: Oracle Coalfields
0.74 14.8%
BALUCHISTAN Other Coal Fields in Sindh
1320 MW : Hub Power Co/ China Power Hub Generation Co. (Hub). (2020)
0.43 8.7% Badin Coal Field (1110 sq. km )
PUNJAB 1.358 Billion M.Tons Coal Reserves
1320 MW: Sahiwal Coal-Fired Power Plant.. (2017)
163 MW: Grange Power Limited (Arifwala).. (2019)
Storage Area 1320 MW: Muzaffargarh Coal-Fired Power Plant. (under feasibility study) Sonda-Jherruk Coal Field (1822 sq. km)
COAL CONSUMPTION 250,000 sq. yard 1320 MW: Rahimyar Khan Coal-Fired Power Plant. (under feasibility study)
7.112 Billion M.Tons Coal Reserves
120 MW : Fatima Energy (Muzaffargarh,). (under construction)
Major Sectors
CEMENT ||||||||||||||||||||| 56% Storage Capacity Lakhra Coal Field (1309 sq. km)
1 million tons 1.328 Billion M.Tons Coal Reserves
BRICK KILN ||||||||||||||||||||| 39%
||||||||||||||||||||| 5% Port Qasim
OTHERS Handling Capacity
Authority 12~18 million tons per annum
Imported Coal Local Coal
PAKISTAN COAL RESERVES (billion tonnes)
Coal Discharge
ANNUAL COAL IMPORTS 4 Days (KPT) | 2 Days (Port Qasim) SINDH 184.61
Ship-to-Berth BALUCHISTAN 0.202

5 MILLION Transit Time 3~4 Days to Up-Country


PUNJAB
KPK
AJK
0.091
0.008
0.235

METRIC TONNES Coal Transport


Truck Loading 300 Trucks Daily 2.04 BILLION TON
50 Tons Per Min 50 Ton each MINEABLE COAL PRESENTLY
Coal Dispatch
55,000 METRIC TON (Port Qasim)
15000 tons
Per Vessel Discharge per day

Vessels Size
75000 DWT

36
Port Drafts for Vessel Expected
Anchorage
Demand
UPCOMING
Of
13291 MW
185
10.67 m
KPT Coal
COAL POWER PROJECTS
12 m IMPORTED COAL LOCAL COAL BILLION TONS
Port Qasim
MILLION GCV: 6000 ~ 6600 kcal/kg GCV: 5500 ~ 7800 kcal/kg COAL RESERVES

13 m
KPT
TONNES
COAL RESERVES (Billion Tonnes): WORLD (891) | Europe & Eurasia (310) | ASIA PACIFIC (288) | North America (245) | Middle East & Africa (32) | South & Central America (14)