APPENDIX-A

Page # 1/2
TECHNICAL SPECIFICATION FOR MOBILE FLOOD LIGHTING TOWER
Qty: 02
(Noise level less than 75db at a distance of lm from all sides)
Delta temperature should be less than 50
,
A. TRAILER
A.1 Wheel Heavy-duty two wheel trailer complete with axle and quality suspension.
A.2 Stability i) Four jacks to be fitted properly to provide mechanical stability during
operation.
ii) Jacks should be uplifted easily for cross-country movement.
A.3 Enclosure Fully enclosed cabin complete with sound proofing (noise level should be less
than75db at a distance of 1m from all sides.
A.4 Paint Rustproof paint over the exposed parts of the system.
B. ENGINE
B.1 Make Kirloskar/Cummins
B.2 Capacity A suitable engine of 1500 RPM for 30 KVA Alternator of 4005 %, 50Hz
B.3 Oil Diesel
B.4 Cooling Water cooled
B.5 Starting type Battery operated self start (12 V DC) along with battery.
B.6. Standard CPCB complied
C. ALTERNATOR
C.1 Make Kriloskar/ Cummins/Greaves cotton/Stanford
C.2 Capacity 30KVA
C.3 Voltage 400 5% (regulation)
C.4 Phase Three
C.5 Frequency 50Hz
C.6 Insulation Class H
C.7 Type of Alternator Brushless
D. CONTROL PANEL
D.1 Voltage/ Current Voltmeter/Ammeter
measurement
D.2 Frequency Frequency meter
D.3 Indicator Lamp Three phase indicating lamp
D.4 Stop Emergency stop switch
D.5 COntrol/plugs Sufficient number of MCCBs & plugs for Single/ Three phase power output
operations other than supply to flood light
D.6 Protection Intelligent protection system for fuel, oil, coolant, overload, engine speed
E. LIGHTING TOWER
E.1 Lighting system Symmetrical beam non-integral flood light luminaries of 4 x 400 W metal
halide lamps
E.2 Mast i) Heavy-duty electrically operated mast of height 6m.
ii) Rotation of the mast should be 360
iii) Mast can be tilted at different angle
iv) Manual operation facility must be available if electrical operation fails
v) Mast should have the facility for detached from the DG set.
E.3 Cable 10 mm2 cable of 50m length (for each system) along with male female
sockets
E.4 Grounding Proper electrical grounding arrangement should be provided with the system.
Page # 2/2
F. INSPECTION AND ACCEPTANCE
F. I Factory site User will conduct acceptance test at the firm's factory site during
inspection manufacturing
F.2 Final inspection User will accept the system upon its satisfactory performance during test
a n d ac ce p t a nc e run at PXE, Chandipur
G. WARRANTY&SPARES
G.1 Warranty Minimum 1 year
G.2 Spares 4 nos. of 400 W metal halide lamps

NB: Firm has to produce the following certificates:


1 OEM Certificate fiCA "D_ Or-- Ce-it
2 Pollution Certificate from competent authority
3 Test report for Engine and Alternator by the manufacturer.