Professional Documents
Culture Documents
PAKISTAN
SINDH THAR COAL FIELD 13 Mining Blocks
Storage Area 118 MW : Fauji Fertilizer Bin Qasim Ltd (Port Qasim) (2017)
COAL IMPORTS 180,000 sq. yard 1320 MW
660 MW
: Shanghai Electric, China (Thar-Block 1) (2017)
: Port Qasim Energy (H) Ltd. (Port Qasim) Unit 1 (2017)
9100 sq. km | 175 Billion M.Tons Coal Reserves
million metric tonnes 660 MW : Port Qasim Energy (H) Ltd. (Port Qasim) Unit 2 (2018)
Storage Capacity 330 MW
330 MW
: Engro-Powergen Unit 1 (Thar-Block 2) (2018)
: Hub Power Co (Thar-Block 2). (2018)
Blocks Allocated for Projects
2.72 700,000 tons 330 MW : Thal Nova Power (Thar-Block 2) (2018) Block 1: Sino Sindh Resource Pvt. Ltd.(SSRL)
54.3% 1320 MW : Jamshoro Coal Power Plant (Jamshoro) (2018)
Karachi Port 330 MW : Engro-Powergen Unit 2 (Thar-Block 2) (2019) Block 2: Sindh-Engro Coal Minning Co. (SECMC)
1.03 Handling Capacity 660 MW : Lucky Electric Power Co. (Port Qasim) (2020) Block 5: UCG Project
20.7% Trust (KPT)
8 million tons per annum 350 MW : Siddiqsons Ltd (Port Qasim) (2020)
1320 MW : Oracle Coal Fields (Thar-Block 6) (2021) Block 6: Oracle Coalfields
0.74 14.8%
BALUCHISTAN Other Coal Fields in Sindh
1320 MW : Hub Power Co/ China Power Hub Generation Co. (Hub). (2020)
0.43 8.7% Badin Coal Field (1110 sq. km )
PUNJAB 1.358 Billion M.Tons Coal Reserves
1320 MW: Sahiwal Coal-Fired Power Plant.. (2017)
163 MW: Grange Power Limited (Arifwala).. (2019)
Storage Area 1320 MW: Muzaffargarh Coal-Fired Power Plant. (under feasibility study) Sonda-Jherruk Coal Field (1822 sq. km)
COAL CONSUMPTION 250,000 sq. yard 1320 MW: Rahimyar Khan Coal-Fired Power Plant. (under feasibility study)
7.112 Billion M.Tons Coal Reserves
120 MW : Fatima Energy (Muzaffargarh,). (under construction)
Major Sectors
CEMENT ||||||||||||||||||||| 56% Storage Capacity Lakhra Coal Field (1309 sq. km)
1 million tons 1.328 Billion M.Tons Coal Reserves
BRICK KILN ||||||||||||||||||||| 39%
||||||||||||||||||||| 5% Port Qasim
OTHERS Handling Capacity
Authority 12~18 million tons per annum
Imported Coal Local Coal
PAKISTAN COAL RESERVES (billion tonnes)
Coal Discharge
ANNUAL COAL IMPORTS 4 Days (KPT) | 2 Days (Port Qasim) SINDH 184.61
Ship-to-Berth BALUCHISTAN 0.202
Vessels Size
75000 DWT
36
Port Drafts for Vessel Expected
Anchorage
Demand
UPCOMING
Of
13291 MW
185
10.67 m
KPT Coal
COAL POWER PROJECTS
12 m IMPORTED COAL LOCAL COAL BILLION TONS
Port Qasim
MILLION GCV: 6000 ~ 6600 kcal/kg GCV: 5500 ~ 7800 kcal/kg COAL RESERVES
13 m
KPT
TONNES
COAL RESERVES (Billion Tonnes): WORLD (891) | Europe & Eurasia (310) | ASIA PACIFIC (288) | North America (245) | Middle East & Africa (32) | South & Central America (14)